CN104803285A - Method for replacing movable pulley block in bridge crane - Google Patents

Method for replacing movable pulley block in bridge crane Download PDF

Info

Publication number
CN104803285A
CN104803285A CN201510141937.5A CN201510141937A CN104803285A CN 104803285 A CN104803285 A CN 104803285A CN 201510141937 A CN201510141937 A CN 201510141937A CN 104803285 A CN104803285 A CN 104803285A
Authority
CN
China
Prior art keywords
reel
running block
steel rope
fixed pulley
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510141937.5A
Other languages
Chinese (zh)
Other versions
CN104803285B (en
Inventor
王光成
刘喆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Iron and Steel Group Co Ltd SISG
Original Assignee
Shandong Iron and Steel Group Co Ltd SISG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Iron and Steel Group Co Ltd SISG filed Critical Shandong Iron and Steel Group Co Ltd SISG
Priority to CN201510141937.5A priority Critical patent/CN104803285B/en
Publication of CN104803285A publication Critical patent/CN104803285A/en
Application granted granted Critical
Publication of CN104803285B publication Critical patent/CN104803285B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C17/00Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/04Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage
    • B66D3/06Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage with more than one pulley

Abstract

The invention provides a method for replacing a movable pulley block in a bridge crane. According to the method, an original steel wire rope is separated from an original movable pulley block and is wound on another movable pulley block for replacement by connecting and adjusting a nylon rope between each fixed pulley and the corresponding movable pulley, so that the replacement operation of the movable pulley block in the bridge crane is completed, and by comparison of an existing movable pulley block replacement method of the bridge crane, the replacement operation time is shortened, the operation strength is greatly reduced, the workload of workers is reduced, and the operation efficiency is improved.

Description

A kind of method changed for running block in crane in bridge type
Technical field
The invention belongs to overhead traveling crane machine equipment field engineering field, be specifically related to a kind of method changed for running block in crane in bridge type.
Background technology
The using state of crane in bridge type running block of the prior art as shown in Figure 1, first, its first fag end 201 is fixed on reel 1 by pressing plate (not shown) by steel rope 2, a part for this steel rope 2 is wrapped on reel 1, then the second fag end 202 is passed successively the first movable pulley 401 on old running block 4, the first fixed pulley 301 in fixed pulley group 3, the second movable pulley 402 on old running block 4, the second fixed pulley 302 in fixed pulley group 3, the 3rd movable pulley 403 on old running block 4, the 3rd fixed pulley 303 in fixed pulley group 3 and the 4th movable pulley 404 on old running block 4, second fag end 202 of this root steel rope 2 is fixed on reel 1 by another pressing plate.
At present, the step that the replacing options of existing running block mainly comprises is:
First, old running block is fallen to operating area, and place new running block in operating area simultaneously; Then, carry out the rope threading operations of steel rope, all peel off by the steel rope 2 that reel 1 is wound around, and be separated from fixed pulley group 3 and old running block 4, with steel rope successively through fixed pulley group 3 and new movable pulley, two fag ends of new steel rope are fixed on reel 1 by the pressing plate of described fag end side;
The method of above-mentioned wire rope handling needs manually to carry out rope threading operations successively, and namely artificial haulage cable is successively by fixed pulley group and running block, thus causes working strength large, and replacing construction is long, reduces operating efficiency.
Summary of the invention
The object of the invention is to, the working strength that the method changed for solving existing crane in bridge type running block causes is large, replacing construction is long, and the technical matters that operating efficiency is low; A kind of method changed for running block in crane in bridge type is provided, use the method can realize when not more change steel rope complete the replacing of running block, and it is short to change production time, greatly reduces operation intensity, decrease the work capacity of workman, improve operating efficiency.
For achieving the above object, the invention provides a kind of method changed for running block in crane in bridge type, said method comprising the steps of:
Step 1) remove limit switch on reel, by spool turns, the old running block that steel rope is wound around is transferred to operating area;
Step 2) fag end of the one section of steel rope be wound around between old running block one end and reel is pulled out, make this fag end freely sagging, the one section of steel rope be wound around between the old running block other end and reel is peeled off from reel;
Step 3) by placed side by side in the side of old running block for the new running block replaced, one end of steel rope is made to continue to be wound around on reel by rotating drum, make freely sagging fag end move down, and the other end of haulage cable move to reel along the winding route between fixed pulley group and running block simultaneously;
Step 4) after steel rope departs from a fixed pulley in fixed pulley group and a movable pulley on old running block, a nylon rope is wound around in the same position of the new running block of this fixed pulley and replacement, described nylon rope is identical with the winding route of steel rope, and the end of this nylon rope along moving direction is docked with fag end freely sagging on steel rope, this nylon rope is fixed on reel along the front end of moving direction;
Step 5) continue rotating in same direction reel, traction nylon rope moves along being wound around route to reel, after steel rope departs from another fixed pulley in fixed pulley group and another movable pulley on old running block, perform step 4), until nylon rope is wound to after on last fixed pulley in fixed pulley group and last movable pulley on new running block perform step 6);
Step 6) continue rotating in same direction reel, the wirerope-winding of traction and nylon rope end on to reel after, nylon rope is peeled off from steel rope;
Step 7) two ends of steel rope are individually fixed in the both sides of reel, and limit switch is reinstalled on reel.
As the further improvement of technique scheme, staggered being wound between fixed pulley and movable pulley of described steel rope.
As the further improvement of technique scheme, the two ends of described steel rope are fixed on reel by pressing plate.
A kind of method advantage for running block replacing in crane in bridge type of the present invention is:
Method of the present invention by utilize a nylon rope each fixed pulley be connected between movable pulley with adjustment, former steel rope is made to depart from old running block, and be wound on the new running block of replacement, thus complete the replacement operation of running block in crane in bridge type, compared with the method changed with existing crane in bridge type running block, change production time short, greatly reduce operation intensity, decrease the work capacity of workman, improve operating efficiency.
Accompanying drawing explanation
Fig. 1 is a kind of annexation figure of fixed pulley group, running block and steel rope in existing crane in bridge type.
Fig. 2 utilizes method of the present invention to carry out replacing schematic diagram to the running block shown in Fig. 1.
Reference numeral
1, reel 2, steel rope
3, fixed pulley group 4, old running block
5, new running block 201, steel rope first fag end
202, steel rope second fag end 301, first fixed pulley
302, the second fixed pulley 303, the 3rd fixed pulley
401, the first movable pulley 402, second movable pulley
403, the 3rd movable pulley 404, the 4th movable pulley
6, nylon rope
Detailed description of the invention
Below in conjunction with drawings and Examples, a kind of method for running block replacing in crane in bridge type of the present invention is described in detail.
A kind of method changed for running block in crane in bridge type of the present invention, comprising:
Step 1) remove limit switch on reel, by spool turns, the old running block that steel rope is wound around is transferred to operating area;
Step 2) fag end of the one section of steel rope be wound around between old running block one end and reel is pulled out, make this fag end freely sagging, the one section of steel rope be wound around between the old running block other end and reel is peeled off from reel;
Step 3) by placed side by side in the side of old running block for the new running block replaced, one end of steel rope is made to continue to be wound around on reel by rotating drum, make freely sagging fag end move down, and the other end of haulage cable move to reel along the winding route between fixed pulley group and running block simultaneously;
Step 4) after steel rope departs from a fixed pulley in fixed pulley group and a movable pulley on old running block, a nylon rope is wound around in the same position of the new running block of this fixed pulley and replacement, described nylon rope is identical with the winding route of steel rope, and the end of this nylon rope along moving direction is docked with fag end freely sagging on steel rope, this nylon rope is fixed on reel along the front end of moving direction;
Step 5) continue rotating in same direction reel, traction nylon rope moves along being wound around route to reel, after steel rope departs from another fixed pulley in fixed pulley group and another movable pulley on old running block, perform step 4), until nylon rope is wound to after on last fixed pulley in fixed pulley group and last movable pulley on new running block perform step 6);
Step 6) continue rotating in same direction reel, the wirerope-winding of traction and nylon rope end on to reel after, nylon rope is peeled off from steel rope;
Step 7) two ends of steel rope are individually fixed in the both sides of reel, and limit switch is reinstalled on reel.
Embodiment one
As shown in Figure 2, in the present embodiment, utilize the above-mentioned method changed for running block in crane in bridge type, replacing carried out to the running block with four movable pulleys and comprises the following steps:
Step 101) remove limit switch (not shown) on reel 1, the old running block 4 that steel rope is wound around is transferred to operating area, and by placed side by side before and after old running block 4 and the new running block 5 replaced;
Step 102) steel rope 2 that reel 1 is wound around all is put down, until two fag end parts that steel rope is pushed down by pressing plate (not shown) are stayed on reel 1, the pressing plate of one end on reel 1 is removed, and steel rope first fag end 201 exposed is positioned on ground after reel 1 is peeled off;
Step 103) rotate forward reel 1, the other end lay winding wire ropes 2 of reel 1 is made to continue to be wound around on reel 1, and haulage cable first fag end 201 moves along the winding route between fixed pulley group 3 and old running block 4 to reel 1, until described steel rope first fag end 201 departs from the first movable pulley 401 on old running block 4, now remove the pressing plate of the other end on reel 1, and steel rope second fag end 202 exposed is pulled out from reel 1, keep the free hang of this fag end
Step 104) then continue to rotate forward reel 1, make steel rope second fag end 202 slowly descending, make steel rope first fag end 201 continue to move to reel 1 along winding route simultaneously, until after this steel rope first fag end 201 is separated from the first fixed pulley 301 in fixed pulley group 3, nylon rope 6 is positioned on the first fixed pulley 301, and this nylon rope 6 is pressed wirerope-winding first fixed pulley 301, the order of the first movable pulley 401 and the second movable pulley 402, Stagger-wrap at the first fixed pulley 301 with on two movable pulleys corresponding to the new running block 5 replaced, afterwards this nylon rope is connected and fixed along the end of moving direction and steel rope second fag end 202, nylon rope is fixed on the position of steel rope first fag end 201 when unstripped reel 1 along the front end of moving direction,
Step 105) continue to rotate forward reel 1, haulage cable second fag end 202 passes the first movable pulley 401 on new running block 5 successively with nylon rope 6, the first fixed pulley 301 in fixed pulley group 3 and the second movable pulley 402 on new running block 5, now unclamp the nylon rope fag end be fixed on reel 1, this nylon rope 6 is positioned on the second fixed pulley 302 of fixed pulley group 3, and the order Stagger-wrap pressing the 3rd movable pulley 403 on the old running block of wirerope-winding 4 is on the movable pulley corresponding to new running block 5, afterwards nylon rope fag end is retightened on position identical on reel,
Step 106) continue to rotate forward reel 1, until when steel rope second fag end 202 has been wound on the 3rd movable pulley 403 of new running block 5, now again unclamp the nylon rope fag end be fixed on reel 1, nylon rope 6 is positioned on the 3rd fixed pulley 303 on fixed pulley group 3 end, and on the order Stagger-wrap pressing the 4th movable pulley 403 on the old running block of wirerope-winding 4 last movable pulley on new running block 5 end, afterwards nylon rope fag end is retightened on position identical on reel;
Step 107) continue to rotate forward reel 1, until when steel rope second fag end 202 is wrapped on reel 1 with nylon rope 6, disconnect the connection of this nylon rope and steel rope second fag end 202, now steel rope first fag end 201 is also wound in the opposite side of reel 1;
Step 108) steel rope first fag end 201 and steel rope the 2 202 are fixed on reel 1 with a pressing plate respectively, continue afterwards to rotate forward reel 1, to wire rope winding, and reinstall the limit switch that reel 1 is arranged, complete the synchronous replacing of running block in crane in bridge type.
In addition, in step 104) in, after described nylon rope 6 is wound around in fixed pulley group 3 and new running block 5, the end of this nylon rope 6 along moving direction can be connected with other any steel ropes, to realize the synchronous replacement of running block and steel rope.
It should be noted last that, above embodiment is only in order to illustrate technical scheme of the present invention and unrestricted.Although with reference to embodiment to invention has been detailed description, those of ordinary skill in the art is to be understood that, modify to technical scheme of the present invention or equivalent replacement, do not depart from the spirit and scope of technical solution of the present invention, it all should be encompassed in the middle of right of the present invention.

Claims (3)

1., for the method that running block in crane in bridge type is changed, it is characterized in that, comprising:
Step 1) remove limit switch on reel, by spool turns, the old running block that steel rope is wound around is transferred to operating area;
Step 2) fag end of the one section of steel rope be wound around between old running block one end and reel is pulled out, make this fag end freely sagging, the one section of steel rope be wound around between the old running block other end and reel is peeled off from reel;
Step 3) by placed side by side in the side of old running block for the new running block replaced, one end of steel rope is made to continue to be wound around on reel by rotating drum, make freely sagging fag end move down, and the other end of haulage cable move to reel along the winding route between fixed pulley group and running block simultaneously;
Step 4) after steel rope departs from a fixed pulley in fixed pulley group and a movable pulley on old running block, a nylon rope is wound around in the same position of the new running block of this fixed pulley and replacement, described nylon rope is identical with the winding route of steel rope, and the end of this nylon rope along moving direction is docked with fag end freely sagging on steel rope, this nylon rope is fixed on reel along the front end of moving direction;
Step 5) continue rotating in same direction reel, traction nylon rope moves along being wound around route to reel, after steel rope departs from another fixed pulley in fixed pulley group and another movable pulley on old running block, perform step 4), until nylon rope is wound to after on last fixed pulley in fixed pulley group and last movable pulley on new running block perform step 6);
Step 6) continue rotating in same direction reel, the wirerope-winding of traction and nylon rope end on to reel after, nylon rope is peeled off from steel rope;
Step 7) two ends of steel rope are individually fixed in the both sides of reel, and limit switch is reinstalled on reel.
2. the method changed for running block in crane in bridge type according to claim 1, is characterized in that, staggered being wound between fixed pulley and movable pulley of described steel rope.
3. the method changed for running block in crane in bridge type according to claim 1, it is characterized in that, the two ends of described steel rope are fixed on reel by pressing plate.
CN201510141937.5A 2015-03-27 2015-03-27 A kind of method that running block is changed in bridge crane Expired - Fee Related CN104803285B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510141937.5A CN104803285B (en) 2015-03-27 2015-03-27 A kind of method that running block is changed in bridge crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510141937.5A CN104803285B (en) 2015-03-27 2015-03-27 A kind of method that running block is changed in bridge crane

Publications (2)

Publication Number Publication Date
CN104803285A true CN104803285A (en) 2015-07-29
CN104803285B CN104803285B (en) 2016-09-28

Family

ID=53688564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510141937.5A Expired - Fee Related CN104803285B (en) 2015-03-27 2015-03-27 A kind of method that running block is changed in bridge crane

Country Status (1)

Country Link
CN (1) CN104803285B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106044574A (en) * 2016-06-06 2016-10-26 山东钢铁股份有限公司 Method for synchronously replacing gantry beam and steel wire ropes of ladle crane
CN106586871A (en) * 2017-01-11 2017-04-26 唐山首钢京唐西山焦化有限责任公司 Method for replacing movable pulley block of coke dry quenching elevator
CN109019306A (en) * 2018-09-04 2018-12-18 宣化钢铁集团有限责任公司 A kind of method of quick-replaceable bridge crane single hook head
CN110436365A (en) * 2019-07-26 2019-11-12 山东钢铁股份有限公司 Crane rope replacing options

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2258662C2 (en) * 2002-07-25 2005-08-20 Федеральное государственное унитарное предприятие "Конструкторское бюро "Мотор" Method of replacement of wire rope in hoisting device
CN101712443A (en) * 2009-12-22 2010-05-26 舞阳钢铁有限责任公司 Quick replacement method of steel cables of crane
JP2012056716A (en) * 2010-09-09 2012-03-22 Mitsubishi Electric Corp Method and apparatus for replacing main rope of elevator
CN102887426A (en) * 2012-09-27 2013-01-23 山东丰汇设备技术有限公司 Full-magnification transformed and multi-fetching device interchangeable combined lifting device and using method for combined lifting device
CN103274323A (en) * 2013-06-13 2013-09-04 济钢集团有限公司 Quick replacement method for movable pulley blocks and wire ropes in cranes

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2258662C2 (en) * 2002-07-25 2005-08-20 Федеральное государственное унитарное предприятие "Конструкторское бюро "Мотор" Method of replacement of wire rope in hoisting device
CN101712443A (en) * 2009-12-22 2010-05-26 舞阳钢铁有限责任公司 Quick replacement method of steel cables of crane
JP2012056716A (en) * 2010-09-09 2012-03-22 Mitsubishi Electric Corp Method and apparatus for replacing main rope of elevator
CN102887426A (en) * 2012-09-27 2013-01-23 山东丰汇设备技术有限公司 Full-magnification transformed and multi-fetching device interchangeable combined lifting device and using method for combined lifting device
CN103274323A (en) * 2013-06-13 2013-09-04 济钢集团有限公司 Quick replacement method for movable pulley blocks and wire ropes in cranes

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106044574A (en) * 2016-06-06 2016-10-26 山东钢铁股份有限公司 Method for synchronously replacing gantry beam and steel wire ropes of ladle crane
CN106044574B (en) * 2016-06-06 2017-07-07 山东钢铁股份有限公司 The synchronous method for changing ladle carne gantry beam and steel wire rope
CN106586871A (en) * 2017-01-11 2017-04-26 唐山首钢京唐西山焦化有限责任公司 Method for replacing movable pulley block of coke dry quenching elevator
CN109019306A (en) * 2018-09-04 2018-12-18 宣化钢铁集团有限责任公司 A kind of method of quick-replaceable bridge crane single hook head
CN109019306B (en) * 2018-09-04 2019-08-06 宣化钢铁集团有限责任公司 A kind of method of quick-replaceable bridge crane single hook head
CN110436365A (en) * 2019-07-26 2019-11-12 山东钢铁股份有限公司 Crane rope replacing options
CN110436365B (en) * 2019-07-26 2021-03-05 山东钢铁股份有限公司 Method for replacing steel wire rope of crane

Also Published As

Publication number Publication date
CN104803285B (en) 2016-09-28

Similar Documents

Publication Publication Date Title
CN104828696B (en) A kind of method for running block in bridge crane and steel rope replacing
CN104944282B (en) A kind of method for steel rope replacing in crane
CN104803285A (en) Method for replacing movable pulley block in bridge crane
CN103274323B (en) A kind of crane pulley group and steel wire rope quick-replaceable method
CN202481651U (en) Functional device capable of replacing and repairing tape quickly
CN104590812A (en) Tape replacing machine for replacing belt type conveyor adhesive tape
CN107651546B (en) The main replacing lifting ropes of multi-rope technique of vertical
JP2013249678A (en) Replacement method of oblique cable and temporary hanger for replacing oblique cable
CN104631329B (en) A kind of suspension bridge continuous way cat road integral linear method of adjustment
CN205397744U (en) Experimental automatic coiling and uncoiling device of on --spot multiunit that overhauls of transformer substation
CN104668309A (en) Automatic enameled wire feeding, moving and paying-off device
CN206318579U (en) Transport pipe flatcar cable automatic retraction device
CN103588092B (en) A kind of method adopting auxiliary device more change steel rope
CN103287997B (en) Double-layer winding hoisting mechanism
CN104659708A (en) Electric winch for power transmission line
CN106044574A (en) Method for synchronously replacing gantry beam and steel wire ropes of ladle crane
CN202816449U (en) Composable traveling cable of lift
JP2018065558A (en) Device and method to relocate support cable for cableway equipment
CN204475035U (en) A kind of three strands of machines
CN103708371A (en) Cable-driving rope replacing mechanism
CN203865920U (en) Steel wire rope winding structure for large-tonnage crane hoisting mechanism
CN204030524U (en) A kind of cable handler and towing cable system
CN203612868U (en) Cable-driven rope exchange mechanism
CN204416307U (en) For changing the tape swapping machine of conveyor belt running
CN104724615A (en) Penetrating and winding method of large-diameter variable-amplitude steel wire rope of large moving-arm type tower crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160928

CF01 Termination of patent right due to non-payment of annual fee