CN104779553A
CN104779553A CN201510147684.2A CN201510147684A CN104779553A CN 104779553 A CN104779553 A CN 104779553A CN 201510147684 A CN201510147684 A CN 201510147684A CN 104779553 A CN104779553 A CN 104779553A
Authority
CN
China
Prior art keywords
carriage
pedal frame
entablature
upper cross
cross beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510147684.2A
Other languages
English (en)
Inventor
张森
宋丽
赵会
闵杰
杜晶
王雷
杨赫
薛丽敏
许静静
张乐
潘鹏飞
曲家波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510147684.2A priority Critical patent/CN104779553A/zh
Publication of CN104779553A publication Critical patent/CN104779553A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本发明适用于所有钢管型杆塔,尤其涉及一种带电断接引流地电位操作所用的钢管型杆塔正面操作平台。该平台包括脚踏框以及与脚踏板垂直的支撑框,所述脚踏框与支撑框之间形成L形,脚踏框与支撑框通过斜梁固定,在支撑框的顶部两侧与脚踏框相反的一侧分别设置L形上横梁与支撑框垂直,在上横梁靠近支撑框端设置圆孔,在另一端设置长条形孔,设置一紧固横梁,所述紧固横梁的一端设置圆孔与上横梁的圆孔对应,在紧固横梁的另一端设置长条形孔与上横梁的长条形孔对应,通过两个螺栓将紧固横梁与上横梁固定。本发明具备较高的可靠性、安全性和实用性。通过此平台,解决了困惑已久的220千伏钢管型杆塔输电线路无法带电更换直线绝缘子的工作。

Description

一种钢管型杆塔正面操作平台
技术领域
本发明适用于所有钢管型杆塔,尤其涉及一种带电断接引流地电位操作所用的钢管型杆塔正面操作平台。
背景技术
随着输电线路整体绝缘水平逐渐提高,220千伏输电线路的设计空气间隙随之增大至4米左右。由于钢管型杆塔的塔身简洁,传统操作平台无法安装,导致220千伏钢管型杆塔线路大空气间隙的输电线路无法带电更换直线绝缘子。工作人员在使用常规的工具进行操作时,不能满足大空气间隙的输电线路,影响到人员的安全问题,以及操作的繁琐性。
因为带电作业地电位更换220千伏直线绝缘子,需要2名地电位操作人员同时站在操作平台内,因此操作平台的可靠性,安全性,及确切的安装位置都成为技术难题。
发明内容
本发明所要解决的技术问题在于提供一种具备较高的可靠性、安全性和实用性的钢管型杆塔正面操作平台,解决了困惑已久的220千伏钢管型杆塔输电线路无法带电更换直线绝缘子的工作。
本发明是这样实现的,一种钢管型杆塔正面操作平台,该平台包括脚踏框以及与脚踏板垂直的支撑框,所述脚踏框与支撑框之间形成L形,所述脚踏框与支撑框通过斜梁固定,在支撑框的顶部两侧与脚踏框相反的一侧分别设置L形上横梁与支撑框垂直,在上横梁靠近支撑框端设置圆孔,在另一端设置长条形孔,设置一紧固横梁,所述紧固横梁的一端设置圆孔与上横梁的圆孔对应,在紧固横梁的另一端设置长条形孔与上横梁的长条形孔对应,通过两个螺栓将紧固横梁与上横梁固定。
进一步地,所述脚踏框为口字型框架,在口字型框架内设置一调节梁,所述调节梁的两端位于口字型框架的平行两侧边设置的轨道里,口字型框架的平行两侧边上对应位置设置固定螺丝孔,在移动调节梁时,通过螺丝穿过固定螺丝孔固定。
本发明与现有技术相比,有益效果在于:
本发明具备较高的可靠性、安全性和实用性。
通过此绝缘操作平台,解决了困惑已久的220千伏钢管型杆塔输电线路无法带电更换直线绝缘子的工作。
附图说明
图1是本发明实施例提供的设备结构示意图;
图2是本发明实施例提供的设备安装状态示意图。
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
参见图1,一种钢管型杆塔正面操作平台,该平台包括脚踏框2以及与脚踏板垂直的支撑框1,所述脚踏框2与支撑框1之间形成L形,所述脚踏框2与支撑框1通过斜梁固定,在支撑框1的顶部两侧与脚踏框相反的一侧分别设置L形上横梁7与支撑框垂直,上横梁7的端部设置一钩形件9起到阻挡移动的作用,在上横梁靠近支撑框端设置圆孔10,在另一端设置长条形孔12,设置一紧固横梁11,所述紧固横梁11的一端设置圆孔与上横梁的圆孔对应,在紧固横梁的另一端设置长条形孔与上横梁的长条形孔对应,通过两个螺栓(6、8)将紧固横梁11与上横梁7固定。
脚踏框2为口字型框架,在口字型框架内设置一调节梁3,调节梁3的两端位于口字型框架的平行两侧边设置的轨道5里,口字型框架的平行两侧边上对应位置设置固定螺丝孔4,在移动调节梁时,通过螺丝穿过固定螺丝孔4固定。
参见图2,在钢管型杆塔横担13正面面安装一个本发明,地电位人员站在操作平台内可拉近地电位人员与导线和直线绝缘子的距离。使用绝缘操作杆便可安全有效的进行操作。安装位置应与待更换绝缘子侧横担相平行,安装高度略低于绝缘子底部托线器。本发明采用高强度铝合金材料制作,其螺栓可调整夹具厚度以应对横担的厚度,其上横梁与固禁横梁设有长孔以应对横担的宽度。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。

Claims (2)

1.一种钢管型杆塔正面操作平台,其特征在于,该平台包括脚踏框以及与脚踏板垂直的支撑框,所述脚踏框与支撑框之间形成L形,所述脚踏框与支撑框通过斜梁固定,在支撑框的顶部两侧与脚踏框相反的一侧分别设置L形上横梁与支撑框垂直,在上横梁靠近支撑框端设置圆孔,在另一端设置长条形孔,设置一紧固横梁,所述紧固横梁的一端设置圆孔与上横梁的圆孔对应,在紧固横梁的另一端设置长条形孔与上横梁的长条形孔对应,通过两个螺栓将紧固横梁与上横梁固定。
2.如权利要求1所述的钢管型杆塔正面操作平台,其特征在于,所述脚踏框为口字型框架,在口字型框架内设置一调节梁,所述调节梁的两端位于口字型框架的平行两侧边设置的轨道里,口字型框架的平行两侧边上对应位置设置固定螺丝孔,在移动调节梁时,通过螺丝穿过固定螺丝孔固定。
CN201510147684.2A 2015-03-31 2015-03-31 一种钢管型杆塔正面操作平台 Pending CN104779553A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510147684.2A CN104779553A (zh) 2015-03-31 2015-03-31 一种钢管型杆塔正面操作平台

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510147684.2A CN104779553A (zh) 2015-03-31 2015-03-31 一种钢管型杆塔正面操作平台

Publications (1)

Publication Number Publication Date
CN104779553A true CN104779553A (zh) 2015-07-15

Family

ID=53620866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510147684.2A Pending CN104779553A (zh) 2015-03-31 2015-03-31 一种钢管型杆塔正面操作平台

Country Status (1)

Country Link
CN (1) CN104779553A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108381482A (zh) * 2018-02-12 2018-08-10 国家电网公司 一种gil安装机具及控制系统和方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006340473A (ja) * 2005-06-01 2006-12-14 Chugoku Electric Power Co Inc:The 絶縁変台
CN201972390U (zh) * 2010-12-01 2011-09-14 河南省电力公司南阳供电公司 轴向旋转高空作业台架
CN202586161U (zh) * 2012-04-26 2012-12-05 辽宁省电力有限公司辽阳供电公司 拉杆式绝缘硬梯
CN202596144U (zh) * 2012-05-23 2012-12-12 中国十七冶集团有限公司 H型钢对接安装可移动式简易操作平台
CN202783280U (zh) * 2012-08-30 2013-03-13 浙江吉利汽车研究院有限公司杭州分公司 一种汽车车身的运输拖架
CN203871746U (zh) * 2014-04-24 2014-10-08 国家电网公司 66kV线路钢管杆带电更换直线绝缘子所用杆头卡具
CN204517270U (zh) * 2015-03-31 2015-07-29 国网辽宁省电力有限公司辽阳供电公司 一种钢管型杆塔正面操作平台

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006340473A (ja) * 2005-06-01 2006-12-14 Chugoku Electric Power Co Inc:The 絶縁変台
CN201972390U (zh) * 2010-12-01 2011-09-14 河南省电力公司南阳供电公司 轴向旋转高空作业台架
CN202586161U (zh) * 2012-04-26 2012-12-05 辽宁省电力有限公司辽阳供电公司 拉杆式绝缘硬梯
CN202596144U (zh) * 2012-05-23 2012-12-12 中国十七冶集团有限公司 H型钢对接安装可移动式简易操作平台
CN202783280U (zh) * 2012-08-30 2013-03-13 浙江吉利汽车研究院有限公司杭州分公司 一种汽车车身的运输拖架
CN203871746U (zh) * 2014-04-24 2014-10-08 国家电网公司 66kV线路钢管杆带电更换直线绝缘子所用杆头卡具
CN204517270U (zh) * 2015-03-31 2015-07-29 国网辽宁省电力有限公司辽阳供电公司 一种钢管型杆塔正面操作平台

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108381482A (zh) * 2018-02-12 2018-08-10 国家电网公司 一种gil安装机具及控制系统和方法
CN108381482B (zh) * 2018-02-12 2020-03-03 国家电网公司 一种gil安装机具及控制系统和方法

Similar Documents

Publication Publication Date Title
CN103086278A (zh) 一种滑动式龙门行车及其用途
CN204517270U (zh) 一种钢管型杆塔正面操作平台
CN202535016U (zh) Opgw进站光缆安全接地固定组件
CN104779553A (zh) 一种钢管型杆塔正面操作平台
CN103311811A (zh) 无晕避雷针
CN103323629A (zh) 避雷器测试用试验支架
CN102611036B (zh) 间距可调式横担固定器
CN104167678A (zh) 带电更换110千伏隔离开关的装置及其应用方法
CN204012185U (zh) 一种架空线路可调间隙多功能避雷器
CN203398639U (zh) 架空地线防振锤跑位追回器
CN204517273U (zh) 一种钢管型杆塔侧面操作平台
CN106285167A (zh) 一种杆塔下引电缆支撑横担
CN105041028A (zh) 一种输电线路角钢塔中跳线防风偏绝缘子安装装置
CN105977860B (zh) 一种更换架空输电线路复合横担绝缘子装置及方法
CN202260336U (zh) 10千伏带电作业用绝缘限位挡板
CN204178834U (zh) 耐张合成绝缘子作业保护平台
CN107601282A (zh) 一种触滑式龙门吊供电系统
CN203813320U (zh) 带电更换220kV窄基塔耐张绝缘子串用工具
CN105464418A (zh) 一种隔离开关检修平台装置
CN207175254U (zh) 一种触滑式龙门吊供电系统
CN205209797U (zh) 用于室内变电检修的污秽度取样装置
CN204809803U (zh) 一种可悬挂避雷线的新型耐张杆
CN103928867A (zh) 220kV线路钢管杆带电更换直线绝缘子所用双吊点杆头卡具
CN210915064U (zh) 一种防雷击塔式起重机
CN103825221A (zh) 一种等电位导线上带电作业相间距离控制装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150715