CN104765949B - 一种电能表自动化检定流水线设备的维护方法 - Google Patents
一种电能表自动化检定流水线设备的维护方法 Download PDFInfo
- Publication number
- CN104765949B CN104765949B CN201510097549.1A CN201510097549A CN104765949B CN 104765949 B CN104765949 B CN 104765949B CN 201510097549 A CN201510097549 A CN 201510097549A CN 104765949 B CN104765949 B CN 104765949B
- Authority
- CN
- China
- Prior art keywords
- equipment
- regular maintenance
- assembly line
- mrow
- priority factor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G16—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
- G16Z—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
- G16Z99/00—Subject matter not provided for in other main groups of this subclass
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
设备 | 故障次序i | 第i次故障的修复时间ti/h |
第1号设备(即耐压单元) | 1 | 30 |
第1号设备(即耐压单元) | 2 | 27 |
第1号设备(即耐压单元) | 3 | 32 |
第5号设备(即检定仓) | 1 | 15 |
第5号设备(即检定仓) | 2 | 28 |
第5号设备(即检定仓) | 3 | 25 |
第2号设备(即铅封机) | 1 | 40 |
第2号设备(即铅封机) | 2 | 43 |
第4号设备(即上下料机器人A) | 1 | 14 |
第4号设备(即上下料机器人A) | 2 | 23 |
设备 | 设备不可用度 |
第1号设备(即耐压单元) | 0.01016 |
第5号设备(即检定仓) | 0.00776 |
第2号设备(即铅封机) | 0.00947 |
第4号设备(即上下料机器人A) | 0.00422 |
设备 | 设备故障后流水线日检定量 |
第1号设备(即耐压单元) | N/2 |
第5号设备(即检定仓) | 15N/16 |
第2号设备(即铅封机) | 2N/3 |
第4号设备(即上下料机器人A) | N/2 |
设备 | 设备故障后流水线日检定量 |
第1号设备(即耐压单元) | 1/2 |
第5号设备(即检定仓) | 1/16 |
第2号设备(即铅封机) | 1/3 |
第4号设备(即上下料机器人A) | 1/2 |
设备 | 日常维护优先级系数P |
第1号设备(即耐压单元) | 0.0051 |
第2号设备(即铅封机) | 0.0032 |
第4号设备(即上下料机器人A) | 0.0021 |
第5号设备(即检定仓) | 0.0005 |
Claims (1)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510097549.1A CN104765949B (zh) | 2015-03-05 | 2015-03-05 | 一种电能表自动化检定流水线设备的维护方法 |
PCT/CN2015/086110 WO2016138737A1 (zh) | 2015-03-05 | 2015-08-05 | 一种电能表自动化检定流水线设备维护方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510097549.1A CN104765949B (zh) | 2015-03-05 | 2015-03-05 | 一种电能表自动化检定流水线设备的维护方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104765949A CN104765949A (zh) | 2015-07-08 |
CN104765949B true CN104765949B (zh) | 2018-04-27 |
Family
ID=53647774
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510097549.1A Active CN104765949B (zh) | 2015-03-05 | 2015-03-05 | 一种电能表自动化检定流水线设备的维护方法 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN104765949B (zh) |
WO (1) | WO2016138737A1 (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104765949B (zh) * | 2015-03-05 | 2018-04-27 | 国家电网公司 | 一种电能表自动化检定流水线设备的维护方法 |
CN106249190B (zh) * | 2016-07-21 | 2019-07-19 | 国网河北省电力公司电力科学研究院 | 基于马尔萨斯模型的流水线循环检定下可靠性t检验方法 |
CN110380886A (zh) * | 2018-04-13 | 2019-10-25 | 国家电网公司 | 基于不可用度的电力通信网络风险评估方法 |
CN117369398B (zh) * | 2023-12-05 | 2024-03-08 | 国网江西省电力有限公司供电服务管理中心 | 基于统一精简控制指令集的流水线检定集中控制方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102955888A (zh) * | 2011-08-26 | 2013-03-06 | 国家电网公司 | 设备缺陷的分析方法与装置 |
EP2720063A1 (en) * | 2012-10-12 | 2014-04-16 | ALSTOM Transport SA | Automatic calibration of energy meter central unit |
CN104077660A (zh) * | 2014-07-04 | 2014-10-01 | 李阳 | 一种设备备件管理方法 |
CN104183110A (zh) * | 2014-09-05 | 2014-12-03 | 国家电网公司 | 用于采集终端自动化检定流水线装置的校验系统和方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102495967B (zh) * | 2011-12-12 | 2014-07-02 | 山东电力集团公司济宁供电公司 | 在运电力变压器检修周期计算方法 |
US9058568B2 (en) * | 2012-12-11 | 2015-06-16 | International Business Machines Corporation | System and method for maintenance planning and failure prediction for equipment subject to periodic failure risk |
CN103839112A (zh) * | 2014-03-04 | 2014-06-04 | 北京电研华源电力技术有限公司 | 一种配电网架空线路检修方案优化方法及系统 |
CN104299038A (zh) * | 2014-11-19 | 2015-01-21 | 国网河南省电力公司濮阳供电公司 | 一种继电保护装置定期检验管理方法 |
CN104765949B (zh) * | 2015-03-05 | 2018-04-27 | 国家电网公司 | 一种电能表自动化检定流水线设备的维护方法 |
-
2015
- 2015-03-05 CN CN201510097549.1A patent/CN104765949B/zh active Active
- 2015-08-05 WO PCT/CN2015/086110 patent/WO2016138737A1/zh active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102955888A (zh) * | 2011-08-26 | 2013-03-06 | 国家电网公司 | 设备缺陷的分析方法与装置 |
EP2720063A1 (en) * | 2012-10-12 | 2014-04-16 | ALSTOM Transport SA | Automatic calibration of energy meter central unit |
CN104077660A (zh) * | 2014-07-04 | 2014-10-01 | 李阳 | 一种设备备件管理方法 |
CN104183110A (zh) * | 2014-09-05 | 2014-12-03 | 国家电网公司 | 用于采集终端自动化检定流水线装置的校验系统和方法 |
Non-Patent Citations (1)
Title |
---|
电能表自动化检定及智能仓储系统研究;龙贵山等;《电测与仪表》;20130531;第50卷(第5期);第95-100页 * |
Also Published As
Publication number | Publication date |
---|---|
WO2016138737A1 (zh) | 2016-09-09 |
CN104765949A (zh) | 2015-07-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104765949B (zh) | 一种电能表自动化检定流水线设备的维护方法 | |
CN103838202B (zh) | 参数控制方法和参数控制系统 | |
CN104867840B (zh) | Ye在线检测管控方法 | |
CN108629525A (zh) | 一种考虑负荷重要程度的节点电压暂降严重程度评估方法 | |
CN104977903A (zh) | 基于实时派工系统的机台组下的晶圆批次派工方法和系统 | |
CN108649892B (zh) | 光伏电站的缺陷诊断方法及装置 | |
CN106054106B (zh) | 一种基于电力线载波的电能表时钟异常自动检测方法 | |
CN107591814A (zh) | 一种低频低压自适应精确切负荷方法 | |
CN107677903A (zh) | 一种变压器状态监测数据的聚类分析方法 | |
CN104089760B (zh) | 内燃机零部件的疲劳试验方法 | |
CN106813761A (zh) | 提前量自动修正方法 | |
CN106529582A (zh) | 针对贝叶斯网络中引入专家评价的先验概率评估方法 | |
CN107947156A (zh) | 基于改进Softmax回归的电网故障临界切除时间判别方法 | |
CN107910251B (zh) | 一种基于缺陷贡献度的缺陷检测机台自动派工系统和方法 | |
CN107590560A (zh) | 一种配送中心的选址方法和装置 | |
CN102495302A (zh) | 元器件分类检测法 | |
CN107358017A (zh) | 数据处理方法和装置 | |
Sankle et al. | Single sampling plans for variables indexed by AQL and AOQL with measurement error | |
CN102024672B (zh) | 分析半导体产品的基准良率值的方法 | |
CN104134620B (zh) | 半导体制造过程的监控方法及半导体生产方法 | |
CN106849792A (zh) | 电机设备及集群系统的能耗计算和节能措施评估方法 | |
CN105425195A (zh) | 一种高压电能表可靠性验证试验统计方法 | |
CN206665620U (zh) | 一种电能表检定位置自动调整装置 | |
CN105759748A (zh) | 一种半导体生产机台硬件性能的动态监控系统及监控方法 | |
CN104183511A (zh) | 一种确定晶圆测试数据规范的界限的方法及晶粒标记方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District Patentee after: STATE GRID CORPORATION OF CHINA Patentee after: STATE GRID HEBEI ELECTRIC POWER Research Institute Patentee after: STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE Co.,Ltd. Address before: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District Patentee before: State Grid Corporation of China Patentee before: ELECTRIC POWER SCIENCES RESEARCH INSTITUTE OF STATE GRID HEBEI ELECTRIC POWER Co. Patentee before: HEBEI ELECTRIC POWER COMMISSIONING INSTITUDE |
|
CP01 | Change in the name or title of a patent holder | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220523 Address after: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District Patentee after: STATE GRID CORPORATION OF CHINA Patentee after: STATE GRID HEBEI ELECTRIC POWER Research Institute Patentee after: Marketing service center of State Grid Hebei Electric Power Co.,Ltd. Patentee after: STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE Co.,Ltd. Address before: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District Patentee before: STATE GRID CORPORATION OF CHINA Patentee before: STATE GRID HEBEI ELECTRIC POWER Research Institute Patentee before: STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE Co.,Ltd. |
|
TR01 | Transfer of patent right |