CN104763454A - Built-in type full-length anticorrosion anchor rod - Google Patents

Built-in type full-length anticorrosion anchor rod Download PDF

Info

Publication number
CN104763454A
CN104763454A CN201510162241.0A CN201510162241A CN104763454A CN 104763454 A CN104763454 A CN 104763454A CN 201510162241 A CN201510162241 A CN 201510162241A CN 104763454 A CN104763454 A CN 104763454A
Authority
CN
China
Prior art keywords
tray
concave
anchor
threaded rod
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510162241.0A
Other languages
Chinese (zh)
Inventor
陈国庆
张岩
张国峰
郭帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Univeristy of Technology
Original Assignee
Chengdu Univeristy of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Univeristy of Technology filed Critical Chengdu Univeristy of Technology
Priority to CN201510162241.0A priority Critical patent/CN104763454A/en
Publication of CN104763454A publication Critical patent/CN104763454A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0013Protection against corrosion
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to an anchor rod of geotechnical engineering, in particular to a built-in type full-length anticorrosion anchor rod. One end of a hollow threaded rod is connected with the front end of the anchor rod, the other end of the hollow threaded rod is connected with an external anchor head, and an aligner is mounted on the hollow threaded rod; the external anchor rod comprises a concave tray, wherein the concave tray comprises a tray; a concave cavity is connected in the center of the tray; the concave cavity of the concave tray is connected with the hollow threaded rod through a gasket and a nut, and a concave sealing cap is arranged in the concave cavity; the concave tray is fixed on a rack wall through a cement steel bolt; a grouting and gas exhausting tube is mounted in the concave cavity of the concave tray; a protective layer is arranged at the outer side of the tray of the concave tray. According to the built-in type full-length anticorrosion anchor rod, the grouting and fixing is used for realizing anti-corrosion protection on the rod body, and the external anchor rod realizes anti-corrosion protection on the external anchor head, and the anti-corrosion protection of the whole anchor rod is realized by sealing through a protective layer, and the built-in type full-length anticorrosion anchor rod is especially suitable for perpetual rock-soil anchoring projects with high anti-corrosion requirements.

Description

内置式全长防腐锚杆Built-in full-length anti-corrosion anchor

技术领域technical field

本发明涉及岩土工程的锚杆,具体为内置式全长防腐锚杆。The invention relates to an anchor rod for geotechnical engineering, in particular to a built-in full-length anti-corrosion anchor rod.

背景技术Background technique

在岩土工程涉及的地下工程、采矿工程、基坑与边坡工程中锚杆是一种主要的支护技术,其应用范围广泛,加固效果好。但是随着工程建设的不断增多,涉及锚固的工程所面临的地质条件越来越复杂,新的问题不断涌现,其中锚杆腐蚀问题就是一个亟需解决的关键性问题。Anchor bolt is a main support technology in underground engineering, mining engineering, foundation pit and slope engineering involved in geotechnical engineering. It has a wide range of applications and good reinforcement effect. However, with the continuous increase of engineering construction, the geological conditions faced by the engineering involving anchorage are becoming more and more complex, and new problems are constantly emerging. Among them, the corrosion of anchor rods is a key problem that needs to be solved urgently.

由于地层或地下水对混凝土和锚杆总有或轻或重的腐蚀性,所以永久性锚固、抗浮或抗拔工程的耐久性和承载力很难得到有效保障,需要对锚杆进行防腐处理。传统锚杆在设计制造过程中很少考虑锚杆的防腐问题。已投入使用的一些防腐锚杆也存在结构复杂、抗腐蚀性能不佳等问题。Since the stratum or groundwater is always slightly or heavily corrosive to concrete and anchors, it is difficult to effectively guarantee the durability and bearing capacity of permanent anchorage, anti-floating or pull-out engineering, and anti-corrosion treatment is required for anchors. In the process of design and manufacture of traditional anchor bolts, the anti-corrosion problem of anchor bolts is seldom considered. Some anti-corrosion bolts that have been put into use also have problems such as complex structure and poor corrosion resistance.

锚杆防腐技术措施主要有隔离和绝缘,主要方法有锚杆镀锌层、环氧树脂涂层、注浆固结保护、套管包裹保护等,其中注浆固结是最主要的防腐方式之一。对防腐锚杆的研究大部分还是集中在杆体的防腐研究,较少涉及外锚头的防腐研究。如申请号为CN97217266.1公开的防腐金属锚杆,其表面电镀层的加工工序复杂、厚度很小,储运、施工中的碰撞刮擦易使其表面防腐层脱落失效;申请号为201220476433.0公开的一种矿山热塑防腐锚杆支护装置,其进行防腐作业时需要加热融化热塑性材料,操作繁琐,并且结构过于复杂,实用性差;申请号为201220609725.7公开的一种囊式防腐锚杆,其防腐结构为一种不透水的袋子,降低了锚杆与水泥砂浆的握裹力,影响了锚固质量且施工时也容易导致袋子破裂而失去防腐效果。The anti-corrosion technical measures of anchor bolts mainly include isolation and insulation. The main methods include galvanized layer of anchor bolts, epoxy resin coating, grouting consolidation protection, casing wrapping protection, etc., among which grouting consolidation is the most important anti-corrosion method. one. Most of the research on anti-corrosion bolts still focuses on the anti-corrosion research of the rod body, and less involves the anti-corrosion research of the outer anchor head. Such as the anti-corrosion metal anchor disclosed by the application number CN97217266.1, the processing procedure of its surface electroplating layer is complicated, the thickness is very small, and the collision and scraping in storage, transportation and construction can easily make the surface anti-corrosion layer fall off and fail; the application number is 201220476433.0 publication A thermoplastic anti-corrosion bolt support device for mines, which needs to heat and melt thermoplastic materials during anti-corrosion operations, the operation is cumbersome, and the structure is too complicated, and the practicability is poor; the application number is 201220609725.7 A capsule-type anti-corrosion anchor, its The anti-corrosion structure is a kind of impermeable bag, which reduces the holding force between the anchor rod and the cement mortar, affects the anchoring quality, and is easy to cause the bag to rupture during construction and lose the anti-corrosion effect.

发明内容Contents of the invention

针对上述技术问题,本发明提供一种内置式全长防腐锚杆,对锚杆的进行有效的防腐,具体技术方案为:In view of the above technical problems, the present invention provides a built-in full-length anti-corrosion anchor, which can effectively prevent the anti-corrosion of the anchor. The specific technical solution is:

内置式全长防腐锚杆,包括空心螺纹杆、锚杆前端、外锚头、保护层;所述的空心螺纹杆一端与锚杆前端连接,另一端与外锚头连接,空心螺纹杆上安装有对中器;外锚头包括内凹形托盘,内凹形托盘包括托盘,托盘中心连接凹腔,内凹形托盘的凹腔通过垫片和螺母与空心螺纹杆连接,凹腔由内凹形封帽;内凹形托盘的托盘紧贴岩壁的一面带有锯齿状突刺,内凹形托盘通过水泥钢钉固定在岩壁上,内凹形托盘的凹腔上留有小孔用于安装注浆排气管,内凹形托盘的托盘外侧有保护层。The built-in full-length anti-corrosion anchor includes a hollow threaded rod, the front end of the anchor rod, an outer anchor head, and a protective layer; one end of the hollow threaded rod is connected to the front end of the anchor rod, and the other end is connected to the outer anchor head. There is a centering device; the outer anchor head includes an inner concave tray, the inner concave tray includes a tray, the center of the tray is connected to the cavity, and the cavity of the inner concave tray is connected to the hollow threaded rod through a gasket and a nut, and the cavity is formed by the inner concave shaped cap; the side of the inner concave tray close to the rock wall has serrated thorns, the inner concave tray is fixed on the rock wall by cement steel nails, and there are small holes in the cavity of the inner concave tray for The grouting exhaust pipe is installed, and there is a protective layer on the outside of the tray of the concave tray.

所述的锚杆前端为实心螺纹杆,实心螺纹杆通过连接套筒与空心螺纹杆连接,连接套筒中部有出浆孔,出浆孔与空心螺纹杆的中空腔体连通,连接套筒外壁有阻浆器。阻浆器为圆环,圆环有喇叭型的挡板。The front end of the anchor rod is a solid threaded rod, and the solid threaded rod is connected to the hollow threaded rod through a connecting sleeve. There is a slurry blocker. The slurry blocker is a ring, and the ring has a trumpet-shaped baffle.

用早强锚固剂锚固实心螺纹杆,待早强锚固剂达到一定强度要求后可对锚杆进行张拉施加预应力,并通过空心螺纹杆的中空腔体灌注水泥砂浆,实现全长锚固。Use the early-strength anchoring agent to anchor the solid threaded rod. After the early-strength anchoring agent reaches a certain strength requirement, the anchor rod can be tensioned and prestressed, and cement mortar can be poured through the hollow cavity of the hollow threaded rod to achieve full-length anchoring.

或者,所述的锚杆前端为涨壳式锚固头,涨壳式锚固头通过螺纹与空心螺纹杆连接。Alternatively, the front end of the anchor rod is a shell-expanding anchor head, and the shell-expanding anchor head is connected to the hollow threaded rod through threads.

涨壳式锚固头采用普通钢制涨壳,将锚杆送入钻孔内后,将涨壳式锚固头顶压涨开后可施加预应力,并通过空心螺纹杆的中空腔体灌注水泥砂浆,实现全长锚固。The expansion shell anchor head adopts ordinary steel expansion shell. After the anchor rod is sent into the drill hole, the top of the expansion shell anchor head is compressed and prestressed, and the cement mortar is poured through the hollow cavity of the hollow threaded rod. Achieving full length anchorage.

本发明提供的内置式全长防腐锚杆,通过注浆固结实现了锚杆杆体的抗腐蚀保护,通过外锚头内置实现了外锚头的抗腐蚀保护,“暗锚式”的外锚头不会裸露在钻孔之外,而是内置于钻孔内,在实现锚杆全长防腐的同时,又节省了原来外置的外锚头所占的空间,有效的增加了施工作业空间,减少了对施工的干扰和不利影响,通过保护层密封实现了整个锚杆的抗腐蚀保护,锚杆可以有效的抗腐蚀,防腐性能持久可靠、适用范围广,尤其适用于对防腐有高度要求的永久性岩土锚固工程。The built-in full-length anti-corrosion bolt provided by the present invention realizes the anti-corrosion protection of the bolt body through grouting consolidation, and realizes the anti-corrosion protection of the outer anchor head through the built-in outer anchor head. The "hidden anchor" outer anchor The head will not be exposed outside the drill hole, but built into the drill hole. While realizing the anti-corrosion of the entire length of the anchor rod, it also saves the space occupied by the original external anchor head, effectively increasing the construction work space , reducing the interference and adverse effects on construction, and realizing the anti-corrosion protection of the entire anchor rod through the sealing of the protective layer, the anchor rod can effectively resist corrosion, the anti-corrosion performance is durable and reliable, and the application range is wide, especially suitable for high requirements on anti-corrosion permanent geotechnical anchoring works.

附图说明Description of drawings

图1是本发明的实施例1结构示意图;Fig. 1 is the structural representation of embodiment 1 of the present invention;

图2是本发明的实施例1的局部结构示意图。Fig. 2 is a partial structural schematic diagram of Embodiment 1 of the present invention.

图3是本发明的对中器结构示意图;Fig. 3 is a schematic structural view of the centering device of the present invention;

图4是本发明的实施例2结构示意图;Fig. 4 is the structural representation of embodiment 2 of the present invention;

图5是本发明的内凹形托盘结构示意图。Fig. 5 is a schematic diagram of the structure of the concave tray of the present invention.

具体实施例specific embodiment

结合附图说明本发明的具体实施方式。The specific embodiment of the present invention will be described with reference to the accompanying drawings.

实施例1Example 1

如图1所示,内置式全长防腐锚杆,包括空心螺纹杆16、锚杆前端、外锚头、保护层3;所述的空心螺纹杆16一端与锚杆前端连接,另一端与外锚头连接,空心螺纹杆16上安装有对中器17;As shown in Figure 1, the built-in full-length anti-corrosion anchor includes a hollow threaded rod 16, the front end of the anchor rod, an outer anchor head, and a protective layer 3; one end of the hollow threaded rod 16 is connected to the front end of the anchor rod, and the other end is connected to the outer anchor rod. The anchor head is connected, and a centering device 17 is installed on the hollow threaded rod 16;

外锚头包括内凹形托盘4,内凹形托盘4包括托盘,托盘中心连接凹腔,内凹形托盘4的凹腔通过垫片8和螺母6与空心螺纹杆16连接,螺母6为阻尼式螺母,材料采用Q235A、抗拉强度不低于375MPa的碳素结构钢。凹腔由内凹形封帽2密封,密封空间内填充黄油5;内凹形托盘4的托盘紧贴岩壁的一面带有锯齿状突刺,内凹形托盘4通过水泥钢钉1固定在岩壁上,内凹形托盘4的凹腔上留有小孔用于安装注浆排气管7,内凹形托盘4的托盘外侧有保护层3。The outer anchor head includes an inner concave tray 4, the inner concave tray 4 includes a tray, and the center of the tray is connected to a cavity, and the cavity of the inner concave tray 4 is connected to the hollow threaded rod 16 through a gasket 8 and a nut 6, and the nut 6 is a damping The nut is made of Q235A carbon structural steel with a tensile strength not less than 375MPa. The concave cavity is sealed by the concave-shaped sealing cap 2, and butter 5 is filled in the sealed space; the side of the concave-shaped tray 4 close to the rock wall has serrated thorns, and the concave-shaped tray 4 is fixed on the rock by cement steel nails 1. On the wall, small holes are left on the cavity of the inner concave tray 4 for installing the grouting exhaust pipe 7, and the outer side of the inner concave tray 4 has a protective layer 3.

如图2所示,所述的锚杆前端包括实心螺纹杆13,实心螺纹杆13通过连接套筒10与空心螺纹杆16连接,连接套筒10中部有出浆孔15,出浆孔15与空心螺纹杆16的中空腔体连通,连接套筒10外壁有阻浆器14。阻浆器14为圆环,圆环有喇叭型的挡板。As shown in Figure 2, the front end of the anchor rod includes a solid threaded rod 13, the solid threaded rod 13 is connected with the hollow threaded rod 16 through the connecting sleeve 10, the middle part of the connecting sleeve 10 has a grout hole 15, and the grout hole 15 is connected to the hollow threaded rod 16. The hollow cavity of the hollow threaded rod 16 is connected, and the outer wall of the connecting sleeve 10 has a slurry trap 14 . The slurry blocker 14 is a ring, and the ring has a trumpet-shaped baffle.

实心螺纹杆13与空心螺纹杆16组成杆体,杆体镀锌处理,空心螺纹杆16外径为25~40mm,壁厚为5mm;实心螺纹杆13采用螺纹钢筋,直径为20~30mm,杆体总长度为2~6m,实心螺纹杆13与空心螺纹杆16的长度比例为1∶6~1∶2。The solid threaded rod 13 and the hollow threaded rod 16 form a rod body, and the rod body is galvanized. The outer diameter of the hollow threaded rod 16 is 25-40mm, and the wall thickness is 5mm; The length ratio of the solid threaded rod 13 to the hollow threaded rod 16 is 1:6 to 1:2.

连接套筒10由碳素结构钢制成,抗拉强度大于实心螺纹杆13和空心螺纹杆16的抗拉强度,外径大于空心螺纹杆16外径10~15mm;连接套筒10中部出浆孔15数量不小于2个。The connecting sleeve 10 is made of carbon structural steel, the tensile strength is greater than that of the solid threaded rod 13 and the hollow threaded rod 16, and the outer diameter is 10-15mm larger than that of the hollow threaded rod 16; The number of holes 15 is not less than 2.

阻浆器14采用塑料材质,与连接套筒10相连接,挡板外缘与孔壁相贴合。The slurry blocker 14 is made of plastic material, and is connected with the connecting sleeve 10, and the outer edge of the baffle is attached to the hole wall.

如图3所示,对中器17为外表面带定位尺的圆柱体,采用塑料材质,对中器17内表面与空心螺纹杆16相连接,外缘与孔壁相接触。As shown in Figure 3, the centering device 17 is a cylinder with a positioning ruler on the outer surface, made of plastic, the inner surface of the centering device 17 is connected with the hollow threaded rod 16, and the outer edge is in contact with the hole wall.

锚杆安装:用钻孔机在岩壁上进行钻孔并清理钻孔,在钻孔底部放入早强锚固剂12;其次,将内置式全长防腐锚杆用钻机以转动冲压等方式安装就位,内置式全长防腐锚杆前端的实心螺纹杆13将早强锚固剂挤压搅拌,充填密实,形成早强锚固体;待早强锚固体达到一定强度后,安装外锚头,按要求施加预应力;最后,进行注浆,应做到钻孔内的水泥砂浆9充填密实,完成锚杆安装。Bolt installation: use a drilling machine to drill a hole on the rock wall and clean the hole, put an early-strength anchoring agent 12 at the bottom of the hole; secondly, use a drilling machine to install the built-in full-length anti-corrosion bolt by means of rotary stamping, etc. In place, the solid threaded rod 13 at the front end of the built-in full-length anti-corrosion anchor squeezes and stirs the early-strength anchoring agent, fills it densely, and forms an early-strength anchoring body; after the early-strength anchoring body reaches a certain strength, install the outer anchor head, press It is required to apply prestress; finally, grouting should be carried out, and the cement mortar 9 in the borehole should be filled densely to complete the bolt installation.

工作原理:内置式全长防腐锚杆的杆体部分防腐采用水泥砂浆固结保护,是目前最主要的防腐手段之一,在充填均匀密实的情况下,防腐效果良好;通过内置外锚头并用内凹形封帽2密封,中间充填黄油的方式达到了外锚头的防腐;通过水泥浆或混凝土形成保护层3封抹钻孔附近的岩面,保护层3强度不低于C30,保护层厚度不小于50mm,将内凹形托盘4及整个锚固体系密封保护起来,达到与外界空气和水隔绝的目的。通过这三层防腐体系实现了锚杆的抗腐蚀功能,防腐效果持久可靠。Working principle: The rod body of the built-in full-length anti-corrosion anchor is protected by cement mortar consolidation, which is one of the most important anti-corrosion methods at present. In the case of uniform and dense filling, the anti-corrosion effect is good; The concave sealing cap 2 is sealed, and the way of filling butter in the middle achieves the anticorrosion of the outer anchor head; the protective layer 3 is sealed and wiped on the rock surface near the drilling hole by cement slurry or concrete. The strength of the protective layer 3 is not lower than C30, and the thickness of the protective layer is Not less than 50mm, the inner concave tray 4 and the entire anchoring system are sealed and protected to achieve the purpose of isolating from outside air and water. The anti-corrosion function of the bolt is realized through the three-layer anti-corrosion system, and the anti-corrosion effect is durable and reliable.

实施例2Example 2

如图4所示,内置式全长防腐锚杆,包括空心螺纹杆16、锚杆前端、外锚头、保护层3;所述的空心螺纹杆16一端与锚杆前端连接,另一端与外锚头连接,空心螺纹杆16上安装有对中器17;As shown in Figure 4, the built-in full-length anti-corrosion anchor includes a hollow threaded rod 16, the front end of the anchor rod, an outer anchor head, and a protective layer 3; one end of the hollow threaded rod 16 is connected to the front end of the anchor rod, and the other end is connected to the outer anchor rod. The anchor head is connected, and a centering device 17 is installed on the hollow threaded rod 16;

外锚头包括内凹形托盘4,内凹形托盘4包括托盘,托盘中心连接凹腔,内凹形托盘4的凹腔通过垫片8和螺母6与空心螺纹杆16连接,凹腔由内凹形封帽2密封空间内填充黄油5;内凹形托盘4的托盘紧贴岩壁的一面带有锯齿状突刺,内凹形托盘4通过水泥钢钉1固定在岩壁上,内凹形托盘4的凹腔上留有小孔用于安装注浆排气管7,注浆排气管7为塑料管,兼具注浆与排气功能。内凹形托盘4的托盘外侧有保护层3。The outer anchor head includes an inner concave tray 4, and the inner concave tray 4 includes a tray. The concave sealing cap 2 is filled with butter 5 in the sealed space; the inner concave tray 4 has serrated thorns on the side of the tray close to the rock wall, and the inner concave tray 4 is fixed on the rock wall by cement steel nails 1. The concave cavity of the tray 4 has small holes for installing the grouting exhaust pipe 7, and the grouting exhaust pipe 7 is a plastic pipe, which has both grouting and exhaust functions. There is a protective layer 3 on the outside of the inner concave tray 4 .

所述的锚杆前端包括涨壳式锚固头18,涨壳式锚固头18通过螺纹与空心螺纹杆16连接。The front end of the anchor rod includes a shell-expanding anchor head 18, which is connected to the hollow threaded rod 16 through threads.

采用人力或者机器顶压锚杆外端头,使涨壳式锚固头18涨开并紧贴孔壁,形成初步的锚固力,并可通过千斤顶等工具按要求施加预应力;最后,进行注浆,钻孔内的水泥砂浆9充填密实,完成锚杆安装。Manpower or machines are used to press the outer end of the anchor rod, so that the shell-type anchor head 18 expands and clings to the hole wall to form a preliminary anchoring force, and prestress can be applied as required by jacks and other tools; finally, grouting , the cement mortar 9 in the borehole is filled densely, and the bolt installation is completed.

另外,如图5所示,两种实施方式的内凹形托盘4的凹腔,可以为圆柱形凹腔,也可以为锥形凹腔,锥形凹腔的外壁不与钻孔壁相贴合,而是呈一定角度。In addition, as shown in Figure 5, the cavity of the concave tray 4 of the two embodiments can be a cylindrical cavity or a conical cavity, and the outer wall of the conical cavity is not attached to the wall of the drilled hole. together, but at an angle.

实施例1与实施例2的内置式全长防腐锚杆均可进行向下安装和向上安装。当向下安装时,水泥砂浆9由空心螺纹杆16的中空腔体注入,并由钻孔底部向孔口处充填密实,空气从注浆排气管7中排出;当向上安装时,水泥砂浆9由注浆排气管7进入钻孔,并由孔口处向钻孔底部充填密实,空气从空心螺纹杆16的中空腔体排出。The built-in full-length anti-corrosion anchor rods of Embodiment 1 and Embodiment 2 can be installed downwards or upwards. When installed downwards, the cement mortar 9 is injected into the hollow cavity of the hollow threaded rod 16, and is filled densely from the bottom of the borehole to the hole, and the air is discharged from the grouting exhaust pipe 7; when installed upwards, the cement mortar 9 Enter the borehole from the grouting exhaust pipe 7, and fill it from the hole to the bottom of the borehole, and the air is discharged from the hollow cavity of the hollow threaded rod 16.

Claims (4)

1.内置式全长防腐锚杆,其特征在于:包括空心螺纹杆、锚杆前端、外锚头、保护层;所述的空心螺纹杆一端与锚杆前端连接,另一端与外锚头连接,空心螺纹杆上安装有对中器;外锚头包括内凹形托盘,内凹形托盘包括托盘,托盘中心连接凹腔,内凹形托盘的凹腔通过垫片和螺母与空心螺纹杆连接,凹腔由内凹形封帽密封;内凹形托盘的托盘紧贴岩壁的一面带有锯齿状突刺,内凹形托盘通过水泥钢钉固定在岩壁上,内凹形托盘的凹腔上留有小孔用于安装注浆排气管,内凹形托盘的托盘外侧有保护层。1. Built-in full-length anti-corrosion anchor, characterized in that: it includes a hollow threaded rod, the front end of the anchor rod, an outer anchor head, and a protective layer; one end of the hollow threaded rod is connected to the front end of the anchor rod, and the other end is connected to the outer anchor head , a centering device is installed on the hollow threaded rod; the outer anchor head includes an inner concave tray, the inner concave tray includes a tray, the center of the tray is connected to the cavity, and the cavity of the inner concave tray is connected to the hollow threaded rod through a gasket and a nut , the concave cavity is sealed by the concave-shaped sealing cap; the side of the concave-shaped tray close to the rock wall has serrated thorns, the concave-shaped tray is fixed on the rock wall by cement steel nails, the concave cavity of the concave-shaped tray A small hole is left for installing the grouting exhaust pipe, and there is a protective layer on the outside of the inner concave tray. 2.根据权利要求1所述的内置式全长防腐锚杆,其特征在于:所述的锚杆前端为实心螺纹杆,实心螺纹杆通过连接套筒与空心螺纹杆连接,连接套筒中部有出浆孔,出浆孔与空心螺纹杆的中空腔体连通,连接套筒外壁有阻浆器。2. The built-in full-length anti-corrosion anchor according to claim 1, characterized in that: the front end of the anchor is a solid threaded rod, the solid threaded rod is connected to the hollow threaded rod through a connecting sleeve, and the middle part of the connecting sleeve has The slurry outlet is connected with the hollow cavity of the hollow threaded rod, and the outer wall of the connecting sleeve is provided with a slurry stopper. 3.根据权利要求2所述的内置式全长防腐锚杆,其特征在于:阻浆器为圆环,圆环有喇叭型的挡板。3. The built-in full-length anti-corrosion bolt according to claim 2, characterized in that: the slurry trap is a ring, and the ring has a trumpet-shaped baffle. 4.根据权利要求1所述的内置式全长防腐锚杆,其特征在于:所述的锚杆前端为涨壳式锚固头,涨壳式锚固头通过螺纹与空心螺纹杆连接。4. The built-in full-length anti-corrosion anchor according to claim 1, characterized in that: the front end of the anchor is a shell-expanding anchor head, and the shell-expanding anchor head is connected to the hollow threaded rod through threads.
CN201510162241.0A 2015-04-08 2015-04-08 Built-in type full-length anticorrosion anchor rod Pending CN104763454A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510162241.0A CN104763454A (en) 2015-04-08 2015-04-08 Built-in type full-length anticorrosion anchor rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510162241.0A CN104763454A (en) 2015-04-08 2015-04-08 Built-in type full-length anticorrosion anchor rod

Publications (1)

Publication Number Publication Date
CN104763454A true CN104763454A (en) 2015-07-08

Family

ID=53645507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510162241.0A Pending CN104763454A (en) 2015-04-08 2015-04-08 Built-in type full-length anticorrosion anchor rod

Country Status (1)

Country Link
CN (1) CN104763454A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105422150A (en) * 2015-11-23 2016-03-23 浙江工业大学工程设计集团有限公司 FRP sprinkling irrigation combined anchor bolt
CN106014464A (en) * 2016-07-27 2016-10-12 屈荐映 Environment-friendly anchor rod for building municipal engineering
CN106149718A (en) * 2016-07-27 2016-11-23 屈荐映 A kind of building municipal works improvement anchor pole
CN106223990A (en) * 2016-07-27 2016-12-14 屈荐映 A kind of building municipal works anchor pole
CN107059866A (en) * 2017-06-21 2017-08-18 湖北武大珞珈工程结构检测咨询有限公司 A kind of fining twisted steel anchor pole anchor head internal pressure installation system and method
CN107268642A (en) * 2017-06-30 2017-10-20 浙江中良市政工程有限公司 Slope reinforcement synthesis structure and construction method
CN110594836A (en) * 2019-09-18 2019-12-20 浙江发恩集成房屋有限公司 Prefabricated plate material injection and nail insertion integrated equipment
CN110748368A (en) * 2019-11-29 2020-02-04 西南交通大学 Timely active supporting and anchoring system and method
CN111608709A (en) * 2020-06-04 2020-09-01 中铁隆昌铁路器材有限公司 Yielding anchor rod suitable for soft rock large-deformation underground space and supporting method
CN111622218A (en) * 2020-07-07 2020-09-04 中国能源建设集团湖南省电力设计院有限公司 A reinforced mortar anchor rod guide bracket
CN112554921A (en) * 2020-12-04 2021-03-26 中煤科工开采研究院有限公司 Hollow tensioning anchor rod surrounding rock reinforcing method
CN112554925A (en) * 2020-12-04 2021-03-26 中煤科工开采研究院有限公司 Stretch-draw slip casting stock
CN112942387A (en) * 2021-02-04 2021-06-11 中国长江三峡集团有限公司 Corrosion-resistant high-strength anchor rod and method for geotechnical engineering high and steep slope reinforcement
CN118518572A (en) * 2024-07-22 2024-08-20 成都理工大学 Indoor test equipment for hot corrosion performance of supporting anchor rod
CN119195126A (en) * 2024-11-15 2024-12-27 重庆市轨道交通设计研究院有限责任公司 An embedded anchor structure for reducing foundation pit excavation volume
CN119266218A (en) * 2024-11-15 2025-01-07 重庆市轨道交通设计研究院有限责任公司 A method for installing a self-anchored steel cage for reducing land acquisition

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1464176A (en) * 2002-06-24 2003-12-31 吴德兴 A pin timbering process and sectionalized hollow mud injecting stay bolt thereof
CN1651660A (en) * 2005-03-28 2005-08-10 李炳奇 Permanent anchor cables for slope stabilization
CN2911011Y (en) * 2006-06-05 2007-06-13 吴德兴 Prestressed anchor arm device
CN201172823Y (en) * 2008-01-17 2008-12-31 成都现代万通锚固技术有限公司 Exhaustable multiple anti-corrosion bolts
CN101473092A (en) * 2006-06-13 2009-07-01 伍德斯托克泊卡逊有限公司 Recess former for concrete panels
CN102561378A (en) * 2012-01-20 2012-07-11 南京国电南自新能源工程技术有限公司 Concrete pile cap structure and construction method thereof
CN202416311U (en) * 2011-11-27 2012-09-05 中铁西北科学研究院有限公司 Progressive control type anchor rod
CN102900081A (en) * 2012-11-11 2013-01-30 青岛理工大学 Non-metal anti-floating anchor rod and anchoring method thereof
CN202731958U (en) * 2012-09-03 2013-02-13 陈骁澜 Mine thermoplastic antiseptic anchor rod support device
CN202809607U (en) * 2012-09-10 2013-03-20 辽宁山水城市园林景观有限公司 Prestressed anchor for ecologically restoring side slopes and rock masses
CN204532398U (en) * 2015-04-08 2015-08-05 成都理工大学 Built-in total length anticorrosion anchor rod

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1464176A (en) * 2002-06-24 2003-12-31 吴德兴 A pin timbering process and sectionalized hollow mud injecting stay bolt thereof
CN1651660A (en) * 2005-03-28 2005-08-10 李炳奇 Permanent anchor cables for slope stabilization
CN2911011Y (en) * 2006-06-05 2007-06-13 吴德兴 Prestressed anchor arm device
CN101473092A (en) * 2006-06-13 2009-07-01 伍德斯托克泊卡逊有限公司 Recess former for concrete panels
CN201172823Y (en) * 2008-01-17 2008-12-31 成都现代万通锚固技术有限公司 Exhaustable multiple anti-corrosion bolts
CN202416311U (en) * 2011-11-27 2012-09-05 中铁西北科学研究院有限公司 Progressive control type anchor rod
CN102561378A (en) * 2012-01-20 2012-07-11 南京国电南自新能源工程技术有限公司 Concrete pile cap structure and construction method thereof
CN202731958U (en) * 2012-09-03 2013-02-13 陈骁澜 Mine thermoplastic antiseptic anchor rod support device
CN202809607U (en) * 2012-09-10 2013-03-20 辽宁山水城市园林景观有限公司 Prestressed anchor for ecologically restoring side slopes and rock masses
CN102900081A (en) * 2012-11-11 2013-01-30 青岛理工大学 Non-metal anti-floating anchor rod and anchoring method thereof
CN204532398U (en) * 2015-04-08 2015-08-05 成都理工大学 Built-in total length anticorrosion anchor rod

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105422150A (en) * 2015-11-23 2016-03-23 浙江工业大学工程设计集团有限公司 FRP sprinkling irrigation combined anchor bolt
CN106223990B (en) * 2016-07-27 2018-10-02 屈荐映 A kind of building municipal works anchor pole
CN106149718A (en) * 2016-07-27 2016-11-23 屈荐映 A kind of building municipal works improvement anchor pole
CN106223990A (en) * 2016-07-27 2016-12-14 屈荐映 A kind of building municipal works anchor pole
CN106014464B (en) * 2016-07-27 2018-10-19 深圳百勤建设工程有限公司 A kind of environment-friendly type building municipal works anchor pole
CN106149718B (en) * 2016-07-27 2018-11-13 屈荐映 A kind of building municipal works improvement anchor pole
CN106014464A (en) * 2016-07-27 2016-10-12 屈荐映 Environment-friendly anchor rod for building municipal engineering
CN107059866A (en) * 2017-06-21 2017-08-18 湖北武大珞珈工程结构检测咨询有限公司 A kind of fining twisted steel anchor pole anchor head internal pressure installation system and method
CN107059866B (en) * 2017-06-21 2022-09-02 武大巨成结构股份有限公司 Finish rolling deformed steel bar anchor head internal pressure mounting system and method
CN107268642A (en) * 2017-06-30 2017-10-20 浙江中良市政工程有限公司 Slope reinforcement synthesis structure and construction method
CN110594836A (en) * 2019-09-18 2019-12-20 浙江发恩集成房屋有限公司 Prefabricated plate material injection and nail insertion integrated equipment
CN110748368A (en) * 2019-11-29 2020-02-04 西南交通大学 Timely active supporting and anchoring system and method
CN111608709A (en) * 2020-06-04 2020-09-01 中铁隆昌铁路器材有限公司 Yielding anchor rod suitable for soft rock large-deformation underground space and supporting method
CN111622218A (en) * 2020-07-07 2020-09-04 中国能源建设集团湖南省电力设计院有限公司 A reinforced mortar anchor rod guide bracket
CN112554925A (en) * 2020-12-04 2021-03-26 中煤科工开采研究院有限公司 Stretch-draw slip casting stock
CN112554921A (en) * 2020-12-04 2021-03-26 中煤科工开采研究院有限公司 Hollow tensioning anchor rod surrounding rock reinforcing method
CN112942387A (en) * 2021-02-04 2021-06-11 中国长江三峡集团有限公司 Corrosion-resistant high-strength anchor rod and method for geotechnical engineering high and steep slope reinforcement
CN112942387B (en) * 2021-02-04 2022-06-07 中国长江三峡集团有限公司 Corrosion-resistant high-strength anchor rod and method for geotechnical engineering high-steep slope reinforcement
CN118518572A (en) * 2024-07-22 2024-08-20 成都理工大学 Indoor test equipment for hot corrosion performance of supporting anchor rod
CN118518572B (en) * 2024-07-22 2024-10-01 成都理工大学 Indoor test equipment for hot corrosion performance of supporting anchor rod
CN119195126A (en) * 2024-11-15 2024-12-27 重庆市轨道交通设计研究院有限责任公司 An embedded anchor structure for reducing foundation pit excavation volume
CN119266218A (en) * 2024-11-15 2025-01-07 重庆市轨道交通设计研究院有限责任公司 A method for installing a self-anchored steel cage for reducing land acquisition
CN119195126B (en) * 2024-11-15 2025-06-03 重庆市轨道交通设计研究院有限责任公司 Embedded anchorage device structure for reducing excavation quantity of foundation pit
CN119266218B (en) * 2024-11-15 2025-07-22 重庆市轨道交通设计研究院有限责任公司 Method for installing reinforcement cage with anchor for reducing land sign

Similar Documents

Publication Publication Date Title
CN104763454A (en) Built-in type full-length anticorrosion anchor rod
CN105604593B (en) A Three-Stage Anchor Combined Hollow Grouting Anchor
CN101634149B (en) Prestressed anchor foundation pit support and construction method
CN105201514B (en) A kind of water-bearing stratum shaft wall structure and construction method
CN102720196B (en) Anticorrosive anchor rod capable of preventing slurry from leaking
CN209837018U (en) Prefabricated prestressed anchor rod construction structure
CN104947700B (en) A kind of sealing method of precipitation well
CN103557012B (en) A kind of roadway with large deformation wall rock grouting fastening carrying structure and construction method
CN206554832U (en) Component and the grouting cable anchor and anchor pole using the component are only starched in a kind of hole
CN103089276A (en) Deep-shallow hole and high-low pressure coupling grouting technology
CN103277122A (en) Method for drilling anchor rod hole and anchoring anchor rod in broken roof
CN203230443U (en) Novel case expanding reverse wedging type slip casting anchor rod
CN102226375A (en) Easy-to-collapse hole drilling and forming method
CN206667247U (en) Large dosage expanding cement paddle recoverable anchor pole for temporary supporting
CN105714819B (en) A kind of outer anchor head multi-protective device of prestress anchorage cable and its fixing means
CN201411692Y (en) Multi-corrosion controllable expansion extruded soil bolt
CN209892222U (en) Support device
CN108386217A (en) A kind of the automatic classification expansion head Pulling-Resistant Anchor Rod and its application method of reinforcing soft rock mass
CN107013238A (en) Resin mortar combined bolt support structure and its construction method
CN102392457B (en) Friction type resin anchor rod and installation method thereof
CN217870641U (en) Rock-socketed cast-in-place uplift pile with embedded anchor rod
CN206144587U (en) Odd -shaped cross section cavity self -drilling stock
CN202108045U (en) Sleeve pipe with anchor rod penetrating through underground continuous wall
CN113107564A (en) Anchor rod structure for fixing water-rich karst tunnel surrounding rock and using method thereof
CN107975041A (en) One kind is used for anchor pole corrosion-resistant casing bit and anchor pole anticorrosion construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150708