CN1464176A CN 02112233 CN02112233A CN1464176A CN 1464176 A CN1464176 A CN 1464176A CN 02112233 CN02112233 CN 02112233 CN 02112233 A CN02112233 A CN 02112233A CN 1464176 A CN1464176 A CN 1464176A
Authority
CN
China
Prior art keywords
anchor
hollow
rod
hollow lever
slip casting
Prior art date
Application number
CN 02112233
Other languages
Chinese (zh)
Other versions
CN1200199C (en
Inventor
吴德兴
Original Assignee
吴德兴
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 吴德兴 filed Critical 吴德兴
Priority to CN 02112233 priority Critical patent/CN1200199C/en
Publication of CN1464176A publication Critical patent/CN1464176A/en
Application granted granted Critical
Publication of CN1200199C publication Critical patent/CN1200199C/en

Links

Abstract

The present invention is anchor support method and one kind of sectional hollow grouted anchor and has the features of first early strengthening locking and then grouting protection and prestressing. The sectional hollow grouted anchor consists of two sections including front solid rod and back hollow rod connected via connecting sleeve, the connecting sleeve has mortar blocking unit and hollow rod section has several centralizing units. There are side hole canal in the joint of the connecting sleeve and the hollow rod and hole canal in the support cushion for some pipe to pass through. The said anchor support method of the present invention is used for temporary and permanent fast support in both hard and weak rock formation conditions.

Description

A kind of anchor rod support method and segmented hollow grouting anchor thereof

Technical field

The invention belongs to geotechnical engineering anchoring support technical field.The present invention relates to a kind of can prestressed anchor rod support method and segmented hollow grouting anchor thereof, be applicable to the earth formation supporting of aspects such as underground construction, mining engineering, foundation ditch and slope project.

Background technology

In underground construction, mining engineering, foundation ditch and the slope project process that geotechnical engineering relates to, for preventing that stratum deformation from caving in or unstability jeopardizes safety, a kind of main support technology that the stratum is reinforced is to adopt anchor pole.By be arranged on anchor pole had in the stratum high strength resistance to tension and by closely knit mode such as combine between anchor pole and anchor pole injecting cement paste on every side and the stratum with stratum consolidation, to improve the globality on stratum, with the control stratum deformation, make it to reach the stability and safety state.The development of this technology is existing century-old history, and multiple bolt support type is proposed and the anchoring technology that adapts with anchor pole to adapt to the different stratum and the needs of different condition.

At present the anchor pole that adopts is with regard to type, can be divided into reinforcing bar or steel pipe by the rigidity of anchor bar body and make the bar reinforcement anchor pole (Bar anchor) of the body of rod and make Anchor cable-rod (strand anchor) the two big classes of the body of rod with flexible high strength steel strand.The multi beam type anchor pole (multi-strand anchor) that Anchor cable-rod is generally formed with many steel strand based on prestressing force, because construction is complicated, requires high to plant equipment.Be applicable to that generally anchored force has greater than 500KN, the stratum that length 10m is above.And the bar reinforcement anchor-holding force of anchor bolt generally uses less than 500KN, and the machinery that is adopted is simple, easy construction, so be to use maximum anchor poles at present, be widely used in middle-size and small-size anchoring need the stratum supporting in.As traffic tunnel, water conservancy and hydropower tunnel, mining tunnel, general foundation ditch and slope retaining.

The classification of bar reinforcement anchor pole can be divided into following several substantially:

1) can be divided into grouted anchor bar and non-grouted anchor bar by the anchoring type.2) can be divided into non-prestressed anchor pole and prestressed anchor by the prestressing force mode.3) can be divided into mechanical. points anchor type (end anchorage formula) and full bond-anchorage type by the prestress anchoraging mode.4) can divide non-binding type prestressed anchor and binding type prestressed anchor by the free section of prestressed anchor.5) can be divided into solid anchor pole and hollow (hollow) anchor pole by body of rod shape.6) can be divided into automatic anchor pole and non-automatic anchor pole by the mode of creeping into.

In the bar reinforcement anchor pole, China's National Standard anchor pole concrete-spraying technology standard " (GB50086-2001), " highway tunnel design specifications " (TJJ026-90), " Design of Railway Tunnel standard " (TB10003-99), " anchoring and slurry injection technique handbook (China Electric Power Publishing House, publish in September, 1999) etc. relate to multiple bar reinforcement anchor pole type in the document, below make a presentation roughly:

1. bar reinforcement grouting rock bolt: adopt indented bars to make the body of rod, its construction technology be earlier in the stratum boring back inject cement mortar, in band slurry duct, insert reinforcing bar then, reinforcing bar, mortar are combined with the stratum.Its job practices belongs to grouting back anchoring earlier, and its mechanics principle is after mortar solidifies, and the body of rod bears pulling force restriction stratum deformation with the stratum distortion.Belong to non-prestressed, the grouted anchor bar that bonds entirely.This anchor bolt construction is easy.Its shortcoming is: 1) the slurry plumpness is difficult to guarantee, and has off-set phenomenon when inserting reinforcing bar, and thickness of protection tier is difficult for evenly, and anchored force is little.Destroy so make corrosion of steel bar.2) simultaneously because of not implementing prestressing force, injecting cement paste ftractures with the reinforcing bar distortion, makes aqueous vapor directly invade reinforcing bar, influences application life.3) be not suitable for broken formation.4) because of bolt support power slowly forms the hard back of knot at mortar, so inapplicable need form the occasion of supporting power rapidly.

2. high-early (strength) cement powder stick anchor pole and the solid anchor pole of resin explosive roll anchoring: belong to early strong anchoring rod, adopt indented bars to make the body of rod.Its basic construction technology is to insert high-early (strength) cement powder stick or resin explosive roll in the duct bottom of having bored in the stratum or the length range, inserts the solid reinforced anchor bolt of total length then, treats that powder stick sclerosis back forms anchored force.Its job practices also belongs to the type of grouting back anchoring earlier.Though this method is improved the solid anchor pole of ordinary mortar, applicable stratum expanded range, and can form supporting power rapidly, anchoring slurry plumpness and thickness of protection tier still be cannot say for sure to demonstrate,prove because of structure aspect problem, influence the reliability of anchor bar body.

3. water swelling formula anchor pole and pipe-seam type anchor rod: utilize the body of rod and hole wall and rub and form supporting power.Water swelling formula anchor pole is to adopt the special steel pipe of band groove to make anchor bar body, and body of rod sealing two ends forms cavity, and wherein the tail end head is established the aperture that can inject water under high pressure.Its job practices is to insert anchor bar body in earth-boring, behind the anchor pole installation in position, injects water under high pressure with high-pressure hydraulic pump by water filling port, makes the steel pipe expandable cavity of matrix section, and is closely connected with the boring wall, by the closely connected instant supporting power that forms of friction that produces.

Pipe-seam type anchor rod is to adopt the steel pipe that vertical total length is cracked to make the body of rod, and its front end tip is less than boring aperture, and its job practices is with forcing press the body of rod to be pressed in the boring, makes the body of rod closely connected with the boring wall, produces the instant supporting power that forms of friction.

Water swelling formula anchor pole and pipe-seam type anchor rod generally can not prestressing force, belong to the non-grouted anchor bar of friction-type, generally are only applicable in temporary lining and the good rock stratum.

4. expansion type rock bolt: utilize the shell power that rises of anchor head to form the mechanical. points anchor-hold.Anchor bar body is generally solid reinforcing bar, have not slip casting and the full bonding of slip casting and can prestressed polytype.Its job practices is that the anchor pole that front end is equipped with the shell anchor head that rises is inserted in the boring, behind the installation in position, rotates with turning tool the shell that rises is fully opened, and is closely connected with the boring wall, produces the instant supporting power that forms of friction.Shell power is by shell and the hole wall friction formation of rising owing to rise, so be only applicable to preferably in the rock stratum.And the anti-corrosion protection to the shell anchor head that rises is difficult, is used for temporary lining more.

5. hollow automatic anchor pole: disclose a kind of drilling type grouted anchor bar as Chinese patent ZL95202848.4, made drilling rod by hollow lever and add drill bit and realize drilling rod and anchor pole unification, slip casting again after creeping into.This technical scheme lays particular emphasis on grouting support weak and broken rock, but its shortcoming is an injecting cement paste anchoring overlong time, because of technological reason can not form anchored force rapidly, so the inapplicable stratum that needs quick supporting.

In sum, all there are shortcoming separately in above-mentioned anchor pole type and anchor rod support method, are only applicable to certain specific rock stratum condition and occasion.

Summary of the invention

The invention provides a kind of anchor rod support method,, can guarantee that the full anchor pole topping that can make again of slip casting is even, to be applicable in interim or the permanent support engineering not only applicable to good rock stratum but also can be used for weakness and the quick supporting of broken rock condition.

The invention provides a kind of segmented hollow grouting anchor, this anchor pole can satisfy the requirement of above-mentioned anchor rod support method, and fore-end is solid, has good intensity, and is with low cost again; Aft section hollow has into slurry or degassing function concurrently, can adapt to the interim or permanent support engineering of various rock stratum.

The present invention adopts and a kind ofly can prestressed anchor rod support method be:

1) the usefulness auger is holed in the stratum and is cleaned boring;

2) hollow lever of site assembly segmented hollow grouting anchor, centralizer, branch sleeve, the solid body of rod, slurry-blocking device are formed anchor bar body;

3) the early strong anchoring agent of packing in the boring deep;

4) above-mentioned anchor bar body is made the anchor bar body installation in position with rig to rotate means such as impact; The solid body of rod of anchor bar body front end fully stirs early strong anchoring agent, pushes and fill in boring closely knit, forms strong anchoring body morning;

5) after treating that early strong anchoring body knot is hard, reaching desirable strength, mounting support backing plate, packing ring, nut and pipeline on bearing surface, and apply prestressing force as required;

6) carry out slip casting, slurries stop slip casting after being full of boring, finish anchor pole and install.

The anchor bar body installation site has installs two kinds of situations up and down, when anchor bar body is installed downwards, described slip casting with the cavity of hollow lever as the slip casting road, be installed in pipeline on the backing plate as exhaust duct, from the end slip casting of hollow lever cavity, slurries flow out from the side direction duct that branch sleeve links to each other with the hollow lever cavity by hollow lever and enter boring, and are full of boring formation injecting cement paste gradually.When slurries when pipeline flows out, stop slip casting, finish anchor pole and install.

When anchor bar body is upwards installed, described slip casting is the slip casting road with the pipeline that is installed on the backing plate, the cavity of hollow lever is made exhaust duct, from pipeline opening slip casting, the full gradually boring of slurries forms injecting cement paste, and enters the cavity of hollow lever from the side direction duct that branch sleeve links to each other with the hollow lever cavity, when slurries flow out from the hollow lever end, stop slip casting, finish anchor pole and install.

A kind of segmented hollow grouting anchor is made up of for two sections the solid body of rod of front end and rear portion hollow lever, and hollow lever combines by branch sleeve with the solid body of rod, has slurry-blocking device on the branch sleeve, has several centralizers on the hollow lever; Branch sleeve endoporus and hollow lever cavity connecting place are provided with the side direction duct; Bearing plate, nut, packing ring cooperate with the hollow lever rearward end; Described bearing plate is provided with the duct, and a segment pipe penetrates from the duct of bearing plate.

The end endoporus that described branch sleeve is connected with the solid body of rod can be communicated with also and can not be communicated with the side direction duct.

The described solid body of rod adopts solid notched bars, and its body of rod bottom tail end tangent plane is a scarf.Described slurry-blocking device is the annulus that a band trumpet type retaining is pulled, and in the afterbody that retaining is pulled was made up of a plurality of limbs, the length of baffle plate should extend beyond the position in branch sleeve duct.

Described centralizer is the cylinder that appearance is worn the positioning tooth sheet, and the centralizer inner surface matches with hollow lever.

Described backing plate is the butterfly backing plate, and described packing ring is the hemispherical packing ring, and the contact surface of bearing plate and packing ring is the sphere that is complementary.

The present invention is the improvement to existing anchor rod support method.The invention has the advantages that:

1) adopt early strong bond-anchorage method by the anchor pole layered front portion, the mechanical. points anchor method that has overcome the existing shell anchor head that rises requires the shortcoming of good rock stratum condition.Early strong bond-anchorage method both can be used for good rock stratum and also can be used for weakness and broken rock stratum, had expanded the scope of application.

2) by the post-grouting method of anchor pole, can make the slip casting of anchor pole aft section full, even, improved anchor pole reliability and durability, and had into slurry or degassing function concurrently by hollow lever, method is simply effective.

Adopt anchor rod support method of the present invention,, have earlier early strong anchoring grouting behind shaft or drift lining protection and can prestressed characteristic, can avoid the single applicability of existing anchor rod support method, can extensively be suitable for multiple rock stratum by two staged constructions.

Segmented hollow grouting anchor of the present invention combines by hollow lever two sections with the solid body of rod, the solid body of rod in boring and early by force anchoring body realize quick anchoring power jointly.Make anchoring section with the solid body of rod, hollow lever is made free section, and by backing plate, nut and packing ring are made Lock Part, can realize prestressing force, realize quick supporting power.By hollow lever and the special extract duct and the side direction duct of hollow lever and branch sleeve, can realize grouting behind shaft or drift lining, make injecting cement paste full evenly.Centralizer, slurry-blocking device and stop grouting plug can guarantee the slip casting effect and the slip casting topping of the body of rod.Adopt segmented hollow grouting anchor of the present invention, make supporting method of the present invention realize smoothly, reach necessary requirement.

1231A-A41B-B51567248493103:1—— 2—— 3——4—— 5—— 6——7—— 8—— 9——10—— 11——12——10 ( 、 ) 13——10 14——415—— 16——17——2 18——119——1 20——521——5 22——323——324——4625——4226——3 30——

The specific embodiment

Be installed in elevation in the stratum as Fig. 1 for adopting anchor pole behind the anchor rod support method of the present invention.Fig. 2 is a kind of segmented hollow grouting anchor that anchor rod support method of the present invention adopts.Anchor pole of the present invention is made up of for 6 two sections with the rear portion hollow lever the solid body of rod 2 of front end, and hollow lever 6 combines by branch sleeve 4 with the solid body of rod 2, has slurry-blocking device 3 on the branch sleeve 4, has several centralizers 5 on the hollow lever 6; Branch sleeve 4 is provided with side direction duct 14 with hollow lever 6 cavitys 18 connecting places; Bearing plate 10, nut 8, packing ring 9 cooperate with the end of hollow lever 6; Described bearing plate 10 is provided with duct 13, and pipeline 7 passes from duct 13.

The anchor rod support method that the present invention adopts: with auger in the stratum, hole 1 and cleaning hole 1.At the scene hollow lever 6, centralizer 5, branch sleeve 4, the solid body of rod 2 and slurry-blocking device 3 are assembled, form anchor bar body.The early strong anchoring agent of packing in boring 1 deep.Charge weight is to be as the criterion the actual anchoring spatial volume of the boring volume between the solid body of rod 2 and the slurry-blocking device 3 after the solid body of rod 2 inserts.

The above-mentioned anchor bar body that assembles is made the anchor bar body installation in position with rig to rotate means such as impact, and the solid body of rod 2 fully stirs early strong anchoring agent, pushes and fill in boring 1 closely knit, the early strong anchoring body 15 of formation.After treating that early strong anchoring body 15 knots are hard, reaching desirable strength, mounting support backing plate 10, packing ring 9, nut 8 and pipeline 7 on bearing surface 12, bearing plate 10 closely connected bearing surfaces 12.

During as needs, also want at boring 1 oral area stop grouting plug 30 to be installed earlier.When on the anchor pole when installing (when foot of hole is higher than the aperture), for preventing spillage, stop grouting plug 30 is set at boring 1 oral area.Deeply hole 1 length of pipeline 7 surpasses stop grouting plug 30, in order to slip casting.(when hang down in the relative aperture of foot of hole) can not establish stop grouting plug 30 when anchor pole is installed downwards.Stop grouting plug 30 can be early strong slurry or is solid element.

When anchor pole being carried out prestressing force as needs, available hydraulic hollow plunger jack pair hollow lever 6 stretch-draw prestressing forces, and with nut 8 locking prestressing force loads; Perhaps directly use moment of torsion wrench fastening nut 8, realize prestressing force.This anchor pole is during as prestressed anchor, and hollow lever 6 be free section to length between the side direction duct 14 of branch sleeve 4, and the solid body of rod 2 is an anchoring section to the length between the slurry-blocking device 3.

After finishing above-mentioned steps, to 6 sections slip castings of hollow lever.Injecting paste material adopts cement paste (water/binder ratio was at 1: 0.3~1: 0.5).

The anchor pole installation site has installs two kinds of situations up and down.When anchor pole was installed downwards, the cavity 18 of hollow lever 6 was as the slip casting road, was installed in pipeline 7 on the backing plate 10 as exhaust duct.Cavity end slip casting from hollow lever 6, slurries 14 flow out and enter boring from side direction duct that branch sleeve 4 links to each other with hollow lever cavity 18 by hollow lever 6, and are full of boring gradually and form injecting cement paste 11, when slurries when pipeline 7 flows out, stop slip casting, finish anchor pole and install.

When anchor pole was upwards installed, pipeline 7 was the slip casting road, and the cavity 18 of hollow lever 6 is made exhaust duct.During slip casting, the full gradually injecting cement paste 11 that forms of slurries, and from branch sleeve 4 and side direction duct 14 that hollow lever cavity 18 links to each other, enter in the cavity 18 of hollow lever 6.When slurries flow out from the end of hollow lever, stop slip casting, finish anchor pole and install.

As Fig. 3, hex nut 8 and hollow lever 6 cooperate with screw threads for fastening, and bearing plate 10 is a butterfly, contacts with the sphere that is complementary with the contact surface 16 of packing ring 9, the load that nut bears is delivered on the bearing surface 12 by the contact surface 16 between hemispherical packing ring 9 and the butterfly bearing plate 10.Pipeline 7 penetrates from the backing plate 10 that has hole 13 in the boring 1.

As Fig. 4, Fig. 5, at least one centralizer 5 is installed on hollow lever 6.Centralizer 5 inner surfaces 20 match with hollow lever 6, can also can adopt other localization method by being threaded.The appearance of centralizer 5 is worn positioning tooth sheet 21.The effect of centralizer 5 is to guarantee that anchor bar body has enough slip casting toppings, prevents the anchor pole corrosion.

A kind of situation when Fig. 6 is anchor bar body axis and bearing surface 12 non-perpendicular installations.By the contact position of adjustment hemispherical packing ring 9, realize that load is delivered on the bearing surface 12 effectively with the contact surface 16 of butterfly base plate 10.Nut 8 also can be made a whole accessory with packing ring 9, and threaded engagement between the hollow lever 6.

Hollow lever 6 not only comprises total length thread surface 19, the total length screw-thread steel body that can any point be threaded; And comprise the only partial screw threads surface in the length of hollow lever two ends, with as with being threaded of the endoporus 24 of the threaded engagement of nut 8 and branch sleeve 4, and the middle part is the steel pipe body of rod of light face.

As Fig. 7, shown in Figure 8, branch sleeve 4 two ends have endoporus 24 that can be connected with hollow lever 6 and the endoporus 25 that can be connected with the solid body of rod 2.Branch sleeve 4 middle part sidewalls are provided with side direction duct 14, are used for exhaust or slip casting.Side direction duct 14 is connected with endoporus 24, and can be communicated with and can also not be communicated with endoporus 15.Hollow lever 6 adopts with branch sleeve 4 and is threaded, and the solid body of rod 2 adopts screw thread or sleeve extruding to be connected with branch sleeve 4.

The solid body of rod 2 adopts solid notched bars, and its body of rod bottom tail end tangent plane 17 is a scarf, the die-cut effect of tip when guaranteeing that anchor pole is sent into.

As Fig. 9, Figure 10, slurry-blocking device 3 is enclosed within on the branch sleeve 4.The inner surface 23 of slurry-blocking device 3 cooperates with the branch sleeve intimate; Trumpet type baffle plate 22 afterbodys of slurry-blocking device 3 are that a plurality of limbs 26 are formed.The effect of slurry-blocking device 3 is to prevent that the solid body of rod 2 from impacting when entering, and its anchoring agent is flowed and obstruction duct 14 to hollow lever 6 directions, so that influences the grouting behind shaft or drift lining effect of 6 sections of hollow levers.Limb 26 can make baffle plate 22 distortion and be beneficial to exhaust in boring 1, the length of baffle plate 22 should extend beyond 14 positions, side direction duct of branch sleeve 4.

Claims (9)

1. anchor rod support method is characterized in that:
1) in the stratum, holes (1) and cleaning boring (1) with auger;
2) hollow lever of site assembly segmented hollow grouting anchor (6), centralizer (5), branch sleeve (4), the solid body of rod (2), slurry-blocking device (3) are formed anchor bar body;
3) the early strong anchoring agent of packing in boring (1) deep;
4) above-mentioned anchor bar body is made the anchor bar body installation in position with rig to rotate means such as impact; The solid body of rod (2) of anchor bar body front end fully stirs early strong anchoring agent, pushes and fill in boring (1) closely knit, the early strong anchoring body (15) of formation;
5) after treating that early strong anchoring body (15) knot is hard, reaching desirable strength, go up mounting support backing plate (10), packing ring (9), nut (8) and pipeline (7) at bearing surface (12), and apply prestressing force as required;
6) carry out slip casting, slurries stop slip casting after being full of boring (1), finish anchor pole and install.
2. a kind of anchor rod support method according to claim 1, it is characterized in that: when described anchor bar body is installed downwards, described slip casting with the cavity (18) of hollow lever (6) as the slip casting road, be installed in pipeline (7) on the backing plate (10) as exhaust duct, from hollow lever (6) cavity end slip casting, slurries flow out from the side direction duct (14) that branch sleeve (4) links to each other with the cavity (18) of hollow lever (6) by hollow lever (6) and enter boring (1), and are full of boring (1) formation injecting cement paste (11) gradually; When slurries when pipeline flows out, stop slip casting.
3. a kind of anchor rod support method according to claim 1, it is characterized in that: when described anchor bar body is upwards installed, described slip casting is the slip casting road with the pipeline (7) that is installed on the backing plate (10), the cavity (18) of hollow lever (6) is made exhaust duct, from pipeline (7) mouthful slip casting, slurries full boring (1) gradually form injecting cement paste (11), and enter from the side direction duct (14) that branch sleeve (4) links to each other with hollow lever cavity (18) in the cavity (18) of hollow lever (2), when slurries flow out from the hollow lever end, stop slip casting.
4. segmented hollow grouting anchor, form for (6) two sections by the solid body of rod (2) of front end and the hollow lever at rear portion, it is characterized in that: hollow lever (6) combines by branch sleeve (4) with the solid body of rod (2), has slurry-blocking device (3) on the branch sleeve (4); Have several centralizers (5) on the hollow lever (6); Branch sleeve (4) endoporus and hollow lever (6) cavity connecting place are provided with side direction duct (14); Bearing plate (10), nut (8), packing ring (9) cooperate with hollow lever (6) rearward end; Described bearing plate (10) is provided with duct (13), and a segment pipe (7) penetrates from the duct (13) of bearing plate (10).
5. a kind of segmented hollow grouting anchor according to claim 4 is characterized in that: the end endoporus (25) that described branch sleeve (4) is connected with the solid body of rod (2) can not be communicated with side direction duct (14).
6. a kind of segmented hollow grouting anchor according to claim 4 is characterized in that: the described solid body of rod (2) adopts solid notched bars, and its body of rod bottom tail end tangent plane (17) is a scarf.
7. a kind of segmented hollow grouting anchor according to claim 4, it is characterized in that: described slurry-blocking device (3) is that a band trumpet type retaining is pulled the annulus of (22), keep off the afterbody of pulling (22) and be made up of a plurality of limbs (26), the length of baffle plate (22) should extend beyond the position in branch sleeve (4) interior side direction duct (14).
8. a kind of segmented hollow grouting anchor according to claim 4 is characterized in that: described centralizer (5) is worn the cylinder of positioning tooth (21) for appearance, and centralizer (5) inner surface (20) matches with hollow lever (6).
9. a kind of segmented hollow grouting anchor according to claim 4, it is characterized in that: described bearing plate (10) is the butterfly backing plate, described packing ring (9) is the hemispherical packing ring, and bearing plate (10) is the sphere that is complementary with the contact surface (16) of packing ring (9).
CN 02112233 2002-06-24 2002-06-24 A pin timbering process and sectionalized hollow mud injecting stay bolt thereof CN1200199C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02112233 CN1200199C (en) 2002-06-24 2002-06-24 A pin timbering process and sectionalized hollow mud injecting stay bolt thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02112233 CN1200199C (en) 2002-06-24 2002-06-24 A pin timbering process and sectionalized hollow mud injecting stay bolt thereof

Publications (2)

Publication Number Publication Date
CN1464176A true CN1464176A (en) 2003-12-31
CN1200199C CN1200199C (en) 2005-05-04

Family

ID=29742098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02112233 CN1200199C (en) 2002-06-24 2002-06-24 A pin timbering process and sectionalized hollow mud injecting stay bolt thereof

Country Status (1)

Country Link
CN (1) CN1200199C (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005098165A1 (en) * 2004-04-08 2005-10-20 Hong Kong Fiberglass Technology Limited Instrumented bars and system
CN101949294A (en) * 2010-08-13 2011-01-19 山西潞安环保能源开发股份有限公司常村煤矿 Prestressed full-length anchorage support method
CN102505687A (en) * 2011-12-13 2012-06-20 江苏建筑职业技术学院 Pre-explosion drilling, grouting and anchoring integrated anchor rod and construction method thereof
CN103696787A (en) * 2013-12-06 2014-04-02 西北矿冶研究院 Deformed steel bar high-pressure grouting bolt and supporting method for reinforcing roadways
CN104500115A (en) * 2014-12-15 2015-04-08 王振伟 Pre-stress full-length anchoring rock bolt retaining and protecting method
CN104695436A (en) * 2015-04-10 2015-06-10 郑卫华 Expansion type pre-stress anchor cable
CN104763454A (en) * 2015-04-08 2015-07-08 成都理工大学 Built-in type full-length anticorrosion anchor rod
CN105604593A (en) * 2016-03-17 2016-05-25 天津大学 Three-stage anchoring combined type hollow grouting anchor rod
CN105863695A (en) * 2016-05-03 2016-08-17 许国安 Sectional and modular combined anchor rod capable of resisting large deformation and impact and assembling method of combined anchor rod
CN108775255A (en) * 2018-07-19 2018-11-09 贵州磷镁材料有限公司 A kind of anchor pole construction based on phosphorus magnesium Anchor Agent
CN109026100A (en) * 2018-07-19 2018-12-18 贵州磷镁材料有限公司 A kind of preparation of phosphorus magnesium material anchoring agent anchor rod and its construction method
CN109083666A (en) * 2018-07-19 2018-12-25 贵州磷镁材料有限公司 A kind of grouted anchor bar construction and its construction method
CN109611135A (en) * 2018-12-05 2019-04-12 贵州大学 A kind of Novel hollow cross grouting anchor rod device and application method
CN111502720A (en) * 2020-05-28 2020-08-07 淮南矿业(集团)有限责任公司 Solid anchor rod capable of grouting

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102031981B (en) * 2010-11-19 2012-12-05 湖南科技大学 Anchoring method of extensible anchor rod

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005098165A1 (en) * 2004-04-08 2005-10-20 Hong Kong Fiberglass Technology Limited Instrumented bars and system
CN101949294A (en) * 2010-08-13 2011-01-19 山西潞安环保能源开发股份有限公司常村煤矿 Prestressed full-length anchorage support method
CN102505687B (en) * 2011-12-13 2014-08-06 江苏建筑职业技术学院 Pre-explosion drilling, grouting and anchoring integrated anchor rod and construction method thereof
CN102505687A (en) * 2011-12-13 2012-06-20 江苏建筑职业技术学院 Pre-explosion drilling, grouting and anchoring integrated anchor rod and construction method thereof
CN103696787A (en) * 2013-12-06 2014-04-02 西北矿冶研究院 Deformed steel bar high-pressure grouting bolt and supporting method for reinforcing roadways
CN104500115A (en) * 2014-12-15 2015-04-08 王振伟 Pre-stress full-length anchoring rock bolt retaining and protecting method
CN104763454A (en) * 2015-04-08 2015-07-08 成都理工大学 Built-in type full-length anticorrosion anchor rod
CN104695436A (en) * 2015-04-10 2015-06-10 郑卫华 Expansion type pre-stress anchor cable
CN105604593B (en) * 2016-03-17 2018-05-04 天津大学 A kind of three stages anchoring Combined hollow grouted anchor bar
CN105604593A (en) * 2016-03-17 2016-05-25 天津大学 Three-stage anchoring combined type hollow grouting anchor rod
CN105863695B (en) * 2016-05-03 2017-11-03 许国安 A kind of anti-large deformation of sectional modular and shock resistance assembled bolt and its assemble method
CN105863695A (en) * 2016-05-03 2016-08-17 许国安 Sectional and modular combined anchor rod capable of resisting large deformation and impact and assembling method of combined anchor rod
CN108775255A (en) * 2018-07-19 2018-11-09 贵州磷镁材料有限公司 A kind of anchor pole construction based on phosphorus magnesium Anchor Agent
CN109026100A (en) * 2018-07-19 2018-12-18 贵州磷镁材料有限公司 A kind of preparation of phosphorus magnesium material anchoring agent anchor rod and its construction method
CN109083666A (en) * 2018-07-19 2018-12-25 贵州磷镁材料有限公司 A kind of grouted anchor bar construction and its construction method
CN109611135A (en) * 2018-12-05 2019-04-12 贵州大学 A kind of Novel hollow cross grouting anchor rod device and application method
CN111502720A (en) * 2020-05-28 2020-08-07 淮南矿业(集团)有限责任公司 Solid anchor rod capable of grouting

Also Published As

Publication number Publication date
CN1200199C (en) 2005-05-04

Similar Documents

Publication Publication Date Title
WO2015176614A1 (en) Construction method and structure of pressure dispersing expansion head anchor rod
US6665990B1 (en) High-tension high-compression foundation for tower structures
CN100501129C (en) Truss supporting technology for ingredient top slope deformation control
JP5114529B2 (en) Pile digging method
CN102414396B (en) Friction bolt
CN1152995C (en) Method, member, and tendon for constructing anchoring device
CN101967984B (en) Deep well tunnel cable anchor rigid-flexible coupling support and surrounding rock overall reinforced support method
RU2458226C2 (en) Hollow anchor bolt, self-drilling anchor bolt and method to shape hollow anchor bolt
CN101338679B (en) Deep well great section loose wall rock laneway support method
US3962879A (en) Reinforced pile in earth situs and method of producing same
CN201013018Y (en) Injection anchor bar of plasm capsule bag
CN103643977A (en) Full-anchor partition pressure transferring grouting anchor rod and application method thereof
WO2006057545A1 (en) Tunnelling method using pre-support concept and an adjustable apparatus thereof
AU2017301079B2 (en) Supporting Method of An Extensible Reaming Self-Anchoring Anchor Rod
CN104373145B (en) Embedded classification constant-resistance shearing resistance large deformation anchor and method
CN100497844C (en) Multi-anchoring point antisliding pile adapted to multilayer slide surface and deep sliding face
CN1517511A (en) Rock roofbolt
CN102278130B (en) Process method for reinforcing and grouting of high-pressure water-rich solution cavity of tunnel
US7708502B2 (en) System and method for stabilizing landslides and steep slopes
CN104500115B (en) A kind of prestressing force Bolt method for protecting support
CN1912255A (en) Construction method of immersed tube club-footed bored concrete pile
Li et al. Failure mechanism of bolting support and high-strength bolt-grouting technology for deep and soft surrounding rock with high stress
CN205025479U (en) Administer bottom plate support system of soft rock tunnel pucking
CN103388481B (en) A kind of assembling-type precast plate for administering pucking and the method administering pucking
CN201686986U (en) Pre-stressed anchor bar with detachable main bar

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hangzhou Dodrive Engineering Materials Ltd.

Assignor: Wu Dexing

Contract record no.: 2012330000384

Denomination of invention: A pin timbering process and sectionalized hollow mud injecting stay bolt thereof

Granted publication date: 20050504

License type: Exclusive License

Open date: 20031231

Record date: 20120615

ASS Succession or assignment of patent right

Owner name: XIANG XIAOZHEN

Free format text: FORMER OWNER: WU DEXING

Effective date: 20131204

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 310008 HANGZHOU, ZHEJIANG PROVINCE TO: 310052 HANGZHOU, ZHEJIANG PROVINCE

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20131204

Address after: 3 building 88, 502 Jiangling Road, Binjiang District, Zhejiang, Hangzhou 310052, China

Patentee after: Xiang Xiaozhen

Address before: Hangzhou City, Zhejiang province 310008 Qiutao Road No. 18 building 6 floor Hangzhou City Knitting Chinese Tuqiang Engineering Material Co Ltd

Patentee before: Wu Dexing

EC01 Cancellation of recordation of patent licensing contract

Assignee: Hangzhou Dodrive Engineering Materials Ltd.

Assignor: Wu Dexing

Contract record no.: 2012330000384

Date of cancellation: 20131121

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
EC01 Cancellation of recordation of patent licensing contract

Assignee: Hangzhou Dodrive Engineering Materials Ltd.

Assignor: Xiang Xiaozhen

Contract record no.: 2013330000415

Date of cancellation: 20150601

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
TR01 Transfer of patent right

Effective date of registration: 20190717

Address after: 100081 Beijing city Haidian District Daliushu Road No. 2 district two building 303

Co-patentee after: China Railway Economic Planning Research Institute Co., Ltd.

Patentee after: Railway Construction Research Institute of China Railway Research Institute Group Co., Ltd.

Co-patentee after: Hangzhou Dodrive Engineering Materials Ltd.

Co-patentee after: Xiang Xiao Zhen

Address before: 3 building 88, 502 Jiangling Road, Binjiang District, Zhejiang, Hangzhou 310052, China

Patentee before: Xiang Xiaozhen

TR01 Transfer of patent right