CN106149718B - A kind of building municipal works improvement anchor pole - Google Patents
A kind of building municipal works improvement anchor pole Download PDFInfo
- Publication number
- CN106149718B CN106149718B CN201610606050.3A CN201610606050A CN106149718B CN 106149718 B CN106149718 B CN 106149718B CN 201610606050 A CN201610606050 A CN 201610606050A CN 106149718 B CN106149718 B CN 106149718B
- Authority
- CN
- China
- Prior art keywords
- cylinder
- block
- inserted link
- guide rod
- gear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention discloses a kind of building municipal works improvement anchor poles, including the straight cylinder of hollow length, the outer wall of the cylinder is equipped with external screw thread, the cylinder inboard wall top position is fixed with a bearing, a guide rod is installed in the bearing inner race interference, the guide rod is located at cylinder on same axis, the lower position of the guide rod is equipped with spire and threaded portion successively from top to bottom, the both sides of the cylinder are equipped with gear inserted link, the gear inserted link includes connected gear end and inserted link end, the gear end is rotatablely installed by shaft on the cylinder, and a part for the gear end is located at inner barrel, it is engaged with the spire of guide rod.Structure of the invention reasonable design is combined raising stability by extensible gear inserted link with the concrete mortar in hole.
Description
Technical field
The present invention relates to building municipal works technical fields, particularly relate to a kind of building municipal works improvement anchor pole.
Background technology
Anchor pole is a kind of main branch in underground engineering, mining engineering, foundation pit and the slope project that geotechnical engineering is related to
Shield technology, has wide range of applications, and consolidation effect is good.But being on the increase with engineering construction, it is related to the engineering institute of anchoring
The geological conditions faced becomes increasingly complex, and new problem continues to bring out, and wherein anchor pole etching problem and stability are exactly that there is an urgent need for solutions
Certainly the problem of.
Invention content
Technical problem to be solved by the invention is to provide a kind of building municipal works improvement anchor poles, to solve above-mentioned skill
Art problem.
In order to solve the above technical problems, the embodiment of the present invention provides a kind of building municipal works improvement anchor pole, including
The outer wall of the straight cylinder of hollow length, the cylinder is equipped with external screw thread, and the cylinder inboard wall top position is fixed with a bearing, described
A guide rod is installed in bearing inner race interference, and the guide rod and cylinder are located on same axis, the lower position of the guide rod from up to
Under be equipped with spire and threaded portion successively, the both sides of the cylinder are equipped with gear inserted link, and the gear inserted link includes connected
Gear end and inserted link end, the gear end is rotatablely installed by shaft on the cylinder, and a part of position of the gear end
It in inner barrel, is engaged with the spire of guide rod, the lower sidewalls of the cylinder are equipped with notch section, and the notch section is for housing
The inserted link end is threaded with multiple reinforcement blocks on the outer wall of the cylinder, is connected by flange block between the reinforcement block,
The lateral wall of the reinforcement block has the annular groove of axially spaced setting, and the flange block is by being threaded into the outside of cylinder
On wall, the upper and lower end face of the flange block is connected by screw reinforcement block respectively;The lateral wall of the cylinder adds positioned at top layer
Gu the top of block, which screws in, centering block, the centering block is equipped with mortar entrance hole in the axial direction, and the lateral wall of the cylinder is located at
Pallet is also inserted in above centering block, there is cavity, the cavity to be placed in pad by the lateral wall in cylinder at the center of the pallet
Piece and nut are connected with cylinder, and the both sides of the pallet are fixed on by cement steel nail on palisades, and the top surface of the cavity is by close
Sealing cap seals, and the upper layer of the pallet is equipped with concrete mortar protective layer;Sleeve, the set are threaded on the threaded portion
The both sides of cylinder are equipped with guide runner, and the madial wall of the cylinder lower position is equipped with the sliding block to be mutually slidably connected with guide runner,
The lower section of the sleeve is equipped with rotation seat, and two connecting rods, the lower end both sides difference of the cylinder are rotatablely connected on the rotation seat
A hinged fixed jaw, the other end of two connecting rods are rotationally connected with the medium position of a wherein fixed jaw respectively;The cylinder
The top for being located at notch section on external side wall is equipped with spacing ring.
Wherein, the upper end of the guide rod is equipped with detachable handle.
The above-mentioned technical proposal of the present invention has the beneficial effect that:
In said program, structure of the invention reasonable design passes through extensible gear inserted link and the concrete sand in drilling
Slurry is combined raising stability, so that it is combined with concrete mortar by the design of annular groove on reinforcement block, further increases
Cross-brace and stability make anchor pole obtain preferable anti-corrosion effect, by setting by the way that seal cap and mortar cover is arranged
It is combined with the concrete mortar in drilling after the fixed jaw expansion of cylinder bottom end and further increases the stability of combination.
Description of the drawings
Fig. 1 is the structural schematic diagram of the pre-installation of the present invention.
Fig. 2 is structural schematic diagram of the present invention after installation is complete.
Fig. 3 is the structural schematic diagram of the flange block of the present invention.
Fig. 4 is the structural schematic diagram of the sleeve of the present invention.
Specific implementation mode
To keep the technical problem to be solved in the present invention, technical solution and advantage clearer, below in conjunction with attached drawing and tool
Body embodiment is described in detail.
As shown in Figures 1 to 4, the embodiment of the present invention provides a kind of building municipal works improvement anchor pole, including hollow length
Straight cylinder 1, for the convenience of description, the orientation word in following is cylinder placement position shown in FIG. 1, the cylinder 1
Outer wall is equipped with external screw thread, and 1 inner wall top position of the cylinder is fixed with a bearing 2, can be used welding form, in the bearing 2
It encloses interference and one guide rod 3 is installed, the guide rod 3 and cylinder 1 are located on same axis, and the lower section of the guide rod 3 is equipped with position from upper
It is equipped with spire 31 and threaded portion 33 successively under, the both sides of the cylinder 1 are equipped with gear inserted link 4, and the gear inserted link 4 wraps
Include connected gear end 41 and inserted link end 42, the rotational installation of the gear end 41 is on the cylinder 1, and the gear end 41
A part is located inside cylinder 1, is engaged with the spire 31 of guide rod 3, the gear end 41 can be by being set to 41 center of gear end
Shaft be installed on the side wall of cylinder 1, the lower sidewalls of the cylinder 1 are equipped with notch section 101, and the notch section 101 is used for
The inserted link end 42 is housed, when the rotation of guide rod 3, the spire 31 for passing through 3 lower section of guide rod drives 41 turns of the gear end of gear inserted link 4
Dynamic, gear end 41 drives inserted link end 42 to rotate, and makes inserted link end 42 that can be placed in notch section 101, or make the 42 horizontal exhibition of inserted link end
It opens.It is threaded with multiple reinforcement blocks 5 on the outer wall of the cylinder 1, is connected by flange block 6 between the reinforcement block 5, it is described
The lateral wall of reinforcement block 5 has the annular groove 51 of axially spaced setting, and the flange block 6 is by being threaded into the outer of cylinder 1
On side wall, the upper and lower end face of the flange block 6 passes through 7 reinforcement by connection block 5 of screw respectively.
The top screw-in that the lateral wall of the cylinder 1 is located at top layer's reinforcement block 5 has centering block 8, and the centering block 8 is in axis
It is equipped with mortar entrance hole 81 upwards, the lateral wall of the cylinder 1 is located at 8 top of centering block and is also inserted in pallet 9, the pallet 9
There is cavity 91, the cavity 91 to be connected with cylinder 1 by the lateral wall merging gasket 10 and nut 11 in cylinder 1 at center, institute
The both sides for stating pallet 9 are fixed on by cement steel nail 18 on palisades 19, and the top surface of the cavity 91 is sealed by seal cap 16, described
The upper layer of pallet 9 is equipped with concrete mortar protective layer 17.
Sleeve 12 is threaded on the threaded portion 33, the both sides of the sleeve 12 are equipped with guide runner 121, the cylinder
The madial wall of 1 lower position is equipped with the sliding block 13 to be slidably connected with 121 phase of guide runner, and the lower section of the sleeve 1, which is equipped with, to be turned
Seat 14 is moved, is rotatablely connected two connecting rods 15 on the rotation seat 14, the lower end both sides of the cylinder 1 are respectively articulated with a fixed jaw
16, the other end of two connecting rods 15 is rotationally connected with the medium position of a wherein fixed jaw 16 respectively.After guide rod 3 rotates
It is moved by 33 drive sleeve 1 of threaded portion, due to being limited by sliding block 13, the rotational motion of sleeve 12 is converted into directly sleeve 12
Line moves, and sleeve 12 is made to move downward, to drive fixed jaw 16 to rotate by connecting rod 15.
The upper end of the guide rod 3 is equipped with detachable handle 32.
In use, be ready to be equipped with the device of cylinder, guide rod, gear inserted link, reinforcement block, flange block, centering block in advance,
And sleeve and fixed jaw are assembled in the lower end of cylinder, flange block and the installation of reinforcing block gap, reinforcement block are installed on two flanges
The centre of block, plays connection function, first and the last one be all reinforcement block, by rotational handle by the inserted link of gear inserted link
End is accommodated in the notch section of cylinder, and fixed jaw is maintained to the initial position of rounding state, and sleeve is located on threaded portion
On the initial position of side, suitable drilling is then vertically squeezed into palisades, which is placed in the drilling, initial position
Two fixed jaws form a tip-shape guide way, convenient for whole device to be placed in drilling, are then turned by handle
Dynamic, guide rod rotation keeps the inserted link end of gear inserted link horizontal, while making fixed jaw in expansion shape, then by centering block
Mortar entrance hole penetration concrete mortar in the borehole, pallet is inserted on cylinder after solidification, pallet is fixed on palisades
On, then gasket, nut are set on cylinder body outer wall, seal cap is then set to cavity top surface, finally in the upper of pallet
Layer setting concrete mortar protective layer.
The above is the preferred embodiment of the present invention, it is noted that for those skilled in the art
For, without departing from the principles of the present invention, several improvements and modifications can also be made, these improvements and modifications
It should be regarded as protection scope of the present invention.
Claims (2)
1. a kind of building municipal works improvement anchor pole, which is characterized in that including the straight cylinder of hollow length, the outer wall of the cylinder
Equipped with external screw thread, the cylinder inboard wall top position is fixed with a bearing, and a guide rod is installed in the bearing inner race interference, described to lead
Bar is located at cylinder on same axis, and the lower position of the guide rod is equipped with spire and threaded portion successively from top to bottom, described
The both sides of cylinder are equipped with gear inserted link, and the gear inserted link includes connected gear end and inserted link end, and the gear end passes through
Shaft rotational installation is on the cylinder, and a part for the gear end is located at inner barrel, is engaged with the spire of guide rod,
The lower sidewalls of the cylinder are equipped with notch section, and the notch section is for housing the inserted link end, spiral shell on the outer wall of the cylinder
Line is connected with multiple reinforcement blocks, is connected by flange block between the reinforcement block, and the lateral wall of the reinforcement block has in an axial direction
Spaced annular groove, the flange block is by being threaded on the lateral wall of cylinder, the upper and lower end face point of the flange block
Reinforcement block is not connected by screw it;The top screw-in that the lateral wall of the cylinder is located at top layer's reinforcement block has centering block, described
Centering block is equipped with mortar entrance hole in the axial direction, and the lateral wall of the cylinder, which is located above centering block, is also inserted in pallet, the support
There is cavity, the cavity to be connected with cylinder by the lateral wall merging gasket and nut in cylinder at the center of disk, the pallet
Both sides be fixed on palisades by cement steel nail, the top surface of the cavity is sealed by seal cap, and the upper layer of the pallet is equipped with
Concrete mortar protective layer;Sleeve is threaded on the threaded portion, the both sides of the sleeve are equipped with guide runner, the cylinder
The madial wall of lower position is equipped with the sliding block to be mutually slidably connected with guide runner, and the lower section of the sleeve is equipped with rotation seat, institute
State on rotation seat two connecting rods of rotation connection, the lower end both sides of the cylinder are respectively articulated with a fixed jaw, two connecting rods
The other end is rotationally connected with the medium position of a wherein fixed jaw respectively;It is located on the cylinder lateral wall above notch section and sets
Restraining position ring block.
2. building municipal works according to claim 1 improvement anchor pole, which is characterized in that the upper end of the guide rod is equipped with
Detachable handle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610606050.3A CN106149718B (en) | 2016-07-27 | 2016-07-27 | A kind of building municipal works improvement anchor pole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610606050.3A CN106149718B (en) | 2016-07-27 | 2016-07-27 | A kind of building municipal works improvement anchor pole |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106149718A CN106149718A (en) | 2016-11-23 |
CN106149718B true CN106149718B (en) | 2018-11-13 |
Family
ID=58060979
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610606050.3A Expired - Fee Related CN106149718B (en) | 2016-07-27 | 2016-07-27 | A kind of building municipal works improvement anchor pole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106149718B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115094923A (en) * | 2022-06-29 | 2022-09-23 | 山东省路桥集团有限公司 | Be applied to stable protector of soil property high slope protection |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050076589A (en) * | 2004-10-08 | 2005-07-26 | 곽윤형 | Anchor-nail device for slope-reinforcement-construction |
CN202140022U (en) * | 2011-07-11 | 2012-02-08 | 无锡金帆钻凿设备有限公司 | Anchor rod bottom-enlarging bit |
CN202441404U (en) * | 2012-03-02 | 2012-09-19 | 淮南矿业(集团)有限责任公司 | Anchor bolt support flexible locking structure |
CN203475460U (en) * | 2013-07-29 | 2014-03-12 | 成都中交信达路桥工程有限公司 | Replaceable contact network pillar base |
CN104179185A (en) * | 2014-07-31 | 2014-12-03 | 浙江水利水电学院 | Novel soil nail diameter expanding device and diameter expanding method |
CN104763454A (en) * | 2015-04-08 | 2015-07-08 | 成都理工大学 | Built-in type full-length anticorrosion anchor rod |
CN105178994A (en) * | 2015-09-08 | 2015-12-23 | 中国矿业大学(北京) | Recyclable anchor rod and retaining and protecting method thereof |
CN105544566A (en) * | 2016-01-25 | 2016-05-04 | 重庆工商职业学院 | Buffer damping anchor stock |
-
2016
- 2016-07-27 CN CN201610606050.3A patent/CN106149718B/en not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050076589A (en) * | 2004-10-08 | 2005-07-26 | 곽윤형 | Anchor-nail device for slope-reinforcement-construction |
CN202140022U (en) * | 2011-07-11 | 2012-02-08 | 无锡金帆钻凿设备有限公司 | Anchor rod bottom-enlarging bit |
CN202441404U (en) * | 2012-03-02 | 2012-09-19 | 淮南矿业(集团)有限责任公司 | Anchor bolt support flexible locking structure |
CN203475460U (en) * | 2013-07-29 | 2014-03-12 | 成都中交信达路桥工程有限公司 | Replaceable contact network pillar base |
CN104179185A (en) * | 2014-07-31 | 2014-12-03 | 浙江水利水电学院 | Novel soil nail diameter expanding device and diameter expanding method |
CN104763454A (en) * | 2015-04-08 | 2015-07-08 | 成都理工大学 | Built-in type full-length anticorrosion anchor rod |
CN105178994A (en) * | 2015-09-08 | 2015-12-23 | 中国矿业大学(北京) | Recyclable anchor rod and retaining and protecting method thereof |
CN105544566A (en) * | 2016-01-25 | 2016-05-04 | 重庆工商职业学院 | Buffer damping anchor stock |
Also Published As
Publication number | Publication date |
---|---|
CN106149718A (en) | 2016-11-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106245644B (en) | A kind of building municipal administration anchor pole | |
CN106014464B (en) | A kind of environment-friendly type building municipal works anchor pole | |
CN109057840A (en) | Adaptive grouting and reinforcing anchor pole and its anchoring construction method under a kind of high stress | |
CN205297600U (en) | Shield constructs an empty ejector sleeve piece dual -purpose pipe of teeming thick liquid and a section of jurisdiction top, slip casting structure thereof | |
CN206530353U (en) | One kind allows pressure grouting anchor pole | |
CN109083668A (en) | A kind of grouting and reinforcing anchor pole suitable for high stress breaking surrounding rock supporting | |
CN206592139U (en) | A kind of external poured is segmented anchoring rod | |
CN106759305B (en) | One kind is reusable provisionally to descend foundation pile | |
CN207436069U (en) | A kind of deep foundation pit supporting structure | |
CN106149718B (en) | A kind of building municipal works improvement anchor pole | |
CN210396781U (en) | Anchor rod for reinforcing tunnel construction | |
CN201924948U (en) | Expansion type slotting anchor rod | |
CN106759385B (en) | Municipal drainage pipeline pit slot supporting construction | |
CN101858196A (en) | Low gravity center three-axle spiral drilling machine and drilling method thereof | |
CN111424658B (en) | Anchor rod construction device for constructional engineering | |
CN106149735B (en) | A kind of municipal civil engineering side slope reinforcing apparatus of building | |
CN208605210U (en) | A kind of novel slurry filling anchor system | |
CN106013186B (en) | A kind of building municipal works slope reinforcement device | |
CN106223990B (en) | A kind of building municipal works anchor pole | |
CN108518235A (en) | A kind of anchor rod device | |
CN201258492Y (en) | Barrel type underground structure device for underground garage | |
CN208441091U (en) | Three wings spiral top expanding Recyclable anchor rope | |
CN209179801U (en) | A kind of construction anchor structure | |
CN106401625A (en) | Drillable anchor rod device capable of being anchored in crossed mode and construction method | |
CN204627644U (en) | The rotary anchor head of a kind of prestressed anchor watt axle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20181115 Address after: 223800 Room A1108, Chengyu Building, Suqian Economic Development Zone, Suqian City, Jiangsu Province Patentee after: Jiangsu Wan Construction Co.,Ltd. Address before: 315700 Xiangshan Road, Dandong street, Ningbo, Zhejiang 1279 Patentee before: Qu Jianying |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181113 Termination date: 20210727 |