CN208605210U - A kind of novel slurry filling anchor system - Google Patents
A kind of novel slurry filling anchor system Download PDFInfo
- Publication number
- CN208605210U CN208605210U CN201821314196.1U CN201821314196U CN208605210U CN 208605210 U CN208605210 U CN 208605210U CN 201821314196 U CN201821314196 U CN 201821314196U CN 208605210 U CN208605210 U CN 208605210U
- Authority
- CN
- China
- Prior art keywords
- cylindrical steel
- steel tube
- solid screw
- pressing plate
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
A kind of novel slurry filling anchor system, is related to a kind of anchor system.Solid screw one end is fixed with anchor head, the solid screw bar wall other end is sequentially installed with stop grouting plug from inside to outside, backing plate and nut, cylindrical steel tube coaxial spaced is set in outside solid screw, cylindrical steel tube tube wall edge is axially arranged with multiple through-holes, cylindrical steel tube outer wall top suit is fixed with annulus, annulus outer circumference surface is relatively fixed, and there are two foot-operated wing plates, cylindrical steel tube inner wall edge is axially arranged with two bar shaped retention beads, two bar shaped retention beads are oppositely arranged, the circular slab of threaded hole is equipped with centered on mobile pressing plate, and there are two notches with respect to setting for mobile pressing plate periphery, mobile pressing plate is screwed in solid screw by threaded hole, two notches slide respectively simultaneously is fastened in two bar shaped retention beads of cylindrical steel tube.It is effectively combined and is not easily disconnected from rock stratum, avoid reducing shear resistance.
Description
Technical field
The utility model relates to a kind of anchor system, especially a kind of novel slurry filling anchor system.
Background technique
Pucking easily occurs for the tunnel of gob side entry retaining under the conditions of mining of deep mine, therefore, coal mining technology field
Frequently with the mode anchored to roadway floor, pucking amount is reduced in allowable range, to guarantee tunnel normal function.
It is usually anchored at present using end anchorage type anchor pole or common grouted anchor bar in anchoring operation, but due to
It can cause high stress concentrations after tunnel initating, the former bar wall is easily detached from rock stratum, and so as to cause fastening invalidation, and the latter is sky
Core structure, shear resistance is weaker for solid anchor pole, and deformation is easily caused to make the Anchor Agent cracking for penetrating into rock crack
Reduce anchorage effect.
Therefore, it is simple and practical to need one kind, not only can realize slip casting form but also the anchor system of solid screw can be used.
Summary of the invention
To solve deficiency existing for background technique, the utility model provides a kind of novel slurry filling anchor system.
Realize above-mentioned purpose, the utility model takes following technical proposals: a kind of novel slurry filling anchor system, including anchoring
Anchor pole, the anchoring rod include solid screw, anchor head, stop grouting plug, backing plate and nut, and described solid screw one end is fixed with anchor
Head, the solid screw bar wall other end are sequentially installed with stop grouting plug, backing plate and nut, the novel slurry filling anchor system from inside to outside
It further include mobile pressing plate and slip casting shell, the slip casting shell includes cylindrical steel tube, and the cylindrical steel tube coaxial spaced is set in solid
Outside screw rod, cylindrical steel tube tube wall is along multiple through-holes are axially arranged with, and cylindrical steel tube outer wall top, which is set with, is fixed with annulus, outside the annulus
Periphery is relatively fixed there are two foot-operated wing plate, and cylindrical steel tube inner wall edge is axially arranged with two bar shaped retention beads, two items
Shape retention bead is oppositely arranged, and the circular slab of threaded hole is equipped with centered on the mobile pressing plate, and mobile pressing plate periphery is opposite
If mobile pressing plate is screwed in solid screw by the threaded hole, while described two notches slide respectively there are two notch
It is fastened in two bar shaped retention beads of cylindrical steel tube.
Compared with prior art, the utility model has the beneficial effects that the utility model passes through outside anchoring rod and slip casting
The combination of shell not only can effectively be combined with rock stratum by way of slip casting and is not easily disconnected from, but also can avoid reducing using solid screw
Shear resistance, it is simple and practical in structure, and mobile pressing plate is added on anchoring rod, can slurries be played with pressurization, increased
Depth of penetration.
Detailed description of the invention
Fig. 1 is the fractionation structural representation of the novel slurry filling anchor system of the utility model;
Fig. 2 is the mobile pressing plate of the utility model and the assembling structure schematic diagram of slip casting shell.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, to the technical solution in the utility model carry out it is clear,
It being fully described by, it is clear that described embodiment is only a part of the embodiment of utility model, instead of all the embodiments,
Based on the embodiments of the present invention, obtained by those of ordinary skill in the art without making creative efforts
Every other embodiment, fall within the protection scope of the utility model.
Specific embodiment 1: the utility model discloses a kind of novel slurry filling anchor system, packets as shown in Fig. 1 ~ Fig. 2
Anchoring rod is included, the anchoring rod includes solid screw 1, anchor head 2, stop grouting plug 3, backing plate 4 and nut 5, the solid screw 1
One end is fixed with anchor head 2, the 1 bar wall other end of solid screw be sequentially installed with from inside to outside stop grouting plug 3, backing plate 4 and nut 5(its
In, stop grouting plug 3 and backing plate 4 and solid screw 1 are socketed, and nut 5 and solid screw 1 are spirally connected), the novel slurry filling anchor system is also
It include cylindrical steel tube 7 including mobile pressing plate 6 and slip casting shell, the slip casting shell, 7 coaxial spaced of cylindrical steel tube is set in solid
Outside screw rod 1,7 tube wall of cylindrical steel tube is fixed with annulus 8, institute along multiple through-hole 7-1,7 outer wall top of cylindrical steel tube suit is axially arranged with
It is relatively fixed there are two foot-operated wing plate 8-1 to state 8 outer circumference surface of annulus, 7 inner wall of cylindrical steel tube edge is axially arranged with two bar shaped limit convexes
7-2 is played, two bar shaped retention beads 7-2 is oppositely arranged, and the circle of threaded hole 6-1 is equipped with centered on the mobile pressing plate 6
Plate, and mobile 6 periphery of pressing plate is set relatively there are two notch 6-2, mobile pressing plate 6 is screwed in solid by the threaded hole 6-1
On screw rod 1, while described two notch 6-2 are slided be fastened on two bar shaped retention bead 7-2 of cylindrical steel tube 7 respectively.
Specific embodiment 2: as shown in Figure 1, present embodiment is made furtherly to specific embodiment one
Bright, the anchor head 2 is that wedge shape rises shell anchor head.
Specific embodiment 3: as shown in Figure 1, present embodiment is to specific embodiment one or specific embodiment two
The further explanation made, the stop grouting plug 3 can carry out tight closure to 7 end of cylindrical steel tube.
Specific embodiment 4: as shown in Fig. 2, present embodiment is made furtherly to specific embodiment one
It is bright, mobile 6 periphery of pressing plate and 7 inner wall gap setting of cylindrical steel tube.
When the utility model is used, external drilling device is first passed through to drill to roadway floor and thorough borehole cleaning, it will
The cylindrical steel tube 7 of slip casting shell inserts in the hole, 7 bottom end of cylindrical steel tube be inserted into pore-forming bottom, two foot-operated wing plate 8-1 on the ground,
Later to carrying out slip casting in cylindrical steel tube 7, slurries can via through holes 7-1 penetrate into rock crack, then anchoring rod is inserted into cylindrical steel tube 7
It is interior, anchor head 2 be wedge shape rise shell anchor head be inserted into pore-forming bottom, move pressing plate 6 at this time and be located at 7 top of cylindrical steel tube, step on two ride
Wing plate 8-1 driving motor can be used to connect by shaft coupling with solid screw 1 using external drive equipment rotation solid screw 1(,
The driving motor is powered using external power supply), since mobile pressing plate 6 is screwed in solid screw 1, while two notch 6-2 points
It Hua Dong not be fastened on two bar shaped retention bead 7-2 of cylindrical steel tube 7, solid screw 1 rotates time shift dynamic pressure plate 6 along solid screw
1 is axial mobile to 7 bottom end of cylindrical steel tube, can play pressurization to the slurries in injection cylindrical steel tube 7, increase it and penetrate into rock crack
Depth, later again into cylindrical steel tube 7 carry out slip casting and utilize 3 tight closure of stop grouting plug, tightening nut 5 is after grout cures
Prestressing force is pulled to specified value.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and
And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in the form of others dress body
Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new
The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing the condition of equivalent for falling in claim
All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting
Related claim.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiments being understood that.
Claims (4)
1. a kind of novel slurry filling anchor system, including anchoring rod, the anchoring rod include solid screw (1), anchor head (2),
Stop grouting plug (3), backing plate (4) and nut (5), described solid screw (1) one end are fixed with anchor head (2), and solid screw (1) bar wall is another
One end is sequentially installed with stop grouting plug (3), backing plate (4) and nut (5) from inside to outside, it is characterised in that: the novel slurry filling anchoring
System further includes mobile pressing plate (6) and slip casting shell, and the slip casting shell includes cylindrical steel tube (7), the same between centers of the cylindrical steel tube (7)
Spacer is located at solid screw (1) outside, and cylindrical steel tube (7) tube wall edge is axially arranged with multiple through-holes (7-1), cylindrical steel tube (7) outer wall top
End cap dress is fixed with annulus (8), and annulus (8) outer circumference surface is relatively fixed, and there are two foot-operated wing plate (8-1), cylindrical steel tubes (7)
Inner wall is along two bar shaped retention beads (7-2) are axially arranged with, and two bar shaped retention beads (7-2) are oppositely arranged, the shifting
The circular slab of threaded hole (6-1) is equipped with centered on dynamic pressure plate (6), and there are two notch (6- with respect to setting for mobile pressing plate (6) periphery
2), mobile pressing plate (6) are screwed on solid screw (1) by the threaded hole (6-1), while described two notches (6-2) point
It Hua Dong not be fastened on two bar shaped retention beads (7-2) of cylindrical steel tube (7).
2. a kind of novel slurry filling anchor system according to claim 1, it is characterised in that: the anchor head (2) is risen for wedge shape
Shell anchor head.
3. a kind of novel slurry filling anchor system according to claim 1 or 2, it is characterised in that: the stop grouting plug (3) can be right
Cylindrical steel tube (7) end carries out tight closure.
4. a kind of novel slurry filling anchor system according to claim 1, it is characterised in that: mobile pressing plate (6) circumference
Face and cylindrical steel tube (7) inner wall gap setting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821314196.1U CN208605210U (en) | 2018-08-15 | 2018-08-15 | A kind of novel slurry filling anchor system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821314196.1U CN208605210U (en) | 2018-08-15 | 2018-08-15 | A kind of novel slurry filling anchor system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208605210U true CN208605210U (en) | 2019-03-15 |
Family
ID=65679458
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821314196.1U Expired - Fee Related CN208605210U (en) | 2018-08-15 | 2018-08-15 | A kind of novel slurry filling anchor system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208605210U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111794789A (en) * | 2020-07-06 | 2020-10-20 | 薛燕芬 | Self-drilling type dendritic grouting anchoring workpiece |
CN112360533A (en) * | 2020-12-29 | 2021-02-12 | 石家庄铁道大学 | Anchoring structure for tunnel interbedded rock mass |
-
2018
- 2018-08-15 CN CN201821314196.1U patent/CN208605210U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111794789A (en) * | 2020-07-06 | 2020-10-20 | 薛燕芬 | Self-drilling type dendritic grouting anchoring workpiece |
CN112360533A (en) * | 2020-12-29 | 2021-02-12 | 石家庄铁道大学 | Anchoring structure for tunnel interbedded rock mass |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110410123B (en) | Novel high-strength anchor rod supporting equipment for coal mine | |
CN104500115B (en) | A kind of prestressing force Bolt method for protecting support | |
CN109057840A (en) | Adaptive grouting and reinforcing anchor pole and its anchoring construction method under a kind of high stress | |
CN102704971B (en) | Grouting grouting cable anchor in hole | |
CN103557012B (en) | A kind of roadway with large deformation wall rock grouting fastening carrying structure and construction method | |
CN206592139U (en) | A kind of external poured is segmented anchoring rod | |
CN208605210U (en) | A kind of novel slurry filling anchor system | |
CN103277122B (en) | Method for drilling anchor rod hole and anchoring anchor rod in broken roof | |
CN103758549B (en) | Anchor prestressing force full-length anchorage support method after a kind of first filling based on ointment material | |
CN105715287A (en) | Combined self feeding type grouting anchor rod | |
CN106014464B (en) | A kind of environment-friendly type building municipal works anchor pole | |
CN105840222B (en) | Push-press type can quick anchoring installation binding type hollow bolt | |
CN112211656B (en) | Prestressed constant-resistance grouting anchor rod device and working method | |
CN110042835A (en) | It is bored certainly for native, layer of sand from anchor recoverable anchor rod and its anchoring process | |
CN103321222A (en) | Recoverable type anchor rod, pressure-bearing plate type anchor pile and anchoring method | |
CN205530246U (en) | Shape pawl formula of preapring for an unfavorable turn of events soil bolt | |
CN204327134U (en) | A kind of prestressing force balance anchor cable | |
CN103306280B (en) | A kind of drill pipe bore implants stirring-type anchoring pile and anchoring process | |
CN203361147U (en) | Recyclable anchor rod and bearing plate type anchor pile | |
CN112963182A (en) | Anchoring device and motor disassembling method based on same | |
CN104373144A (en) | Expansive high-pressure hole sealing hollow slurry/grease injecting anchor rod | |
CN213928396U (en) | Full-anchor grouting anchor rod | |
CN210087360U (en) | High-pressure rotary joint for mounting anchor rod | |
CN210660155U (en) | Grouting anchoring device and groutable solid anchor rod composed of same | |
CN112360534A (en) | Full-anchor grouting anchor rod and anchoring method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190315 Termination date: 20190815 |