CN104763152B - A kind of construction method of steel construction water tower flower-basket type support - Google Patents

A kind of construction method of steel construction water tower flower-basket type support Download PDF

Info

Publication number
CN104763152B
CN104763152B CN201510209618.3A CN201510209618A CN104763152B CN 104763152 B CN104763152 B CN 104763152B CN 201510209618 A CN201510209618 A CN 201510209618A CN 104763152 B CN104763152 B CN 104763152B
Authority
CN
China
Prior art keywords
type support
water tower
basket type
component
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510209618.3A
Other languages
Chinese (zh)
Other versions
CN104763152A (en
Inventor
赛音吉亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
China 19th Metallurgical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Corp filed Critical China 19th Metallurgical Corp
Priority to CN201510209618.3A priority Critical patent/CN104763152B/en
Publication of CN104763152A publication Critical patent/CN104763152A/en
Application granted granted Critical
Publication of CN104763152B publication Critical patent/CN104763152B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The invention discloses the construction method of a kind of steel construction water tower flower-basket type support, comprise the following steps: A, in factory, each component of composition water tower flower-basket type support is decomposed blanking, then cut the intersection of each component according to the space structure of water tower flower-basket type support;B, by each component conveying to erecting bed;C, in erecting bed, each component assembly is become water tower flower-basket type support.Because in factory by the intersection well cutting of each component, the assembled work of erecting bed will be very quick, and assembled quality is the highest, and the water tower flower-basket type support being assembled into does not haves dimensional discrepancy yet, good looking appearance;Simultaneously as transport is each component, not being overall structure, therefore, cost of transportation also ratio is relatively low.Therefore, the construction method of the steel construction water tower flower-basket type support of the present invention, can not only improve construction quality and efficiency of construction, and cost of transportation is low.

Description

A kind of construction method of steel construction water tower flower-basket type support
Technical field
The present invention relates to the construction method of steel construction, particularly relate to the construction method of a kind of steel construction water tower flower-basket type support.
Background technology
The flower-basket type support of view technique steel construction water tower spherical water tank is the handstand in hollow by steel pipe and Plate Welding Truncated cone-shaped structure.Owing to this structure space angle is many, therefore, between steel pipe, between steel pipe and steel plate, assembled welding exists not The intersection of rule.The construction method of traditional labyrinth steel construction: one, loose mail is transported to scene, comparison is surveyed at the scene Cut-to-measure cuts rear installation forming;Two, after prefabrication molding, transport to in-site installation.The shortcoming that first method exists: on-the-spot Matching measurement error is relatively big, and molding effect unsightly and wastes material;The shortcoming that second method exists: although prefabrication molding Effect after installation is preferable, but whole Transporting is difficult, and cost of transportation is bigger.
Summary of the invention
The technical problem to be solved is to provide the construction method of a kind of steel construction water tower flower-basket type support, not only improves and executes Working medium amount and efficiency of construction, and cost of transportation is low.
The present invention solves the construction method of a kind of steel construction water tower flower-basket type support that its technical problem is used, and comprises the following steps:
A, in factory, each component of composition water tower flower-basket type support is decomposed blanking, then tie according to the space of water tower flower-basket type support Structure cuts the intersection of each component;
B, by each component conveying to erecting bed;
C, in erecting bed, each component assembly is become water tower flower-basket type support.
Preferably, the component processed in step A include column, annular the burst component of collar tie beam, heel slab, horizontal support, Top bearing diagonal and bottom bearing diagonal.
Preferably, step C specifically includes: C1, the burst Member Welding of annular collar tie beam is become circular top annular collar tie beam;
Comprise the following steps the most successively:
C2, erecting bed tile an assembling plate, the base point of column is welded on described assembling plate;
C3, weld horizontal support between two adjacent root posts;
C4, between two adjacent root posts, weld top bearing diagonal and bottom bearing diagonal;
C5, top annular collar tie beam is welded to the top of column;
C6, assembling plate is disassembled from the bottom of column;
C7, at the bottom welding heel slab of each column;
Described step C1 completed before step C5.
Preferably, between described heel slab with described column, weld the first gusset, at described top annular collar tie beam and described column Between weld the second gusset.
The invention has the beneficial effects as follows: in step A, before cutting the intersection of each component, can shift to an earlier date in software by steel construction The model of the three-D space structure of water tower flower-basket type support carries out intersection cutting after setting up, generate digital process data or manually cut Cut the construction drawing of intersection, then carry out the blanking of each component and the cutting of intersection;Then by each component conveying of well cutting extremely Erecting bed;Then each component assembly is become water tower flower-basket type support.Because in factory by the intersection well cutting of each component, The assembled work of erecting bed will be very quick, and assembled quality is the highest, and the water tower flower-basket type support being assembled into does not haves yet Dimensional discrepancy, good looking appearance;Simultaneously as transport is each component, not being overall structure, therefore, cost of transportation also compares Low.Therefore, the construction method of the steel construction water tower flower-basket type support of the present invention, construction quality and efficiency of construction can not only be improved, And cost of transportation is low.
Accompanying drawing explanation
Fig. 1 is the structural representation of the steel construction water tower flower-basket type support of the present invention.
Fig. 2 is the scheme of installation of water tank and steel construction water tower flower-basket type support.
Shown in figure: column 1, top annular collar tie beam 2, the burst component 21 of annular collar tie beam, heel slab 3, horizontal support 4, Top bearing diagonal 5, bottom bearing diagonal 6, spherical water tank the 7, first gusset the 8, second gusset 9.
Detailed description of the invention
The present invention is further described with embodiment below in conjunction with the accompanying drawings.
The construction method of a kind of steel construction water tower flower-basket type support of the present invention, comprises the following steps:
A, factory will composition water tower flower-basket type support component decompose blanking, then according to the space structure of water tower flower-basket type support Cut the intersection of each component;
B, by each component conveying to erecting bed;
C, in erecting bed, each component assembly is become water tower flower-basket type support.
In step A, before cutting the intersection of each component, the three-dimensional in software by steel construction water tower flower-basket type support can be shifted to an earlier date The model of space structure carries out intersection cutting after setting up, generate digital process data or the artificial construction drawing cutting intersection, so After carry out the blanking of each component and the cutting of intersection;Then by each component conveying of well cutting to erecting bed;Then by each structure Part is assembled into water tower flower-basket type support.Because in factory by the intersection well cutting of each component, the assembled work of erecting bed Will be very quick, assembled quality is the highest, and the water tower flower-basket type support being assembled into does not haves dimensional discrepancy yet, good looking appearance; Simultaneously as transport is each component, not being overall structure, therefore, cost of transportation also ratio is relatively low.Therefore, the steel of the present invention The construction method of structure water tower flower-basket type support, can not only improve construction quality and efficiency of construction, and cost of transportation is low.
Steel construction water tower flower-basket type support can only include column 1 and top annular collar tie beam 2, but this steel structure water for convenience Tower flower-basket type support is connected with bottom beam column of steel structure, also includes heel slab 3;In order to strengthen column 1 in the horizontal direction Stability, strengthens the lateral stiffness of this steel construction water tower flower-basket type support, it is to avoid topple over, also include horizontal support 4;In order to add The integral rigidity of this steel construction water tower flower-basket type support strong, improves stability, also includes top bearing diagonal 5 and bottom bearing diagonal 6; Therefore, as shown in Figure 1 and Figure 2, as preferred embodiment, the component processed in step A includes column 1, annular ring The burst component 21 of beam, heel slab 3, horizontal support 4, top bearing diagonal 5 and bottom bearing diagonal 6.
In step C, by column 1, annular the burst component 21 of collar tie beam, heel slab 3, horizontal support 4, top bearing diagonal 5 and Bottom bearing diagonal 6 is assembled into the concrete steps of steel construction water tower flower-basket type support and includes: C1, by annular collar tie beam burst component 21 It is welded into circular top annular collar tie beam 2;
Comprise the following steps the most successively:
C2, erecting bed tile an assembling plate, the base point of column 1 is welded on described assembling plate;All columns 1 structure surrounded is truncated cone-shaped or the cylinder table shape etc. of hollow of the handstand of the truncated cone-shaped of hollow, hollow.But, if all The structure that column 1 surrounds is truncated cone-shaped or the cylinder table shape of hollow, then only have top annular collar tie beam 2 straight with spherical water tank 7 Contact, lifting surface area is little.Accordingly, as preferably, the structure that all columns 1 surround is the truncated cone-shaped of the handstand of hollow.Fall Vertical round platform is up big and down small, and after spherical water tank 7 is placed in steel construction water tower flower-basket type support, spherical water tank 7 is not only by top ring Shape collar tie beam 2 directly supports, also tangent with column 1, increases lifting surface area, more improves the security reliability of support.Specifically During enforcement, as preferred embodiment, the 90% of a diameter of spherical water tank 7 diameter of top annular collar tie beam 2, steel structure water The height of tower flower-basket type support is the 80% of spherical water tank 7 diameter, makes spherical water tank 7 lower half be completely embedded into this steel construction water tower In flower-basket type support.
C3, weld horizontal support 4 between two adjacent root posts 1;
C4, between two adjacent root posts 1, weld top bearing diagonal 5 and bottom bearing diagonal 6;
C5, top annular collar tie beam 2 is welded to the top of column 1;After top annular collar tie beam 2 is welded to the top of column 1, Column 1 is uniformly distributed along top annular collar tie beam 2 circumference, and the angle phase of every root post 1 and top annular collar tie beam 2 place plane Deng;
C6, assembling plate is disassembled from the bottom of column 1;
C7, at the bottom welding heel slab 3 of each column 1;
Described step C1 completed before step C5.
Steel construction water tower flower-basket type support bottom to be connected with beam column of steel structure, for convenience steel construction water tower flower-basket type support with under Portion's beam column of steel structure connects, and arranges heel slab 3 bottom described column 1, and described heel slab 3 is parallel to top annular collar tie beam 2;Institute The plane stating horizontal support 4 place is parallel to the plane at top annular collar tie beam 2 place, and column 1 is divided into by described horizontal support 4 Two parts, the part near top annular collar tie beam 2 is top, and the part away from top annular collar tie beam 2 is bottom;Described top Bearing diagonal 5 is positioned at the top of column 1, and top bearing diagonal 5 and respective horizontal support 4 are in the angle more than 0 degree, and this is corresponding Horizontal support 4 is in top bearing diagonal 5 between same two adjacent root posts 1;Described bottom bearing diagonal 6 is positioned at column 1 Bottom, bottom bearing diagonal 6 and respective horizontal support 4 in the angle more than 0 degree, and the support 4 of this respective horizontal is oblique with bottom Supporting 6 to be between same two adjacent root posts 1, top bearing diagonal 5 and bottom bearing diagonal 6 are in the horizontal direction with the most square To all to the effect that corresponding column 1 is strong so that the integral rigidity of steel construction water tower flower-basket type support is strengthened, and is more beneficial for Support spherical water tank 7.
In order to make the integral rigidity of steel construction water tower flower-basket type support be strengthened, as preferred embodiment, in institute further State and between heel slab 3 with described column 1, weld the first gusset 8, weld between described top annular collar tie beam 2 and described column 1 Connect the second gusset 9.

Claims (2)

1. the construction method of a steel construction water tower flower-basket type support, it is characterised in that comprise the following steps:
A, in factory, each component of composition water tower flower-basket type support is decomposed blanking, then cut the intersection of each component according to the space structure of water tower flower-basket type support;
B, by each component conveying to erecting bed;
C, in erecting bed, each component assembly is become water tower flower-basket type support;
The component processed in step A includes column (1), the annular burst component (21) of collar tie beam, heel slab (3), horizontal support (4), top bearing diagonal (5) and bottom bearing diagonal (6);
Step C specifically includes: C1, by annular collar tie beam burst component (21) be welded into circular top annular collar tie beam (2);
Comprise the following steps the most successively:
C2, erecting bed tile an assembling plate, the base point of column (1) is welded on described assembling plate;
C3, between adjacent two root posts (1) weld horizontal support (4);
C4, between adjacent two root posts (1), weld top bearing diagonal (5) and bottom bearing diagonal (6);
C5, top annular collar tie beam (2) is welded to the top of column (1);
C6, assembling plate is disassembled from the bottom of column (1);
C7, at the bottom welding heel slab (3) of each column (1);
Described step C1 completed before step C5.
The construction method of a kind of steel construction water tower flower-basket type support the most as claimed in claim 1, it is characterized in that: between described heel slab (3) with described column (1), weld the first gusset (8), between described top annular collar tie beam (2) and described column (1), weld the second gusset (9).
CN201510209618.3A 2015-04-28 2015-04-28 A kind of construction method of steel construction water tower flower-basket type support Active CN104763152B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510209618.3A CN104763152B (en) 2015-04-28 2015-04-28 A kind of construction method of steel construction water tower flower-basket type support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510209618.3A CN104763152B (en) 2015-04-28 2015-04-28 A kind of construction method of steel construction water tower flower-basket type support

Publications (2)

Publication Number Publication Date
CN104763152A CN104763152A (en) 2015-07-08
CN104763152B true CN104763152B (en) 2016-11-30

Family

ID=53645215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510209618.3A Active CN104763152B (en) 2015-04-28 2015-04-28 A kind of construction method of steel construction water tower flower-basket type support

Country Status (1)

Country Link
CN (1) CN104763152B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779005A (en) * 2019-02-01 2019-05-21 广州市恒盛建设工程有限公司 A kind of removable potted landscape construction method of assembled open type
CN115492310B (en) * 2022-10-31 2023-07-11 中国十九冶集团有限公司 Reinforcement cage expansion device and construction method for installing box-type steel column in reinforcement cage

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH542335A (en) * 1971-03-10 1973-09-30 Impresa Costruzioni Ingg Giova Procedure for creating cantilevered load-bearing slabs on a load-bearing construction, at any height from the ground and with any inclination with respect to the vertical
CN2434386Y (en) * 2000-07-31 2001-06-13 黄振助 Water tower foundation
CN201206258Y (en) * 2007-05-28 2009-03-11 蔡晓泉 Angle-bar frame of spherical tank
CN201343890Y (en) * 2008-12-11 2009-11-11 重庆市君豪玻璃钢有限责任公司 Erection tower of water storage tank
CN104074364A (en) * 2013-03-28 2014-10-01 来彬 Steel casting funnel-shaped structure pre-assembling positioning construction method
CN103850515B (en) * 2014-03-20 2016-01-20 杭州建工集团有限责任公司 A kind of mounting method of overlength large angle of inclination mast of space structures

Also Published As

Publication number Publication date
CN104763152A (en) 2015-07-08

Similar Documents

Publication Publication Date Title
CN104763152B (en) A kind of construction method of steel construction water tower flower-basket type support
CN104018514A (en) Inverted installation method of embedded foundation bolts of large tower-type equipment foundation
CN103276895B (en) Die supporting method of reversed-cone-shaped column cap die
CN109610851A (en) Assembly jig frame of curved truss and construction method thereof
CN212599888U (en) Hyperboloid arc steel form preparation frock
TW201402912A (en) Base structure and finished structure using the same
CN113047503A (en) Bifurcated column and curved surface grid integrated steel structure roof and mounting method thereof
CN104264792B (en) A kind of bean column node of layered assembling type steel structure
CN103321302B (en) Complex welded steel tube support node including prestressed cable and assembling method thereof
CN108716221A (en) A kind of detachable pre-embedded bolt group supporting and mounting bracket and application method
CN1197493A (en) Prefabrication type high level and structure and construction method thereof
CN205000351U (en) Steel -pipe pile that efficiency of construction is high
JP5499194B1 (en) Solar panel mounting base
CN204781309U (en) Roof beam plate -column structure of green ecological feasibility building system
CN105729030A (en) Combined tool for manufacturing manifolds
CN108005403B (en) Repairing method and repairing structure of wooden column of historical building
CN101875163A (en) Assembling and welding jig frame used for bracket of bridge fabrication machine and method for fabricating bracket by using same
CN110963174A (en) Assembled prefabricated staircase stacking rack and construction method
CN110127520A (en) The small lattice funnel of large-type sinterer and dust-fall pipe installation method
CN105369890A (en) Earthquake-proof folk house steel framework and installation method thereof
CN202227714U (en) Height-adjustable temporary support frame for construction
CN103938920A (en) Method for installing vertical-bar fence
KR101686976B1 (en) a wreath holder
CN104153386B (en) Pile foundation support table periphery facade bed course tool-type punching block and construction method thereof
CN104775652A (en) Tower type structure and processing and mounting method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant