CN104747191A - 井筒与井底车场连接结构的施工方法 - Google Patents
井筒与井底车场连接结构的施工方法 Download PDFInfo
- Publication number
- CN104747191A CN104747191A CN201510059646.1A CN201510059646A CN104747191A CN 104747191 A CN104747191 A CN 104747191A CN 201510059646 A CN201510059646 A CN 201510059646A CN 104747191 A CN104747191 A CN 104747191A
- Authority
- CN
- China
- Prior art keywords
- wall
- shaft
- borehole wall
- arch
- basket handle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 36
- 230000008093 supporting effect Effects 0.000 claims abstract description 9
- 238000007493 shaping process Methods 0.000 claims description 27
- 238000005266 casting Methods 0.000 claims description 15
- 238000005728 strengthening Methods 0.000 claims description 8
- 230000003014 reinforcing effect Effects 0.000 claims description 5
- 238000000034 method Methods 0.000 abstract description 9
- 238000004519 manufacturing process Methods 0.000 abstract description 4
- 229910001294 Reinforcing steel Inorganic materials 0.000 abstract 2
- 230000005641 tunneling Effects 0.000 abstract 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 230000008602 contraction Effects 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 2
- 239000012141 concentrate Substances 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 238000000465 moulding Methods 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 239000003245 coal Substances 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D1/00—Sinking shafts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/006—Lining anchored in the rock
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D5/00—Lining shafts; Linings therefor
- E21D5/11—Lining shafts; Linings therefor with combinations of different materials, e.g. wood, metal, concrete
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Mechanical Engineering (AREA)
- Wood Science & Technology (AREA)
- Environmental & Geological Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (4)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710811785.4A CN107587878A (zh) | 2015-02-05 | 2015-02-05 | 井筒与井底车场连接结构 |
CN201510059646.1A CN104747191B (zh) | 2015-02-05 | 2015-02-05 | 井筒与井底车场连接结构的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510059646.1A CN104747191B (zh) | 2015-02-05 | 2015-02-05 | 井筒与井底车场连接结构的施工方法 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710811785.4A Division CN107587878A (zh) | 2015-02-05 | 2015-02-05 | 井筒与井底车场连接结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104747191A true CN104747191A (zh) | 2015-07-01 |
CN104747191B CN104747191B (zh) | 2017-10-17 |
Family
ID=53587370
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710811785.4A Pending CN107587878A (zh) | 2015-02-05 | 2015-02-05 | 井筒与井底车场连接结构 |
CN201510059646.1A Active CN104747191B (zh) | 2015-02-05 | 2015-02-05 | 井筒与井底车场连接结构的施工方法 |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710811785.4A Pending CN107587878A (zh) | 2015-02-05 | 2015-02-05 | 井筒与井底车场连接结构 |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN107587878A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105201514A (zh) * | 2015-09-15 | 2015-12-30 | 中国矿业大学 | 一种含水岩层井壁结构及施工方法 |
CN105386768A (zh) * | 2015-11-16 | 2016-03-09 | 内蒙古福城矿业有限公司 | 井筒与井底车场连接结构 |
CN108590680A (zh) * | 2018-05-04 | 2018-09-28 | 北京市政建设集团有限责任公司 | 一种盾构始发井基坑竖向分段浇筑的施工方法 |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108590666A (zh) * | 2018-04-10 | 2018-09-28 | 中煤第三建设(集团)有限责任公司 | 立井井筒与巷道连接处快速定向施工方法 |
CN208252120U (zh) * | 2018-05-23 | 2018-12-18 | 淮矿西部煤矿投资管理有限公司 | 一种立井井筒与井底车场连接部 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1078016A (zh) * | 1993-01-15 | 1993-11-03 | 山西矿业学院 | 立井井壁环周支承式凿井设备及其施工方法 |
CN103452561A (zh) * | 2013-08-20 | 2013-12-18 | 中铁二局股份有限公司 | 一种地铁暗挖车站多层横向通道竖向进洞施工方法、以及东、西两侧施工方法 |
CN103470270A (zh) * | 2013-09-10 | 2013-12-25 | 安徽理工大学 | 深井马头门支护结构及其施工方法 |
CN103485794A (zh) * | 2013-09-10 | 2014-01-01 | 安徽理工大学 | 马头门复合支护结构及其施工方法 |
CN103939104A (zh) * | 2014-04-22 | 2014-07-23 | 安徽理工大学 | 煤矿深立井抗扰动马头门结构 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3814059B2 (ja) * | 1997-09-01 | 2006-08-23 | 日立建機株式会社 | 立坑掘削機 |
CN2653129Y (zh) * | 2003-10-15 | 2004-11-03 | 栾振辉 | 椭圆形u型钢可缩性支架 |
JP5431864B2 (ja) * | 2009-10-20 | 2014-03-05 | 株式会社安藤・間 | バケット受け渡し装置 |
CN102345463A (zh) * | 2011-10-19 | 2012-02-08 | 中交第一公路工程局有限公司 | 一种城市敏感区大跨浅埋暗挖隧道支护结构 |
CN103603679B (zh) * | 2013-09-17 | 2015-08-12 | 中国神华能源股份有限公司 | 用于支护隧道拱部的拱顶钢架与隧道施工方法 |
CN203925523U (zh) * | 2014-06-06 | 2014-11-05 | 中铁二院工程集团有限责任公司 | 合修至分修隧道大跨过渡段非对称临时支护构造 |
-
2015
- 2015-02-05 CN CN201710811785.4A patent/CN107587878A/zh active Pending
- 2015-02-05 CN CN201510059646.1A patent/CN104747191B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1078016A (zh) * | 1993-01-15 | 1993-11-03 | 山西矿业学院 | 立井井壁环周支承式凿井设备及其施工方法 |
CN103452561A (zh) * | 2013-08-20 | 2013-12-18 | 中铁二局股份有限公司 | 一种地铁暗挖车站多层横向通道竖向进洞施工方法、以及东、西两侧施工方法 |
CN103470270A (zh) * | 2013-09-10 | 2013-12-25 | 安徽理工大学 | 深井马头门支护结构及其施工方法 |
CN103485794A (zh) * | 2013-09-10 | 2014-01-01 | 安徽理工大学 | 马头门复合支护结构及其施工方法 |
CN103939104A (zh) * | 2014-04-22 | 2014-07-23 | 安徽理工大学 | 煤矿深立井抗扰动马头门结构 |
Non-Patent Citations (2)
Title |
---|
李德新等: "井底车场连接处硐室快速施工", 《建井技术》 * |
陈密武: "马头门与井筒同时下行分层掘进技术", 《建井技术》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105201514A (zh) * | 2015-09-15 | 2015-12-30 | 中国矿业大学 | 一种含水岩层井壁结构及施工方法 |
CN105386768A (zh) * | 2015-11-16 | 2016-03-09 | 内蒙古福城矿业有限公司 | 井筒与井底车场连接结构 |
CN108590680A (zh) * | 2018-05-04 | 2018-09-28 | 北京市政建设集团有限责任公司 | 一种盾构始发井基坑竖向分段浇筑的施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104747191B (zh) | 2017-10-17 |
CN107587878A (zh) | 2018-01-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10612378B2 (en) | Method for recovering room-mining coal pillars by solid filling in synergy with artificial pillars | |
CN104747191A (zh) | 井筒与井底车场连接结构的施工方法 | |
CN106988758A (zh) | 一种用于穿越大型竖向溶洞群隧道施工方法 | |
CN103696784B (zh) | 一种浅埋大跨隧道下穿建构筑物的大直径长管幕施工方法 | |
CN106223967B (zh) | 一种大埋深矩形或类矩形隧道盾构施工装置及方法 | |
CN107905799B (zh) | 一种高铁隧底过水溶洞的加固结构及其施工方法 | |
CN104847380B (zh) | 一种减小隧道衬砌结构内力的结构及其施工方法 | |
CN106014446B (zh) | 一种增强高地应力软岩隧道仰拱结构稳定性的加固方法 | |
CN205977229U (zh) | 一种适用于偏压条件的连拱隧道非齐平洞口结构 | |
CN102720498B (zh) | 采煤工作面沿空留巷开采工艺方法 | |
CN106930777A (zh) | 地铁暗挖区间正线装配式二衬的施工方法 | |
CN105908625B (zh) | 一种既有铁路线下拖拉法增设框架桥的施工方法 | |
CN101545376A (zh) | 小断面隧道横向进入超大断面隧道的施工方法 | |
CN106089207B (zh) | 特厚煤层工作面沿空掘巷窄煤柱留设方法 | |
CN105370304A (zh) | 高应力强扰动煤层沿空留巷多级加固方法 | |
CN106121689A (zh) | 一种非煤矿山地下大型硐室的开挖方法 | |
CN103939104B (zh) | 煤矿深立井抗扰动马头门结构 | |
CN205743911U (zh) | 加固型矿山溜井 | |
CN103334778A (zh) | 台阶临时支撑加部分双侧壁的施工工艺 | |
CN102748070B (zh) | 沿空留巷砌块扣榫结构墙支护法 | |
CN209838435U (zh) | 一种穿越大型无充填溶洞隧道的卸载拱回填结构 | |
CN207960680U (zh) | 一种用于煤矿井下防水的闸墙 | |
CN203296778U (zh) | 一种刚柔结合的沿空留巷巷旁支护装置 | |
CN105386768A (zh) | 井筒与井底车场连接结构 | |
CN114320365A (zh) | 一种整体式预制钢筋混凝土衬砌隧洞的快速施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Ruoxiang Inventor after: Hu Xiaoxu Inventor after: Wu Wendong Inventor after: Si Hongxiang Inventor after: Ao Shuaishuai Inventor before: Hu Xiaoxu Inventor before: Gong Huagang Inventor before: Ao Shuaishuai Inventor before: Song Mingxing Inventor before: Zhou Leilei Inventor before: Li Bin |
|
CB03 | Change of inventor or designer information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20170905 Address after: 271233 Shandong city of Tai'an province Xintai City Xinwen Street Office New Road No. 401 Applicant after: Xinwen Mining Group Co., Ltd. Address before: 271233 Shandong city of Tai'an province Xintai City Xinwen Street office Wen Road No. 48 Applicant before: Co., Ltd of new building engineering group of Shandong China |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |