CN104724441B - Adjust the parallel rule of roller spacing - Google Patents
Adjust the parallel rule of roller spacing Download PDFInfo
- Publication number
- CN104724441B CN104724441B CN201310720525.8A CN201310720525A CN104724441B CN 104724441 B CN104724441 B CN 104724441B CN 201310720525 A CN201310720525 A CN 201310720525A CN 104724441 B CN104724441 B CN 104724441B
- Authority
- CN
- China
- Prior art keywords
- parallel
- roller
- connecting portion
- projection
- parallel rule
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G13/00—Roller-ways
- B65G13/11—Roller frames
- B65G13/12—Roller frames adjustable
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Rollers For Roller Conveyors For Transfer (AREA)
Abstract
The invention discloses a kind of parallel rule for adjusting roller spacing, including at least two the first straight panels being parallel to each other, at least two regulation chis being parallel to each other are vertically connected with by first connecting portion between two the first straight panels.Parallel rule of the present invention adjusts the horizontal and vertical spacing of chi by adjusting first, then accurately adjusts the position of roller.It is parallel eat it is simple in construction, it is collapsible, it is convenient to adjust and pick and place in chamber.Also, parallel rule of the present invention reduces the equipment downtime adjustment roller time, improves the rate of transferring of operating efficiency and equipment.
Description
Technical field
The present invention relates to a kind of field of mechanical technique, more particularly to roller(Roller)The spacing adjustment of transport mechanism.
Background technology
Glass substrate is required in transmission carrying out work in display industry, wet etching, photoetching process, cleaning
Skill.Due to long-play, roller is transmitted(Roller)Position can shift, and double roller(Bilateral is rolled
Wheel)It can produce and misplace up and down, cause the skew of glass substrate, or even fragmentation.In adjustment roller(Roller)When position is offset, need
To be transmitted by a sheet glass on transmission line, the scroll wheel positions on transmission line be adjusted one by one, it is ensured that roller is all straight in same
Above line, this method needs many people to coordinate, while spending the substantial amounts of working time, has a strong impact on the rate of transferring of equipment.
The all roller of glass transmission mode of current waterline equipment(Roller)Transmission, due to roller(Roller)Itself
Design feature, fixed structure rotates have loosening for a long time, causes roller(Roller)Position is offset.And without specially during adjusting
Industry tool, adjustment time is long, and efficiency is low, it is necessary to which transmission substrate checking repeatedly, wastes plenty of time, influence equipment capacity and experiment
Progress.
The content of the invention
In view of this, the technical problem to be solved in the present invention is to provide a kind of parallel rule for adjusting roller spacing, accurately
Two row roller of positioning adjustment(Roller)Spacing.
In order to solve the above technical problems, the technical proposal of the invention is realized in this way:It is a kind of to adjust the flat of roller spacing
Row chi, including at least two the first straight panels being parallel to each other, are vertically connected between two the first straight panels by first connecting portion
There are at least two regulation chis being parallel to each other.
Further, the first connecting portion includes the first chute being arranged in the first straight panel and is arranged on regulation chi two
The projection at end, the projection can be embedded into first chute and along the first slide just.
Further, the first connecting portion also includes nut, and screw thread is connected between the nut and the projection.
Further, the regulation chi is the linear chi that the second straight panel and ruler are connected as one by second connecting portion
Length can be adjusted between son, and the second straight panel and ruler.
Further, the second connecting portion includes the second chute being opened in the second straight panel and is arranged on ruler end
Projection, the projection can be embedded into second chute and along the second slide just.
Further, the second connecting portion also includes nut, and screw thread is connected between the nut and the projection.
The technique effect that the present invention reaches is as follows:Parallel rule of the present invention adjusts the horizontal and vertical of chi by adjusting first
Spacing, then accurately adjust roller position.Parallel rule it is simple in construction, it is collapsible, it is convenient to adjust and pick and place in chamber.
Also, parallel rule of the present invention reduces the equipment downtime adjustment roller time, improves the rate of transferring of operating efficiency and equipment.
Brief description of the drawings
Fig. 1 adjusts the parellel ruler structure schematic diagram of roller spacing for the present invention;
Fig. 2 is the structural representation of ruler;
Fig. 3 is the structural representation of the second straight panel;
Fig. 4 is the first straight panel structural representation;
Fig. 5 is the structural representation of nut;
Fig. 6 is the implementation legend that parallel rule of the present invention is used to adjust roller spacing.
Embodiment
As Figure 1-Figure 5, be the parallel rule 1 of present invention adjustment roller spacing, including at least two be parallel to each other the
One straight panel 11, at least two regulations being parallel to each other are vertically connected between two the first straight panels 11 by first connecting portion 13
Chi 12.In the present embodiment, illustrated by taking two the first straight panels 11 and two regulation chis 12 as an example, multiple first straight panels 11 or tune
It is consistent to save the attachment structure of chi 12, be will not be repeated here.First connecting portion 13 includes first be arranged in the first straight panel 11
The chute 11a and raised 121a or projection 122a for being arranged on regulation chi 12 two ends(Raised 121a, 122a are arranged to identical rule
Lattice size is optimal).Raised 121a, 122a can be embedded into the first chute 11a and can be slided along chute 11a just, slip be for
Lateral separations between two regulation chis 12 of adjustment.After two regulation chis 12 of parallel rule 1 adjust lateral separation, first
Connecting portion 13 also includes nut 15, is connected between the nut 15 and projection 121a, 122a by screw thread, nut 15 is used for
Regulation chi 12 is fastened in the first straight panel 11.
Regulation chi 12 is the linear ruler that the second straight panel 122 and ruler 121 are connected as one by second connecting portion 14,
And second can adjust length between straight panel 122 and ruler 121.Referring to figs. 2 and 3 one end of the second straight panel 122 is provided with
122a, for being connected to the first straight panel 11, and offers the second chute 122b.The two ends of ruler 121 are provided with projection
121a, ruler 121 is provided with two identical projection 121a in the present embodiment.Second connecting portion 14 include the second chute 122b with
And projection 121a, raised 121a can be embedded into second chute 122b and be slided in the second chute 122b just.Second connection
Portion 14 also includes nut 15, between the nut 15 and projection 121a screw thread be connected, when regulation chi 12 adjustment finish it is laggard
Row is fixed.
As shown in fig. 6, being used for the embodiment for adjusting roller spacing for parallel rule 1 of the present invention, parallel rule 1, which is placed on, to be needed to adjust
Between two whole row's rollers 2, the outline roller all along the first straight panel 11 is fixed.
The foregoing is only a preferred embodiment of the present invention, is not intended to limit the scope of the present invention.
Claims (6)
1. a kind of parallel rule for adjusting roller spacing, is positioned between the two row's rollers that need to be adjusted, it is characterised in that including at least
Two the first straight panels for being parallel to each other, it is mutual between two the first straight panels by first connecting portion to be vertically connected with least two
Parallel regulation chi, outline of the roller along first straight panel is fixed.
2. the parallel rule of roller spacing is adjusted as claimed in claim 1, it is characterised in that the first connecting portion includes setting
The first chute in the first straight panel and the projection for being arranged on regulation chi two ends, the projection can be embedded into first chute just
In and along the first slide.
3. the parallel rule of roller spacing is adjusted as claimed in claim 2, it is characterised in that the first connecting portion also includes
Nut, screw thread is connected between the nut and the projection.
4. as claimed in claim 1 adjustment roller spacing parallel rule, it is characterised in that the regulation chi be the second straight panel and
The linear ruler that ruler is connected as one by second connecting portion, and length can be adjusted between the second straight panel and ruler.
5. the parallel rule of roller spacing is adjusted as claimed in claim 4, it is characterised in that the second connecting portion includes opening up
The second chute in the second straight panel and the projection for being arranged on ruler end, the projection can be embedded into second chute just
And along the second slide.
6. the parallel rule of roller spacing is adjusted as claimed in claim 5, it is characterised in that the second connecting portion also includes
Nut, screw thread is connected between the nut and the projection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310720525.8A CN104724441B (en) | 2013-12-24 | 2013-12-24 | Adjust the parallel rule of roller spacing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310720525.8A CN104724441B (en) | 2013-12-24 | 2013-12-24 | Adjust the parallel rule of roller spacing |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104724441A CN104724441A (en) | 2015-06-24 |
CN104724441B true CN104724441B (en) | 2017-09-29 |
Family
ID=53448964
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310720525.8A Active CN104724441B (en) | 2013-12-24 | 2013-12-24 | Adjust the parallel rule of roller spacing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104724441B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105480634B (en) * | 2015-11-23 | 2018-01-19 | 天津华夏联盛汽车部件有限公司 | A kind of unpowered roller conveying device |
CN108689075A (en) * | 2018-05-18 | 2018-10-23 | 湖州银轴智能装备有限公司 | A kind of no-power drum for conveying |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201753213U (en) * | 2010-06-30 | 2011-03-02 | 扬博科技股份有限公司 | Gap adjustment mechanism for substrate conveying device |
CN202784847U (en) * | 2012-07-24 | 2013-03-13 | 北京京东方光电科技有限公司 | Roller calibrating device |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2717153B2 (en) * | 1989-10-31 | 1998-02-18 | 武藤工業株式会社 | Method for controlling electrostatic attraction force in automatic drafting machine |
CN1970414B (en) * | 2006-12-21 | 2011-05-11 | 友达光电股份有限公司 | Roller device capable of quickly regulating positioning |
CN101905606A (en) * | 2009-06-05 | 2010-12-08 | 魏聪颖 | Parallel ruler |
CN201970703U (en) * | 2011-01-20 | 2011-09-14 | 郭延朋 | Adjustable sliding straight scale |
-
2013
- 2013-12-24 CN CN201310720525.8A patent/CN104724441B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201753213U (en) * | 2010-06-30 | 2011-03-02 | 扬博科技股份有限公司 | Gap adjustment mechanism for substrate conveying device |
CN202784847U (en) * | 2012-07-24 | 2013-03-13 | 北京京东方光电科技有限公司 | Roller calibrating device |
Also Published As
Publication number | Publication date |
---|---|
CN104724441A (en) | 2015-06-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104724441B (en) | Adjust the parallel rule of roller spacing | |
CN105836440B (en) | One kind feed transfer mechanism | |
KR20130051193A (en) | Blanking line | |
CN104986499A (en) | Conveying line with adjustable interval | |
CN203792498U (en) | All-in-one machine for a normal brick and hollow brick blank overturning system | |
CN205441883U (en) | Roll table positioner | |
CN204702210U (en) | The face glass feeding device of supplemental support can be realized | |
CN204508056U (en) | The roller control apparatus of extendable conveyor | |
CN207696181U (en) | A kind of transport limiting device for aluminum profile cutting machine | |
CN202193426U (en) | Woodwork turnaround machine for edge sealing | |
CN204643064U (en) | A kind of by electronics package carrier plate transmission to the mechanism of conveying track | |
CN205436749U (en) | A PI stiffening plate stamping device for FPC | |
CN203227665U (en) | Separating roller device | |
CN202824255U (en) | Leveling machine | |
CN205183408U (en) | Panel make -up machine | |
CN106994480A (en) | A kind of body perforating device | |
CN201605019U (en) | Multidirectional adjusting device for side retaining roller | |
CN106735511B (en) | A kind of compound cutter | |
CN204296174U (en) | Wallpaper positive and negative turning device | |
CN104692108A (en) | Slope type lifting and transferring machine | |
CN204294833U (en) | A kind of blanking device being applicable to different length reinforcing bar | |
CN104210253A (en) | Double-roller printer | |
CN204777786U (en) | Conveying mechanism of electric wire threading frid with tensioning coding device | |
CN202592514U (en) | Plasterboard homing device | |
CN203820100U (en) | Paper die-cutting equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201211 Address after: No.146 Tianying Road, high tech Zone, Chengdu, Sichuan Province Patentee after: Chengdu CHENXIAN photoelectric Co.,Ltd. Address before: NO.320 Fuchunjiang Road, Optoelectronic Industrial Park, Kunshan Development Zone, Suzhou City, Jiangsu Province Patentee before: Kunshan New Flat Panel Display Technology Center Co.,Ltd. Patentee before: KunShan Go-Visionox Opto-Electronics Co.,Ltd. |