CN104696597A - Fixator - Google Patents
Fixator Download PDFInfo
- Publication number
- CN104696597A CN104696597A CN201310661762.1A CN201310661762A CN104696597A CN 104696597 A CN104696597 A CN 104696597A CN 201310661762 A CN201310661762 A CN 201310661762A CN 104696597 A CN104696597 A CN 104696597A
- Authority
- CN
- China
- Prior art keywords
- half latch
- segmental arc
- latch closures
- clamped
- guard member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/08—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
- F16L3/10—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two or more members engaging the pipe, cable or protective tubing
- F16L3/1091—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two or more members engaging the pipe, cable or protective tubing with two members, the two members being fixed to each other with fastening members on each side
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B3/00—Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Power Engineering (AREA)
- Clamps And Clips (AREA)
Abstract
The invention provides a fixator. An element to be clamped is fixed on a fixing body through the fixator. The fixator comprises a first half buckle, a second half buckle, and connecting parts, wherein the first half buckle and the second half buckle are oppositely arranged and form a clamping space for clamping the element to be clamped; the connecting parts are connected onto the first half buckle and the second half buckle; the element to be clamped is clamped in the clamping space through the connecting parts. The fixator has the advantages that instead of being stabilized through manual support, the element to be clamped can be firmly arranged on the fixing body by operators, so that the operator originally responsible for supporting the element to be locked is freed, which reduces the labor cost, as well as the labor intensity of the operators.
Description
Technical field
The present invention relates to power equipment maintaining instrument field, in particular to a kind of fixture.
Background technique
When processing non-resident low-voltage power accident, power equipment maintaining personnel need carry out the maintenance operatioies such as replacing ammeter, switch.Often can there is the situation of cable from the cable hole landing at the bottom of case in inlet wire cable or outlet cable.At this moment, power equipment maintaining personnel will, by cable back and forth through cable hole, so also easily cause the insulated hull of cable damaged.So, power equipment maintaining personnel when carrying out this type of operation, in order to avoid by cable back and forth through cable hole, just must arrange a staff table case below hold cable.If in the maintenance sites of two people, power equipment maintaining work just may lose care provider.In such cases, there is the potential safety hazard to power equipment maintaining personnel in power equipment maintaining work, and directly affects the wiring work of power equipment maintaining personnel, affects working efficiency.
Summary of the invention
The present invention aims to provide a kind of fixture, must arrange a staff below electric power box, hold the problem of cable to solve staff in prior art when changing the operation such as ammeter, switch.
To achieve these goals, according to an aspect of the present invention, the invention provides a kind of fixture, to be clamped is fixed on fixed body by fixture, comprises: the first half latch closures; The second half latch closures, the first half latch closures and the second half latch closures are oppositely arranged and form the clamping space clamping to be clamped; And joint, joint is connected to the first half latch closures and the second semi-ring is buckled, and is clamped in be clamped in clamping space.
Further, the first half latch closures comprise the first segmental arc and the first connecting plate, and two section of first connecting plate is separately positioned on the first segmental arc two ends and extends along the direction away from the first segmental arc respectively, and the bearing of trend of two section of first connecting plate is contrary; The second half latch closures comprise the second segmental arc and the second connecting plate, and two section of second connecting plate is separately positioned on the second segmental arc two ends and extends along the direction away from the second segmental arc respectively, and the bearing of trend of two section of second connecting plate is contrary; Second segmental arc and the first segmental arc are oppositely arranged and form the clamping space clamping to be clamped.
Further, the first segmental arc is stated and the second segmental arc is isometrical arc.
Further, the first connecting plate comprises the first long slab and the first short slab, and the second connecting plate comprises the second long slab and the second short slab, and the first long slab abuts on the second short slab, and the first short slab abuts on the second long slab.
Further, joint is bolt, bolt is connected with the locking nut of locking the first half latch closure and the second half latch closures.
Further, the first long slab is hinged on the second short slab, and the second long slab is hinged with snap close, the first end of snap close can fastening on the first short slab, first end is away from the anchor hole on snap close.
Further, snap close comprise be arranged on first end hold out against screw, the one end holding out against screw is connected on the first short slab.
Further, the first half latch closures comprise the first guard member be fixedly installed in the first segmental arc, and the second half latch closures comprise the second guard member be fixedly installed in the second segmental arc, and the first guard member coordinates with the second guard member the guard space being formed and protect and treat locking element.
Further, the first guard member and the second guard member are rubber guard member.
Apply technological scheme of the present invention, this fixture comprises: the first half latch closures, the second half latch closure and joints.The first half latch closures and the second half latch closures are oppositely arranged, and, the clamping space clamping to be clamped is defined between the first half latch closures and the second half latch closures, multiple joint is connected to the two ends of the first half latch closures and the second half latch closures, after completing connection work above, to be clamped can be clamped in clamping space by two and half latch closures, and therefore, to be clamped is just fixed on fixed body by fixture.Like this, to be clamped just can be arranged on fixed body by staff securely, or else be utilize the mode of artificial support to keep to be clamped stable, and the staff that locking element carries out support that treats originally be arranged just can be freed, save labor cost, and alleviate the labor intensity of staff.
Accompanying drawing explanation
The accompanying drawing forming a part of the present invention is used to provide a further understanding of the present invention, and schematic description and description of the present invention, for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 shows the main TV structure schematic diagram of the first embodiment of fixture of the present invention;
Fig. 2 shows the side-looking structural representation of the first embodiment of fixture of the present invention;
Fig. 3 shows the plan structure schematic diagram of the first embodiment of fixture of the present invention;
Fig. 4 shows the structural representation sketch of the second embodiment of fixture of the present invention; And
Fig. 5 shows the structural representation of the snap close of the second embodiment of fixture of the present invention.
Reference character:
10, the first half latch closures; 11, the first segmental arc; 12, the first connecting plate; 121, the first long slab; 122, the first short slab; 13, the first guard member; 20, the second half latch closures; 21, the second segmental arc; 22, the second connecting plate; 221, the second long slab; 222, the second short slab; 23, the second guard member; 30, joint; 40, snap close; 41, screw is held out against.
Embodiment
Hereinafter also describe the present invention in detail with reference to accompanying drawing in conjunction with the embodiments.It should be noted that, when not conflicting, the embodiment in the application and the feature in embodiment can combine mutually.
As shown in Figure 1, according to the first embodiment of the present invention, this fixture comprises: the first half latch closures 10, the second half latch closure 20 and joints 30.The first half latch closures 10 and the second half latch closures 20 are oppositely arranged, and, the clamping space clamping to be clamped is defined between the first half latch closures 10 and the second half latch closures 20, multiple joint 30 is connected on the two ends of the first half latch closures 10 and the second half latch closures 20, after completing connection above, to be clamped just can be clamped in clamping space by two and half latch closures; Therefore, to be clamped is just fixed on fixed body by fixture.
To be clamped just can be arranged on fixed body by staff securely, or else be utilize the mode of artificial support to keep to be clamped stable, and the staff that locking element carries out support that treats originally be arranged just can be freed, save labor cost, and alleviate the labor intensity of staff.
Shown in reference Fig. 3, the first half latch closures 10 comprise the first segmental arc 11 and the first connecting plate 12, two section of first connecting plate 12 is separately positioned on the first segmental arc 11 two ends, and two section of first connecting plate 12 extends along the direction away from the first segmental arc 11 respectively, and the bearing of trend of two section of first connecting plate 12 is contrary; The second half latch closures 20 comprise the second segmental arc 21 and the second connecting plate 22, two section of second connecting plate 22 is separately positioned on the second segmental arc 21 two ends, and two section of second connecting plate 22 extends along the direction away from the second segmental arc 21 respectively, and the bearing of trend of two section of second connecting plate 22 is contrary; Second segmental arc 21 and the first segmental arc 11 are oppositely arranged, and form the clamping space of to be clamped of clamping.
Preferably, the first segmental arc 11 and the second segmental arc 21 are circular arcs of equal diameters.
Particularly, the first connecting plate 12 comprises the first long slab 121 and the first short slab 122, second connecting plate 22 comprises the second long slab 221 and the second short slab 222, first long slab 121 abuts on the second short slab 222, and the first short slab 122 abuts on the second long slab 221.
In conjunction with see shown in Fig. 2 and Fig. 3, according to the first embodiment of the present invention, joint 30 is bolt, and bolt is connected with the locking nut of locking the first half latch closure 10 and the second half latch closures 20.
The application first embodiment of the present invention, power equipment maintaining personnel by the jiont treatment of cable dismantled on the holder, particularly, cable joining is clamped in clamping space that the first half latch closures 10 and the second half latch closures 20 are formed jointly, then, power equipment maintaining personnel will be connected on the connecting plate at the first half latch closures 10 and the second half latch closure 20 two ends, what so just cable can be clamped in fixture adds in space, finally, fixture is fixed on fixed body by power equipment maintaining personnel, and cable has also just been fixed on fixed body.
In conjunction with see shown in Fig. 4 and Fig. 5, according to a second embodiment of the present invention, the first long slab 121 is hinged on the second short slab 222, and the second long slab 221 is hinged with snap close 40, the first end of snap close 40 can fastening on the first short slab 122, the first end of snap close 40 is away from the anchor hole on snap close 40.What snap close 40 comprised the first end being arranged on snap close 40 holds out against screw 41, and the one end holding out against screw 41 is connected on the first short slab 122.
The application second embodiment of the present invention, the first half latch closures 10 and the second half latch closures 20 can rotate around both hinged places mutually.End is put into the fixture opened by power equipment maintaining personnel, the clamping space that segmental arc cable being put into half latch closure is formed.Then, power equipment maintaining personnel close the first half latch closures 10 and the second half latch closures 20, are more directly tipped on the first short slab 122 by snap close 40.What contact with the segmental arc of half latch closure to make cable is more tight, and cable not easily slippage from fixture, power equipment maintaining personnel will hold out against screw 41 and screw, and be connected on the first short slab 122, and cable press from both sides tighter and tighter the most at last until hold out against screw 41.Subsequently, fixture is fixed on fixed body by power equipment maintaining personnel.
Again combine see shown in Fig. 2 and Fig. 3, the first half latch closures 10 comprise the first guard member 13, first guard member 13 and are fixedly installed in the first segmental arc 11; The second half latch closures 20 comprise the second guard member 23, second guard member 23 and are fixedly installed in the second segmental arc 21; First guard member 13 coordinates with the second guard member 23 guard space being formed and protect and treat locking element.
Preferably, the first guard member 13 and the second guard member 23 are rubber guard member.
When cable is fixed on the holder, and fixture is fixed on after on fixed body, and fixed body has sharp-pointed place unavoidably, and the insulation rubber of cable is damaged.Rubber guard member can protect cable sharply not located to damage preferably, thus ensure that the integrity of cable insulation rubber.
As can be seen from the above description, the above embodiments of the present invention achieve following technique effect:
1, to be clamped can be arranged on fixed body securely, or else be utilize artificial support to keep to be clamped stable, and the staff that locking element carries out support that treats originally be arranged just can be freed, and saves labor cost, and alleviates the labor intensity of staff.
2, rubber guard member can protect cable sharply not located to damage preferably, thus ensure that the integrity of cable insulation rubber.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (9)
1. a fixture, to be clamped is fixed on fixed body by described fixture, it is characterized in that, comprising:
The first half latch closures (10);
The second half latch closures (20), described the first half latch closures (10) are oppositely arranged with described the second half latch closures (20) and form the clamping space clamping to be clamped; And
Joint (30), described joint (30) is connected on described the first half latch closures (10) and described the second half latch closures (20), and is clamped in described to be clamped in described clamping space.
2. fixture according to claim 1, is characterized in that,
Described the first half latch closures (10) comprise the first segmental arc (11) and the first connecting plate (12), two sections of described first connecting plates (12) are separately positioned on described first segmental arc (11) two ends and extend along the direction away from described first segmental arc (11) respectively, and the bearing of trend of two sections of described first connecting plates (12) is contrary;
Described the second half latch closures (20) comprise the second segmental arc (21) and the second connecting plate (22), two sections of described second connecting plates (22) are separately positioned on described second segmental arc (21) two ends and extend along the direction away from described second segmental arc (21) respectively, and the bearing of trend of two sections of described second connecting plates (22) is contrary;
Described second segmental arc (21) and described first segmental arc (11) are oppositely arranged and form the clamping space clamping to be clamped.
3. fixture according to claim 2, is characterized in that, described in state the first segmental arc (11) and described second segmental arc (21) be isometrical arc.
4. fixture according to claim 2, it is characterized in that, described first connecting plate (12) comprises the first long slab (121) and the first short slab (122), described second connecting plate (22) comprises the second long slab (221) and the second short slab (222), described first long slab (121) abuts on described second short slab (222), and described first short slab (122) abuts on described second long slab (221).
5. fixture according to any one of claim 1 to 4, is characterized in that, described joint (30) is bolt, described bolt is connected with the locking nut of described the first half latch closures (10) of locking and described the second half latch closures (20).
6. fixture according to claim 4, it is characterized in that, described first long slab (121) is hinged on the second short slab (222), described second long slab (221) is hinged with snap close (40), the first end of described snap close (40) can fastening on described first short slab (212), described first end is away from the anchor hole on described snap close (40).
7. fixture according to claim 6, is characterized in that, described snap close (40) comprise be arranged on described first end hold out against screw (41), described in hold out against screw (41) one end be connected on described first short slab (122).
8. fixture according to claim 2; it is characterized in that; described the first half latch closures (10) comprise the first guard member (13) be fixedly installed in described first segmental arc (11); described the second half latch closures (20) comprise the second guard member (23) be fixedly installed in described second segmental arc (21), and described first guard member (13) coordinates with described second guard member (23) guard space being formed and protect and treat locking element.
9. fixture according to claim 8, is characterized in that, described first guard member (13) and described second guard member (23) are rubber guard member.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310661762.1A CN104696597A (en) | 2013-12-09 | 2013-12-09 | Fixator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310661762.1A CN104696597A (en) | 2013-12-09 | 2013-12-09 | Fixator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104696597A true CN104696597A (en) | 2015-06-10 |
Family
ID=53344002
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310661762.1A Pending CN104696597A (en) | 2013-12-09 | 2013-12-09 | Fixator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104696597A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107332193A (en) * | 2016-01-19 | 2017-11-07 | 张佳训 | A kind of cable connects connection method |
CN110568239A (en) * | 2019-10-16 | 2019-12-13 | 国网河南省电力公司济源供电公司 | Plum blossom contact clamping device for switch cabinet loop resistance test |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2300781Y (en) * | 1997-08-18 | 1998-12-16 | 郑福春 | Pipe clamp structure |
JP2009038899A (en) * | 2007-08-01 | 2009-02-19 | Furukawa Electric Co Ltd:The | Supporting body for corrugate clamp, and corrugate clamp |
KR20100006290A (en) * | 2008-07-09 | 2010-01-19 | 민지훈 | Pipe connector |
CN202302328U (en) * | 2011-10-27 | 2012-07-04 | 航天精工有限公司 | Quick fixing structure of clamping hoop |
CN202302326U (en) * | 2011-09-29 | 2012-07-04 | 浙江金刚汽车有限公司 | Water passage cable fixing clamp |
CN202790947U (en) * | 2012-09-18 | 2013-03-13 | 无锡电站辅机厂 | Single-bearing tube clamp |
CN203176544U (en) * | 2013-04-24 | 2013-09-04 | 固力发集团有限公司 | Cable clip |
CN103343838A (en) * | 2013-07-24 | 2013-10-09 | 国家电网公司 | Pre-stress type cable fixing clamp |
-
2013
- 2013-12-09 CN CN201310661762.1A patent/CN104696597A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2300781Y (en) * | 1997-08-18 | 1998-12-16 | 郑福春 | Pipe clamp structure |
JP2009038899A (en) * | 2007-08-01 | 2009-02-19 | Furukawa Electric Co Ltd:The | Supporting body for corrugate clamp, and corrugate clamp |
KR20100006290A (en) * | 2008-07-09 | 2010-01-19 | 민지훈 | Pipe connector |
CN202302326U (en) * | 2011-09-29 | 2012-07-04 | 浙江金刚汽车有限公司 | Water passage cable fixing clamp |
CN202302328U (en) * | 2011-10-27 | 2012-07-04 | 航天精工有限公司 | Quick fixing structure of clamping hoop |
CN202790947U (en) * | 2012-09-18 | 2013-03-13 | 无锡电站辅机厂 | Single-bearing tube clamp |
CN203176544U (en) * | 2013-04-24 | 2013-09-04 | 固力发集团有限公司 | Cable clip |
CN103343838A (en) * | 2013-07-24 | 2013-10-09 | 国家电网公司 | Pre-stress type cable fixing clamp |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107332193A (en) * | 2016-01-19 | 2017-11-07 | 张佳训 | A kind of cable connects connection method |
CN107332193B (en) * | 2016-01-19 | 2019-03-29 | 河北秦淮数据有限公司 | A kind of cable connects connection method |
CN110568239A (en) * | 2019-10-16 | 2019-12-13 | 国网河南省电力公司济源供电公司 | Plum blossom contact clamping device for switch cabinet loop resistance test |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206211429U (en) | A kind of fastening clip for cable used for transmission line | |
CN108636714B (en) | Auxiliary mechanism and insulator rubberizing device are paintd to structural adhesive | |
CN104696597A (en) | Fixator | |
CN105356368A (en) | Installation tool for insulated shield | |
CN109361172B (en) | Universal ground rod for overhead transmission line ground wire | |
CN205385267U (en) | Parallel groove clamp for power transmission and transformation | |
CN211208713U (en) | Cable connecting device | |
KR20150138770A (en) | Insulated Cover | |
DE602004017988D1 (en) | NEM ELECTRICAL OUTPUT CONNECTION FIXED TO THE EQUIVALENT EQUIPMENT OF AN ELECTRIC LATHE | |
CN104348122A (en) | Ground potential mounting type shunt wire clamp device and mounting method thereof | |
CN104734086A (en) | Cable fixator | |
CN203607778U (en) | Cable fixing device | |
KR20130020389A (en) | Hot line clamp for power line | |
KR20170115359A (en) | Cross Arm Descending Device And Method For The none power cut construction In The power distribution lines | |
US10734792B2 (en) | Bus conductor connection structure for electric field relaxation | |
CN105680394B (en) | A kind of gold utensil and its application method of electrification code wire | |
CN115459151B (en) | Post insulator wire fixing device capable of operating without power failure and use method | |
CN205600632U (en) | Interior electric elements of switch board appurtenance for dismouting | |
CN105048132A (en) | High voltage grounding wire apparatus | |
CN217740995U (en) | Safety protection power distribution cabinet for power supply and distribution | |
CN103441446A (en) | Pulley hanging device | |
KR101832669B1 (en) | Bindless Locking Apparatus of Insulator for Straight Line | |
CN202978113U (en) | Fixing device for electrified mounting of assisting device | |
KR101607215B1 (en) | Mounting structure of a water-cooling cable | |
KR100865495B1 (en) | Safety device for transformer live wire in electric pole for supply of electric power |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150610 |