CN104696588B - 深水海底管线起始铺设的方法 - Google Patents
深水海底管线起始铺设的方法 Download PDFInfo
- Publication number
- CN104696588B CN104696588B CN201510128941.8A CN201510128941A CN104696588B CN 104696588 B CN104696588 B CN 104696588B CN 201510128941 A CN201510128941 A CN 201510128941A CN 104696588 B CN104696588 B CN 104696588B
- Authority
- CN
- China
- Prior art keywords
- initial
- end socket
- anchor
- starting
- laying
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/12—Laying or reclaiming pipes on or under water
- F16L1/16—Laying or reclaiming pipes on or under water on the bottom
Abstract
一种深水海底管线起始铺设的方法,采用以下步骤:一,将主作业船驶到作业地点就位后,与抛锚拖轮连接;二,将拖轮驶向主作业船尾,并放出起始缆,拖轮航行至目标后将起始锚抛至目标点;三,主作业船拉动起始缆进行起始锚拉力试验;并对起始锚位置进行定位;四,将起始缆固定到船尾;五,将起始管线向船尾铺设;六,在起始封头出托管架前,主作业船向前走船,并控制铺管张力;七,在起始封头安装过程中,监控起始封头通过托管架、下放状态、扭转情况,并对起始封头定位,确认着泥位置及坐标;八,起始封头定位、调查后进行管线正常铺设。本发明能够在深水进行海底管线的铺设;且主作业船在水下机器人的协助下,对海底管线起始封头进行精确定位。
Description
技术领域
本发明涉及海底管线的铺设方法,尤其涉及一种适用于深水海底管线起始铺设的方法。属于海洋石油工程领域。
背景技术
随着海底管线铺设逐渐走向深水,深水海底管线铺设的项目逐年增加,而且很多油田生产区块已经达到千米级。
目前,现有海底管线一般都仅限于浅水管线起始铺设,其最深水深不超过300米,主作业船都是采用锚系铺管船进行管线的起始铺设,而无法进行深水管线起始铺设。其主要原因有以下几点:
1.由于主作业船都是采用锚系铺管船,只适用于水深不超过300米的水域,因此,无法进行深水管线起始铺设。
2.由于浅水管线终端基本采用膨胀弯连接,因此,浅水起始铺设位置精度要求不高,定位精度从几米到十几米。而深水水下管汇则安装的比较多,多采用水下跨接管连接,管端水下定位精度要求高,定位精度要求达到亚米级以内。
3.由于浅水起始铺设定位多数采用计算或潜水员利用超短基线定位系统(USBL)进行水下定位,因此,定位精度要求不高。
4.由于浅水起始铺设监控措施非常少,因此,一般只限于对主作业船张紧器及收、放缆张力进行监控。
5.由于浅水管线铺设张力较小,管线在铺设过程中扭转力较小。而深水管线随着铺设张力的加大、水深的增加以及铺设距离的加长,管线上积聚大量扭力也较大。
6.由于浅水管线起始封头设计较简单,而深水起始封头设计复杂,控制阀组也较多。
发明内容
本发明的主要目的在于克服现有技术存在的上述缺点,而提供一种深水 海底管线起始铺设的方法,其利用深水动力定位铺管船进行作业,不仅能够在深水进行海底管线的铺设;而且,主作业船在水下机器人的协助下,还能够对海底管线起始封头进行精确定位;同时,还能够对深水管线起始封头进行实时监视控制,确保深水管线起始铺设安全高效的进行;解决了深水管线起始铺设中定位精度、定位效率、监控、管线扭转以及封头复杂不易控制安装的问题。
本发明的目的是由以下技术方案实现的:
一种深水海底管线起始铺设的方法,其特征在于:采用以下步骤:
第一步,将主作业船驶到作业地点就位,然后,将主作业船与抛锚拖轮连接,并将拖轮的起始缆牵引至主作业船的船尾;由主作业船将弃管回收缆绳与起始缆连接;
第二步,将拖轮驶向主作业船船尾,并放出起始缆,拖轮航行至目标抛锚点,将起始锚抛至目标点区域;
第三步,主作业船利用弃管回收缆绳拉动起始缆进行起始锚的拉力试验;同时,由水下机器人对起始锚位置进行定位;
第四步,起始锚的锚点位置满足要求,且拉力试验拉力满足管线铺设张力需求后,主作业船将调整船位,将起始缆末端固定到船尾;
第五步,主作业船回收弃管回收缆绳,并将起始封头安装到管线上开始正常铺设,当起始封头通过张紧器时,根据铺设张力由张紧器加紧起始铺设管线,并利用张紧器将起始铺设管线向船尾铺设;当起始封头到达船尾时,将起始缆与起始封头连接;
第六步,主作业船进行正常管线铺设,起始封头通过张紧器后,在起始封头上连接浮筒,防止起始封头入水后翻转;在起始封头出托管架前,主作业船向前走船,通过调整主作业船的船位和张紧器的张力控制正常铺管张力;
第七步,在起始封头安装过程中,监控起始封头通过托管架、下放状态、扭转情况,并对起始封头最终定位,确认着泥位置及坐标;
第八步,由水下机器人进行起始封头定位、调查,然后,进行管线正常铺设。
所述起始锚拉力试验的拉力为:管线正常铺设张力的1.25-1.5倍;若起始锚在拉力试验过程中,起始锚的位置发生变化,主作业船通过调整缆不能 满足起始铺设精度要求时,由拖轮将起始锚重新提起,根据海底泥质和上次走锚位置重新进行抛锚。
所述水下机器人是利用超短基线定位系统或长基线定位系统对起始锚位置进行定位。
所述起始缆末端固定到船尾后,根据起始锚的位置,增加或减少调整缆的数量。
所述起始封头通过托管架、下放状态、扭转情况是由托管架上的高清水下摄像头、托管架上压力传感器进行;当起始封头通过托管架后、接近海底时,是由水下机器人进行监控;并根据超短基线定位系统或长基线定位系统对起始封头最终定位,确认着泥位置及坐标。
本发明的有益效果:
本发明由于采用上述技术方案,其利用深水动力定位铺管船进行作业,不仅能够在深水进行海底管线的铺设;而且,主作业船在水下机器人的协助下,还能够对海底管线起始封头进行精确定位;同时,还能够对深水管线起始封头进行实时监视控制,确保深水管线起始铺设安全高效的进行;解决了深水管线起始铺设中定位精度、定位效率、监控、管线扭转以及封头复杂不易控制安装的问题。
附图说明
图1为本发明深水海底管线起始铺设流程图。
图2为本发明拖轮配合主作业船抛锚作业及拉力试验过程示意图。
图3为本发明起始封头及起始封头通过张紧器示意图。
图4为本发明起始封头及浮筒放大示意图。
图中主要标号说明:
1.主作业船;2.拖轮;3.起始缆;4.锚头缆;5.弃管回收缆绳;6.起始锚;7.水下机器人;8.起始封头;9.张紧器;10.管线;11.浮筒;12.托管架。
具体实施方式
如图1—图3所示,本发明采用以下步骤:
第一步,将主作业船1驶到作业地点就位,然后,通过牵引钢丝将主作业船1与抛锚拖轮2连接,由拖轮2将盘好的起始缆3与主作业船1的牵引 钢丝连接,并利用牵引钢丝将拖轮2的起始缆3牵引至主作业船1的船尾;由主作业船1将弃管回收缆绳5与起始缆3连接;
第二步,将拖轮2驶向主作业船1船尾,并放出起始缆3,拖轮2航行至目标抛锚点,利用拖轮滚筒上的锚头缆4将起始锚6抛至目标点区域。
第三步,如图2所示,主作业船1利用弃管回收缆绳5拉动起始缆3进行起始锚6的拉力试验;同时,由水下机器人7利用超短基线定位系统或长基线定位系统对起始锚6位置进行定位,如果起始锚6在拉力试验过程中,起始锚6的位置发生变化,主作业船1通过调整缆不能满足起始铺设精度要求时,由拖轮2将起始锚6重新提起,根据海底泥质和上次走锚位置重新进行抛锚;
上述起始锚6拉力试验的拉力为:管线正常铺设张力的1.25-1.5倍。
第四步,水下机器人7利用超短基线定位系统或长基线定位系统对起始锚6的锚点进行定位,起始锚6的锚点位置满足要求,且拉力试验拉力满足管线铺设张力需求后,主作业船1将调整船位,并降低起始缆3的张力,将起始缆3末端固定到船尾,并根据起始锚6的位置,增加或减少调整缆的数量。
第五步,主作业船1回收弃管回收缆绳5,并将起始封头8采用焊接方式安装到管线上,并开始正常铺设,当起始封头8通过张紧器9时,根据铺设张力由张紧器9加紧起始铺设管线10,并利用张紧器9将起始铺设管线10向船尾铺设;当起始封头8到达船尾时,利用卡环等索具将起始缆3与起始封头8连接。
第六步,如图3所示,主作业船1进行正常管线铺设,起始封头8通过张紧器9后,在起始封头8上连接浮筒11,防止起始封头8入水后翻转;在起始封头8出托管架12前,主作业船1向前走船,通过调整主作业船1的船位和张紧器9的张力控制正常铺管张力。
第七步,在起始封头8通过托管架12时,利用托管架12上的高清水下摄像头观察起始封头8通过托管架12情况,调整走船速度和张紧器9的张力,防止起始封头8与托管架12滚轮组干涉,并利用托管架12上压力传感器监控托管架12的滚轮组张力。当起始封8头通过托管架12后,利用水下机器人7监控起始封头8下放状态;在起始封头8接近海底时,由水下机器人7 检查起始封头8扭转情况,并根据超短基线定位系统或长基线定位系统对起始封头8最终定位,确认着泥位置及坐标。
第八步,由水下机器人7进行起始封头8定位、调查,然后,进行管线正常铺设。
上述主作业船;拖轮;水下机器人;张紧器;浮筒;托管架;超短基线定位系统、长基线定位系统为现有技术,未作说明的技术为现有技术,故不再赘述。
以上所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。
Claims (5)
1.一种深水海底管线起始铺设的方法,其特征在于:采用以下步骤:
第一步,将主作业船驶到作业地点就位,然后,将主作业船与抛锚拖轮连接,并将拖轮的起始缆牵引至主作业船的船尾;由主作业船将弃管回收缆绳与起始缆连接;
第二步,将拖轮驶向主作业船船尾,并放出起始缆,拖轮航行至目标抛锚点,将起始锚抛至目标点区域;
第三步,主作业船利用弃管回收缆绳拉动起始缆进行起始锚的拉力试验;同时,由水下机器人对起始锚位置进行定位;
第四步,起始锚的锚点位置满足要求,且拉力试验中的拉力满足管线铺设的张力需求后,主作业船将调整船位,将起始缆末端固定到船尾;
第五步,主作业船回收弃管回收缆绳,并将起始封头安装到管线上开始正常铺设,当起始封头通过张紧器时,根据铺设张力由张紧器加紧起始铺设管线,并利用张紧器将起始铺设管线向船尾铺设;当起始封头到达船尾时,将起始缆与起始封头连接;
第六步,主作业船进行正常管线铺设,起始封头通过张紧器后,在起始封头上连接浮筒,防止起始封头入水后翻转;在起始封头出托管架前,主作业船向前走船,通过调整主作业船的船位和张紧器的张力控制正常铺管张力;
第七步,在起始封头安装过程中,监控起始封头通过托管架、下放状态、扭转情况,并对起始封头最终定位,确认着泥位置及坐标;
第八步,由水下机器人进行起始封头定位、调查,然后,进行管线正常铺设。
2.根据权利要求1所述的深水海底管线起始铺设的方法,其特征在于:所述起始锚拉力试验的拉力为:管线正常铺设中张紧器的张力的1.25-1.5倍;若起始锚在拉力试验过程中,起始锚的位置发生变化,主作业船通过调整缆不能满足起始铺设精度要求时,由拖轮将起始锚重新提起,根据海底泥质和上次走锚位置重新进行抛锚。
3.根据权利要求1或2所述的深水海底管线起始铺设的方法,其特征在于:所述水下机器人是利用超短基线定位系统或长基线定位系统对起始锚位置进行定位。
4.根据权利要求1所述的深水海底管线起始铺设的方法,其特征在于:所述起始缆末端固定到船尾后,根据起始锚的位置,增加或减少调整缆的数量。
5.根据权利要求1所述的深水海底管线起始铺设的方法,其特征在于:所述起始封头通过托管架、下放状态、扭转情况是由托管架上的高清水下摄像头、托管架上压力传感器进行;当起始封头通过托管架后、接近海底时,是由水下机器人进行监控;并根据超短基线定位系统或长基线定位系统对起始封头最终定位,确认着泥位置及坐标。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510128941.8A CN104696588B (zh) | 2015-03-24 | 2015-03-24 | 深水海底管线起始铺设的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510128941.8A CN104696588B (zh) | 2015-03-24 | 2015-03-24 | 深水海底管线起始铺设的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104696588A CN104696588A (zh) | 2015-06-10 |
CN104696588B true CN104696588B (zh) | 2017-04-19 |
Family
ID=53343993
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510128941.8A Active CN104696588B (zh) | 2015-03-24 | 2015-03-24 | 深水海底管线起始铺设的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104696588B (zh) |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2540142A (en) * | 2015-07-06 | 2017-01-11 | Petrofac Services Ltd | Field joint transfer system |
CN105204506A (zh) * | 2015-09-24 | 2015-12-30 | 哈尔滨工程大学 | 一种动力定位船舶铺管循迹导引方法 |
CN105605314B (zh) * | 2016-02-23 | 2017-09-12 | 中国海洋石油总公司 | 双层海底管道的s形铺设方法 |
CN105805415B (zh) * | 2016-04-26 | 2017-11-17 | 中国海洋石油总公司 | 深水海底管道起始的铺设方法 |
GB2561375B (en) * | 2017-04-12 | 2019-11-27 | Technip France | Pipe Tensioner |
CN106979382A (zh) * | 2017-05-26 | 2017-07-25 | 海洋石油工程股份有限公司 | 深水s型海底管道的起始铺设工艺 |
CN107618626A (zh) * | 2017-08-25 | 2018-01-23 | 中国海洋石油总公司 | 改进的深水半潜式铺管起重船 |
CN108909956B (zh) * | 2018-07-13 | 2020-11-06 | 中国石油集团工程技术研究有限公司 | 一种玻纤增强柔性管的铺设方法 |
CN109747789A (zh) * | 2019-01-14 | 2019-05-14 | 海洋石油工程股份有限公司 | 海底管线铺设时避让浮式生产储油卸油装置的方法 |
CN112709865A (zh) * | 2020-12-09 | 2021-04-27 | 海洋石油工程股份有限公司 | 一种利用重力锚进行超深水海管起始铺设方法 |
CN112803303A (zh) * | 2021-02-05 | 2021-05-14 | 周宏勤 | 一种管缆施工工艺 |
CN113063823A (zh) * | 2021-04-02 | 2021-07-02 | 哈尔滨工程大学 | 一种多船联动的海上爆炸试验方法 |
CN113700938B (zh) * | 2021-08-25 | 2022-04-01 | 哈尔滨工程大学 | 一种海底管道铺设过程中触泥点监视装置及监视方法 |
CN113790311A (zh) * | 2021-09-02 | 2021-12-14 | 海洋石油工程股份有限公司 | 一种海底管道水下导向回拖起始铺设施工方法 |
CN114084283B (zh) * | 2021-12-02 | 2023-02-28 | 中国船舶科学研究中心 | 一种拖点转换结构及利用拖点转换结构的拖点转换方法 |
CN114413846A (zh) * | 2022-01-07 | 2022-04-29 | 中海辉固地学服务(深圳)有限公司 | 基于长基线声学定位系统的深水跨接管安装测量方法 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB934151A (en) * | 1960-09-23 | 1963-08-14 | James George Coultrup | Improvements relating to laying submarine pipelines |
GB0811437D0 (en) * | 2008-06-20 | 2008-07-30 | Saipem Spa | Pipe-laying vessel and method of laying a pipeline |
IT1393703B1 (it) * | 2009-04-23 | 2012-05-08 | Saipem Spa | Gruppo e metodo di posa ed interramento di condotte a fondo mare |
GB201000556D0 (en) * | 2010-01-13 | 2010-03-03 | Saipem Spa | Undersea pipe-laying |
CN103527851B (zh) * | 2013-10-18 | 2015-06-03 | 中国海洋石油总公司 | 海底管道起始铺设系统的预布设工艺 |
CN103912722B (zh) * | 2014-04-23 | 2016-01-13 | 中国化学工程第三建设有限公司 | 一种管道穿越河流的组对沉管方法 |
-
2015
- 2015-03-24 CN CN201510128941.8A patent/CN104696588B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN104696588A (zh) | 2015-06-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104696588B (zh) | 深水海底管线起始铺设的方法 | |
CN102454828B (zh) | 深水s型海底管道铺设过程中的收弃管工艺 | |
CN103527851B (zh) | 海底管道起始铺设系统的预布设工艺 | |
CN102374338A (zh) | 深水s型海底管道的铺设工艺 | |
CN106979382A (zh) | 深水s型海底管道的起始铺设工艺 | |
CN203164099U (zh) | 依托海洋石油平台的串挂式实海腐蚀试验系统 | |
CN102269296A (zh) | 海底管道穿越浮式生产储油装置系统铺设工艺 | |
CN104631602A (zh) | 污水深海排放工程海域管道施工方法 | |
CN203129178U (zh) | 一种超大型沉管绞缆出坞系统 | |
US20050180820A1 (en) | Method and device for anchoring a pipeline | |
CN104696589A (zh) | 深水海底管线终止铺设的方法 | |
CN101218459B (zh) | 近海浮式采油装置上的提升管安装 | |
CN104613234B (zh) | 深水管线弃管的回收方法 | |
CN103926669B (zh) | 一种伴随海洋油气管道铺设安全监测光缆的方法 | |
CN103398218B (zh) | 一种长距离并行海底管线施工保护方法 | |
JP2005121077A (ja) | 海底管敷設工法 | |
CN202746765U (zh) | 海底设置反拖拉点机构 | |
CN112709865A (zh) | 一种利用重力锚进行超深水海管起始铺设方法 | |
CN103899842B (zh) | 深水在线三通的安装方法 | |
US7559721B2 (en) | Towing and installation method for deepwater pipelines and risers | |
CN203383796U (zh) | 一种基于干式采油树的超深水油气开发系统 | |
CN106677721B (zh) | 防台风深水钻井隔水管自动垂直调节装置 | |
CN104653863A (zh) | 单船舶海洋软管挖沟铺设同步作业法 | |
CN107701802A (zh) | J型和s型复合深海铺管系统 | |
KR20100003448A (ko) | 해저 케이블 포설공법 및 이에 사용되는 탐지기 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing Co-patentee after: Offshore Oil Engineering Co., Ltd. Patentee after: China Offshore Oil Group Co., Ltd. Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing Co-patentee before: Offshore Oil Engineering Co., Ltd. Patentee before: China National Offshore Oil Corporation |