CN104695740B - The shock insulation construction method of air conditioner equipment machine room - Google Patents

The shock insulation construction method of air conditioner equipment machine room Download PDF

Info

Publication number
CN104695740B
CN104695740B CN201510006246.4A CN201510006246A CN104695740B CN 104695740 B CN104695740 B CN 104695740B CN 201510006246 A CN201510006246 A CN 201510006246A CN 104695740 B CN104695740 B CN 104695740B
Authority
CN
China
Prior art keywords
keel
machine room
face
air conditioner
abatvoix
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510006246.4A
Other languages
Chinese (zh)
Other versions
CN104695740A (en
Inventor
张军
陈耀钢
顾春明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Zhongnan Construction Equipment Installation Co.,Ltd.
Original Assignee
Jiangsu Zhongnan Construction Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhongnan Construction Industry Group Co Ltd filed Critical Jiangsu Zhongnan Construction Industry Group Co Ltd
Priority to CN201510006246.4A priority Critical patent/CN104695740B/en
Publication of CN104695740A publication Critical patent/CN104695740A/en
Application granted granted Critical
Publication of CN104695740B publication Critical patent/CN104695740B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The invention discloses the shock insulation construction method of a kind of air conditioner equipment machine room, damping spring shock absorber and steel reinforced concrete mixed structure pedestal is increased including under freezing unit, inlet channel and outlet conduit obtain the shockproof support of level by steelframe supporting construction, fresh air pipeline carries out lifting vibration isolation and installs, metope end face all carries out abatvoix construction, and installs sound insulated fire door.Beneficial effect: its different pipelines are independently arranged vibration isolation support, can avoid colliding with other pipelines;Can reduce noise 24 decibels efficiently, be only about 32 decibels in making machine room, effect of vibration and noise reduction is obvious;Easy accessibility, construction easily, cost relatively low, effectively solve indoor air exchange, realize the most effective ventilation, reach to administer indoor pollution air rapidly, economically, be particularly well-suited to place higher to air quality requirements, that personnel activity is more, rate of ventilation is more need realize air exchange and circulation.

Description

The shock insulation construction method of air conditioner equipment machine room
Technical field
The present invention relates to a kind of shock insulation construction method, particularly relate to the shock insulation of a kind of air conditioner equipment machine room Construction method.
Background technology
Although house and window sealing effectiveness in the past are bad, enter cold wind winter, summer enters hot gas, but logical Wind effect is fine, and natural ventilation i.e. can guarantee that the quality of room air.
Along with the development of modern architecture, the raising of country's building energy-saving standard, double glazing, exterior-wall heat insulation etc. The application of technology and product, the airtight performance in house is more and more higher, house just like become airtight jar and Block the approach of gravity-flow ventilation.
But, according to the use situation of top-grade building, people generally feel that indoor humidity is bigger than normal, air is inadequate Pure and fresh, therefore it is the discharge of accelerating chamber internal contamination air, most effective direct method improves room air exactly Circulation, with accelerate indoor pollution air discharge, accelerate outdoor fresh air injection.
At present, the use of VMC achieves the most effective ventilation, by ventilation reasonable in design substantially Path, discharges the air of foul indoor and outdoor treated fresh air is sent into indoor, can reach Rapidly, the effect of indoor pollution air is administered economically.
But, owing to people are more and more higher to the requirement of environment of living, relative to environmental noise and vibration More sensitive, the most anti-vibration and noise of new Ventilator Room has just become the emphasis in construction now.
The generation of existing new Ventilator Room noise and vibration is typically due to produce noise when electromechanical equipment runs, Including air-borne sound and solid-borne noise (vibration), simultaneously because the inertia force of rotary part and bias imbalance produce The power of disturbing part of appliance can be caused to produce forced vibration, and by plant bottom case, the connection of pipeline and building Partial vibration produces transmission solid-borne noise with the form of sound to surrounding space radiation.
Summary of the invention
Present invention is primarily targeted at, overcome deficiency of the prior art, it is provided that a kind of air conditioner equipment The shock insulation construction method of machine room, be particularly well-suited to higher to air quality requirements, personnel activity is more, ventilation The more need of number of times realize the place of air exchange and circulation, such as hospital, KTV, Internet bar, hotel, business The buildings such as field, factory, office building, restaurant, bank, classroom, kindergarten.
The technical problem to be solved be to provide compact conformation, easy accessibility, construction easily, cost The shock insulation construction method of relatively low, safe and reliable, practical air conditioner equipment machine room, not only vibration damping fall Make an uproar, effect substantially, and effectively solves indoor air exchange, it is achieved the most effective ventilation, reaches Rapidly, indoor pollution air is administered economically, hence it is evident that improve living environment, environmental-friendly and comfortable, and there is industry On value.
In order to achieve the above object, the technical solution adopted in the present invention is:
The shock insulation construction method of a kind of air conditioner equipment machine room, described air conditioner equipment machine room is arranged on Standby layer, including freezing unit, the inlet channel being connected with freezing unit and outlet conduit, with freezing unit phase Connect and be used for the fresh air pipeline of air-supply;The construction of its shock insulation comprises the following steps:
Step 1: steel reinforced concrete mixed structure pedestal is set at mechanical floor, at steel reinforced concrete mixed structure Damping spring shock absorber is installed between pedestal and mechanical floor;Freezing unit is arranged on steel reinforced concrete hybrid junctions The upper surface of structure pedestal;
Step 2: inlet channel is all connected, separately with freezing unit by connecting hose with one end of outlet conduit One end away from after freezing unit by the steelframe supporting construction shockproof support of acquisition level being arranged on mechanical floor;
Described steelframe supporting construction includes the rubber vibration isolation acoustic pad being sequentially connected with, compound vibration isolation table from bottom to top Seat, adjustable spring shock absorber one, steelframe, elastic bracket one and anchor ear one;Described inlet channel and water outlet In the elastic bracket one that pipeline is fixed on steelframe by anchor ear one, described inlet channel and outlet conduit with embrace It is provided with rubber strip one between hoop one, elastic bracket one;
Step 3: the blower fan at fresh air pipeline is imported and exported and is respectively mounted silencer;
Step 4: fresh air pipeline is carried out lifts vibration isolation and installs;
Step 4-1: carry out gallows frame installation, suspension bracket spacing should meet when being horizontally mounted, and fresh air pipeline is straight Less than 400mm, footpath or big limit require that suspension bracket spacing is more than or equal to less than 4m, fresh air pipeline diameter or big limit 400mm then requires that suspension bracket spacing is less than 3m;
Step 4-2: install elastic bracket two and anchor ear two on gallows frame the most successively, by new wind Pipeline is fixed in elastic bracket two by anchor ear two, also fresh air pipeline and anchor ear two, elastic bracket two it Between be provided with rubber strip two;
Fresh air pipeline uses flangeless conjunction mode, and carries out external thermal insulation, described rock with rock wool acoustical absorption heat preserving plate Cotton acoustical absorption heat preserving plate bar for line is fixed;
Be provided with between described gallows frame and elastic bracket two adjustable spring shock absorber two, for realize every Shake, or, described gallows frame is hung by suspension spring damper and is located at end face, for realizing vibration isolation;
Step 4-3: carry out the laying of rectangle external thermal insulation;
Step 5: carry out metope abatvoix construction;
Step 5-1: measure metope actual size, confirms installation site, determines horizontal line and vertical line, really The sky of cutting determining wire-socket or pipe reserves size;
Step 5-2: install wall surface keel along metope, described wall surface keel includes carrying main joist and clad can is secondary Keel;Use setscrew that carrying main joist is installed to fix with metope, laterally fix according to 1200mm width, Joint area carries out staggered, keeps staggering distance >=60mm and carrying out the adjustment of levelness and perpendicularity, Glass silk flosssilk wadding is laid afterwards along carrying main joist direction;Directly snap in clad can false keel by main joist grab, cover The spacing of face false keel is 400mm, and joint area carries out staggered, and keep staggering distance >=60mm;
Step 5-3: carry out sealing plasterboard construction, start to install plasterboard from by side, corner, plasterboard Long side direction is parallel to carry main joist, be perpendicular to clad can false keel;The plasterboard fissure of displacement install, be formed without logical Seam;Being fixed by plasterboard with self-tapping screw, screw afterbody gos deep into plasterboard plate face 0.5mm, screw distance plate Limit is more than 15mm more than 10mm, distance cutting edge;Plasterboard is carried out joint treatment;
Step 5-4: carry out pasting abatvoix construction, inhales from starting to install 600mm*600mm by side, corner Soundboard, uses building adhesive to carry out the fissure of displacement and pastes installation, and corner is strengthened fixing with nailing;
Step 6: carry out end face abatvoix construction;
Step 6-1: snap the line setting-out, is as the criterion with indoor datum line absolute altitude, finds the design of furred ceiling on metope Relief, along metope periphery snap the line setting-out;According to snap the line, install along keelson along metope periphery;
Step 6-2: hanger erection, with 1.2m for away from snap the line on floor, beats boom hole, loads expanding screw Bolt, fixed derrick, on the basis of keelson height, determine screw thread length of boom with horizontal line;Carry out water again Heibei provincial opera is whole, determines top cap nut position height with horizontal line on suspension rod, and the screw screwing suspension rod reaches to want The height asked, it is ensured that the bottom surface horizontal line of end face keel is consistent with along keelson bottom line;
Step 6-3: install end face keel and baked keel, uses suspension rod to be fixed by end face keel, reaches to want The height asked;Use connector to be fixed on end face keel by baked keel, reach height and the entirety of requirement Levelness;
Step 6-4: carry out end face abatvoix and lay, is placed in baking vanish dragon by end face abatvoix from left to right order On bone;
Step 7: sound insulated fire door is installed;
Use building adhesive that door abatvoix pastes the inner side of fire resistant doorsets, and stop, use are installed on ground In protection door abatvoix.
The present invention is further arranged to: described steelframe is portal frame or drum steelframe.
The present invention is further arranged to: described elastic bracket one and elastic bracket two are DT type caoutchouc elasticity Bracket.
The present invention is further arranged to: described connecting hose is arranged on the side of freezing unit.
The present invention is further arranged to: described connecting hose is rubber flexible connecting pipe.
The present invention is further arranged to: the cross section of described fresh air pipeline is circular or oval.
Compared with prior art, the invention have the advantages that:
1, vibration and noise reducing, effectively solves indoor air exchange, it is achieved the most effective ventilation, reach rapidly, Administer indoor pollution air economically, hence it is evident that improve living environment, be particularly well-suited to air quality requirements relatively The need high, personnel activity is more, rate of ventilation is more realize the place of air exchange and circulation.
2, damping spring shock absorber and steel reinforced concrete are increased under the freezing unit in air conditioner equipment machine room Mixed structure pedestal, inlet channel and outlet conduit obtain the shockproof support of level by steelframe supporting construction, newly Wind pipeline carries out lifting vibration isolation and installs, and the metope end face of machine room all carries out abatvoix construction, and installs sound insulation Fire resistant doorsets, its different pipelines are independently arranged vibration isolation support, can avoid colliding with other pipelines;Can be efficient Reduction noise 24 decibels, make to be only about 32 decibels in machine room, effect of vibration and noise reduction is obvious;Meanwhile, Indoor air exchange is well orderly, environmental-friendly and comfortable.
Foregoing is only the general introduction of technical solution of the present invention, in order to be better understood upon the technology hand of the present invention Section, the invention will be further described below in conjunction with the accompanying drawings.
Accompanying drawing explanation
Fig. 1 is that in air conditioner equipment machine room of the present invention, structural representation is faced in the installation of freezing unit;
Fig. 2 be in air conditioner equipment machine room of the present invention inlet channel and outlet conduit face structural representation Figure;
Fig. 3 is inlet channel and the side-looking structural representation of outlet conduit in air conditioner equipment machine room of the present invention Figure;
Fig. 4 is a kind of mounting structure cut-away view of fresh air pipeline in air conditioner equipment machine room of the present invention;
Fig. 5 is another mounting structure cut-away view of fresh air pipeline in air conditioner equipment machine room of the present invention.
Detailed description of the invention
Below in conjunction with Figure of description, the present invention is further illustrated.
Air conditioner equipment machine room as shown in Figure 1, Figure 2 and Figure 3 is arranged on mechanical floor 10, including freezing Unit 1, the inlet channel 2 being connected with freezing unit 1 and outlet conduit 3, it is connected also with freezing unit 1 Fresh air pipeline 4 for air-supply.
The present invention provides the shock insulation construction method of air conditioner equipment machine room, including following shock insulation construction procedure:
Step 1: arrange steel reinforced concrete mixed structure pedestal 11 at mechanical floor 10, mixes at steel reinforced concrete Close and damping spring shock absorber 12 is installed between construction pedestals 11 and mechanical floor 10;Freezing unit 1 is arranged on The upper surface of steel reinforced concrete mixed structure pedestal 11, as shown in Figure 1;Damping spring shock absorber stress is equal Even, reduce vibration isolation center of gravity, it is ensured that freezing unit resistance to overturning, make freezing unit vibration be controlled also The amplitude of minimizing, it is ensured that freezing unit properly functioning own.
Step 2: by one end of inlet channel 2 and outlet conduit 3 all by connecting hose 13 and freezing unit 1 Being connected, the other end is obtained by the steelframe supporting construction 20 being arranged on mechanical floor 10 away from after freezing unit 1 Obtain the shockproof support of level, as it is shown in figure 1, described connecting hose is arranged on the side of freezing unit, scratches for rubber Property adapter;
As shown in Figures 2 and 3, described steelframe supporting construction 20 includes the rubber being sequentially connected with from bottom to top Shock insulation acoustic pad 21, compound vibration isolation pedestal 22, adjustable spring shock absorber 1, steelframe 24, elastic torr Frame 1 and anchor ear 1;Described steelframe 24 is drum steelframe, and described elastic bracket 1 is DT type Caoutchouc elasticity bracket;Described inlet channel 2 and outlet conduit 3 are fixed on steelframe 24 by anchor ear 1 Elastic bracket 1 in, described inlet channel 2 and outlet conduit 3 and anchor ear 1, elastic bracket one Rubber strip 1 it is provided with between 25.
Step 3: the blower fan at fresh air pipeline 4 is imported and exported and is respectively mounted silencer, relative to the feelings without silencer Condition can reduce noise about 10 decibels.
Step 4: fresh air pipeline 4 is carried out lifts vibration isolation and installs;
Step 4-1: carry out gallows frame 40 and install, suspension bracket 40 spacing should meet when being horizontally mounted, new wind Less than 400mm, pipeline 4 diameter or big limit require that suspension bracket 40 spacing is less than 4m, fresh air pipeline 4 diameter Or more than or equal to 400mm, limit then requires that suspension bracket 40 spacing is less than 3m greatly;
Step 4-2: install elastic bracket 2 41 and anchor ear 2 42 on gallows frame 40 the most successively, Fresh air pipeline 4 is fixed in elastic bracket 2 41, also at fresh air pipeline 4 and anchor ear by anchor ear 2 42 2 42, it is provided with rubber strip 2 43 between elastic bracket 2 41;Described elastic bracket 2 41 is also DT Type caoutchouc elasticity bracket;
Wherein, fresh air pipeline 4 uses flangeless conjunction mode, and (does not shows in figure with rock wool acoustical absorption heat preserving plate Go out) carry out external thermal insulation, described rock wool acoustical absorption heat preserving plate bar for line is fixed, rock wool have fire prevention, insulation and The effect of sound-absorbing can improve fresh air pipeline vibration isolation;The cross section of described fresh air pipeline 4 is circular or oval;
As shown in Figure 4, it is provided with adjustable spring between described gallows frame 40 and elastic bracket 2 41 to subtract Shake device 2 44, for realizing vibration isolation;Or, as it is shown in figure 5, described gallows frame 40 is by suspension bracket bullet Spring damper 45 hangs and is located at end face, for realizing vibration isolation;
Step 4-3: carry out the laying of rectangle external thermal insulation.
Different pipelines in air conditioner equipment machine room are independently arranged vibration isolation support, can avoid sending out with other pipelines Life is collided and is produced noise.
Step 5: carry out metope abatvoix construction;
Step 5-1: measure metope actual size, confirms installation site, determines horizontal line and vertical line, really The sky of cutting determining wire-socket or pipe reserves size;
Step 5-2: install wall surface keel along metope, described wall surface keel includes carrying main joist and clad can is secondary Keel;Use setscrew that carrying main joist is installed to fix with metope, laterally fix according to 1200mm width, Joint area carries out staggered, keeps staggering distance >=60mm and carrying out the adjustment of levelness and perpendicularity, Glass silk flosssilk wadding is laid afterwards along carrying main joist direction;Directly snap in clad can false keel by main joist grab, cover The spacing of face false keel is 400mm, and joint area carries out staggered, and keep staggering distance >=60mm;
Step 5-3: carry out sealing plasterboard construction, start to install plasterboard from by side, corner, plasterboard Long side direction is parallel to carry main joist, be perpendicular to clad can false keel;The plasterboard fissure of displacement install, be formed without logical Seam;Being fixed by plasterboard with self-tapping screw, screw afterbody gos deep into plasterboard plate face 0.5mm, screw distance plate Limit is more than 15mm more than 10mm, distance cutting edge;Plasterboard is carried out joint treatment;
Step 5-4: carry out pasting abatvoix construction, inhales from starting to install 600mm*600mm by side, corner Soundboard, uses building adhesive to carry out the fissure of displacement and pastes installation, and corner is strengthened fixing with nailing.
Step 6: carry out end face abatvoix construction;
Step 6-1: snap the line setting-out, is as the criterion with indoor datum line absolute altitude, finds the design of furred ceiling on metope Relief, along metope periphery snap the line setting-out;According to snap the line, install along keelson along metope periphery;
Step 6-2: hanger erection, with 1.2m for away from snap the line on floor, beats boom hole, loads expanding screw Bolt, fixed derrick, on the basis of keelson height, determine screw thread length of boom with horizontal line;Carry out water again Heibei provincial opera is whole, determines top cap nut position height with horizontal line on suspension rod, and the screw screwing suspension rod reaches to want The height asked, it is ensured that the bottom surface horizontal line of end face keel is consistent with along keelson bottom line;
Step 6-3: install end face keel and baked keel, uses suspension rod to be fixed by end face keel, reaches to want The height asked;Use connector to be fixed on end face keel by baked keel, reach height and the entirety of requirement Levelness;
Step 6-4: carry out end face abatvoix and lay, is placed in baking vanish dragon by end face abatvoix from left to right order On bone.
Step 7: sound insulated fire door is installed;
Use building adhesive that door abatvoix pastes the inner side of fire resistant doorsets, and stop, use are installed on ground In protection door abatvoix.
The general principle of the present invention, principal character and advantage have more than been shown and described.The technology people of the industry Member it should be appreciated that the present invention is not restricted to the described embodiments, described in above-described embodiment and specification only Being the principle that the present invention is described, without departing from the spirit and scope of the present invention, the present invention also has respectively Planting changes and improvements, these changes and improvements both fall within scope of the claimed invention.Application claims Protection domain is defined by appending claims and equivalent thereof.

Claims (6)

1. a shock insulation construction method for air conditioner equipment machine room, described air conditioner equipment machine room is arranged At mechanical floor, including freezing unit, the inlet channel being connected with freezing unit and outlet conduit, with refrigerator Group is connected and for the fresh air pipeline blown;It is characterized in that, including following shock insulation construction procedure:
Step 1: steel reinforced concrete mixed structure pedestal is set at mechanical floor, at steel reinforced concrete mixed structure Damping spring shock absorber is installed between pedestal and mechanical floor;Freezing unit is arranged on steel reinforced concrete hybrid junctions The upper surface of structure pedestal;
Step 2: inlet channel is all connected, separately with freezing unit by connecting hose with one end of outlet conduit One end away from after freezing unit by the steelframe supporting construction shockproof support of acquisition level being arranged on mechanical floor;
Described steelframe supporting construction includes the rubber vibration isolation acoustic pad being sequentially connected with, compound vibration isolation table from bottom to top Seat, adjustable spring shock absorber one, steelframe, elastic bracket one and anchor ear one;Described inlet channel and water outlet In the elastic bracket one that pipeline is fixed on steelframe by anchor ear one, described inlet channel and outlet conduit with embrace It is provided with rubber strip one between hoop one, elastic bracket one;
Step 3: the blower fan at fresh air pipeline is imported and exported and is respectively mounted silencer;
Step 4: fresh air pipeline is carried out lifts vibration isolation and installs;
Step 4-1: carry out gallows frame installation, suspension bracket spacing should meet when being horizontally mounted, and fresh air pipeline is straight Less than 400mm, footpath or big limit require that suspension bracket spacing is more than or equal to less than 4m, fresh air pipeline diameter or big limit 400mm then requires that suspension bracket spacing is less than 3m;
Step 4-2: install elastic bracket two and anchor ear two on gallows frame the most successively, by new wind Pipeline is fixed in elastic bracket two by anchor ear two, also fresh air pipeline and anchor ear two, elastic bracket two it Between be provided with rubber strip two;
Fresh air pipeline uses flangeless conjunction mode, and carries out external thermal insulation, described rock with rock wool acoustical absorption heat preserving plate Cotton acoustical absorption heat preserving plate bar for line is fixed;
Be provided with between described gallows frame and elastic bracket two adjustable spring shock absorber two, for realize every Shake, or, described gallows frame is hung by suspension spring damper and is located at end face, for realizing vibration isolation;
Step 4-3: carry out the laying of rectangle external thermal insulation;
Step 5: carry out metope abatvoix construction;
Step 5-1: measure metope actual size, confirms installation site, determines horizontal line and vertical line, really The sky of cutting determining wire-socket or pipe reserves size;
Step 5-2: install wall surface keel along metope, described wall surface keel includes carrying main joist and clad can is secondary Keel;Use setscrew that carrying main joist is installed to fix with metope, laterally fix according to 1200mm width, Joint area carries out staggered, keeps staggering distance >=60mm and carrying out the adjustment of levelness and perpendicularity, Glass silk flosssilk wadding is laid afterwards along carrying main joist direction;Directly snap in clad can false keel by main joist grab, cover The spacing of face false keel is 400mm, and joint area carries out staggered, and keep staggering distance >=60mm;
Step 5-3: carry out sealing plasterboard construction, start to install plasterboard from by side, corner, plasterboard Long side direction is parallel to carry main joist, be perpendicular to clad can false keel;The plasterboard fissure of displacement install, be formed without logical Seam;Being fixed by plasterboard with self-tapping screw, screw afterbody gos deep into plasterboard plate face 0.5mm, screw distance plate Limit is more than 15mm more than 10mm, distance cutting edge;Plasterboard is carried out joint treatment;
Step 5-4: carry out pasting abatvoix construction, inhales from starting to install 600mm*600mm by side, corner Soundboard, uses building adhesive to carry out the fissure of displacement and pastes installation, and corner is strengthened fixing with nailing;
Step 6: carry out end face abatvoix construction;
Step 6-1: snap the line setting-out, is as the criterion with indoor datum line absolute altitude, finds the design of furred ceiling on metope Relief, along metope periphery snap the line setting-out;According to snap the line, install along keelson along metope periphery;
Step 6-2: hanger erection, with 1.2m for away from snap the line on floor, beats boom hole, loads expanding screw Bolt, fixed derrick, on the basis of keelson height, determine screw thread length of boom with horizontal line;Carry out water again Heibei provincial opera is whole, determines top cap nut position height with horizontal line on suspension rod, and the screw screwing suspension rod reaches to want The height asked, it is ensured that the bottom surface horizontal line of end face keel is consistent with along keelson bottom line;
Step 6-3: install end face keel and baked keel, uses suspension rod to be fixed by end face keel, reaches to want The height asked;Use connector to be fixed on end face keel by baked keel, reach height and the entirety of requirement Levelness;
Step 6-4: carry out end face abatvoix and lay, is placed in baking vanish dragon by end face abatvoix from left to right order On bone;
Step 7: sound insulated fire door is installed;
Use building adhesive that door abatvoix pastes the inner side of fire resistant doorsets, and stop, use are installed on ground In protection door abatvoix.
The shock insulation construction method of air conditioner equipment machine room the most according to claim 1, its feature exists In: described steelframe is portal frame or drum steelframe.
The shock insulation construction method of air conditioner equipment machine room the most according to claim 1, its feature exists In: described elastic bracket one and elastic bracket two are DT type caoutchouc elasticity bracket.
The shock insulation construction method of air conditioner equipment machine room the most according to claim 1, its feature exists In: described connecting hose is arranged on the side of freezing unit.
The shock insulation construction method of air conditioner equipment machine room the most according to claim 1, its feature exists In: described connecting hose is rubber flexible connecting pipe.
The shock insulation construction method of air conditioner equipment machine room the most according to claim 1, its feature exists In: the cross section of described fresh air pipeline is circular or oval.
CN201510006246.4A 2015-01-06 2015-01-06 The shock insulation construction method of air conditioner equipment machine room Active CN104695740B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510006246.4A CN104695740B (en) 2015-01-06 2015-01-06 The shock insulation construction method of air conditioner equipment machine room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510006246.4A CN104695740B (en) 2015-01-06 2015-01-06 The shock insulation construction method of air conditioner equipment machine room

Publications (2)

Publication Number Publication Date
CN104695740A CN104695740A (en) 2015-06-10
CN104695740B true CN104695740B (en) 2016-09-07

Family

ID=53343251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510006246.4A Active CN104695740B (en) 2015-01-06 2015-01-06 The shock insulation construction method of air conditioner equipment machine room

Country Status (1)

Country Link
CN (1) CN104695740B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105928180A (en) * 2016-05-25 2016-09-07 青岛海川建设集团有限公司 Environmentally-friendly noise reduction structure of VRV (Variable Refrigerant Volume) air-conditioning system and construction method thereof
CN106197680B (en) * 2016-06-24 2019-01-01 湖北久之洋红外系统股份有限公司 Detector refrigeration machine integrated system for silent formula thermal infrared imager
CN106223645B (en) * 2016-07-30 2018-08-07 浙江天诚中央空调工程有限公司 Air conditioner base-isolated equipment computer room and its construction method and regulating system
CN108265754B (en) * 2016-12-30 2019-05-28 北京市第五建筑工程集团有限公司 Anechoic chamber's construction method
CN107763759A (en) * 2017-09-30 2018-03-06 南京市园林规划设计院有限责任公司 A kind of building in the style of the ancients air-conditioner outdoor unit concealed structure
CN109990030A (en) * 2019-05-06 2019-07-09 中建一局集团安装工程有限公司 Flexible machine room damping system and foundation construction method thereof
CN111894313A (en) * 2020-06-30 2020-11-06 圣晖系统集成集团股份有限公司 Prefabricating method of integral machine room
CN114688205B (en) * 2020-12-31 2023-08-29 北京科益虹源光电技术有限公司 Vibration isolation structure and impeller rotor system for laser

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102287578A (en) * 2011-07-29 2011-12-21 华东理工大学 Spring-rubber vibration isolating hanging frame for damping vibration and reducing noise for warm ventilation pipe
CN202831698U (en) * 2012-08-25 2013-03-27 东莞市优赛科创企业管理咨询有限公司 Noise reduction, shock absorption and smoke processing system for generator set
CN103225863A (en) * 2013-05-13 2013-07-31 南车戚墅堰机车有限公司 Ventilation device for power chamber of diesel engine test station
CN203160760U (en) * 2013-01-24 2013-08-28 东莞市天明环保节能工程有限公司 Noise abatement machine room
JP2014015989A (en) * 2012-07-09 2014-01-30 Tokkyokiki Corp Base isolation structure, base isolation floor structure and clean room including the same
JP2014240556A (en) * 2013-06-11 2014-12-25 株式会社東芝 Vibration control method, power plant using the same and vibration control system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102287578A (en) * 2011-07-29 2011-12-21 华东理工大学 Spring-rubber vibration isolating hanging frame for damping vibration and reducing noise for warm ventilation pipe
JP2014015989A (en) * 2012-07-09 2014-01-30 Tokkyokiki Corp Base isolation structure, base isolation floor structure and clean room including the same
CN202831698U (en) * 2012-08-25 2013-03-27 东莞市优赛科创企业管理咨询有限公司 Noise reduction, shock absorption and smoke processing system for generator set
CN203160760U (en) * 2013-01-24 2013-08-28 东莞市天明环保节能工程有限公司 Noise abatement machine room
CN103225863A (en) * 2013-05-13 2013-07-31 南车戚墅堰机车有限公司 Ventilation device for power chamber of diesel engine test station
JP2014240556A (en) * 2013-06-11 2014-12-25 株式会社東芝 Vibration control method, power plant using the same and vibration control system

Also Published As

Publication number Publication date
CN104695740A (en) 2015-06-10

Similar Documents

Publication Publication Date Title
CN104695740B (en) The shock insulation construction method of air conditioner equipment machine room
CN203160760U (en) Noise abatement machine room
CN209817233U (en) Sound insulation and absorption ceiling structure
CN202055357U (en) Combined type soundproof room
CN109138212B (en) Villa noise reduction system
CN105840459A (en) Sound insulation and noise reduction method and device for MVR energy saving vaporization system
CN205825228U (en) A kind of floating vibration isolation noise reduction type air conditioning system building formula building
CN104727452B (en) A kind of composite sound isolating material and the sound-proof wall body structure based on the material
CN106373759A (en) Noise-reduction protective apparatus for power distribution transformer
CN109025379A (en) A kind of household can reduce the small-sized noise reduction cell structure of noise
CN105972802A (en) Vibration isolation noise reduction type air conditioner system for floating building and installation method thereof
CN211341321U (en) Sandwich sound insulation curtain wall
CN102261151A (en) Bar-type air outlet, silencing plenum box and grille lamp combined suspended ceiling and construction method thereof
CN206220588U (en) A kind of power transformer computer room
CN102997384B (en) Construction method of air pipe in full-replacement type fresh air system
CN202467263U (en) Noise reduction room for gas pressure regulation station
CN102268922B (en) Method for constructing curved roof of integral semi-anechoic room of automobile noise laboratory
CN108074560A (en) Sound absorber and its noise reduction furniture in a kind of broadband room
CN205403534U (en) Two curve type cooling tower noise elimination systems
CN207672782U (en) Assembled acoustics room
CN210267501U (en) Air conditioning system suitable for high-rise curtain wall building body
CN208205320U (en) A kind of ventilated box
CN205259679U (en) Soundproof and heat resistant room
CN201546334U (en) Double layer damping sound insulation plate
CN205637721U (en) Reduce structure that transformer station owner becomes room noise

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180620

Address after: 226100 Changle Town, Haimen City, Nantong City, Jiangsu Province

Patentee after: Nantong Zhongnan Construction Equipment Installation Co.,Ltd.

Address before: 226124 Eastern District, 5 floor, Zhongnan group, Changle Town, Nantong, Jiangsu

Patentee before: Jiangsu Zhongnan Construction Industry Group Co., Ltd.

TR01 Transfer of patent right