CN104695447B - deep basement support - Google Patents

deep basement support Download PDF

Info

Publication number
CN104695447B
CN104695447B CN201510124628.7A CN201510124628A CN104695447B CN 104695447 B CN104695447 B CN 104695447B CN 201510124628 A CN201510124628 A CN 201510124628A CN 104695447 B CN104695447 B CN 104695447B
Authority
CN
China
Prior art keywords
layer
basement
ring
layers
inner ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510124628.7A
Other languages
Chinese (zh)
Other versions
CN104695447A (en
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HAINAN WANTAI BUILDING ENGINEERING Co.,Ltd.
Original Assignee
朱奎
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 朱奎 filed Critical 朱奎
Priority to CN201510124628.7A priority Critical patent/CN104695447B/en
Publication of CN104695447A publication Critical patent/CN104695447A/en
Application granted granted Critical
Publication of CN104695447B publication Critical patent/CN104695447B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1607Shapes round, e.g. circle

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a deep basement support. The deep basement support is characterized in that engineering piles are applied to first-layer steel upright columns foundation piles and foundation piles of second-layer steel upright columns 7, and inner rings are arranged according to arranging conditions of the engineering piles; outer rings are arranged according to plane conditions of a basement, the outer rings are tangent to inner sides of support row piles, and the outer rings are elliptical or circular; the area formed by first-layer basement inner ring beams is 7-18M2, and the area formed by second-layer basement inner ring beams is 20-35M2; sectional sizes of the first-layer basement inner ring beams and the second-layer basement inner ring beams are equal, the first-layer basement inner ring beams and the second-layer basement inner ring beams are 500-700mm in height, and first-layer basement outer ring beams and second-layer basement outer ring beams are 500-700mm in height; concrete beams or steel beams are applied to first-layer diagonal braces, second-layer diagonal braces and angle braces, sections of first-layer steel upright columns and sections of the second-layer steel upright columns are the same, the sections of the first-layer steel upright columns and the second-layer steel upright columns are square, and side length of the squares is 800-1000mm.

Description

Deep basement supporting
Technical field
The present invention relates to deep basement supporting is it is adaptable to the realm of building construction.
Background technology
During city development at present is built, in city, land resource assumes the situation of an inch of land is an inch of gold, and basement does deeper and deeper, with When basement construction when surrounding enviroment protection requirement more and more higher, any to the deep basement construction of business district guarantee basement The safety of construction is a difficult problem for engineering field, and the construction safety of especially more than three layers basements is more difficult.
Content of the invention
The present invention is to provide a kind of deep basement supporting, solves the problems, such as deep basement supporting construction safety.
For this reason, one layer of steel column foundation pile, two layers of steel column foundation pile utilizing works stake in the present invention, interior ring is according to work Journey stake deployment scenarios are configured.After steel column foundation pile utilizing works stake, can substantially reduce construction cost.Outer ring according to Basement planar environment is arranged, and outer ring is tangent with the inner side of retaining piles, and outer ring is oval or circular.
The area that one layer of basement inner ring ring beam is formed is 7~18m2, the face that two layers of basement inner ring ring beam is formed Amass as 20~35m2, the area that in the present invention, one layer of basement inner ring ring beam is formed formed than two layers of basement inner ring ring beam Little excavator when can significantly expand shoveling of area working space.One layer of basement inner ring ring beam and two layers of basement Inner ring ring beam sectional dimension is identical, and one layer of basement inner ring ring beam and two layers of basement inner ring ring beam height are 500~700mm, One layer of underground outdoor coil ring beam and two layers of underground outdoor coil ring beam height are 500~700mm.One layer to support, two layers to support and angle Support adopts beams of concrete or girder steel, and one layer of steel column section be identical with two layers of steel column section, one layer of steel column and two layers of steel Column section is square, and the square length of side is 800~1000mm.
In the present invention, one layer of basement inner ring ring beam and two layers of basement inner ring ring beam setting concrete linking beam are joined Connect, the upper connection part position of concrete linking beam is in one layer of basement inner ring ring beam and one layer of junction to support, and concrete is even The lower link position of binder is in two layers of basement inner ring ring beam and two layers of junction to support, to increase the firm of support system Degree.
Construction procedure includes:
(1) construction one layer of steel column foundation pile of post, two layers of steel column foundation pile, construct one layer of steel column, two layers of steel column.
(2) construction basement support pile.
(3) construction basement water-stop curtain, using cement mixing pile as basement water-stop curtain.
(4) a layer of basement inner ring ring beam, one layer of outer ring ring beam of construction.
(5) one layer of construction is to support, angle brace.
(6) hole in earth excavation to two layers of basement inner ring ring beam bottom construction elevation.
(7) two layers of basement inner ring ring beam, two layers of outer ring ring beam of construction.
(8) two layers of construction is to support.
(9) hole in earth excavation to three layers of basement bottom board bottom construction elevation.
(10) construction basement bottom board.
(11) construction basement concrete exterior wall.
(12) two layers of basement inner ring ring beam, two layers of outer ring ring beam are removed, two layers to support.
(13) two layers of basement floor of construction.
(14) one layer of basement inner ring ring beam, one layer of outer ring ring beam are removed, one layer to support.
(15) one layer of basement floor of construction.
The invention is not restricted to three layers of basement, four layers of basement can be extended to this technical scheme.
The present invention has a following beneficial effect:
(1) basement support system and surrounding building safety and stability, effective control horizontal displacement, can guarantee that basement Unearthed safety in work progress and smooth construction, structure meets the stable requirement of basement construction safety.
(2) the relatively conventional basement construction of the present invention, greatly reduces support rod member, and armored concrete consumption significantly subtracts Few, engineering cost reduces.
(3) because basement construction is to supportting quantity far fewer than traditional basement construction, basement earth excavation space is big, and Be conducive to backhoe excavation and construction, can significantly increase construction speed.
Brief description
Fig. 1 is one layer of basement supporting site plan, and Fig. 2 is two layers of basement supporting site plan.
Reference: 1, one layer of basement inner ring ring beam, 2, one layer of steel column, 3, one layer to support, 4, one layer of outer ring ring beam, 5th, angle brace, 6, two layers of basement inner ring ring beam, 7, two layers of steel column, 8, two layers to support, 9, two layers of outer ring ring beam.
Specific embodiment
Certain engineering basement is located at business district, and depth is 15.4m, foundation ditch Zhou Changwei 418m, and basement surrounding enviroment are over the ground Lower room construction requirement is higher, and northwest side is municipal road, has a lot of underground pipings, and southeast side is 6 layers of office building, and office building basis is adopted With cement mixing pile, structure situation is not good.
One layer of steel column 2 foundation pile, the foundation pile utilizing works stake of two layers of steel column 7 in the present invention, interior ring is according to engineering Stake deployment scenarios are configured.Under outer ring base area, room planar environment is arranged, the inner side phase of outer ring and retaining piles Cut, outer ring is oval or circular.The area that one layer of basement inner ring ring beam 1 is formed is 9.6m2, two layers of underground interior The area that ring beam 6 is formed is 25.8m2.One layer of basement inner ring ring beam 1 and two layers of basement inner ring ring beam 6 sectional dimension Identical, one layer of basement inner ring ring beam 1 and two layers of basement inner ring ring beam 6 height are 600mm, one layer of underground outdoor coil ring beam 4 It is 600mm with two layers of underground outdoor coil ring beam 9 height.One layer adopts beams of concrete or steel to supportting 3, two layers to support 8 and angle brace 5 Beam, one layer of steel column 2 section is identical with two layers of steel column 7 section, and one layer of steel column 2 and two layers of steel column 7 section are square, The square length of side is 900mm.
In the present embodiment, one layer of basement inner ring ring beam 1 and two layers of basement inner ring ring beam 6 setting concrete linking beam enter Row connection, the upper connection part position of concrete linking beam is in one layer of basement inner ring ring beam 1 and one layer of junction to support 3, mixes The lower link position of solidifying soil linking beam is in two layers of basement inner ring ring beam 6 and two layers of junction to support 8.
The present embodiment construction procedure includes:
(1) construction one layer of steel column 2 foundation pile of post, two layers of steel column 7 foundation pile, construction 2, two layers of steel of one layer of steel column stand Post 7.
(2) construction basement support pile.
(3) construction basement water-stop curtain, using cement mixing pile as basement water-stop curtain.
(4) construction 1, one layer of outer ring ring beam 4 of one layer of basement inner ring ring beam.
(5) one layer of construction is to support 3, angle brace 5.
(6) hole in earth excavation to two layers of basement inner ring ring beam 6 bottom construction elevation.
(7) construction 6, two layers of outer ring ring beam 9 of two layers of basement inner ring ring beam.
(8) two layers of construction is to support 8.
(9) hole in earth excavation to three layers of basement bottom board bottom construction elevation.
(10) construction basement bottom board.
(11) construction basement concrete exterior wall.
(12) 9, two layers of 6, two layers of outer ring ring beam of two layers of basement inner ring ring beam are removed to support 8
(13) two layers of basement floor of construction.
(14) remove 4, one layer of 1, one layer of outer ring ring beam of one layer of basement inner ring ring beam to support 3.
(15) one layer of basement floor of construction.
During basement construction, soil mass displacement at the deep layer is within 12mm, to support axle power not less than 1500kn, surrounding buildingses Thing Stability Analysis of Structures, construction effect is preferable.

Claims (1)

1. a kind of deep basement supporting construction, is characterized in that one layer of steel column basis, two layers of steel column basis all using engineering pile As its foundation pile, inner ring ring beam is configured according to engineering pile deployment scenarios;Outer ring ring beam enters according to basement planar environment Row arrangement, outer ring ring beam is tangent with the inner side of retaining piles, and outer ring ring beam is oval or circular;Ring in one layer of basement The area that beam is formed is 7~18m2, the area that two layers of basement inner ring ring beam is formed is 20~35m2;One layer of underground interior Ring beam and two layers of basement inner ring ring beam sectional dimension are identical, one layer of basement inner ring ring beam and two layers of basement inner ring ring beam Highly it is 500~700mm, one layer of underground outdoor coil ring beam and two layers of underground outdoor coil ring beam are highly 500~700mm; One layer to support, two layers to support and angle brace adopt beams of concrete or girder steel, one layer of steel column section and two layers of steel column section phase Together, one layer of steel column and two layers of steel column section are square, and the square length of side is 800~1000mm;One layer is arranged on to support Between one layer of basement inner ring ring beam and outer ring ring beam, two layers support is arranged on two layers of basement inner ring ring beam and outer ring ring beam it Between, angle brace is located at one layer of basement inner corner portion position;
One layer of basement inner ring ring beam and two layers of basement inner ring ring beam setting concrete linking beam are coupled, and concrete links The upper connection part position of beam is in one layer of basement inner ring ring beam and one layer of junction to support, the second line of a couplet socket part of concrete linking beam Position is in two layers of basement inner ring ring beam and two layers of junction to support.
CN201510124628.7A 2015-03-13 2015-03-13 deep basement support Active CN104695447B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510124628.7A CN104695447B (en) 2015-03-13 2015-03-13 deep basement support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510124628.7A CN104695447B (en) 2015-03-13 2015-03-13 deep basement support

Publications (2)

Publication Number Publication Date
CN104695447A CN104695447A (en) 2015-06-10
CN104695447B true CN104695447B (en) 2017-01-25

Family

ID=53342962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510124628.7A Active CN104695447B (en) 2015-03-13 2015-03-13 deep basement support

Country Status (1)

Country Link
CN (1) CN104695447B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887891A (en) * 2016-04-16 2016-08-24 朱奎 Deep basement supporting construction method
CN109024613B (en) * 2017-09-15 2020-09-15 叶长青 Large-span foundation pit supporting construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1097227A (en) * 1993-07-08 1995-01-11 天津市第一建筑工程公司 Flat lattice type ring-beam supporting method
CN2294993Y (en) * 1997-05-15 1998-10-21 天津市五环经济技术开发公司 Wall-protection assembled supporting device for deep-foundation pit
CN2835351Y (en) * 2005-10-14 2006-11-08 浙江中成建工集团有限公司 Horizontal supporting structure for reinforced concrete loop truss in deep foundation pit
CN201074331Y (en) * 2007-09-18 2008-06-18 天津一建建筑工程有限公司 Horizontal supporting structure for deep-large foundation ditch annular girders
CN101615212A (en) * 2009-07-28 2009-12-30 武汉理工大学 A kind of campshed-Nei Zhi supporting system simplified design calculation method
CN101666095A (en) * 2009-09-11 2010-03-10 朱奎 Irregular foundation pit support and construction method
CN102828520A (en) * 2012-09-11 2012-12-19 中煤科工集团武汉设计研究院中汉岩土工程分公司 Ring-shaped inner supporting structure used in deep peat soil deep foundation pit

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4248716B2 (en) * 1999-12-20 2009-04-02 西松建設株式会社 Caisson top end construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1097227A (en) * 1993-07-08 1995-01-11 天津市第一建筑工程公司 Flat lattice type ring-beam supporting method
CN2294993Y (en) * 1997-05-15 1998-10-21 天津市五环经济技术开发公司 Wall-protection assembled supporting device for deep-foundation pit
CN2835351Y (en) * 2005-10-14 2006-11-08 浙江中成建工集团有限公司 Horizontal supporting structure for reinforced concrete loop truss in deep foundation pit
CN201074331Y (en) * 2007-09-18 2008-06-18 天津一建建筑工程有限公司 Horizontal supporting structure for deep-large foundation ditch annular girders
CN101615212A (en) * 2009-07-28 2009-12-30 武汉理工大学 A kind of campshed-Nei Zhi supporting system simplified design calculation method
CN101666095A (en) * 2009-09-11 2010-03-10 朱奎 Irregular foundation pit support and construction method
CN102828520A (en) * 2012-09-11 2012-12-19 中煤科工集团武汉设计研究院中汉岩土工程分公司 Ring-shaped inner supporting structure used in deep peat soil deep foundation pit

Also Published As

Publication number Publication date
CN104695447A (en) 2015-06-10

Similar Documents

Publication Publication Date Title
CN102635120B (en) Circular deep foundation ditch is without Construction of Supporting structure and construction method
CN205776249U (en) A kind of combined inner supporting structure
CN101117805A (en) Underground engineering one-pile multi-use semi reverse construction method
JP2020522635A (en) Open caisson construction structure and construction method
CN203654294U (en) Foundation pit supporting structure used in reverse building method
JP5555643B2 (en) Structure and construction method of mountain retaining support
CN105155554A (en) Deep foundation pit of arched supporting system
CN102561384A (en) Steel hoop truss type elevated pile cap tower crane foundation construction method and structure
CN201762710U (en) Pile-wall combined enclosing structure for offshore deep foundation pit
CN204590038U (en) A kind of permanent foundation pit supporting construction
CN104389317B (en) The only pile foundation construction of large-span arch bridge ultra-large type tilting
CN101793023A (en) Foundation pit construction method
CN205975658U (en) Steel platform tower crane foundation
JP2013256793A (en) Construction method for underground structure, and underground structure
CN105155602A (en) Multi-support foundation strengthening comprehensive controlling method
CN106245927A (en) A kind of frame structure building underground that is applicable to increases method and the building of layer
CN108978677A (en) Deep pit digging combined support structure under complicated landform
CN202519697U (en) Steel hoop truss high pile-cap tower crane basic structure
JP2018017111A (en) Construction method of water cutoff work space
CN104695447B (en) deep basement support
CN103498475A (en) Foundation pit supporting structure for controlling existing building deformation and construction method for excavating foundation pit
CN104846832A (en) Construction method of circular deep foundation pit enclosure of discrete pile support
JP5259510B2 (en) Retaining wall and its construction method
CN105421477A (en) Construction method for tower crane foundation
CN108035360A (en) A kind of method for pattern foundation pit supporting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 236000 room 604, unit 2, building 3, Huichuang Jiangnan County, Guanzhong Avenue, Yingshang County, Fuyang City, Anhui Province

Patentee after: Zhu Kui

Address before: Xincheng mountain road 325000 in Zhejiang province Lucheng District Garden Room 1901

Patentee before: Zhu Kui

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: Lucheng mountain road Xincheng District of Wenzhou City, Zhejiang province 325000 Garden Room 1901

Patentee after: Zhu Kui

Address before: 236000 room 604, unit 2, building 3, Huichuang Jiangnan County, Guanzhong Avenue, Yingshang County, Fuyang City, Anhui Province

Patentee before: Zhu Kui

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhu Kui

Inventor after: Wu Qianmin

Inventor before: Zhu Kui

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201106

Address after: Room c3009, third floor, new Bund Fuxing City, No.32 Binhai Avenue, Binhai street, Longhua District, Haikou City, Hainan Province 570105

Patentee after: HAINAN WANTAI BUILDING ENGINEERING Co.,Ltd.

Address before: Lucheng mountain road Xincheng District of Wenzhou City, Zhejiang province 325000 Garden Room 1901

Patentee before: Zhu Kui