CN104662926A - Interior sensor network building device and method - Google Patents

Interior sensor network building device and method Download PDF

Info

Publication number
CN104662926A
CN104662926A CN201280076070.4A CN201280076070A CN104662926A CN 104662926 A CN104662926 A CN 104662926A CN 201280076070 A CN201280076070 A CN 201280076070A CN 104662926 A CN104662926 A CN 104662926A
Authority
CN
China
Prior art keywords
transducer
building
connection
machine
router
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201280076070.4A
Other languages
Chinese (zh)
Other versions
CN104662926B (en
Inventor
村上伸太郎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Publication of CN104662926A publication Critical patent/CN104662926A/en
Application granted granted Critical
Publication of CN104662926B publication Critical patent/CN104662926B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
    • H04L43/0805Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability
    • H04L43/0817Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability by checking functioning
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/28Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
    • H04L12/2803Home automation networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0677Localisation of faults
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
    • H04L43/0805Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability
    • H04L43/0811Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability by checking connectivity
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Environmental & Geological Engineering (AREA)
  • Automation & Control Theory (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)
  • Telephonic Communication Services (AREA)
  • Selective Calling Equipment (AREA)

Abstract

Provided are an interior sensor network building device and method whereby it is possible to automatically carry out operation and connection verifications for energy quantity measurement sensors which are installed in a building. The device builds a network (21) between facility apparatuses and sensors which measure energy quantities, and a server, which are installed in a building (2). The device comprises: a means for testing an automatic connection with a router and the server; a means for displaying, if the connection fails, the apparatus which fails and the cause of the failure; a means for, if the connection with the router and the server is made, testing, via the router and the server, an automatic connection with the facility apparatuses and the sensors; a means for displaying, if the connection with either the facility apparatuses or the sensors fails, the apparatus which fails and the cause of the failure; a means for displaying the operation verification statuses and the installation sites within the building (2) of the facility apparatuses and the sensors whereon the connection is made; and a means for registering in a verification result storage means, for the facility apparatuses and the sensors whereon the connection is made, information of the result of the automatic connection tests, the operation verification statuses, and the installation sites.

Description

The building device of building inner sensor network and method
Technical field
The present invention relates to building device and the method for building inner sensor network, particularly relate to building device and the method for the building inner sensor network of the sensor network of the information of constructing the transducer can automatically collected from the energy consumption of measurement energy ezpenditure machine and the energy output of Blast Furnace Top Gas Recovery Turbine Unit (TRT) etc.
Background technology
Control electric power equipment etc., the control system of the energy ezpenditure the operation of a machine state used in building is known, in these control system, exist and possess and energy ezpenditure machine communication, and the system (for example, referring to patent documentation 1) of the control device of far distance controlled energy ezpenditure the operation of a machine state.
The system that patent documentation 1 is recorded is by using portable mobile terminal access system outward from house, can from the premises electric power equipment remote control system of the various electric power equipments of far distance controlled premises house.In patent documentation 1, in order to construct this system, carry out to the electric power equipment of premises arrange and power wiring equipment etc. distribution after, the premises information distributor cap device of the function realized as so-called home server is set, in the construction project of house, carries out the operation of constructing network in residence.
And whether in patent documentation 1, before house is consigned to trustee, carrying out can the action checking of electric power equipment of far distance controlled premises.
Because described action checking is before house consigns to trustee, therefore, by the PC checked being directly connected in the premises information distributor cap device of separate state, by premises information distributor cap device, communicate with the electric power equipment of premises, carry out the confirming operation of these machines.On the picture of inspection PC, searching picture and setting website are shown, and these pictures carry out confirming operation.
Accordingly, as existing, after can preventing trustee from moving in, external staff enters house inside in order to check, trustee has moved in the rear generation needing to carry out the inconvenience such as the correction of system.
Patent documentation 1: patent No. 4653448 publication
Summary of the invention
, in the prior art as patent documentation 1, during communication acknowledgement, whether a display communication is successful, and therefore, the connection existing problems of which part need to check that operator oneself finds, and judge.
Also have, about the loop be branched at distributor cap quantity and be arranged at duplexure etc. electric power measuring device presence or absence, also have,, there is the part that can not automatically identify, need operator to input in the presence or absence of the various equipment machines of solar power generation cell and fuel cell etc.
Also have, in prior art as patent documentation 1, whether carry out can the action checking of electric power equipment of remote operation premises, but when the remote control system of premises is constructed, the technology of carrying out the action checking of the wound energy equipment of device of solar generating and fuel cell etc. and the electrical quantity sensor of each electric power equipment is not disclosed.
The present invention in view of the foregoing, its object is to provide a kind of energy fluence measurement sensor for being arranged in building, automatically can carry out action, the building device connecting the building inner sensor network confirmed and method.
Other objects of the present invention are, there is provided a kind of be arranged at the energy fluence measurement sensor in building auto-action, connect confirm in, during connection failure, building device and the method for the building inner sensor network gone wrong with the connection of which machine can be represented.
Described problem is solved by following manner.According to the invention that claim 1 relates to, a kind of device constructing the network between transducer and server being arranged at equipment machine in building and measurement energy fluence, comprising: the unit attempting automatic connection route device and described server; When to the connection failure of described router or described server, the machine of display connection failure and the unit of item can considered as the reason of connection failure; When being successfully connected with described router and described server, by described router and described server, attempt the unit from be dynamically connected described equipment machine and described transducer; When to the connection failure of any one of described equipment machine and described transducer, the machine of display connection failure and the unit of item can considered as the reason of connection failure; Show the unit of described equipment machine and the confirming operation situation of described transducer and the setting place in described building successfully connected; The described equipment machine connected about described success and described transducer, the information registering of the result, described confirming operation situation and the described setting place that described trial are certainly dynamically connected is in the unit confirming result memory cell.
Described problem is solved by following manner.According to the invention that claim 7 relates to, a kind of method of constructing the network between transducer and server being arranged at equipment machine in building and measurement energy fluence, comprising: the operation of automatic connection route device and described server attempted by computer; When to the connection failure of described router or described server, the machine of display connection failure and the operation of item can considered as the reason of connection failure; Described computer, when being successfully connected with described router and described server, by described router and described server, attempts the operation from be dynamically connected described equipment machine and described transducer; When to the connection failure of any one of described equipment machine and described transducer, the machine of display connection failure and as the reason of connection failure can consider the operation of item; Show the operation of the setting place in the described equipment machine and the confirming operation situation of described transducer and described building that successfully connect; The described equipment machine connected about described success and described transducer, the information registering of the result, described confirming operation situation and the described setting place that described trial are certainly dynamically connected is in the operation confirming result memory cell.
Due to formation like this, the electric power equipment not only in building, the transducer for measurement energy fluence also automatically can carry out confirming operation and connection at server side.
Further, owing to possessing when to the connection failure of router or server, the machine of display connection failure and the unit of item can considered as the reason of connection failure; When to the connection failure of any one of equipment machine and transducer, the machine of display connection failure and the unit of item can considered as the reason of connection failure, when therefore automatically carrying out action, connection confirmation, even if when connection confirms unsuccessfully, can know that in which stage failure, that can save the sensor network in building constructs spent time and time immediately.
Further, due to possess save button clicked time, the e-file of store list is paid to the filename comprising the identifying information identifying corresponding described building, be stored in the unit connecting machine guide look memory cell, about described building, the action of equipment machine and transducer can be left, be connected and be confirmed whether to also have, when part completes, be accomplished to the information in which stage.
Further, preferably described building is supplied to the computer of the merchant of the user of this building.
Due to formation like this, the merchant of building is provided to carry out constructing of building inner sensor network.
Also have, preferably include: be successfully connected to become described network object all described equipment machine and described transducer for condition, show the unit of the save button of the list of the described setting place for preserving described equipment machine and described transducer and this equipment machine and this transducer; When described save button is clicked, the e-file storing described list is paid to the filename comprising the identifying information identifying corresponding described building, be stored in the unit connecting machine guide look memory cell.
Due to formation like this, the information of the setting place of the equipment machine and transducer that are registered in the list that e-file stores can be used for the so-called household energy management system (HEMS) of the electric power equipment controlling to use in building.
Also have, the transducer of preferred measurement described energy fluence measurement is, from comprise the kilowatt meter in the loop that the distributor cap that is installed on described building is arranged, the pulse transducer of use amount of measurement running water and combustion gas, the pulse transducer measuring combustion gas use amount, measurement Blast Furnace Top Gas Recovery Turbine Unit (TRT) generating electricity generating electrical quantity sensor group in the middle of the transducer selected.
Due to formation like this, the building inner sensor network of enlisting the services of and being arranged at the various transducers of building can be constructed.
Also have, preferably possess and to remove with the connection of described router when being instructed to, judge that whether the connection ID inputted to permit with the connection of described router is consistent with the described building device regulation ID for being connected to network used in everyday, when consistent, stop the unit removed with the connection of described router.
Due to formation like this, even in order to be connected to connection ID that router the uses situation consistent with the regulation ID of the network in order to be connected to workplace etc. used in everyday, be automatically eliminated when also can not remove in the connection with router.
Also have, preferred described server possesses, when there is the machine with mutually different communication protocol communication in described some described equipment machines and described transducer, switched by the communication protocol that the communication protocol used when transmitting control signal to described equipment machine and described transducer is used according to the described equipment machine of destination and described transducer, the protocol switching unit of described equipment machine and described transducer can be controlled.
Be above-mentioned formation, switch communication protocol by protocol switching unit according to communication object, in user side without the need to recognizing the difference of communication protocol, just can to the control of each equipment machine of server requirement and transducer.
According to the building device of building inner sensor network of the present invention, the electric power equipment not only in building, the transducer of measurement energy fluence also automatically can carry out confirming operation and connection at server side.
Further, owing to possessing when to the connection failure of router or server, the machine of display connection failure and the unit of item can considered as the reason of connection failure; When to the connection failure of any one of equipment machine and transducer, the unit of the item that can consider of the display machine of connection failure and the reason of connection failure, when therefore automatically carrying out action, connection confirmation, even if when connection confirms unsuccessfully, can know that in which stage failure, that can save the sensor network in building constructs spent time and time immediately.
Further, due to possess save button clicked time, the e-file of store list is paid to the filename comprising the identifying information identifying corresponding described building, be stored in the unit connecting machine guide look memory cell, about described building, the action of equipment machine and transducer can be left, be connected and be confirmed whether to also have, when part completes, be accomplished to the information in which stage.
Accompanying drawing explanation
Fig. 1 is the overall pie graph of the premises sensor network of one embodiment of the invention.
Fig. 2 is the hardware structure diagram of the terminal computer of one embodiment of the invention.
Fig. 3 is the flow chart of the flow process representing the premises sensor network constructing the present embodiment.
Fig. 4 is homepage picture and the router connection picture of calibration tool program.
Fig. 5 is the flow chart of the process representing calibration tool program.
Fig. 6 is the confirmation screen of connection status confirming to perform the terminal of calibration tool program, router, home server.
Fig. 7 is the flow chart of the process representing calibration tool program.
Fig. 8 be for carry out transducer, air-conditioning, storage battery connection confirm connection machine confirmation screen.
Fig. 9 is the sensing data input picture of the data of input pickup in advance before the connection of transducer confirms.
Figure 10 is branch's transducer list screen of the situation that the connection of display transducer confirms, the list screen of other transducers.
Figure 11 is the flow chart of the process representing calibration tool program.
Figure 12 is the flow chart of the process representing calibration tool program.
Figure 13 represents the confirming operation result screen of the result that the connection be performed in calibration tool program confirms and the connection machine guide look file for preserving its content.
Figure 14 is the flow chart of the process representing calibration tool program.
Figure 15 is the air-conditioning list screen of the situation that the connection of display air-conditioning confirms.
Figure 16 is the flow chart of the process representing calibration tool program.
Figure 17 is the flow chart of the process representing calibration tool program.
Figure 18 is the storage battery list screen of the situation that the connection of display storage battery confirms.
Embodiment
Below, with reference to accompanying drawing, embodiments of the invention are described.In addition, the formation below illustrated unrestricted the present invention, undoubtedly can carry out various change according to aim of the present invention.
(premises sensor network)
The premises sensor network of the present embodiment is the energy production of supervision as the premises of building, the sensor network of consumption situation, the electrical quantity sensor of the duplexure etc. at the distributor cap being arranged at house, the information network that sends of the energy output transducer of Blast Furnace Top Gas Recovery Turbine Unit (TRT), combustion gas, the reception that information can be carried out between the pulse transducer etc. of running water and home server, be used to the so-called household energy management system (HEMS) controlling the electric power equipment used in house 2.
HEMS is, the energy consumption in management house 2, the electric power consumption of the some electric power equipments used in visual (visualization) house 2, by described system of being reported and submitted to the user of house 2 by the information of visualization.By the premises sensor network of the present embodiment, home server obtains the data of use amount etc. of the electricity usage amount of each power equipment, the energy output of Blast Furnace Top Gas Recovery Turbine Unit (TRT), combustion gas, running water, visual energy consumption and energy output.
Fig. 1 is the overall pie graph of premises sensor network.
Premises sensor network possesses, the controlled home network 21 and be communicatively connected in a network the terminal computer 51 (following, to be terminal 51) in home network 21 by the router one 3 in house 2 by the home server 10 as the server constructed in house 2.
House 2 is examples for building, and the present invention is also applicable to control the building beyond house 2, the situation of the energy ezpenditure machine that such as, building, shop etc. in commercial mansion, factory use.In addition, house 2 refers to outside the house of independent building, also comprises the concept in a room in the condominiums such as apartment.
In addition, home server 10 is connected to not shown the Internet by router one 3, is communicated by the server computer of the Internet with housing administration company, and the occupant of house 2 also can utilize and be provided to online service from housing administration company.
In house 2, construct the home network 21 being called as each room of the link of LAN in family, as shown in Figure 1, following assembly is connected to described home network 21: home server 10; Measure the branch transducer 11a of the electricity in each loop; Measure the electric power measurement tap 11b of the consumes power of electric power equipment; Temporary transient storage be branched transducer 11a, electric power measurement tap 11b, generating electrical quantity sensor 11c, generating electrical quantity sensor 11d, consumption that combustion gas pulse transducer 11e, running water pulse transducer 11f measure, generating electricity data and be sent to the data logger 11g of home server 10; In house 2, occupant carries out the display unit 12 of the operation of the reading and electric power equipment etc. of the information that the use amount of power consumption etc. relates to; By the network interconnective router one 3 of home network 21 with outside the Internet etc.; The various electric power equipments of air-conditioning, illumination etc.; Distributor cap 30; By device of solar generating 41, fuel cell 42, the storage battery 43 of electric power electric power storage that generated electricity by device of solar generating 41 and fuel cell 42; Combustion gas pulse transducer 11e; Running water pulse transducer 11f.
Home server 10 is devices of the information in managing family network 21, while management is connected to the address of the machine of the display unit 12, distributor cap 30, device of solar generating 41, electric power equipment 23 etc. of home network 21, carry out the communication with these machines, obtain the information of the state of machine etc., there is the machine handing function of the state of control machine.Home server 10 to enroll server computer, home computer, Set Top Box, other the form of original machine etc. realize.The hardware of home server 10 forms identical with terminal 51, and therefore the description thereof will be omitted.
In addition, usually, being recommended in and being equipped with in the house 2 of HEMS, use the electric power equipment adopting common communication protocol (with communication mode and communication standard synonym), such as, expecting the machine of the unified communication protocol for adopting ECHONET association to advocate.On the one hand, as the agreement that ECHONET association advocates, there is ECHONET (registered trade mark) and the ECHONETLite (registered trade mark) as its successor standard, there is the situation that in the electric power equipment in house 2, two agreements are mixed in.Further, also exist in the electric power equipment that user buys, comprise the situation of the machine outside the communication protocol beyond ECHONET and ECHONETLite.
Thus, in home network 21, in the some electric power equipments used in house 2 and transducer, there is the machine with mutually different communication protocol communication.For this reason, the communication assembly communicated with the communication object of house 2 for home server 10 is stored in the memory cell of home server 10 respectively according to communication protocol.That is, the communication assembly of the species number of communication protocol that the electric power equipment in house 2 and transducer only adopt by communication protocol is stored in memory cell.The words illustrated, for with the 1st communication protocol (such as, ECHONET) assembly communicated, memory cell is stored in for the assembly that communicates by the 2nd communication protocol (such as ECHONETLite) and the 3rd communication protocol (communication protocol such as, beyond ECHONET and ECHONETLite).
And, in home network 21, be stored in the communications component of memory cell, be read out and the communications component performed is switched according to communication object.Accordingly, the communication protocol adopted according to the electric power equipment of communication object and transducer with the communication protocol adopted when electric power equipment and sensor communication can switch by home server 10.In addition, switch communication protocol with in order to the communicating machine transmission using other communication protocols, by the text transmitted by certain communication protocol (instruction) with to the mode of other communication protocols should changing and write synonym.Further, home server 10 switches communication protocol and in the electric power equipment of the communication object of communication, comprises the data logger 11g of the present embodiment.
Wherein, to the words that the program execution enviroment in home server 10 is described, the various assemblies that home server 10 possesses OS, JAVA (registered trade mark) virtual machine (following, JVM), OSGi (Open Services Gataway initiative) framework and runs on OSGi framework.OSGi framying, on JVM, manages the life cycle of the download of the assembly run on OSGi framework, installation, starting, stopping etc.And, about the assembly run on OSGi framework, dynamically can change, also have, some assemblies can be performed concurrently.
Wherein, in the assembly that OSGi framework runs, comprise for the assembly with aforesaid 1st communication protocol communication (following, 1st communications component), (following for the assembly with the 2nd communication protocol communication, 2nd communications component) and for the assembly (following, the 3rd communications component) with the 3rd communication protocol communication.And in the function that OSGi framework possesses, by dynamically changing the function of assembly, according to the electric power equipment of communication object become when home server 10 communicates and the communication protocol of transducer, the communications component be performed is replaced.By the replacing of such communications component, the communication protocol that home server 10 adopts is switched.As a result, home server 10 can the similarities and differences of no matter communication protocol, with the electric power equipment in house 2 and sensor communication.
Further, each communications component is registered in OSGi framework, and the interface for the function using each communications component is registered in service registration.The interface of these interfaces integrated provides as API (Application Program Interface) by OSGi framework.Utilize described API, in user side, without the need to recognizing the difference of communications component, that is, the difference of the communication protocol between electric power equipment and transducer.Accordingly, namely, develop relative home server 10 when requiring the program of the control of electric power equipment and transducer, as long as its developer holds each electric power equipment and transducer referent (Object) specifies, just can be suitable for the exploitation gimmick of general Web communication protocol.
When requiring with the electric power equipment in house 2 and the communication of transducer to home server 10, use above-mentioned API, do not need described request text to be organized into the form meeting communication protocol, become comparatively easy text.Be described in more detail, when occupant requires the control of electric power equipment and transducer to home server 10, HTTP request, the execution requirements being specially electric power equipment and transducer control is sent to home server 10 by from display unit 12.On the one hand, home server 10 receives above-mentioned HTTP request from display unit 12, transmits control signal to this electric power equipment and transducer with electric power equipment and sensor communication.As a result, home server 10, according to the control law of specifying in above-mentioned HTTP request, controls the electric power equipment as control object and transducer.Wherein, the communication protocol adopted when home server 10 transmits control signal is set as the communication protocol adopted as electric power equipment and the transducer of the destination of control signal.
Further, home server 10 further with electric power equipment and the sensor communication of reception control signal, receive answer signal from this electric power equipment and transducer.Now, the communication protocol that home server 10 adopts is set as the communication protocol adopted as electric power equipment and the transducer of the originator of answer signal.
As above in home network 21, between home server 10 and electric power equipment and transducer, two-way communication is performed, be specially, control signal is sent to each electric power equipment and transducer by from home server 10, and answer signal is sent to home server 10 by from each electric power equipment and transducer.
Display unit 12 is arranged at kitchen, living room, toilet etc. in house 2 everywhere, possesses the display unit of reception sending function between home server 10 and touch pad.In addition, the indication device 69 of home server 10 can be used as display unit 12.
Electric power equipment 23 is the general names of the machine used within the family, except the household appliances of refrigerator, microwave oven etc. and game machine, AV machine, comprises all electric power equipments in the family of transducer, illumination etc.
The relative home server 10 of each electric power equipment that the present embodiment relates to can be connected communicatedly and be automatically recognized in home server 10 side.The words illustrated, in the electric power equipment that the present embodiment relates to, the household appliances of air-conditioning, illumination etc. become the machine of the ECHONET standard adopting ECHONET (energy is preserved and residential care network) association to advocate, or adopt the machine according to uniform standard.This electric power equipment is by ECHONET standard, and relative home server 10 can be connected communicatedly and be automatically recognized in home server 10 side, further, is registered in home server 10 as the machine in house 2.Wherein, as automatically identifying and registering the technology of electric power equipment, the known technology of plug and play (registered trade mark) technology etc. can be utilized.
The distributor cap 30 trunk electric power be provided with as house 2 entirety provides the trunk loop 31 in loop, some duplexures 32 from trunk branch of a circuit, and the branch transducer 11a be made up of known kilowatt meter is installed on trunk loop 31 and each duplexure 32.
Because trunk loop 31 and each duplexure 32 are associated with the power consumption machine of the regulation of the air-conditioning used in house 2 and illumination etc., by from the galvanometer measured value of electric current and the potentiometer measured value that flow through trunk loop 31 and each duplexure 32, measure the electricity of the electric current flow through respectively, the consumes power of the power consumption machine corresponding to trunk loop 31 and each duplexure 32 can be measured.
In the power consumption machine used in house 2, do not arrange special electric power supply circuit, not corresponding with duplexure 32 machine is connected to known electric power and measures tap 11b, is carried out the measurement of consumes power by this electric power measurement tap 11b.
Device of solar generating 41 is made up of known device of solar generating, is connected with the known generating electrical quantity sensor 11c detecting the electricity generated electricity by device of solar generating 41.
Fuel cell 42 is made up of known fuel cell, is connected with the known generating electrical quantity sensor 11d detecting the electricity generated electricity by fuel cell 42.
Combustion gas pulse transducer 11e, running water pulse transducer 11f detect the combustion gas use amount of premises and the known pulse transducer of running water use amount.
Branch transducer 11a, electric power measurement tap 11b, generating electrical quantity sensor 11c by represent the data of consumes power, combustion gas with pulse transducer 11e by represent the data of amount of consumed gas, running water pulse transducer 11f using represent running water consumption data, as the output of measurement result, these data are temporarily accumulated in data logger 11g, every the stipulated time that 1 minute waits, transmit from data logger 11g to home server 10.
Terminal 51 is confirming operations etc. of home server 10 and other electric power equipment etc. in order to carry out the home network 21 be connected in house 2, the computer that the director of house manufacturer uses.
Represent that the hardware of terminal 51 is formed at Fig. 2.Terminal 51 possesses as the calculation of data, the CPU61 of control treatment device, RAM62, ROM63, the HDD64 and storage media device 65 etc. as storage device.CPU61 performs various process according to the program being stored in ROM63 or HDD64.Be stored in the data of RAM62, CPU61 necessity when performing various process.
Perform the connection between each transducer 11a ~ f, air-conditioning, storage battery 43, confirming operation and title and setting place etc. are stored in HDD64 to the calibration tool program of the preliminary registration of the database of home server 10.The process be performed in calibration tool program is the process of the step S7 of Fig. 3, and being specially, is the process of the flow chart of Fig. 5, Fig. 7, Figure 11, Figure 12, Figure 14, Figure 16 ~ Figure 17.
Further, about each house 2, connection and the confirming operation result table of the result whether connection of the transducer be stored by calibration tool program, air-conditioning, storage battery 43 and confirming operation are completed are stored in HDD64.Connect and confirming operation result table as project, comprise the intrinsic identification serial number of house 2, router one 3 IP address, represent the connection of transducer, whether confirming operation completes completes mark, whether the connection representing air-conditioning, confirming operation complete completes mark, whether the connection of expression storage battery 43, confirming operation complete completes mark.Complete and be labeled as, 1 has represented, 0 expression does not complete.
Store about house 2, comprise be performed by calibration tool program transducer, air-conditioning, the connection of storage battery 43 and the situation of confirming operation the confirmation destination file double-layered quilt of file of data be stored in HDD64.The transducer storing the data of branch's transducer list screen 190 and other transducer list screen 200 confirms that destination file, the air-conditioning confirmation destination file of data of storage air-conditioning list 231 and the storage battery of the data of storage storage battery list 251 confirm that destination file is stored in and confirm that destination file presss from both sides, and the filename being comprised the intrinsic identification serial number of house 2 by paying respectively, representing the mark of transducer/air-conditioning/storage battery respectively.
Store about house 2, comprise the connection machine guide look file completing the connection machine guide look file 214 of Figure 13 of the information of connection and the transducer of confirming operation, air-conditioning, the guide look of storage battery 43 and confirming operation result thereof etc. by calibration tool program and be stored in HDD64.The filename comprising the intrinsic identifying information of house 2 is attached to and connects machine guide look file 214.
Storage media device 65 is made up of external hard disk, CD-R, DVD, memory stick etc., the data storage, reading etc. that can will receive.
(construction method of premises sensor network)
Below, the construction method of the sensor network of premises is described.
First, be described with reference to the flow process of Fig. 3 to the premises sensor network constructing the present embodiment.
First, house manufacturer forms based on the equipment of premises and selects setting etc. to carry out the self-criticism (step S1) of the practice of sensor network.Afterwards, the practice formed based on adopted network and the equipment formation etc. of premises are made picture (step S2).
And, based on the figure be made, carry out the setting process (step S3) of electric power equipment.In described step, house manufacturer and power engineering merchant carry out the power wiring of premises, arrange electric power equipment.Now, the setting of home server 10 display unit 12 is carried out.
Further, power engineering merchant carries out the setting process (step S4) of distributor cap 30 and each transducer 11a ~ f, data logger 11g.
And, completed by the setting process of the electric power equipment done of the house manufacturer of step S3, step S4, distributor cap 30, each transducer 11a ~ f, data logger 11g, the director of house manufacturer checks the presence or absence, operation etc. (step S5) of the tie lines of electric power equipment, distribution, energising.
Afterwards, router one 3 is connected to terminal 51 by the director of house manufacturer, carries out the preliminary registration (step S6) to the database of home server 10 such as the connection between each electric power equipment and home server 10, the title of confirming operation, all electric power equipment and setting place.In described step, also carry out branch transducer 11a, electric power measurement tap 11b, generating electrical quantity sensor 11c, generating electrical quantity sensor 11d, combustion gas pulse transducer 11e, running water with the connecting of pulse transducer 11f and data logger 11g, tentatively register.
In the present embodiment, to by router one 3, home server 10 is connected to the Internet, from the place away from house 2, by the Internet and router one 3, the example that terminal 51 is connected to home server 10 is described, but director brings terminal 51 into house 2, the home server 10 terminal 51 being directly connected in the separate state of the Internet not being connected to house 2 is also passable.
Afterwards, terminal 51 is connected to router one 3, carries out the connection between each transducer 11a ~ f, air-conditioning, storage battery 43, confirming operation and to the preliminary registration (step S7) such as the title of the database of home server 10 and setting place.
Step S7's, connection between each transducer 11a ~ f, air-conditioning, storage battery 43, confirming operation, the preliminary words registered, trustee is carried out to the operating instruction of the premises sensor network of the present embodiment, afterwards, house 2 is consigned to trustee (step S9), complete constructing of premises sensor network.
About the confirming operation of the step S7 of Fig. 3 and the process of preliminary registration, be specifically described.The process of confirming operation and preliminary registration is the process of the calibration tool program of the HDD64 being stored in terminal 51, is controlled by the CPU61 of terminal 51.
The picture of terminal 51 is clicked the words of the icon of not shown calibration tool program, the CPU61 of terminal 51 starts calibration tool program, shows the homepage picture 100 of the wireless connection button 101 of the wireless connections and cut-out being used for carrying out terminal 51 and router one 3, machine is connected ACK button 102, wireless connections disengage button 103 shows Fig. 4.
At homepage picture 100, wireless connection button 101 is clicked, and terminal 51 is retrieved can the router of wireless connections, obtains title and the IP address of the router extracted out.The title of the router obtained shown in router-list 111 list, explicit routing device connects picture 110.
It is show the attachable router-list extracted out by terminal 51 that router connects picture 110, for being connected to the picture of router one 3, possess attachable router-list 111, router image display field 112 that display is routed the image of the router that device list 111 is selected, for connects to router Password Input hurdle 113, for being connected to the connection button 114 of router and termination to the pause button 115 of the connection of router.
At router-list 111, click the words of any router name, with the IP address of described router name for key, client's router registration table of the not shown management server of retrieval house manufacturer, when finding the IP address met, obtain the data of the router Image Name be associated with described IP address at client's router registration table from client's router image storage unit, the router image met is shown in router image display field 112.
Router image is shown in router image display field 112, and director can know that the router selected at router-list 111 is the router one 3 of the house 2 of which client being arranged at house manufacturer.Further, router image and the photo of router one 3 or outward appearance in kind being arranged at house 2 are compared, consistent, the connection handling to described router can be carried out.
Pause button 115 is clicked, and terminal 51 display " will stop the connection to router.Can? " information, for perform termination "Yes" button and for return router connect picture 110 "No" button display not shown confirmation screen.
"Yes" button is clicked, closes router and connects picture 100, end process."No" button is clicked, returns router and connects picture 110.
Picture 110 is connected at router, connect the words that button 114 is clicked, confirm that whether the password being input into password hurdle 113 is consistent with the password of the described router one 3 being registered in client's router registration table, when inconsistent, the error picture of the information of display " code error please inputs again " and the display of Password Input hurdle.
Be input into the password on Password Input hurdle 113 consistent with the password of the described router one 3 being registered in client's router registration table when, terminal 51 is connected to router one 3, when successful connection, ends process.
When terminal 51 is to the connection failure of router one 3, display error picture 120, ends process.
Terminal 51 is connected to router one 3 by director, carries out home server 10 and confirms to the connection of each transducer.
The machine connection ACK button 102 of homepage picture 100 is clicked, and terminal 51 starts the flow chart process of Fig. 5.The process of Fig. 5 is controlled by the CPU61 of terminal 51.
In step S11, obtain the IP address of terminal 51.In step S12, judge that whether the acquisition of IP address is successful.When unsuccessful (step S12:No), in step S14, in IP address display field display " failure " of the terminal 51 of the confirmation screen 130 of Fig. 6, proceed to step S24 by the A of the A to Fig. 7 of Fig. 5, whether the confirmation screen 130 of process decision chart 6 has " failure ".
In the successful situation of IP address acquisition (step S12:Yes), in step S13, the IP address of terminal 51 is shown in the confirmation screen 130 of Fig. 6.
Afterwards, in step S15, obtain IP address from router one 3.In step S16, judge that whether the acquisition of IP address is successful.When unsuccessful (step S16:No), in step S17, in IP address display field display " failure " of the router one 3 of the confirmation screen 130 of Fig. 6, proceed to step S24 by the A of the A to Fig. 7 of Fig. 5, whether the confirmation screen 130 of process decision chart 6 has " failure ".
In the successful situation of IP address acquisition (step S16:Yes), in step S18, the IP address of router one 3 is shown in the confirmation screen 130 of Fig. 6.
Afterwards, in step S19, obtain IP address from home server 10.In step S20, judge that whether the acquisition of IP address is successful.In successful situation (step S20:Yes), in step S21, the version information being stored in the starting state of the HEMS system of home server 10 and the software of HEMS system is obtained from home server 10, in step S22, the confirmation screen 130 of Fig. 6 is shown in together with the address of home server 10, proceed to step S24 by the A of the A to Fig. 7 of Fig. 5, whether the confirmation screen 130 of process decision chart 6 has " failure ".
When the acquisition of IP address is unsuccessful (step S20:No), in step S23, the IP address display field of the home server 10 in the confirmation screen 130 of Fig. 6, display " failure ", proceed to step S24 by the A of the A to Fig. 7 of Fig. 5, whether the confirmation screen 130 of process decision chart 6 has " failure ".
When having " failure " (step S24:Yes), show error picture 140 in step S25, end process.
In the confirmation screen 130 of Fig. 6, when " failure " (step S24:No), in step S26, with the IP address of router one 3 for key, with reference to connection and the confirming operation result table of the HDD64 of terminal 51, the confirmation of acquisition transducer, air-conditioning, storage battery 43 completes situation.
Afterwards, in step S27, the confirmation of the transducer obtained in use step S26, air-conditioning, storage battery 43 completes situation, the connection machine confirmation screen 150 of display Fig. 8.
Connecting machine confirmation screen 150 is, while representing whether transducer, air-conditioning, the connection of storage battery 43, confirming operation complete, when not completing, display starts the picture of the connection of each connection machine, the button 151 ~ 153 of confirming operation, possess, the confirming operation button 151 ~ 153 of transducer, air-conditioning, storage battery 43; Show the acknowledgement state display field 154 ~ 156 completing/do not complete of confirming operation of transducer, air-conditioning, storage battery 43 respectively; The interruption button 157 of connection and confirming operation process; The connection of connection machine and confirming operation become valid, for the confirming button 158 confirmed when completing.
Afterwards, in step S28, whether the confirming operation button 151 of determine sensor is clicked.
When clicked (step S28:Yes), in step S29, determine whether to there is the garble with which transducer.
Exist and (step S29:Yes) when the garble of which transducer, show error picture 160 in step S30, in step S31, whether clickedly judge to interrupt button 157.
When clicked (step S31:Yes), in step S32, display connects release confirmation screen 104, clicked for condition with conclusion button 105, the information of the result of the connection be performed so far and confirming operation is stored in file, pay and comprise the intrinsic identification serial number of the described house 2 of expression and represent that it is the filename of the mark of transducer, be stored in the confirmation destination file folder of the HDD64 of terminal 51, end process.
When interruption button 157 is not clicked (step S31:No), in step S31, whether clickedly judge to interrupt button 157.That is, in step S30, error picture 160 is shown, and to interruption button 157 is clicked, repeats step S31.
When there is not the garble with which transducer (step S29:No), that is, about all sensors, when communicating no problem, in step S33, the sensing data input picture 170 of display Fig. 9.
The sensing data input picture 170 of Fig. 9, possesses, branch's transducer number selectionbar 171; In the step S6 of automatic display Fig. 3 with presence or absence of the generating electrical quantity sensor 11c of registration in advance, generating electrical quantity sensor 11d, combustion gas pulse transducer 11e, running water pulse transducer 11f the transducer of information with or without display field 172; With the flow of every 1 pulse of system intialization display combustion gas pulse transducer 11e, running water pulse transducer 11f, can be set as that director can carry out the flow indication hurdle 173 inputted; For performing the Next button 174 of the communication acknowledgement of each transducer.
In step S34, judge that whether the Next button 174 is clicked.When not clicked (step S34:No), in step S34, judge that whether the Next button 174 is clicked.That is, to the Next button 174 is clicked, repeat step S34.
When the Next button 174 is clicked (step S34:Yes), in step S35, judge whether have misinput at transducer input picture 170.When there is misinput (step S35:Yes), show error picture 181 in step S36, judge that whether the Next button 174 is clicked in step S34.
When sensing data input picture 170 does not have misinput (step S35:No), in step S37, determine whether to there is the garble with which transducer.Because the preliminary registration to data logger 11g of branch transducer 11a, electric power measurement tap 11b, generating electrical quantity sensor 11c, generating electrical quantity sensor 11d, combustion gas pulse transducer 11e, running water pulse transducer 11f is carried out in step S6, therefore the judgement of step S37 judges that whether the communication between data logger 11g is normal.When there is garble (step S37:Yes), in step S38, display error picture 182, in step S34, judges that whether the Next button 174 is clicked.
In step S37, when there is not the garble with transducer (step S37:No), in step S39, carry out the confirming operation of transducer and the registration of setting place.
In described step, first, about the branch transducer 11a being arranged at distributor cap 30, connect successively and carry out confirming operation, be the results are shown in branch's transducer list screen 190 of Figure 10.Further, the setting place of duplexure 32 connection destination of corresponding each branch transducer 11a is manually inputted by director in branch's sensor frames 190.In addition, in the present embodiment, manually input setting place, but it is also passable automatically to input setting place from the data of the construction drawing of house 2.Such as, by the machine ID registration in advance of each machine, transducer in the data of construction drawing, with the data of the machine ID of the branch transducer 11a of automatic acquisition for key retrieval construction drawing, obtain the data of setting place, be automatically input into setting place one hurdle.
In branch's transducer list screen 190, the confirming operation of all branch transducer 11a terminates, and setting place is registered, validation the Next button 191.The Next button 191 is clicked, shows other transducer list screen 200, about other transducers, also carries out confirming operation, shows its result.
Afterwards, proceed to step S40 by the B of the B to Figure 11 of Fig. 7, acts of determination confirms and whether problem occurs in setting place registration.When generation problem (step S40:Yes), in step S41, display display action confirms and the not shown error picture of the meaning of problem occurs in setting place registration, in step S42, whether clickedly judges to interrupt button 192 or 202.
When clicked (step S42:Yes), in step S43, display connects release confirmation screen 104, clicked for condition with conclusion button 105, the connection be performed so far and confirming operation are stored in file to branch's transducer list screen 190 of result and the data of other transducer list screen 200, pay and comprise the intrinsic identification serial number of the described house 2 of expression and represent that it is the filename of the mark of transducer, be stored in the confirmation destination file folder of the HDD64 of terminal 51, end process.
When interruption button 192 or 202 is not clicked (step S42:No), in step S42, whether clickedly judge to interrupt button 192 or 202.That is, to interruption button 192 or 202 is clicked, step S42 is repeated.
About arbitrary branch transducer 11a and other transducers, when problem does not all occur during confirming operation and setting place are registered (step S40:No), also in step S44, show button 201.Afterwards, in step S45, judge that whether button 201 is clicked.
When not clicked (step S44:No), in step S44, judge that whether button 201 is clicked.That is, to complete button 201 clicked, repeat step S44.
Complete button 201 clicked when (step S44:Yes), in step S46, about the record being stored in IP address in the connection of HDD64 of terminal 51 and confirming operation result table, described router one 3, the connection of transducer and confirming operation are completed mark and is set to 1, the confirmation situation of transducer has been set to.Also have, using as to connect and branch's transducer list screen 190 of result of confirming operation and the data of other transducer list screen 200 are stored in file, pay and comprise the intrinsic identification serial number of the described house 2 of expression and represent that it is the filename of the mark of transducer, be stored in the confirmation destination file folder of the HDD64 of terminal 51.
Afterwards, in step S47, using the IP address of router one 3 as key, with reference to connecting and confirming operation result table, determine whether about transducer, air-conditioning, storage battery 43 whole, to connect and confirming operation completes mark and is set to " completing " (1).
When not being set up (step S47:No), C via the C to Fig. 7 of Figure 11 proceeds to step S26, with the IP address of router one 3 for key, with reference to connection and the confirming operation result table of the HDD64 of terminal 51, the confirmation of acquisition transducer, air-conditioning, storage battery 43 completes situation.
About transducer, air-conditioning, storage battery 43 whole, to connect and confirming operation completes (step S47:Yes) when mark is all set to " completing " (1), F via the F to Figure 12 of Figure 11 proceeds to step S48, as shown in figure 13, connect the transducer acknowledgement state display field 154 of machine confirmation screen 150, air-conditioning acknowledgement state display field 155, storage battery acknowledgement state display field 156 display all become " completing " while, validation completes button 158.
Afterwards, in step S49, judge that whether button 158 is clicked.When not clicked (step S49:No), in step S50, whether clickedly judge to interrupt button 157.
When clicked (step S50:Yes), in step S51, display connects release confirmation screen 104, clicked for condition with conclusion button 105, the information of the result of the connection be performed so far and confirming operation is stored in file, pay the filename comprising and represent the identification serial number that described house 2 is intrinsic, be stored in the confirmation destination file folder of the HDD64 of terminal 51, end process.
When interruption button 157 is not clicked (step S50:No), in step S49, judge that whether button 158 is clicked.That is, in step S48, complete button 158 and become valid, to complete button 158 or interrupt button 157 clicked, repeat step S49 and step S50.
Complete button 158 clicked when (step S49:Yes), in step S52, display action confirm result screen 210.
Confirming operation result screen 210 comprises, communication acknowledgement the results list 211 of the title of each transducer, air-conditioning and storage battery 43, the setting place representing these and communication acknowledgement result, in communication acknowledgement the results list 211, when to comprise communication acknowledgement result be the result of " failure ", for perform again communication acknowledgement ACK button again 212, in communication acknowledgement the results list 211, the save button 213 become valid when not comprise communication acknowledgement result be the result of " failure ".
In step S52, be stored in the file of the confirmation destination file folder of the HDD64 of terminal 51 for key retrieval with the intrinsic identification serial number of described house 2, extract the file of the result of connection and the confirming operation representing that described house 2 is performed out.In described file, determine whether to comprise the result that communication acknowledgement result is " failure ", when comprising, validation is ACK button 212 again, when not comprising, and validation save button 213, the confirming operation result screen 210 of display Figure 13.
Below, in step S53, judge that whether save button 213 is clicked.When clicked (step S53:Yes), in step S54, the content of communication acknowledgement the results list 211 is paid the filename comprising the intrinsic identification serial number of described house 2, as connection machine guide look file 214, be stored in the connection machine guide look file of the HDD64 of terminal 51, end process.
When save button 213 is not clicked (step S53:No), in step S55, judge that more whether ACK button 212 is clicked.When not clicked (step S55:No), in step S53, judge that whether save button 213 is clicked.That is, to ACK button 212 again or save button 213 clicked, repeat step S53 and step S55.
When ACK button 212 is clicked again (step S55:Yes), C via the C to Fig. 7 of Figure 12 proceeds to step S26, with the IP address of router one 3 for key, with reference to connection and the confirming operation result table of the HDD64 of terminal 51, the confirmation of acquisition transducer, air-conditioning, storage battery 43 completes situation.
At the step S28 of Fig. 7, when the confirming operation button 151 of transducer is not clicked (step S28:No), the D via the D to Figure 14 of Fig. 7 proceeds to step S56, judges that whether the confirming operation button 152 of air-conditioning is clicked.When clicked (step S56:Yes), detect the whole of the air-conditioning being connected to home network 21, in step S57, display list shows the air-conditioning list screen 230 of the Figure 15 of the air-conditioning detected.In step S57, in the display items display of the automatically air-conditioning list 231 of display air-conditioning list screen 230, setting place, dehumidification function are with or without the project beyond the setting of, energy-saving type air conditioner function.
Setting place, dehumidification function are manually inputted by director with or without, energy-saving type air conditioner function.In addition, in the present embodiment, manually these projects of input, but automatically input also passable from the data of the construction drawing of house 2.Such as, by the machine ID registration in advance of each machine, transducer in the data of construction drawing, with the data of the machine ID of the air-conditioning of automatic acquisition for key retrieval construction drawing, obtain setting place, dehumidification function with or without the data of, energy-saving type air conditioner function, be automatically input into these hurdles.
Afterwards, in step S58, acts of determination confirms and whether problem occurs in setting place registration.When there is problem in confirming operation and setting place registration (step S58:Yes), whether clicked the situation that connection and confirming operation as air-conditioning can not complete, in step S59, judge to interrupt button 232.When not clicked (step S59:No), again in step S59, whether clickedly judge to interrupt button 232.That is, to interruption button 232 is clicked, step S59 is repeated.
When interruption button 232 is clicked (step S59:Yes), in step S60, display connects release confirmation screen 104, clicked for condition with conclusion button 105, the data of the air-conditioning list 231 of the information of the result as the connection be performed so far and confirming operation are stored in file, pay the filename comprising and represent the identification serial number that described house 2 is intrinsic, be stored in the confirmation destination file folder of the HDD64 of terminal 51, end process.
When there is not problem in confirming operation and setting place registration (step S58:No), about air-conditioning, as the parts that whole confirming operation completes, in step S61, validation completes button 233.
Afterwards, in step S62, judge that whether button 233 is clicked.When not clicked (step S62:No), again in step S62, judge that whether button 233 is clicked.That is, to complete button 233 clicked, repeat step S62.
Complete button 233 clicked when (step S62:Yes), in step S63, about be stored in the connection of HDD64 of terminal 51 and confirming operation result table, paid the record of the IP address of described router one 3, the connection of air-conditioning and confirming operation are completed mark and is set to 1, the confirmation situation of air-conditioning has been set to.Further, the data of the air-conditioning list 231 of the result as connection and confirming operation are stored in file, pay the filename comprising and represent the identification serial number that described house 2 is intrinsic, be stored in the confirmation destination file folder of the HDD64 of terminal 51.
Afterwards, in step S64, using the IP address of router one 3 as key, with reference to connecting and confirming operation result table, determine whether about transducer, air-conditioning, storage battery 43 whole, to connect and confirming operation completes mark and is set to " completing " (1).When not being set up (step S64:No), C via the C to Fig. 7 of Figure 14 proceeds to step S26, with the IP address of router one 3 for key, with reference to connection and the confirming operation result table of the HDD64 of terminal 51, the confirmation of acquisition transducer, air-conditioning, storage battery 43 completes situation.
About transducer, air-conditioning, storage battery 43 whole, to connect and confirming operation completes (step S64:Yes) when mark is set to " completing " (1), F via the F to Figure 12 of Figure 14 proceeds to step S48, as shown in figure 13, connect the transducer acknowledgement state display field 154 of machine confirmation screen 150, air-conditioning acknowledgement state display field 155, storage battery acknowledgement state display field 156 display all become " completing " while, validation completes button 158.
In the step S56 of Figure 14, when the confirming operation button 152 of the air-conditioning of Figure 15 is not clicked (step S56:No), E via the E to Figure 16 of Figure 14 proceeds to step S65, judges that whether the confirming operation button 153 of the storage battery 43 connecting machine confirmation screen 150 is clicked.
When clicked (step S64:Yes), detect the storage battery 43 being connected to home network 21, in step S66, display list shows the storage battery list screen 250 of the Figure 18 of the storage battery 43 detected.In step S66, in the display items display of the storage battery list 251 of display storage battery list screen 250 automatically, the project beyond setting place, title.
Setting place, title are manually inputted by director.In addition, in the present embodiment, manually these projects of input, but automatically input also passable from the data of the construction drawing of house 2.Such as, by the machine ID registration in advance of each machine, transducer in the data of construction drawing, with the data of the machine ID of each machine of automatic acquisition, transducer for key retrieval construction drawing, obtain the data of setting place, title, and be automatically input into these hurdles.
Next, in step S67, judge whether problem occurs in confirming operation and setting place registration.When problem does not occur during confirming operation and setting place are registered (step S67:No), about storage battery 43, as the situation completing everything confirmation, in step 72., validation completes button 233.
When there is problem in confirming operation and setting place registration (step S67:Yes), the I via the I to Figure 17 of Figure 16 carries out step S68, display error picture 260.Afterwards, in step S69, whether clickedly judge to interrupt button 252.
When clicked (step S69:Yes), in step S70, display connects release confirmation screen 104, clicked for condition with conclusion button 105, the data of the storage battery list 251 of the information as the connection be performed so far and confirming operation result are stored in file, pay the filename comprising and represent the identification serial number that described house 2 is intrinsic, be stored in the confirmation destination file folder of the HDD64 of terminal 51, end process.
When interruption button 252 is not clicked (step S69:No), in step S71, whether acts of determination confirms and has problems in setting place registration.Deposit (step S71:Yes) in case, as the situation of unsolved problem, in step S69, whether clickedly judge to interrupt button 232.That is, interruption button 252 is clicked, to problem is solved, repeats step S69 and step S70.
When there is not problem in confirming operation and setting place registration (step S71:No), as the situation solving problem, the J via the J to Figure 16 of Figure 17 proceeds to step S72, and validation completes button 253.
Afterwards, in step S73, judge that whether button 253 is clicked.When not clicked (step S73:No), again in step S73, judge that whether button 253 is clicked.That is, to complete button 253 clicked, repeat step S73.
Complete button 253 clicked when (step S73:Yes), in step S74, about be stored in the connection of HDD64 of terminal 51 and confirming operation result table, paid the record of the IP address of described router one 3, the connection of storage battery 43 and confirming operation are completed mark and is set to 1, the confirmation situation of storage battery 43 has been set to.Further, the data of the storage battery list 251 of the result as connection and confirming operation are stored in file, pay the filename comprising and represent the identification serial number that described house 2 is intrinsic, be stored in the confirmation destination file folder of the HDD64 of terminal 51.
Afterwards, in step S74, using the IP address of router one 3 as key, with reference to connecting and confirming operation result table, judge whether about transducer, air-conditioning, storage battery 43 whole, to connect and confirming operation completes mark and is set to " completing " (1).
When not being set up (step S75:No), C via the C to Fig. 7 of Figure 16 proceeds to step S26, with the IP address of router one 3 for key, with reference to connection and the confirming operation result table of the HDD64 of terminal 51, the confirmation of acquisition transducer, air-conditioning, storage battery 43 completes situation.
About transducer, air-conditioning, storage battery 43 whole, to connect and confirming operation completes (step S75:Yes) when mark is set to " completing " (1), F via the F to Figure 12 of Figure 16 proceeds to step S48, as shown in figure 13, connect the transducer acknowledgement state display field 154 of machine confirmation screen 150, air-conditioning acknowledgement state display field 155, storage battery acknowledgement state display field 156 display all become " completing " while, validation completes button 158.
At the step S65 of Figure 16, when the confirming operation button 153 of storage battery 43 is not clicked (step S65:No), in step S76, whether clickedly judge to interrupt button 157.When clicked (step S76:Yes), in step S77, display connects release confirmation screen 104, clicked for condition with conclusion button 105, information as the connection be performed so far and confirming operation result is stored in file, pay the filename comprising and represent the identification serial number that described house 2 is intrinsic, be stored in the confirmation destination file folder of the HDD64 of terminal 51, end process.
When interruption button 157 is not clicked (step S76:No), in step S78, judge that whether button is clicked.When not clicked (step S78:No), the H via the H to Fig. 7 of Figure 16 proceeds to step S28, and whether determine sensor button 151 is clicked.
Complete button clicked when (step S78:Yes), the G via the G to Figure 12 of Figure 16 carries out step S52, display action confirm result screen 210.
After the wireless connection button 101 clicking homepage picture 100, after point hits to the connection handling of router one 3 and machine connects ACK button 102, carrying out the arbitrary time point during the connection confirmation process to each transducer, air-conditioning, storage battery 43, click the wireless connections disengage button 103 of homepage picture 100, by connecting release confirmation screen 104, connection can be removed.
Wireless connections disengage button 103 is clicked, and terminal 51 shows the connection release confirmation screen 104 of the wireless ID in connection.
Judge that whether cancel button 106 is clicked, when cancel button 106 is clicked, closes and connect release confirmation screen 104.
When cancel button 106 is not clicked, judge that whether conclusion button 105 is clicked.When conclusion button 105 is clicked, judge that whether the wireless ID in connecting is consistent at the wireless ID of the normally used company in the job market of director with terminal 51.When inconsistent, remove wireless connections, end process.
Wireless ID and terminal 51 are when the wireless ID of the normally used company in the job market of director is consistent, and " ID that will remove the wireless connections of connection is consistent with the wireless ID of company in display.Stop to remove and connect." warning picture, end process.
At the step S54 of Figure 12, the connection machine guide look file 214 being stored in the connection machine guide look file of the HDD64 of terminal 51 is registered in the not shown memory cell of home server 10 automatically, is used to constructing of HEMS.Further, connect machine guide look file 214 and be stored in the customer data file of the not shown management server of house manufacturer from terminal 51, the historical information as house 2 is managed.
Symbol description
1 the Internet
2 houses
10 home servers
11a branch transducer
11b electric power measurement tap
11c, 11d generate electricity electrical quantity sensor
11e combustion gas pulse transducer
11f running water pulse transducer
11g data logger
12 display unit
13 routers
21 home networks
23 electric power equipments
30 distributor caps
31 trunk loops
32 duplexures
41 device of solar generating
42 fuel cells
43 storage batterys
51 terminal computers

Claims (7)

1. a building device for building inner sensor network, is a kind of device constructing the network between transducer and server being arranged at equipment machine in building and measurement energy fluence, comprises:
Attempt the unit of automatic connection route device and described server;
When to the connection failure of described router or described server, the machine of display connection failure and the unit of item can considered as the reason of connection failure;
When being successfully connected with described router and described server, by described router and described server, attempt the unit from be dynamically connected described equipment machine and described transducer;
When to the connection failure of any one of described equipment machine and described transducer, the machine of display connection failure and the unit of item can considered as the reason of connection failure;
Show the unit of described equipment machine and the confirming operation situation of described transducer and the setting place in described building successfully connected;
The described equipment machine connected about described success and described transducer, the information registering of the result, described confirming operation situation and the described setting place that described trial are certainly dynamically connected is in the unit confirming result memory cell.
2. the building device of building inner sensor network according to claim 1, is characterized in that:
It is the computer of the merchant described building being supplied to the user of this building.
3., according to the building device of the building inner sensor network of claim 1 or 2 record, it is characterized in that, comprising:
Be successfully connected to become described network object all described equipment machine and described transducer for condition, show the unit of the save button of the list of the described setting place for preserving described equipment machine and described transducer and this equipment machine and this transducer;
When described save button is clicked, the e-file storing described list is paid to the filename comprising the identifying information identifying corresponding described building, be stored in the unit connecting machine guide look memory cell.
4., according to the building device of the building inner sensor network of any one record in claims 1 to 3, it is characterized in that:
The transducer measuring the measurement of described energy fluence is, from comprise the kilowatt meter in the loop that the distributor cap that is installed on described building is arranged, the pulse transducer of use amount of measurement running water and combustion gas, the pulse transducer measuring combustion gas use amount, measurement Blast Furnace Top Gas Recovery Turbine Unit (TRT) generating electricity generating electrical quantity sensor group in the middle of the transducer selected.
5., according to the building device of the building inner sensor network of any one record in Claims 1-4, it is characterized in that:
Possess and to remove with the connection of described router when being instructed to, judge that whether the connection ID inputted to permit with the connection of described router is consistent with the described building device regulation ID for being connected to network used in everyday, when consistent, stop the unit removed with the connection of described router.
6., according to the building device of the building inner sensor network of any one record in claim 1 to 5, it is characterized in that:
Described server possesses, when there is the machine with mutually different communication protocol communication in described some described equipment machines and described transducer, switched by the communication protocol that the communication protocol used when transmitting control signal to described equipment machine and described transducer is used according to the described equipment machine of destination and described transducer, the protocol switching unit of described equipment machine and described transducer can be controlled.
7. a construction method for building inner sensor network, is a kind of method of constructing the network between transducer and server being arranged at equipment machine in building and measurement energy fluence, comprises:
The operation of automatic connection route device and described server attempted by computer;
When to the connection failure of described router or described server, the machine of display connection failure and the operation of item can considered as the reason of connection failure;
Described computer, when being successfully connected with described router and described server, by described router and described server, attempts the operation from being dynamically connected at described equipment machine and described transducer;
When to the connection failure of any one of described equipment machine and described transducer, the machine of display connection failure and the operation of item can considered as the reason of connection failure;
Show the operation of described equipment machine and the confirming operation situation of described transducer and the setting place in described building successfully connected;
The described equipment machine connected about described success and described transducer, the information registering of the result, described confirming operation situation and the described setting place that described trial are certainly dynamically connected is in the operation confirming result memory cell.
CN201280076070.4A 2012-09-28 2012-09-28 The building device and method of building inner sensor network Expired - Fee Related CN104662926B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2012/075162 WO2014049849A1 (en) 2012-09-28 2012-09-28 Interior sensor network building device and method

Publications (2)

Publication Number Publication Date
CN104662926A true CN104662926A (en) 2015-05-27
CN104662926B CN104662926B (en) 2018-07-06

Family

ID=50387310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201280076070.4A Expired - Fee Related CN104662926B (en) 2012-09-28 2012-09-28 The building device and method of building inner sensor network

Country Status (4)

Country Link
JP (1) JP5789722B2 (en)
CN (1) CN104662926B (en)
SG (1) SG11201502393PA (en)
WO (1) WO2014049849A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110741607A (en) * 2017-06-21 2020-01-31 西门子瑞士有限公司 System and method for stabilizing BACnet MSTP network when fault occurs

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6044485B2 (en) * 2013-08-22 2016-12-14 株式会社デンソー Energy management system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004364278A (en) * 2003-05-14 2004-12-24 Matsushita Electric Ind Co Ltd Information communication apparatus
CN1815146A (en) * 2005-02-05 2006-08-09 上海自来水市北科技有限公司 Wireless long-distance meter-reading system
CN101458868A (en) * 2008-12-23 2009-06-17 上海城市水资源开发利用国家工程中心有限公司 Data collection method used for remote wireless meter reading system
CN102595654A (en) * 2011-01-07 2012-07-18 华北电网有限公司计量中心 Indoor communication network architecture and indoor communication network architectural method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004134920A (en) * 2002-10-09 2004-04-30 Sanyo Electric Co Ltd Power line connection equipment control system and connection apparatus
WO2005119621A1 (en) * 2004-06-01 2005-12-15 Koninklijke Philips Electronics N.V. Multi-protocol remote control device
JP4653448B2 (en) * 2004-09-29 2011-03-16 大和ハウス工業株式会社 Operation inspection method for home appliance remote control system and personal computer device for inspection used for operation inspection
JP2009165251A (en) * 2007-12-28 2009-07-23 Panasonic Electric Works Co Ltd Dc distribution system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004364278A (en) * 2003-05-14 2004-12-24 Matsushita Electric Ind Co Ltd Information communication apparatus
CN1815146A (en) * 2005-02-05 2006-08-09 上海自来水市北科技有限公司 Wireless long-distance meter-reading system
CN101458868A (en) * 2008-12-23 2009-06-17 上海城市水资源开发利用国家工程中心有限公司 Data collection method used for remote wireless meter reading system
CN102595654A (en) * 2011-01-07 2012-07-18 华北电网有限公司计量中心 Indoor communication network architecture and indoor communication network architectural method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110741607A (en) * 2017-06-21 2020-01-31 西门子瑞士有限公司 System and method for stabilizing BACnet MSTP network when fault occurs

Also Published As

Publication number Publication date
CN104662926B (en) 2018-07-06
WO2014049849A1 (en) 2014-04-03
SG11201502393PA (en) 2015-05-28
JP5789722B2 (en) 2015-10-07
JPWO2014049849A1 (en) 2016-08-22

Similar Documents

Publication Publication Date Title
US8502640B2 (en) System and method for transmitting and receiving information on a neighborhood area network
US6956461B2 (en) Apparatus and method for remotely controlling household appliances
US7822489B2 (en) Electronic device control apparatus, method for controlling electronic device, electronic device control program, and computer-readable recording medium having recorded electronic device control program
CN104412239B (en) Approaches to IM
CN102316387B (en) Remote control equipment, remote control setting method
US9008845B2 (en) Network system and control method thereof
CN101163069A (en) Information processing apparatus and information processing system
Hosek et al. Universal smart energy communication platform
US10210068B2 (en) Device topology definition system
CN1577342B (en) Method for accessing corresponding machine of network and apparatus thereof
CN107018203A (en) A kind of frequency converter remote monitoring control method
KR100786424B1 (en) Home electric appliances remote control system, service provision server, home server, home electric appliances remote control support method of service provision server, and home electric appliances service provision support method of service provision server
JP2004004084A (en) Watthour meter
KR101066827B1 (en) Intelligent remote reading system
CN104199391A (en) Intelligent building monitor system and method
CN104662926A (en) Interior sensor network building device and method
JP2006050651A (en) Home electronic appliance maintenance repair service system
KR101066822B1 (en) Intelligent remote reading system
KR20170117794A (en) Apparatus for integrated metering based on international standard protocol and method for the same
CN107783516A (en) A kind of field apparatus detection and management system
JP2004013386A (en) Communication system
JPH10336766A (en) Communication system and terminal equipment and controller
KR20210078563A (en) artificial intelligence device
JP2003283526A (en) Communication terminal and communication system
JPH03113661A (en) Data input/retrieval device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180706

Termination date: 20210928