CN104662926B - The building device and method of building inner sensor network - Google Patents
The building device and method of building inner sensor network Download PDFInfo
- Publication number
- CN104662926B CN104662926B CN201280076070.4A CN201280076070A CN104662926B CN 104662926 B CN104662926 B CN 104662926B CN 201280076070 A CN201280076070 A CN 201280076070A CN 104662926 B CN104662926 B CN 104662926B
- Authority
- CN
- China
- Prior art keywords
- sensor
- building
- connection
- machine
- router
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/08—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
- H04L43/0805—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability
- H04L43/0817—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability by checking functioning
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L12/00—Data switching networks
- H04L12/28—Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
- H04L12/2803—Home automation networks
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
- H04L41/0677—Localisation of faults
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/08—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
- H04L43/0805—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability
- H04L43/0811—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability by checking connectivity
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Environmental & Geological Engineering (AREA)
- Automation & Control Theory (AREA)
- Arrangements For Transmission Of Measured Signals (AREA)
- Telephonic Communication Services (AREA)
- Selective Calling Equipment (AREA)
Abstract
The present invention provides a kind of energy fluence measurement sensor for being directed to and being set in building, can be acted, connected the building device and method of the building inner sensor network of confirmation automatically.It is the device for constructing the network (21) between the equipment machine being set in building (2) and the sensor and server that measure energy fluence.Have:Attempt the unit of automatic connection router and server;In the case of connection failure, the machine of failure and the unit of reason are shown;In the case where router, sensor are successfully connected, by router, sensor, the unit of automatic connection equipment machine, sensor is attempted;Into equipment machine, sensor in the case of any one connection failure, the machine of failure and the unit of reason are shown;Show equipment machine, the confirming operation situation of sensor and the unit of the setting place in building (2) being successfully connected;And about equipment machine, the sensor being successfully connected, the information registering of the result connected automatically, confirming operation situation, setting place will be attempted in the unit for confirming result storage unit.
Description
Technical field
The present invention relates to the building devices and method of building inner sensor network, can be received automatically more particularly to constructing
Collect the sensor of the information of the sensor of the generated energy of energy consumption and power generator from measurement energy expenditure machine etc.
The building device and method of the building inner sensor network of network.
Background technology
Electric power equipment etc. is controlled, the control system of energy expenditure the operation of a machine state used in building is public
Know in these control systems, exist and have and energy expenditure machine communication, and far distance controlled energy expenditure the operation of a machine shape
The system of the control device of state (for example, referring to patent document 1).
Patent document 1 record system, be by outside house use portable mobile terminal access system, can be outside house
The premises electric power equipment remote control system of the various electric power equipments of far distance controlled premises.In patent document 1, in order to
This system is constructed, after carrying out the electric power equipment setting to premises and the wiring of power wiring equipment etc., setting is realized such as
The premises information distributor cap device of the function of so-called home server, carries out constructing residence Intranet in the construction project of house
The operation of network.
Moreover, in patent document 1, before house is consigned to trustee, being made whether can be with far distance controlled premises
The action checking of electric power equipment.
Due to the action checking be before house consigns to trustee, by by the PC of inspection
The premises information distributor cap device of separate state is directly connected in, by premises information distributor cap device, with premises
Electric power equipment communicates, and carries out the confirming operation of these machines.On the picture of inspection PC, searching picture and setting net
It stands shown, confirming operation is carried out on these pictures.
Accordingly, as existing, after can preventing trustee from moving in, external staff enters to check inside house, commission
People needs the generation of the inconvenience such as amendment of carry out system after having moved in.
Patent document 1:No. 4653448 bulletin of patent
Invention content
But such as patent document 1 in the prior art, during communication acknowledgement, whether only display communication succeeds, therefore, which
Partial connection needs to check that operator oneself finds there are problem, is judged.
In addition, about the circuit that distributor cap is branched quantity and be set to the electric power measuring device of duplexure etc.
The presence or absence of, in addition, the presence or absence of various equipment machines of solar power generation cell and fuel cell etc., exist and are unable to automatic identification
Part needs operator to be inputted.
In addition, whether such as patent document 1 in the prior art, having carried out can be with the electric power equipment of remote-controlled operation premises
Action checking, but when the remote control system of premises is constructed, carry out device of solar generating and fuel cell etc.
The technology of the action checking of the electrical quantity sensor of wound energy equipment and each electric power equipment is not disclosed.
In view of the foregoing, its purpose is to provide a kind of measured for the energy fluence being set in building to pass the present invention
Sensor can be acted, be connected the building device and method of the building inner sensor network of confirmation automatically.
Other objects of the present invention are, provide a kind of in the automatic of the energy fluence measurement sensor being set in building
During action, connection confirm, during connection failure, the building inner sensor net that the connection with which machine goes wrong can be represented
The building device and method of network.
The subject is solved by following manner.It is a kind of to construct the equipment machine being set in building according to the present invention
And the device of the network between the sensor and server of measurement energy fluence, including:Attempt automatic connection router and the clothes
The unit of business device;In the case of the connection failure to the router or the server, show connection failure machine and
Unit as the item that the reason of connection failure is considered that;What is be successfully connected with the router and the server
In the case of, by the router and the server, attempt to connect the unit of the equipment machine and the sensor automatically;
In the case of the connection failure to any one of the equipment machine and the sensor, show connection failure machine,
And the unit of item being considered that as the reason of connection failure;Show the equipment machine being successfully connected and the biography
The confirming operation situation of sensor and the unit of the setting place in the building;About the equipment being successfully connected
Machine and the sensor, by the letter of result, the confirming operation situation and the setting place for attempting to connect automatically
Breath is registered in the unit for confirming result storage unit.
The subject is solved by following manner.It is a kind of to construct the equipment machine being set in building according to the present invention
And the method for the network between the sensor and server of measurement energy fluence, including:Computer attempts automatic connection router and institute
The process for stating server;In the case of the connection failure to the router or the server, the machine of connection failure is shown
Device and the process of item being considered that as the reason of connection failure;The computer with the router and the clothes
In the case that business device is successfully connected, by the router and the server, trial connects the equipment machine and institute automatically
The process for stating sensor;In the case of the connection failure to any one of the equipment machine and the sensor, display
The machine of connection failure and the process of item being considered that as the reason of connection failure;Show the institute being successfully connected
State the confirming operation situation of equipment machine and the sensor and the process of the setting place in the building;About it is described into
Work(connection the equipment machine and the sensor, by it is described attempt connect automatically result, the confirming operation situation and
The information registering of the setting place is in the process for confirming result storage unit.
Due to so forming, the not only electric power equipment in building can also be automatic for the sensor of measurement energy fluence
Ground carries out confirming operation and connection in server side.
In addition, in the case of the connection failure to router or server, shown due to having the machine of connection failure,
And the unit of item being considered that as the reason of connection failure;Connection to any one of equipment machine and sensor
In the case of failure, the unit of item that shows the machine of connection failure and be considered that as the reason of connection failure, because
When this is acted, connects confirmation automatically, even if when connection confirms failure, it can immediately know that in which failure in stage, it can be with
That saves the sensor network in building constructs the time it takes and time.
Further, when being clicked due to having save button, the electronic document for storing list is paid comprising identification phase
The filename of the identification information of the corresponding building is stored in the unit of connection machine guide look storage unit, about described
Building, can leave the action of equipment machine and sensor, connection is confirmed whether to complete, in addition, in the case of being partially completed,
It is accomplished to the information in which stage.
In addition, the building is preferably supplied to the computer of the merchant of the user of the building.
Due to so forming, the merchant for providing building can carry out constructing for building inner sensor network.
In addition, it preferably includes:To be successfully connected in as all equipment machines of the network object and the biography
Sensor is condition, shows the institute for preserving the equipment machine and the sensor and the equipment machine and the sensor
State the unit of the save button of the list of setting place;When the save button is clicked, to storing the electronics text of the list
Part pays the filename for including the identification information for identifying the corresponding building, is stored in connection machine guide look storage unit
Unit.
Due to so forming, the setting of the equipment machine and sensor of the list stored on electronic document can will be registered in
The information in place is used to control the so-called household energy management system (HEMS) of the electric power equipment used in building.
In addition, it is preferred that measuring the sensor of the energy fluence is, from setting comprising being installed on the distributor cap of the building
The kilowatt meter in the circuit put, the pulse transducer of usage amount for measuring tap water, the pulse transducer for measuring combustion gas usage amount, meter
Survey the sensor selected in the group of the power generation electrical quantity sensor of the power generation electricity of power generator.
Due to so forming, the building inner sensor net for enlisting the services of the various sensors for being set to building can be constructed
Network.
In addition, when being preferably provided with being instructed to the connection of router releasing, judge for the company with the router
Whether the connection ID for connecing license and inputting is used in everyday consistent for being connected to the regulation ID of network with the building device, and one
In the case of cause, stop the unit that the connection with the router releases.
Due to so forming, even the connection ID used to be connected to router with used in everyday in order to connect
In the regulation ID unanimous circumstances of the network of workplace etc., will not be automatically eliminated when the connection with router releases.
In addition, it is preferred that the server has, exist in several equipment machine and the sensor and use
During the machine of mutually different communication protocol communication, when controlling signal by that will be sent to the equipment machine and the sensor
The communication protocol used communication protocol according to used in the equipment machine of destination and the sensor switches over, can
To control the protocol switching unit of the equipment machine and the sensor.
If being above-mentioned composition, communication protocol is switched according to communication object by protocol switching unit, it need not in user side
Recognize the difference of communication protocol, it is possible to the control to each equipment machine of server requirement and sensor.
The building device of building inner sensor network according to the present invention, not only the electric power equipment in building, measures
The sensor of energy fluence automatically can also carry out confirming operation and connection in server side.
In addition, in the case of the connection failure to router or server, shown due to having the machine of connection failure,
And the unit of item being considered that as the reason of connection failure;In the company to any one of equipment machine and sensor
In the case of connecing failure, the reason of showing machine and the connection failure of connection failure it is considered that item unit, because
When this is acted, connects confirmation automatically, even if when connection confirms failure, it can immediately know that in which failure in stage, it can be with
That saves the sensor network in building constructs the time it takes and time.
Further, when being clicked due to having save button, the electronic document for storing list is paid comprising identification phase
The filename of the identification information of the corresponding building is stored in the unit of connection machine guide look storage unit, about described
Building, can leave the action of equipment machine and sensor, connection is confirmed whether to complete, in addition, in the case of being partially completed,
It is accomplished to the information in which stage.
Description of the drawings
Fig. 1 is the monolithically fabricated figure of the premises sensor network of one embodiment of the invention.
Fig. 2 is the hardware structure diagram of the terminal computer of one embodiment of the invention.
Fig. 3 is the flow chart for representing to construct the flow of the premises sensor network of the present embodiment.
Fig. 4 is the homepage picture of calibration tool program and router connection picture.
Fig. 5 is the flow chart for the processing for representing calibration tool program.
Fig. 6 be confirm perform the terminal of calibration tool program, router, home server connection status confirmation picture
Face.
Fig. 7 is the flow chart for the processing for representing calibration tool program.
Fig. 8 is the connection machine confirmation screen for confirming into the connection of line sensor, air-conditioning, accumulator.
Fig. 9 is that the sensing data of data for being previously entered sensor before the connection of sensor confirms inputs picture.
Figure 10 is to show branch's sensor list screen of situation that the connection of sensor confirms, the guide look of other sensors
Picture.
Figure 11 is the flow chart for the processing for representing calibration tool program.
Figure 12 is the flow chart for the processing for representing calibration tool program.
Figure 13 is to represent the confirming operation result screen and use of result that the connection being performed in calibration tool program confirms
File is had a guide look of in the connection machine for preserving its content.
Figure 14 is the flow chart for the processing for representing calibration tool program.
Figure 15 is to show the air-conditioning list screen of situation that the connection of air-conditioning confirms.
Figure 16 is the flow chart for the processing for representing calibration tool program.
Figure 17 is the flow chart for the processing for representing calibration tool program.
Figure 18 is to show the accumulator list screen of situation that the connection of accumulator confirms.
Specific embodiment
Hereinafter, the embodiment of the present invention is illustrated with reference to attached drawing.In addition, composition described below not limits this hair
It is bright, undoubtedly can various changes be carried out with objective according to the present invention.
(premises sensor network)
The premises sensor network of the present embodiment is energy production, consumption situation of the monitoring as the premises of building
Sensor network, be electrical quantity sensor in the duplexure for the distributor cap for being set to house etc., power generator generated energy
Sensor, combustion gas, tap water the Information Network that can be sent between home server into the reception of row information such as pulse transducer
Network be used to control the so-called household energy management system (HEMS) of electric power equipment used in house 2.
HEMS is to manage the energy consumption in house 2, visualizes several electric power used in (visualization) house 2
The electric power consumption of machine, the system that the user of the information visualized to the house 2 is reported and submitted.Through this embodiment
Premises sensor network, home server obtain the electricity usage amount of each power equipment, the generated energy of power generator, combustion gas,
The data of the usage amount of tap water etc. visualize energy consumption and generated energy.
Fig. 1 is the monolithically fabricated figure of premises sensor network.
Premises sensor network has, by as the home server 10 constructed in the server in house 2 and by
The home network 21 of control and by the router 13 in house 2 be communicatively connected in a network in home network 21 terminal electricity
Brain 51 (hereinafter, for terminal 51).
House 2 is an example of building, it is suitable for the building other than control house 2, such as commercial mansion,
The situation of energy expenditure machine that building, shop in factory etc. use.In addition, house 2 refer to the house independently built it
Outside, the concept in a room in the condominiums such as apartment is also included.
In addition, home server 10 is connected to internet (not shown) by router 13, pass through internet and house pipe
The server computer communication of reason company, the occupant of house 2, which can also utilize, is provided to online service from housing administration company.
In house 2, the home network 21 in each room of connection for being referred to as LAN in family is constructed, as shown in Figure 1, following
Component is connected to the home network 21:Home server 10;Measure the branch sensor 11a of the electricity in each circuit;It measures
The electric power measurement tap 11b of the consumption electricity of electric power equipment;Temporarily storage is branched sensor 11a, electric power measurement tap
11b, power generation electrical quantity sensor 11c, power generation electrical quantity sensor 11d, combustion gas are sensed with pulse transducer 11e, tap water with pulse
Consumption, the data for the electricity that generates electricity and the data logger 11g for being sent to home server 10 that device 11f is measured;In house 2,
Occupant carries out the display device 12 of the reading for the information that usage amount of consumption electric power etc. is related to and the operation of electric power equipment etc.;
The router 13 that the network of home network 21 and external internet etc. is connected with each other;The various electric power machines of air-conditioning, illumination etc.
Device;Distributor cap 30;It generates electricity by device of solar generating 41, fuel cell 42, by device of solar generating 41 and fuel cell 42
Electric power electric power storage accumulator 43;Combustion gas pulse transducer 11e;Tap water pulse transducer 11f.
Home server 10 is the device for managing the information in home network 21, and management is connected to the display of home network 21
While the address of the machine of device 12, distributor cap 30, device of solar generating 41, electric power equipment etc., carry out and these machines
Communication, obtain the information of the state of machine etc., the machine handing with the state for controlling machine.Home server 10 with
The form for being incorporated into server computer, home computer, set-top box, other original machines etc. is realized.Home server 10
Hardware composition is identical with terminal 51, therefore the description thereof will be omitted.
In addition, usually, recommend in the house 2 equipped with HEMS, using the common communication protocol of use (with communication party
Formula and communication standard are synonymous) electric power equipment, for example, expecting to be unified for the machine of the communication protocol advocated using ECHONET associations
Device.On the one hand, the agreement advocated as ECHONET associations, there are ECHONET (registered trademark) and as its successor standard
ECHONETLite (registered trademark) has that two agreements are mixed in the electric power equipment in house 2.In addition, there is also with
In the electric power equipment that family is bought, the situation of the machine comprising the communication protocol other than ECHONET and ECHONETLite.
So as in home network 21, in several electric power equipments and sensor that are used in house 2, exist with mutually different
Communication protocol communication machine.For this purpose, it is pressed for home server 10 with the communication that the communication object of house 2 communicates with component
The storage unit of home server 10 is stored respectively according to communication protocol.That is, communication protocol is only by the electric power in house 2
The communication of the species number of communication protocol is stored in storage unit with component used by machine and sensor.If illustrating,
For communicated with the 1st communication protocol (for example, ECHONET) component, for the 2nd communication protocol (such as ECHONETLite)
The component of communication and for being communicated with the 3rd communication protocol (for example, communication protocol other than ECHONET and ECHONETLite)
Component is stored in storage unit.
Moreover, in home network 21, it is stored in the communication component of storage unit, the communication component root read and executed
It is switched according to communication object.Accordingly, the communication that home server 10 can will use when communicating with electric power equipment and sensor
Agreement is switched over according to communication protocol used by the electric power equipment and sensor of communication object.In addition, switching communication protocol
With in order to the communicating machine of other communication protocols is used to transmit, by the text (instruction) transmitted with certain communication protocol with it is corresponding should
The mode of other communication protocols change write it is synonymous.In addition, home server 10 switches the electricity of communication protocol and the communication object to communicate
In power machine, the data logger 11g comprising the present embodiment.
Wherein, if being illustrated to the program execution enviroment in home server 10, home server 10 have OS,
JAVA (registered trademark) virtual machine (hereinafter, JVM), OSGi (Open Services Gataway initiative) frame, with
And the various assemblies run on OSGi framework.OSGi framework is constructed on JVM, managing the component that is run on OSGi framework
The life cycle of download, installation, starting, stopping etc..Moreover, about the component run on OSGi framework, it can dynamically more
It changes, in addition, several components can be performed in parallel.
Wherein, in the component run on OSGi framework, comprising for the component of the 1st aforementioned communication protocol communication
(hereinafter, the 1st communication component), for the component of the 2nd communication protocol communication (hereinafter, the 2nd communication component) and for using
The component (hereinafter, the 3rd communication component) of 3 communication protocol communications.Moreover, in the function that OSGi framework has, by that can move
The function of component is replaced to state, according to the electric power equipment of communication object when communicating as home server 10 and sensor
Communication protocol, the communication component being performed are replaced.The replacement of communication component in this way, home server 10 use logical
Letter agreement is switched.As a result, home server 10 can be regardless of the electric power equipment and biography in the similarities and differences of communication protocol, with house 2
Sensor communicates.
Further, if each communication component is registered in OSGi framework, for connecing using the function of each communication component
Mouth is registered in service registration.OSGi framework will integrate the interface of these interfaces as API (Application Program
Interface it) provides.Using the API, in user side, without recognizing the difference of communication component, that is, electric power equipment
And the difference of the communication protocol between sensor.Accordingly, that is, the opposite home server 10 of exploitation requires electric power equipment and sensor
During the program of control, as long as if developer holds each electric power equipment and sensor referent (Object) regulation, just
The exploitation gimmick of general web communication agreement can be applicable in.
During to the requirement of home server 10 and the communication of the electric power equipment in house 2 and sensor, use above-mentioned API's
Words, are not required to for the request message to be organized into the form for meeting communication protocol, become more easy text.It is described in more detail
Words, occupant to home server 10 require the control of electric power equipment and sensor when, HTTP request, specially electric power equipment and
The execution of sensor control requires to be sent from display device 12 to home server 10.On the one hand, home server 10 is from aobvious
If showing device 12 receives above-mentioned HTTP request, communicate with electric power equipment and sensor and sent out to the electric power equipment and sensor
Send control signal.As a result, home server 10, according to the control rule specified in above-mentioned HTTP request, control is as control pair
The electric power equipment and sensor of elephant.Wherein, the communication protocol used during the transmission of home server 10 control signal is set as conduct
Communication protocol used by the electric power equipment and sensor of the destination of control signal.
In addition, home server 10 further communicates with the electric power equipment and sensor for receiving control signal, from the electric power
Machine and sensor receive answer signal.At this point, the communication protocol that home server 10 uses is set as answer signal
Communication protocol used by the electric power equipment and sensor of originator.
As above in home network 21, between home server 10 and electric power equipment and sensor two-way communication held
Row, specifically, control signal is sent from home server 10 to each electric power equipment and sensor, answer signal is by from each electric power
Machine and sensor are sent to home server 10.
Display device 12 be kitchen, living room, toilet being arranged in house 2 etc. everywhere, have and family take
The display device for receiving sending function and touch tablet between business device 10.Furthermore, it is possible to the expression device by home server 10
69 use as display device 12.
Electric power equipment is the general name of the machine used within the family, except the household appliances and game machine of refrigerator, micro-wave oven etc.,
Except AV machines, all electric power equipments in the family comprising sensor, illumination etc..
Each electric power equipment that the present embodiment is related to communicably is connected and with respect to home server 10 in home server
10 sides are automatically recognized.If illustrating, in the electric power equipment that the present embodiment is related to, the household appliances of air-conditioning, illumination etc. into
For the machine of the ECHONET standards using the promotion of ECHONET (energy preserves and residential care network) association or using basis
The machine of uniform standard.This electric power equipment is communicably connected by ECHONET standards with respect to home server 10
It connects and is automatically recognized in 10 side of home server, further, home services are registered in as the machine in house 2
Device 10.Wherein, as automatic identification and the technology of electric power equipment is registered, plug and play (registered trademark) technology can be utilized
Deng known technology.
Distributor cap 30 is provided with the trunk electric power whole as house 2 and provides the trunk circuit 31 in circuit, from trunk circuit
Several duplexures 32 of branch, the branch sensor 11a being made of well known kilowatt meter are installed on trunk circuit 31 and each
Duplexure 32.
Since the air-conditioning and the defined electric power of illumination etc. that are used in trunk circuit 31 and each duplexure 32 and house 2 disappear
Consumption machine is associated, and is measured by the electric current measured value from the electric current for flowing through trunk circuit 31 and each duplexure 32 and voltage
Value, measures the electricity of the electric current flowed through, can measure the power consumption corresponding to trunk circuit 31 and each duplexure 32 respectively
The consumption electricity of machine.
In the power consumption machine used in house 2, be not provided with dedicated power supply circuit, not with 32 phase of duplexure
Corresponding machine is connected to well known electric power measurement tap 11b, and measuring tap 11b by the electric power carries out consumption electricity
Measurement.
Device of solar generating 41 is made of well known device of solar generating, is connected with detection and is filled by solar power generation
Put the well known power generation electrical quantity sensor 11c of the electricity of 41 power generations.
Fuel cell 42 is made of well known fuel cell, is connected with the public affairs of electricity that detection is generated electricity by fuel cell 42
The power generation electrical quantity sensor 11d known.
Combustion gas pulse transducer 11e, tap water pulse transducer 11f are the combustion gas usage amount for detecting premises respectively
And the well known pulse transducer of tap water usage amount.
Branch sensor 11a, electric power measurement tap 11b, the data, the combustion gas pulse transducer that will represent consumption electricity
11e by the data for representing amount of consumed gas, tap water pulse transducer 11f will represent originally the data of water consumption, as
Result output is measured, these data are temporarily accumulated in data logger 11g, every the stipulated time of 1 minute etc., are remembered from data
Record device 11g is transmitted to home server 10.
Terminal 51 is to carry out the home server 10 of the home network being connected in house 2 21 and other electric power
Confirming operation of machine etc. etc., computer used in the responsible person of house manufacturer.
The hardware for representing terminal 51 in Fig. 2 is formed.Terminal 51 has the calculation as data, control process device
CPU61, RAM62, ROM63, HDD64 as storage device and storage media device 65 etc..CPU61 is according to being stored in ROM63
Or the program of HDD64 performs various processing.In RAM62, CPU61 necessary data when performing various processing are stored.
Perform connection between each sensor 11a~f, air-conditioning, accumulator 43, confirming operation and by title and setting field
Etc. be stored in HDD64 to the calibration tool program tentatively registered of the database of home server 10.In calibration tool journey
The processing that sequence is performed is the processing of the step S7 of Fig. 3, specifically, being Fig. 5, Fig. 7, Figure 11, Figure 12, Figure 14, Figure 16~Figure 17
Flow chart processing.
In addition, about each house 2, by the stored sensor of calibration tool program, air-conditioning, accumulator 43 connection and
The connection for the result whether confirming operation is completed and confirming operation result table are stored in HDD64.Connection and confirming operation result
Table includes the intrinsic identification serial number of house 2, the IP address of router 13, the connection for representing sensor, confirming operation as project
The completion whether the completion label whether completed, the connection for representing air-conditioning, confirming operation are completed marks, represents the company of accumulator 43
It connects, the completion label whether confirming operation is completed.Completion is labeled as, and 1 represents to complete, and 0 represents not completing.
Be stored with about house 2, comprising be performed by calibration tool program sensor, air-conditioning, accumulator 43 company
It connects and the confirmation destination file double-layered quilt of the file of the data of the situation of confirming operation is stored in HDD64.Store branch's sensor one
The sensor of data of picture 190 and other sensors list screen 200 look at confirms destination file, storage air-conditioning list 231
The air-conditioning of data confirms that the accumulator of the data of destination file and storage electric power storage pool list 251 confirms that destination file is stored
In confirmation destination file folder, and paid respectively comprising the intrinsic identification serial number of house 2, represent sensor/air-conditioning/electric power storage respectively
The filename of the mark in pond.
Be stored with about house 2, comprising by calibration tool program complete connection and the sensor of confirming operation, air-conditioning,
The connection machine one of the connection machine guide look file 214 of Figure 13 of the guide look of accumulator 43 and its information of confirming operation result etc.
File of looking at is stored in HDD64.Filename comprising the intrinsic identification information of house 2 is attached to connection machine guide look file
214。
Storage media device 65 is made of external hard disk, CD-R, DVD, memory stick etc., the data of reception can be stored,
Read etc..
(construction method of premises sensor network)
In the following, the construction method of the sensor network of premises is illustrated.
First, the flow for constructing the premises sensor network of the present embodiment is illustrated with reference to Fig. 3.
First, the practices of progress sensor network such as equipment of the house manufacturer based on premises is formed and selection is set
It examines (step S1).Later, equipment composition of the practice and premises based on adopted network composition etc. is made picture (step
Rapid S2).
Moreover, based on the figure being made, the setting process (step S3) of electric power equipment is carried out.In the step, house manufacture
Quotient and power engineering merchant carry out the power wiring of premises, set electric power equipment.At this point, it is aobvious to carry out home server 10
The setting of showing device 12.
In addition, power engineering merchant carries out distributor cap 30 and the setting of each sensor 11a~f, data logger 11g
Process (step S4).
Moreover, by step S3, the electric power equipment done of the house manufacturer of step S4, distributor cap 30, each sensor 11a
~f, data logger 11g setting process complete if, the responsible person of house manufacturer checks the tie lines of electric power equipment, matches
The presence or absence of line, energization, operation etc. (step S5).
Later, router 13 is connected to terminal 51 by the responsible person of house manufacturer, is carried out each electric power equipment and is taken with family
Connection, confirming operation, title of whole electric power equipment and setting place being engaged between device 10 etc. is to the data of home server 10
The preliminary registration (step S6) in library.In the step, branch sensor 11a, electric power measurement tap 11b, power generation electricity are also carried out
Quantity sensor 11c, power generation electrical quantity sensor 11d, combustion gas pulse transducer 11e, tap water pulse transducer 11f and data
Logger 11g's connects, tentatively registers.
In the present embodiment, to home server 10 is connected to internet by router 13, from the field far from house 2
Institute, the example that terminal 51 is connected to home server 10 by internet and router 13 illustrate, but responsible person will be eventually
House 2 is brought at end 51 into, and terminal 51 is directly connected in the home server of the separate state for the internet for being not connected to house 2
10 can also.
Later, terminal 51 is connected to router 13, carries out the company between each sensor 11a~f, air-conditioning, accumulator 43
It connects, confirming operation and to the title of database of home server 10 and the preliminary registration (step S7) such as setting place.
Step S7's, connection, confirming operation, preliminary registration between each sensor 11a~f, air-conditioning, accumulator 43 are completed
If, the operating instruction of the premises sensor network of the present embodiment is carried out to trustee, later, house 2 is consigned into commission
People (step S9) completes constructing for premises sensor network.
The confirming operation of step S7 about Fig. 3 and the processing tentatively registered, are specifically described.Confirming operation and preliminary
The processing of registration is the processing of the calibration tool program for the HDD64 for being stored in terminal 51, is controlled by the CPU61 of terminal 51.
If the icon that calibration tool program (not shown) is clicked on the picture of terminal 51, the CPU61 of terminal 51 starts
Calibration tool program, show by for carry out the wireless connection button 101 of the wireless connection of terminal 51 and router 13 and cut-out,
The homepage picture 100 of Fig. 4 that machine connection ACK button 102, wireless connection releasing button 103 are shown.
In homepage picture 100, if wireless connection button 101 is clicked, the retrieval of terminal 51 can wireless connection router,
Obtain the title and IP address of the router of extraction.By the title of the router of acquisition in 111 list display of router-list, show
Show that router connects picture 110.
Router connection picture 110 is to show the attachable router-list extracted out by terminal 51, for being connected to road
By the picture of device 13, has attachable router-list 111, the image of router that display is selected by router-list 111
Router image display field 112, the Password Input column 113 for being connected to router, the connection for being connected to router
Button 114 and the pause button 115 for stopping the connection to router.
In router-list 111, if clicking arbitrary router name, using the IP address of the router name as key, retrieve
Customer's router registration table of the management server (not shown) of house manufacturer, when finding the IP address met, from customer road
The number that associated router Image Name is established in customer's router registration table and the IP address is obtained by device image storage unit
According to the router image met is shown in router image display field 112.
If router image is shown in router image display field 112, responsible person is known that in router-list
The router of 111 selections is disposed on the router 13 of the house 2 of which customer of house manufacturer.In addition, by router figure
As the photo with the router 13 that is set to house 2 or appearance in kind are compared, if consistent, can carry out to the routing
The connection processing of device.
If pause button 115 is clicked, the display of terminal 51 " will stop the connection to router.It can be with" information,
For perform stop "Yes" button and for return router connection picture 110 "No" button show it is (not shown)
Confirmation screen.
If "Yes" button is clicked, router connection picture 100, end processing are closed.If "No" button is clicked,
Return to router connection picture 110.
Router connect picture 110, connection button 114 be clicked if, confirmation input in password field 113 password with
Whether the password for being registered in the router 13 of customer's router registration table is consistent, and in the case of inconsistent, " password is wrong for display
Accidentally, please input again " information and the error picture that shows of Password Input column.
The password for being input into Password Input column 113 and the password of the router 13 for being registered in customer's router registration table
Under unanimous circumstances, terminal 51 is connected to router 13, in the case of successful connection, end processing.
Connection failure from terminal 51 to router 13 in the case of, show error picture 120, end processing.
If terminal 51 is connected to router 13 by responsible person, home server 10 and true to the connection of each sensor is carried out
Recognize.
If the machine connection ACK button 102 of homepage picture 100 is clicked, terminal 51 starts the flow chart processing of Fig. 5.
The processing of Fig. 5 is controlled by the CPU61 of terminal 51.
In step S11, the IP address of terminal 51 is obtained.In step S12, judge whether the acquisition of IP address succeeds.Not into
(step S12 in the case of work(:No), in step S14, shown in the IP address display field of the terminal 51 of the confirmation screen 130 of Fig. 6
Show " failure ", carried out by the A of the A to Fig. 7 of Fig. 5 to step S24, whether had " failure " in the confirmation screen 130 of process decision chart 6.
(step S12 in the case of IP address obtains successfully:Yes), in step S13, the IP address of terminal 51 is shown in Fig. 6
Confirmation screen 130.
Later, in step S15, IP address is obtained from router 13.In step S16, judge IP address acquisition whether into
Work(.(step S16 in the case of failed:No), in step S17, in the IP address of the router 13 of the confirmation screen 130 of Fig. 6
Whether display field shows " failure ", is carried out by the A of the A to Fig. 7 of Fig. 5 to step S24, have in the confirmation screen 130 of process decision chart 6
" failure ".
(step S16 in the case of IP address obtains successfully:Yes), in step S18, the IP address of router 13 is shown in
The confirmation screen 130 of Fig. 6.
Later, in step S19, IP address is obtained from home server 10.In step S20, judging the acquisition of IP address is
No success.(step S20 in the case of successfully:Yes), in step S21, home server is stored in from the acquisition of home server 10
The version information of the starting state of 10 HEMS and the software of HEMS, in step S22, the address one with home server 10
The confirmation screen 130 for being shown in Fig. 6 is acted, is carried out by the A of the A to Fig. 7 of Fig. 5 to step S24, the confirmation screen 130 of process decision chart 6
On whether have " failure ".
(step S20 in the case that the acquisition of IP address is failed:No), in step S23, in the confirmation screen 130 of Fig. 6
Home server 10 IP address display field, show " failure ", carried out by the A of the A to Fig. 7 of Fig. 5 to step S24, judged
Whether have " failure " in the confirmation screen 130 of Fig. 6.
(step S24 in the case of having " failure ":Yes), error picture 140, end processing are shown in step S25.
In the confirmation screen 130 of Fig. 6, there is no (step S24 in the case of " failing ":No), in step S26, with router
13 IP address is key, with reference to the connection of HDD64 of terminal 51 and confirming operation result table, obtains sensor, air-conditioning, accumulator
Situation is completed in 43 confirmation.
Later, in step S27, situation is completed using the confirmation of sensor, air-conditioning, accumulator 43 obtained in step S26,
Show the connection machine confirmation screen 150 of Fig. 8.
Connection machine confirmation screen 150 is to represent whether sensor, air-conditioning, the connection of accumulator 43, confirming operation are completed
While, in the case where not completing, show the connection for starting each connection machine, the picture of the button 151~153 of confirming operation
Face has, sensor, air-conditioning, accumulator 43 confirming operation button 151~153;Sensor, air-conditioning, accumulator are shown respectively
The confirmation status display column 154~156 of the completion of 43 confirming operation/unfinished;The interruption of connection and confirming operation processing is pressed
Button 157;It is become valid when connecting the connection of machine and confirming operation completion, for confirming the confirming button 158 completed.
Later, in step S28, judge whether the confirming operation button 151 of sensor is clicked.
(step S28 in the case of being clicked:Yes), in step S29, determine whether the communication for having with which sensor
Mistake.
In the presence of with the communication mistake of which sensor in the case of (step S29:Yes), error picture is shown in step S30
160, in step S31, judgement interrupts whether button 157 is clicked.
(step S31 in the case of being clicked:Yes), in step S32, display connection release confirmation screen 104, to terminate
Button 105 is clicked as condition, and the information of the connection being performed so far and the result of confirming operation is stored in file, is paid
With comprising representing the intrinsic identification serial number of the house 2 and represent the filename for the mark that it is sensor, being stored in terminal 51
HDD64 confirmation destination file folder, end processing.
Interrupt (step S31 in the case that button 157 is not clicked on:No), in step S31, whether judgement interrupts button 157
It is clicked.That is, in step S30, if error picture 160 is shown, until interrupting button 157 and being clicked, repeat
Step S31.
There is no with the communication mistake of which sensor in the case of (step S29:No), that is to say, that about whole biographies
Sensor, communication in step S33, show the sensing data input picture 170 of Fig. 9 in the case that there is no problem.
The sensing data input picture 170 of Fig. 9, has, branch's sensor number selectionbar 171;The step of automatic display Fig. 3
In rapid S6 by the power generation electrical quantity sensor 11c of registration in advance, power generation electrical quantity sensor 11d, combustion gas pulse transducer 11e, from
Water whether there is display field 172 with the sensor of the information of the presence or absence of pulse transducer 11f;Combustion gas pulse is shown with system intialization
Sensor 11e, the tap water flow of every 1 pulse of pulse transducer 11f, may be set to the flow that responsible person can be inputted
Display field 173;For performing the Next button 174 of the communication acknowledgement of each sensor.
In step S34, whether judgement the Next button 174 is clicked.(step S34 in the case of being not clicked on:No),
In step S34, whether judgement the Next button 174 is clicked.That is, until the Next button 174 is clicked,
Repeat step S34.
(step S34 in the case that the Next button 174 is clicked:Yes), in step S35, judge to input in sensor
Whether picture 170 has misinput.(step S35 in the case of there are misinput:Yes), show that mistake is drawn in step S36
Face 181 judges whether the Next button 174 is clicked in step S34.
(the step S35 in the case where sensing data input picture 170 is without misinput:No), in step S37, sentence
The fixed communication mistake with the presence or absence of with which sensor.Due to branch sensor 11a, electric power measurement tap 11b, power generation electricity
Sensor 11c, power generation electrical quantity sensor 11d, combustion gas pulse transducer 11e, tap water are with pulse transducer 11f to data
The preliminary registration of logger 11g is carried out in step S6, thus the judgement of step S37 be judgement and data logger 11g it
Between communication it is whether normal.(step S37 in the case of there are communication mistake:Yes), in step S38, error picture 182 is shown,
In step S34, whether judgement the Next button 174 is clicked.
(the step S37 in the case where step S37 is there is no the communication mistake with sensor:No), in step S39, carry out
The confirming operation of sensor and the registration of setting place.
In the step, first, about the branch sensor 11a for being set to distributor cap 30, it is sequentially connected and is acted
Confirm, its result is shown in branch's sensor list screen 190 of Figure 10.In addition, the branch of corresponding each branch's sensor 11a
The setting place of 32 connection destination of circuit is manually entered in branch's sensor frames 190 by responsible person.In addition, the present embodiment
In, be manually entered setting place, but the data of the construction drawing from house 2 automatically enter setting place can also.For example, by each machine
Device, sensor machine ID registration in advance in the data of construction drawing, using the machine ID of branch sensor 11a obtained automatically as key
The data of construction drawing are retrieved, the data of setting place is obtained, automatically enters in one column of setting place.
In branch's sensor list screen 190, the confirming operation of all branch's sensor 11a terminates, and setting place is noted
If volume, validation the Next button 191.If the Next button 191 is clicked, other sensors list screen is shown
200, about other sensors, confirming operation is also carried out, shows its result.
Later, it is carried out by the B of the B of Fig. 7 to Figure 11 to step S40, is in acts of determination confirmation and setting place registration
No generation problem.(step S40 in the case of generation problem:Yes), in step S41, display shows confirming operation and setting place
In registration occur problem the meaning error picture (not shown), in step S42, judgement interrupt button 192 or 202 whether by
It clicks.
(step S42 in the case of being clicked:Yes), in step S43, display connection release confirmation screen 104, to terminate
Button 105 is clicked as condition, by branch's sensor guide look picture of the connection being performed so far and confirming operation to result
The data of face 190 and other sensors list screen 200 are stored in file, pay the identification intrinsic comprising the house 2 is represented
Serial number and the filename for representing the mark that it is sensor, the confirmation destination file for being stored in the HDD64 of terminal 51 presss from both sides, at end
Reason.
Interrupt (step S42 in the case that button 192 or 202 is not clicked on:No), in step S42, button is interrupted in judgement
Whether 192 or 202 be clicked.That is, until interrupting button 192 or 202 and being clicked, step S42 is repeated.
About arbitrary branch's sensor 11a and other sensors, do not sent out in confirming operation and setting place registration
(step S40 in the case of raw problem:No), also completing button 201 is shown in step S44.Later, in step S45, judged
Whether it is clicked into button 201.
(step S45 in the case of being not clicked on:No), in step S45, whether judgement completing button 201 is clicked.Also
It is to say, until completing button 201 is clicked, repeats step S45.
(step S45 in the case that completing button 201 is clicked:Yes), in step S46, about being stored in terminal 51
The record of the IP address of router 13 in the connection of HDD64 and confirming operation result table, described by the connection of sensor and moves
Make to confirm that completing label is set as 1, the confirmation situation of sensor is set as completing.In addition, connection and confirming operation will be used as
Branch's sensor list screen 190 of result and the data of other sensors list screen 200 be stored in file, pay and include
It represents the intrinsic identification serial number of the house 2 and represents the filename for the mark that it is sensor, be stored in the HDD64 of terminal 51
Confirmation destination file folder.
Later, in step S47, using the IP address of router 13 as key, with reference to connection and confirming operation result table, judge
Whether about sensor, air-conditioning, accumulator 43 whole, connection and confirming operation complete label be set as " completing " (1).
(step S47 in the case of not being set:No), carried out via the C of the C of Figure 11 to Fig. 7 to step S26, with routing
The IP address of device 13 is key, with reference to the connection of HDD64 of terminal 51 and confirming operation result table, obtains sensor, air-conditioning, electric power storage
Situation is completed in the confirmation in pond 43.
About sensor, air-conditioning, accumulator 43 whole, connection and confirming operation complete label be all set to " complete "
(1) (step S47 in the case of:Yes), carried out via the F of the F of Figure 11 to Figure 12 to step S48, as shown in figure 13, connect machine
Sensor acknowledgement state display field 154, air-conditioning acknowledgement state display field 155, the accumulator acknowledgement state of device confirmation screen 150 are shown
While showing the display on column 156 all as " completion ", validation completing button 158.
Later, in step S49, whether judgement completing button 158 is clicked.(step S49 in the case of being not clicked on:
No), in step S50, judgement interrupts whether button 157 is clicked.
(step S50 in the case of being clicked:Yes), in step S51, display connection release confirmation screen 104, to terminate
Button 105 is clicked as condition, and the information of the connection being performed so far and the result of confirming operation is stored in file, is paid
With comprising the filename for representing the intrinsic identification serial number of the house 2, being stored in the confirmation destination file of the HDD64 of terminal 51
Folder, end processing.
Interrupt (step S50 in the case that button 157 is not clicked on:No), in step S49, whether judgement completing button 158
It is clicked.That is, in step S48, if completing button 158 is become valid, to completing button 158 or button 157 is interrupted
Until being clicked, step S49 and step S50 is repeated.
(step S49 in the case that completing button 158 is clicked:Yes), in step S52, confirming operation result screen is shown
210。
Confirming operation result screen 210 includes, each sensor, air-conditioning and accumulator 43 title, represent these setting
Communication acknowledgement the results list 211 of place and communication acknowledgement result, in communication acknowledgement the results list 211, include communication acknowledgement
As a result for " failure " result in the case of, for execution again the ACK button again 212 of communication acknowledgement, in communication acknowledgement result
In list 211, not comprising communication acknowledgement result for " failure " result in the case of the save button 213 that become valid.
In step S52, the HDD64 of terminal 51 is stored in really by key retrieval of the intrinsic identification serial number of the house 2
Recognize the file of destination file folder, the connection and the file of the result of confirming operation that the extraction expression house 2 is performed.The text
In part, determine whether that comprising communication acknowledgement result be " failure " as a result, comprising in the case of, validation ACK button 212 again,
In the case of not including, validation save button 213 shows the confirming operation result screen 210 of Figure 13.
In the following, in step S53, whether judgement save button 213 is clicked.(step S53 in the case of being clicked:
Yes), in step S54, the content of communication acknowledgement the results list 211 is paid to the text for including the intrinsic identification serial number of the house 2
Part name as connection machine guide look file 214, is stored in the connection machine guide look file of the HDD64 of terminal 51, at end
Reason.
(step S53 in the case that save button 213 is not clicked on:No), in step S55, ACK button 212 is again for judgement
It is no to be clicked.(step S55 in the case of being not clicked on:No), in step S53, whether judgement save button 213 is clicked.
That is until ACK button 212 again or save button 213 are clicked, step S53 and step S55 is repeated.
(step S55 in the case that ACK button 212 is clicked again:Yes), the C via the C of Figure 12 to Fig. 7 is to being walked
Rapid S26 using the IP address of router 13 as key, with reference to the connection of HDD64 of terminal 51 and confirming operation result table, obtains sensing
Situation is completed in the confirmation of device, air-conditioning, accumulator 43.
(the step S28 in the case where the confirming operation button 151 of the step S28 sensors of Fig. 7 is not clicked on:No), pass through
Whether the confirming operation button 152 for step S56, judge air-conditioning by the D of the D to Figure 14 of Fig. 7 is clicked.The feelings being clicked
(step S56 under condition:Yes), detection is connected to the whole of the air-conditioning of home network 21, in step S57, display list display detection
Air-conditioning Figure 15 air-conditioning list screen 230.In step S57, the automatic air-conditioning list 231 for showing air-conditioning list screen 230
Display project in, setting place, dehumidification function whether there is, the project other than the setting of energy-saving type air conditioner function.
Setting place, dehumidification function whether there is, energy-saving type air conditioner function is manually entered by responsible person.In addition, in the present embodiment, hand
It is dynamic to input these projects, but automatically enter can also for the data of the construction drawing from house 2.For example, by each machine, the machine of sensor
Device ID registration in advance is retrieved the data of construction drawing using the machine ID of air-conditioning obtained automatically as key, obtained in the data of construction drawing
Setting place, dehumidification function whether there is, the data of energy-saving type air conditioner function, automatically enter in these columns.
Later, whether problem occurs in step S58, acts of determination confirmation and setting place registration.It confirming operation and sets
Put in site enrollment (step S58 in the case of generation problem:Yes), cannot be completed as the connection of air-conditioning and confirming operation
Situation, in step S59, judgement interrupts whether button 232 is clicked.(step S59 in the case of being not clicked on:No), exist again
Step S59, judgement interrupt whether button 232 is clicked.That is, until interrupting button 232 and being clicked, step is repeated
S59。
Interrupt (step S59 in the case that button 232 is clicked:Yes), in step S60, display connection release confirmation screen
104, it is clicked with conclusion button 105 as condition, it will be as the connection being performed so far and the letter of the result of confirming operation
The data of the air-conditioning list 231 of breath are stored in file, pay comprising the filename for representing the intrinsic identification serial number of the house 2,
It is stored in the confirmation destination file folder of the HDD64 of terminal 51, end processing.
(step S58 in the case of non-generation problem in confirming operation and setting place registration:No), about air-conditioning, as
The component that whole confirming operations are completed, in step S61, validation completing button 233.
Later, in step S62, whether judgement completing button 233 is clicked.(step S62 in the case of being not clicked on:
No), again in step S62, whether judgement completing button 233 is clicked.That is, until completing button 233 is clicked,
Repeat step S62.
(step S62 in the case that completing button 233 is clicked:Yes), in step S63, about being stored in terminal 51
The connection of HDD64 and confirming operation result table, the record of IP address of being paid the router 13, by the connection of air-conditioning and
Confirming operation completes label and is set as 1, and the confirmation situation of air-conditioning is set as completing.In addition, connection and confirming operation will be used as
The data of air-conditioning list 231 of result be stored in file, pay comprising the file for representing the intrinsic identification serial number of the house 2
Name is stored in the confirmation destination file folder of the HDD64 of terminal 51.
Later, in step S64, using the IP address of router 13 as key, with reference to connection and confirming operation result table, judge
Whether about sensor, air-conditioning, accumulator 43 whole, connection and confirming operation complete label be set as " completing " (1).Not by
(step S64 in the case of setting:No), carried out via the C of the C of Figure 14 to Fig. 7 to step S26, with the IP address of router 13
For key, with reference to the connection of HDD64 of terminal 51 and confirming operation result table, acquisition sensor, air-conditioning, the confirmation of accumulator 43 are complete
Into situation.
About sensor, air-conditioning, accumulator 43 whole, connection and confirming operation complete label be arranged to " complete "
(1) (step S64 in the case of:Yes), carried out via the F of the F of Figure 14 to Figure 12 to step S48, as shown in figure 13, connect machine
Sensor acknowledgement state display field 154, air-conditioning acknowledgement state display field 155, the accumulator acknowledgement state of device confirmation screen 150 are shown
While showing the display on column 156 all as " completion ", validation completing button 158.
In the step S56 of Figure 14, (step S56 in the case that the confirming operation button 152 of the air-conditioning of Figure 15 is not clicked on:
No), carried out via the E of the E of Figure 14 to Figure 16 to step S65, the action of the accumulator 43 of judgement connection machine confirmation screen 150
Whether ACK button 153 is clicked.
(step S64 in the case of being clicked:Yes), detection is connected to the accumulator 43 of home network 21, in step S66,
Show the accumulator list screen 250 of Figure 18 of the accumulator 43 of list display detection.In step S66, electric power storage is shown automatically
In the display project of the electric power storage pool list 251 of pond list screen 250, the project other than setting place, title.
Setting place, title are manually entered by responsible person.In addition, in the present embodiment, these projects are manually entered, but from firmly
The data of the construction drawing of residence 2 automatically enter can also.For example, by each machine, sensor machine ID registration in advance in construction drawing
Data, using obtain automatically each machine, the machine ID of sensor as key retrieve construction drawing data, obtain setting place, name
The data of title, and automatically enter in these columns.
Next, in step S67, judge whether problem occurs in confirming operation and setting place registration.It is acting
(step S67 in the case of non-generation problem in confirmation and setting place registration:No), about accumulator 43, as completing
There is the situation of confirming operation, in step 72, validation completing button 253.
(step S67 in the case of generation problem in confirming operation and setting place registration:Yes), via the I of Figure 16 to figure
17 I carries out step S68, shows error picture 260.Later, in step S69, judgement interrupts whether button 252 is clicked.
(step S69 in the case of being clicked:Yes), in step S70, display connection release confirmation screen 104, to terminate
Button 105 is clicked as condition, will be arranged as the accumulator for the connection and the information of confirming operation result being performed so far
The data of table 251 are stored in file, pay comprising the filename for representing the intrinsic identification serial number of the house 2, are stored in terminal
The confirmation destination file folder of 51 HDD64, end processing.
Interrupt (step S69 in the case that button 252 is not clicked on:No), in step S71, acts of determination confirms and setting
It whether there is problem in site enrollment.In the presence of (step S71:Yes), as the situation of unsolved problem, in step
S69, judgement interrupt whether button 232 is clicked.That is, interrupt if button 252 is clicked, to problem be solved for
Only, step S69 and step S70 is repeated.
(step S71 in the case of non-generation problem in confirming operation and setting place registration:No), as solving the problems, such as
Situation, carried out via the J of the J to Figure 16 of Figure 17 to step S72, validation completing button 253.
Later, in step S73, whether judgement completing button 253 is clicked.(step S73 in the case of being not clicked on:
No), again in step S73, whether judgement completing button 253 is clicked.That is, until completing button 253 is clicked,
Repeat step S73.
(step S73 in the case that completing button 253 is clicked:Yes), in step S74, about being stored in terminal 51
The connection of HDD64 and confirming operation result table, the record of IP address of being paid the router 13, by the company of accumulator 43
It connects and confirming operation completes label and is set as 1, the confirmation situation of accumulator 43 is set as completing.In addition, will be used as connection and
The data of the electric power storage pool list 251 of the result of confirming operation are stored in file, pay the identification intrinsic comprising the house 2 is represented
The filename of serial number is stored in the confirmation destination file folder of the HDD64 of terminal 51.
Later, in step S74, using the IP address of router 13 as key, with reference to connection and confirming operation result table, judge
Whether about sensor, air-conditioning, accumulator 43 whole, connection and confirming operation complete label be set as " completing " (1).
(step S75 in the case of not being set:No), carried out via the C of the C of Figure 16 to Fig. 7 to step S26, with routing
The IP address of device 13 is key, with reference to the connection of HDD64 of terminal 51 and confirming operation result table, obtains sensor, air-conditioning, electric power storage
Situation is completed in the confirmation in pond 43.
About sensor, air-conditioning, accumulator 43 whole, connection and confirming operation complete label be arranged to " complete "
(1) (step S75 in the case of:Yes), carried out via the F of the F of Figure 16 to Figure 12 to step S48, as shown in figure 13, connect machine
Sensor acknowledgement state display field 154, air-conditioning acknowledgement state display field 155, the accumulator acknowledgement state of device confirmation screen 150 are shown
While showing the display on column 156 all as " completion ", validation completing button 158.
(the step S65 in the case where the confirming operation button 153 of the step S65 accumulators 43 of Figure 16 is not clicked on:
No), in step S76, judgement interrupts whether button 157 is clicked.(step S76 in the case of being clicked:Yes), in step
S77, display connection release confirmation screen 104, is clicked as condition with conclusion button 105, will be as being performed so far
The information of connection and confirming operation result is stored in file, pays comprising the file for representing the intrinsic identification serial number of the house 2
Name is stored in the confirmation destination file folder of the HDD64 of terminal 51, end processing.
Interrupt (step S76 in the case that button 157 is not clicked on:No), in step S78, whether judgement completing button 158
It is clicked.(step S78 in the case of being not clicked on:No), carried out via the H of the H of Figure 16 to Fig. 7 to step S28, judgement sensing
Whether device button 151 is clicked.
(step S78 in the case that completing button 158 is clicked:Yes), step is carried out via the G of the G of Figure 16 to Figure 12
S52, display confirming operation result screen 210.
After the wireless connection button 101 for clicking homepage picture 100, the connection processing and machine of router 13 are hit in point
Connect ACK button 102 after, carry out to each sensor, air-conditioning, accumulator 43 connection confirmation process during any time
Point clicks the wireless connection releasing button 103 of homepage picture 100, by connecting release confirmation screen 104, released connection.
If wireless connection releasing button 103 is clicked, terminal 51 shows the connection solution of the wireless ID in connection
Except confirmation screen 104.
Whether judgement cancel button 106 is clicked, and in the case where cancel button 106 is clicked, closes connection and releases really
Recognize picture 104.
In the case that cancel button 106 is not clicked on, whether judgement conclusion button 105 is clicked.Conclusion button 105 is by point
In the case of hitting, the wireless ID wireless ID mono- of company whether usually used in the workplace of responsible person with terminal 51 in judgement connection
It causes.In the case of inconsistent, wireless connection, end processing are released.
Wireless ID " will under the wireless ID unanimous circumstances of the company usually used in the workplace of responsible person of terminal 51, showing
The ID for releasing the wireless connection of connection is consistent with the wireless ID of company.Stop to release connection." alerting picture, end processing.
In the step S54 of Figure 12, it is stored in the connection machine guide look of the connection machine guide look file of the HDD64 of terminal 51
File 214 is registered in the storage unit (not shown) of home server 10 automatically, is used for constructing for HEMS.In addition, connection
Machine guide look file 214 is stored in the customer data file of the management server (not shown) of house manufacturer from terminal 51
Folder, the historical information as house 2 are managed.
Symbol description
1 internet
2 houses
10 home servers
11a branches sensor
11b electric power measures tap
11c, 11d power generation electrical quantity sensor
11e combustion gas pulse transducers
11f tap water pulse transducers
11g data logger
12 display devices
13 routers
21 home networks
30 distributor caps
31 trunk circuits
32 duplexures
41 device of solar generating
42 fuel cells
43 accumulators
51 terminal computers
Claims (7)
1. a kind of building device of building inner sensor network is a kind of equipment machine and meter constructed and be set in building
The device of the network between the sensor and server of energy fluence is surveyed, including:
Attempt the unit of automatic connection router and the server;
Judge the whether successful unit of connection to the router and the server;
In the case of the connection failure to the router or the server, the machine of connection failure is shown and as company
The unit for the item that the reason of connecing unsuccessfully is considered that;
In the case where being successfully connected with the router and the server, by the router and the server, taste
Examination connects the unit of the equipment machine and the sensor automatically;
Judge the whether successful unit of connection to the equipment machine and the sensor;
In the case of the connection failure to any one of the equipment machine and the sensor, the machine of connection failure is shown
Device and the unit of item being considered that as the reason of connection failure;
Show the equipment machine being successfully connected and the confirming operation situation of the sensor and setting in the building
Put the unit in place;
About the equipment machine being successfully connected and the sensor, by the result for attempting to connect automatically, described
The information registering of confirming operation situation and the setting place is in the unit for confirming result storage unit.
2. the building device of building inner sensor network according to claim 1, it is characterised in that:
It is the computer of the merchant for the user that the building is supplied to the building.
3. according to the building device for the building inner sensor network that claims 1 or 2 is recorded, which is characterized in that including:
To be successfully connected in as all equipment machines of the network object and the sensor, as condition, display is used for
Preserve the guarantor of the list of the equipment machine and the sensor and the equipment machine and the setting place of the sensor
Deposit the unit of button;
When the save button is clicked, the electronic document for storing the list is paid comprising the corresponding building of identification
The filename of the identification information of object is stored in the unit of connection machine guide look storage unit.
4. according to the building device for the building inner sensor network that claims 1 or 2 is recorded, it is characterised in that:
The sensor of the measurement energy fluence is, from including the electric power for being installed on the circuit set on the distributor cap of the building
It counts, the pulse transducer of the usage amount of measurement tap water, the pulse transducer for measuring combustion gas usage amount, the hair for measuring power generator
The sensor selected in the group of the power generation electrical quantity sensor of power consumption.
5. according to the building device for the building inner sensor network that claims 1 or 2 is recorded, it is characterised in that:Have and institute
The connection releasing of router is stated when being instructed to, judge the connection ID inputted for the connection license with the router whether with
The building device is used in everyday consistent for being connected to the regulation ID of network, under unanimous circumstances, stops and the routing
The unit that the connection of device releases.
6. according to the building device for the building inner sensor network that claims 1 or 2 is recorded, it is characterised in that:
The server has, and exists in several equipment machines and the sensor with mutually different communication protocol
During the machine of communication, communication protocol that by that will send control signal to the equipment machine and sensor when uses according to
Communication protocol used in the equipment machine and the sensor of destination switches over, and can control the equipment machine
And the protocol switching unit of the sensor.
7. a kind of construction method of building inner sensor network is a kind of equipment machine and meter constructed and be set in building
The method for surveying the network between the sensor and server of energy fluence, including:
The process that computer attempts automatic connection router and the server;
In the case of the connection failure to the router or the server, the machine of connection failure is shown and as company
The process for the item that the reason of connecing unsuccessfully is considered that;
The computer passes through the router and the clothes in the case where being successfully connected with the router and the server
Business device, in the process that the equipment machine and sensor trial connect automatically;
In the case of the connection failure to any one of the equipment machine and the sensor, the machine of connection failure is shown
Device and the process of item being considered that as the reason of connection failure;
Show the equipment machine being successfully connected and the confirming operation situation of the sensor and setting in the building
The process for putting place;
About the equipment machine being successfully connected and the sensor, by the result for attempting to connect automatically, described
The information registering of confirming operation situation and the setting place is in the process for confirming result storage unit.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2012/075162 WO2014049849A1 (en) | 2012-09-28 | 2012-09-28 | Interior sensor network building device and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104662926A CN104662926A (en) | 2015-05-27 |
CN104662926B true CN104662926B (en) | 2018-07-06 |
Family
ID=50387310
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201280076070.4A Expired - Fee Related CN104662926B (en) | 2012-09-28 | 2012-09-28 | The building device and method of building inner sensor network |
Country Status (4)
Country | Link |
---|---|
JP (1) | JP5789722B2 (en) |
CN (1) | CN104662926B (en) |
SG (1) | SG11201502393PA (en) |
WO (1) | WO2014049849A1 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6044485B2 (en) * | 2013-08-22 | 2016-12-14 | 株式会社デンソー | Energy management system |
US10348617B2 (en) * | 2017-06-21 | 2019-07-09 | Siemens Schweiz Ag | System and method for stabilizing a BACnet MSTP network when failures occur |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1815146A (en) * | 2005-02-05 | 2006-08-09 | 上海自来水市北科技有限公司 | Wireless long-distance meter-reading system |
CN101458868A (en) * | 2008-12-23 | 2009-06-17 | 上海城市水资源开发利用国家工程中心有限公司 | Data collection method used for remote wireless meter reading system |
CN102595654A (en) * | 2011-01-07 | 2012-07-18 | 华北电网有限公司计量中心 | Indoor communication network architecture and indoor communication network architectural method |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004134920A (en) * | 2002-10-09 | 2004-04-30 | Sanyo Electric Co Ltd | Power line connection equipment control system and connection apparatus |
JP4415751B2 (en) * | 2003-05-14 | 2010-02-17 | パナソニック株式会社 | Information communication equipment |
WO2005119621A1 (en) * | 2004-06-01 | 2005-12-15 | Koninklijke Philips Electronics N.V. | Multi-protocol remote control device |
JP4653448B2 (en) * | 2004-09-29 | 2011-03-16 | 大和ハウス工業株式会社 | Operation inspection method for home appliance remote control system and personal computer device for inspection used for operation inspection |
JP2009165251A (en) * | 2007-12-28 | 2009-07-23 | Panasonic Electric Works Co Ltd | Dc distribution system |
-
2012
- 2012-09-28 SG SG11201502393PA patent/SG11201502393PA/en unknown
- 2012-09-28 JP JP2014538046A patent/JP5789722B2/en active Active
- 2012-09-28 CN CN201280076070.4A patent/CN104662926B/en not_active Expired - Fee Related
- 2012-09-28 WO PCT/JP2012/075162 patent/WO2014049849A1/en active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1815146A (en) * | 2005-02-05 | 2006-08-09 | 上海自来水市北科技有限公司 | Wireless long-distance meter-reading system |
CN101458868A (en) * | 2008-12-23 | 2009-06-17 | 上海城市水资源开发利用国家工程中心有限公司 | Data collection method used for remote wireless meter reading system |
CN102595654A (en) * | 2011-01-07 | 2012-07-18 | 华北电网有限公司计量中心 | Indoor communication network architecture and indoor communication network architectural method |
Also Published As
Publication number | Publication date |
---|---|
CN104662926A (en) | 2015-05-27 |
WO2014049849A1 (en) | 2014-04-03 |
SG11201502393PA (en) | 2015-05-28 |
JP5789722B2 (en) | 2015-10-07 |
JPWO2014049849A1 (en) | 2016-08-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7822489B2 (en) | Electronic device control apparatus, method for controlling electronic device, electronic device control program, and computer-readable recording medium having recorded electronic device control program | |
CN101459564B (en) | Information processing device | |
TWI598735B (en) | Information sharing method | |
CN102316387B (en) | Remote control equipment, remote control setting method | |
CN104412239B (en) | Approaches to IM | |
CN104160657B (en) | Intelligent basis facilities management user equipment | |
US10210068B2 (en) | Device topology definition system | |
CN102985915A (en) | Control system user interface | |
EP2973486A1 (en) | Remote sharing of measurement data | |
CN107294793A (en) | Replacement method, device, equipment and the storage medium of intelligent home device | |
CN101163069A (en) | Information processing apparatus and information processing system | |
CN109477857A (en) | House is wirelessly found | |
CN110225104A (en) | Data capture method, device and terminal device | |
EP2546797A1 (en) | System for managing used resources in guest room | |
CN107122295A (en) | The generation method and device of test case script | |
CN104137525B (en) | Communication system, communicator and communication means | |
CN104662926B (en) | The building device and method of building inner sensor network | |
Xu et al. | A generic user interface for energy management in smart homes | |
CN104199391A (en) | Intelligent building monitor system and method | |
Turner | Flexible management of smart homes | |
JP2006050651A (en) | Home electronic appliance maintenance repair service system | |
CN109688099A (en) | Server end hits library recognition methods, device, equipment and readable storage medium storing program for executing | |
CN107783516A (en) | A kind of field apparatus detection and management system | |
CN107797525A (en) | A kind of manufacturing parameter intelligent management, system and mobile terminal server | |
KR100456405B1 (en) | home automation system using a network and methods thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180706 Termination date: 20210928 |