CN104652740A - Installation method for thermal insulation and decoration integrated facade panels - Google Patents
Installation method for thermal insulation and decoration integrated facade panels Download PDFInfo
- Publication number
- CN104652740A CN104652740A CN201510014680.7A CN201510014680A CN104652740A CN 104652740 A CN104652740 A CN 104652740A CN 201510014680 A CN201510014680 A CN 201510014680A CN 104652740 A CN104652740 A CN 104652740A
- Authority
- CN
- China
- Prior art keywords
- main body
- gap
- side fascia
- square steel
- heat preservation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Finishing Walls (AREA)
Abstract
The invention relates to an installation method for thermal insulation and decoration integrated facade panels in the field of construction methods of the construction industry. The method includes the following steps: (Step 1) main wall surface treatment; (Step 2) datum line making; (Step 3) framing installation; (Step 4) thermal insulation and decoration integrated facade panel installation; (Step 5) gap filling; (Step 6) sealant filling; (Step 7) panel surface cleaning. When the method disclosed by the invention is adopted, integral installation is convenient, cost is reduced, the construction period is short, the load of facade panels is reduced greatly, the utilizability of space and land is enhanced, the application range is wide, temperature is kept, heat is insulated, energy consumption is reduced, structural destruction caused by the circulation of rain, snow, freezing, thawing, dryness and wetness is prevented, the worry about the water seepage of wall surfaces is eased after installation, the phenomenon that indoor wall surfaces go moldy is effectively prevented, and the thermal insulation and decoration integrated facade panels are environment-friendly and durable.
Description
Technical field
the present invention relates to the construction method field of building trade, be specifically related to the mounting method of heat preservation decoration integrative side fascia.
Background technology
china is an energy consumption big country, per capita resources shortage, and energy scarcity is the principal contradiction of restriction China economic development.Therefore, Building Energy-saving must attract great attention, and building energy conservation just becomes alleviates China energy scarcity contradiction, environmental quality of improving the people's livelihood, key one ring that alleviates environment pollution, carry out sustainable development target.And External Thermal Insulation Technology for External is exactly a technology important in building energy conservation, key is played a part to the technology g uarantee External Thermal Insulation Composite Systems quality of working design and work progress.So we will improve the Quality Construction quality of anti-exterior-wall heat insulation, must be rigid in checking up from material, two aspects of constructing.We also should strengthen the research of the aspects such as safety in utilization such as external wall thermal insulation technology cracking resistance, antiseepage simultaneously.Effective control external wall insulation project quality, contributes to building energy conservation.
in the market open use the cast of external wall steel bar concrete, Surgery therapy and incrustation construction technology, basic is step-by-step construction technique, namely first tie up reinforcing bar, formwork supporting plate, casting reinforced concrete complete main body load bearing wall, then paste Surgery therapy, after completing Surgery therapy, finally do incrustation, its main Problems existing is: on-the-spot labour cost is high, and low precision is long in time limit, uncertain factor is many, affects whole construction speed and workmanship.In addition, if when construction technology is not good, also can affects and attractive in appearancely even cause insulation layer to come off, ftracture, seep water and the quality problems such as be full of cracks of wall facing coating, shorten building application life.
Summary of the invention
The object of the invention is to solve above defect, provide the mounting method of heat preservation decoration integrative side fascia, make integral installation more stable, holding capacity is better.
Mounting method of the present invention is applicable to steel work wall, frame construction wall, lightweight brick wall, concrete wall etc.
The object of the invention is to realize in the following manner:
The mounting method of heat preservation decoration integrative side fascia, the method comprises the following steps:
The first step, process main body wall metope, check the situation of original facing tile, the part of hollowing is dug out, with oxalic acid or cleaning agent cleaning metope, guarantee tile surface cleans, free from smutting, then adhesion interface agent is adopted to brush metope, make its complete coverage rate brick wall, and guarantee that planeness reaches middle rank and to plaster standard, finally determine the crossbeam position of the main body steel work of main body wall, as not having main body steel work then at the metalwork of several proper alignment of main body wall metope pre-embedded, metalwork is fixed by chemical anchor bolts.
Second step, reference line product, on main body wall metope according to plan the reference line of vertical and horizontal with line of ink marker bullet on body of wall, each interconnective construction metope all wants snap the line, installs the effect of leveling to reach.Needed first to carry out row's plate and lattice according to plan, quality requirement before snap the line: plan requirement be reached.Detection method: use tape measure.
3rd step, installs keel, is weldingly fixed on the crossbeam of main body steel work like clockwork, as main body wall metope does not have main body steel work to be then weldingly fixed on pre-buried metalwork by vertical square steel pipe by longitudinal snap the line position by vertical square steel pipe steel angle hitch.Absolute altitude and position of center line should be checked at any time during installation, then like clockwork horizontal square steel pipe is weldingly fixed on vertical square steel pipe by horizontal snap the line position, thus composition main body keel structure.
Pre-buried metalwork is arranged on the cement frame of main body wall, more stable after integral installation, holding capacity is better, in order to ensure the stability of installing, be fixed with welding cover on the surface of metalwork, the surface of welding cover by being weldingly fixed on metalwork, welding cover is the structure of intermediate projections, both sides are welded on metalwork surface, and the central convex configuration of welding cover is for installing vertical square steel pipe, and the mode by self-tapping screw, welding or riveted joint installs vertical square steel pipe.
In addition, welding cover also can not be designed in the surface of metalwork, can install steel angle hitch on the surface of metalwork, installs, and be arranged on steel angle hitch by vertical square steel pipe by welding or anchorage style.
The vertical square steel pipe comparatively large to area, floor height is higher, must measure with measuring apparatus and line pendant, correct its position, vertical and smooth with guarantor's steel pipe.
4th step, heat preservation decoration integrative side fascia is installed, heat preservation decoration integrative side fascia is neatly anchored on main body keel structure, concrete employing chromium plating is bored tail tapping screw and is screwed onto on vertical square steel pipe by the extension of decoration integrated for temperature side fascia bottom metal frame, the plate face of the decoration integrated side fascia of integral heat insulation is made to keep smooth after installation, and the dividing joint that aligns, stay gap between plate and plate, to adjust alignment error.First check whether heat preservation decoration integrative side fascia stands intact, then start lifting and install.
The quality requirement installing heat preservation decoration integrative side fascia is as follows:
1) appropriate size mounting screw is selected; first in the middle part of straight flange, by every 300mm ~ 500mm spacing, hold-down screw is installed; at least 8 every square metre; additional outer casting die adjusts the difference of height of plate seam more if desired; interior anchoring piece is installed or outer anchoring piece all can not be firmly excessive; in order to avoid cause the wave-like in plate face, the size of adjustment force should be carried out according to the planeness in plate face;
2) status requirement is smooth vertical and horizontal, marshalling;
3) anchoring piece is installed complete, moderate pressure.
Acceptance inspeciton standard is as follows:
1) use guiding ruler, lean against on the plate face that bondd, then use the size of vertical check chi measurement clearance;
2) whether smooth vertical and horizontal with position, ocular estimate access panel face, whether marshalling;
3) observe anchoring piece whether to be fixed according to a determining deviation, whether be secured entirely in framework.
5th step, blind, polyurethane expansion glue is adopted to fill the gap existed between plate and plate, the mode that gap-filling glue is sprayed in direct employing inside gap is filled, or select the expansion fillet of suitable size to fill, to reach sealing, waterproof, antirust, insulation, fixing effect.
6th step, filling with sealant, again at gap-filling glue surface filling with sealant after gap-filling glue solidification, evenly stamps appropriate fluid sealant with glue sealing gun, then strikes off fluid sealant with flat scraper, for the cracking that expands with heat and contract with cold between waterproof, anti-plate in gap.
7th step, plate face is cleaned, and painting ash, dirt first on clean heat preservation decoration integrative side fascia edge, then tear diaphragm off, then removed by viscose glue legacy clean with clean towel.
The quality requirement that plate face is clean: without stains, without dirt.Detection method: use ocular estimate.
In above-mentioned explanation, as preferred scheme, in the third step, vertical square steel pipe installed height mark deviation should not be greater than 3mm, and before and after reference line, deviation should not be greater than 2mm, and left-right deviation should not be greater than 3mm; The absolute altitude deviation of adjacent two vertical square steel pipes should not be greater than 3mm, and the maximum absolute altitude deviation with layer should not be greater than 5mm, and the range deviation of adjacent two vertical square steel pipes should not be greater than 2mm.
In above-mentioned explanation, as preferred scheme, in the third step, in the square position weldable steel corner brace that horizontal square steel pipe and vertical square steel pipe intersect to form, for increasing the stability of main body keel.
In above-mentioned explanation, as preferred scheme, in the 4th step, when heat preservation decoration integrative side fascia is installed, left and right, upper and lower deviation should not be greater than 1mm.
In above-mentioned explanation, as preferred scheme, in the 5th step, after blind, require that the plate face degree of depth of gap-filling glue or fillet and heat preservation decoration integrative side fascia is 3 ~ 5mm.
In above-mentioned explanation, as preferred scheme, in the 5th step, after gap-filling glue solidification, from both sides, gap with 45 degree of gap-filling glues of cutting sth. askew.
In above-mentioned explanation, as preferred scheme, in the 6th step, before filling with sealant, first gap both sides and U.S. line paper is sticked in the plate face being positioned at heat preservation decoration integrative side fascia, smooth vertical and horizontal to ensure, directly U.S. line paper is torn again after careful sealing to be filled.
In addition, in order to possess good rust-proof effect, need to brush rustproof paint outside all welded contacts of the present invention.
It is as follows that this method invents the beneficial effect produced:
1) install convenient, saving cost, heat preservation decoration integrative side fascia quality is light, volume is little, and it is time saving and energy saving to carry and install, and mounting means is simple, quick, and do not limit by seasonal climate and geographical environment, the whole year is all suitable;
2) construction period is short, and integral installation process is in order coherent, significantly shorten construction period, not only accelerates programming, also save building costs, reduce comprehensive cost;
3) while heat preservation decoration integrative side fascia reaches decoration and heat insulating effect, reduce exterior wall load to greatest extent, the utilizability in space and soil is strengthened;
4) installed by main body keel structure, main body keel structure is arranged on the main body steel work of building simultaneously, and globality is strong, seismic crack, and firm safety, reduces the burden of building itself, and reduces the impact of earthquake on building largely;
5) have wide range of applications; many engineering fields such as urban construction, apartment and flats, office guild hall, villa, sight spot, gardens, old building transforming, entrance guard sentry box can be widely used in; these building materials be both applicable to the building of the types such as newly-built brick mix structure, frame construction, steel work, light-weight house; also the decorative energy-saving transformation of existing building is applicable to, and interior/exterior decoration;
6) thermal insulation, energy-conservation of consumption reduction; main body wall after installation has excellent thermal insulation characteristic, compared with traditional heat preservation and decoration of outer wall building materials, has splendid cold-resistant heat-proof quality; reduce heating and energy consumption for cooling largely, thus save energy expenditure;
7) mounting means compact between sheet material is adopted; avoid rain, avenge, freeze, melt, do, the wet structural deterioration caused that circulates; the sorrow of the infiltration of metope is eliminated after installation; efficiently avoid the phenomenon that indoor wall is mouldy; even in severe cold area; the board of stable performance also has no the sorrow of water penetration and deformation, extends the application life of building;
8) environmental protection, durable in use, by new utilization after flexible dismounting, heat preservation decoration integrative side fascia can be arranged on that other is architectural equally, the leftover pieces of constructed residual also can recycling in addition, in work progress, reduce building waste largely, be high-quality, high-performance environmentally-friendly product.
Accompanying drawing explanation
Fig. 1 is the scheme of installation of main body keel structure in the embodiment of the present invention;
Fig. 2 is the partial enlarged drawing of Fig. 1;
Fig. 3 is the scheme of installation of heat preservation decoration integrative side fascia in the embodiment of the present invention;
Fig. 4 is the partial enlarged drawing of Fig. 3;
Fig. 5 is the scheme of installation in the embodiment of the present invention after filling with sealant;
Fig. 6 is the partial enlarged drawing of Fig. 5;
Fig. 7 is the method frame figure of the embodiment of the present invention;
In figure, 1 is i iron, and 2 is vertical square steel pipe, and 3 is horizontal square steel pipe, and 4 is zinc-plated corner brace, and 5 is gap, and 6 is heat preservation decoration integrative side fascia, and 7 is polyurethane expansion glue, and 8 is weather-resistant pu structure glue, and 9 is chromium plating brill tail tapping screw.
Detailed description of the invention
Below in conjunction with accompanying drawing and detailed description of the invention, the present invention is described in further detail.
The present embodiment, with reference to Fig. 1 ~ Fig. 7, its mounting method specifically implemented comprises the following steps (as shown in Figure 7):
The first step, process main body wall metope, check the situation of original facing tile, the part of hollowing is dug out, with oxalic acid or cleaning agent cleaning metope, guarantee tile surface cleans, free from smutting, then adhesion interface agent is adopted to brush metope, make its complete coverage rate brick wall, and guarantee that planeness reaches middle rank and to plaster standard, finally determine the crossbeam position of the main body steel work of main body wall, in the present embodiment, the crossbeam of the main body steel work of main body wall is the i iron 1 of horizontally set, as shown in figures 1 and 3, i iron 1 is provided with three altogether, be fixed in main body wall, and it is arranged in parallel.
Second step, reference line product, on main body wall metope according to plan the reference line of vertical and horizontal with line of ink marker bullet on body of wall, each interconnective construction metope all wants snap the line, installs the effect of leveling to reach.
3rd step, install keel, as depicted in figs. 1 and 2, be weldingly fixed on the i iron 1 of main body steel work like clockwork by longitudinal snap the line position by the zinc-plated corner brace 4 of vertical square steel pipe 2, the vertical square steel pipe 2 of the present embodiment is 40*20*2mm galvanized pipe.Absolute altitude and position of center line should be checked at any time during installation, then like clockwork horizontal square steel pipe 3 is weldingly fixed on vertical square steel pipe 2 by horizontal snap the line position, thus composition main body keel structure, the horizontal square steel pipe 3 of the present embodiment is also 40*20*2mm galvanized pipe, in order to possess good rust-proof effect, need to brush rustproof paint outside all welded contacts.。
In the present embodiment, vertical square steel pipe 2 installed height mark deviation should not be greater than 3mm, and before and after reference line, deviation should not be greater than 2mm, and left-right deviation should not be greater than 3mm; The absolute altitude deviation of adjacent two vertical square steel pipes 2 should not be greater than 3mm, and the maximum absolute altitude deviation with layer should not be greater than 5mm, and the range deviation of adjacent two vertical square steel pipes 2 should not be greater than 2mm.In addition, as shown in Figures 2 and 3, the square position intersected to form at horizontal square steel pipe 3 and vertical square steel pipe 2 welds zinc-plated corner brace 4, for increasing the stability of main body keel.
4th step, heat preservation decoration integrative side fascia 6 is installed, as shown in Figure 3 and Figure 4, heat preservation decoration integrative side fascia 6 is neatly anchored on main body keel structure, concrete employing chromium plating is bored tail tapping screw 9 and is screwed onto on vertical square steel pipe 2 by the extension of decoration integrated for temperature side fascia bottom metal frame, and coats rustproof paint on chromium plating brill tail tapping screw 9.The plate face of the decoration integrated side fascia of integral heat insulation 6 is made to keep smooth after installation, and the dividing joint that aligns, stay gap 5 between plate and plate, to adjust alignment error.First check whether heat preservation decoration integrative side fascia 6 stands intact, then start lifting and install.When mounted, about it, upper and lower deviation should not be greater than 1mm to heat preservation decoration integrative side fascia 6.In addition, when tail tapping screw 9 is bored in the chromium plating that is spirally connected, best for fixing a chromium plating brill tail tapping screw 9 every 25 ~ 30cm, at least 8 every square metre, additional outer casting die adjusts the difference of height of plate seam more if desired, interior anchoring piece is installed or outer anchoring piece all can not be firmly excessive, in order to avoid cause the wave-like in plate face, the size of adjustment force should be carried out according to the planeness in plate face.
Needing first to check whether this plate stands intact when installing heat preservation decoration integrative side fascia 6, then starting lifting and installing; Integral slab face is made to keep smooth, alignment dividing joint.Seam 14mm is stayed, to adjust alignment error between plate and plate.In addition, in order to the globule in preventing board face produces, guarantee the interchange of air inside and outside plate, the junction of the heat preservation decoration integrative side fascia 6 of every three pieces of horizontally sets and two blocks of heat preservation decoration integrative side fascias 6 longitudinally arranged needs the PVC conduit of downward-sloping 45 ° of installation one, this PVC conduit is long is 200mm, be directly 8mm, and fix with polyurethane foam gap-filling glue.
5th step, blind 5, as shown in Figure 5 and Figure 6, polyurethane expansion glue 7 pairs of gaps 5 existed between plate and plate are adopted to fill, the present embodiment directly adopts the mode of spraying gap-filling glue inside gap 5 to fill, to reach sealing, waterproof, antirust, insulation, fixing effect, after gap-filling glue solidification, from both sides, gap 5 with 45 degree of gap-filling glues of cutting sth. askew.The plate face degree of depth requiring gap-filling glue and heat preservation decoration integrative side fascia 6 after blind 5 is 3 ~ 5mm.
6th step, filling with sealant, as shown in Figure 5 and Figure 6, again at gap-filling glue surface filling with sealant after gap-filling glue solidification, in gap 5, evenly stamp appropriate fluid sealant with glue sealing gun, then strike off fluid sealant with flat scraper, for the cracking that expands with heat and contract with cold between waterproof, anti-plate.The fluid sealant of the present embodiment is weather-resistant pu structure glue 8, for jointing.Due to needs first complete the 5th step after carry out jointing again, therefore the two states of jointing is carried out after drawing blind 5 and filling with sealant in Fig. 5 and Fig. 6 respectively again, also draw the state not having blind 5 in addition, chromium plating for installing heat preservation decoration integrative side fascia 6 can be demonstrated bore and be shown as three kinds of states in tail tapping screw 9, figure and contrast.
Before filling with sealant, first gap 5 both sides and U.S. line paper is sticked in the plate face being positioned at heat preservation decoration integrative side fascia 6, smooth vertical and horizontal to ensure, directly U.S. line paper is torn again after careful sealing to be filled.
7th step, plate face is cleaned, and painting ash, dirt first on clean heat preservation decoration integrative side fascia 6 edge, then tear diaphragm off, then removed by viscose glue legacy clean with clean towel.
Above content is in conjunction with concrete preferred embodiment further description made for the present invention, can not assert that specific embodiment of the invention is confined to these explanations.For general technical staff of the technical field of the invention, without departing from the inventive concept of the premise, some simple deduction or replace can also be made, all should be considered as protection scope of the present invention.
Claims (7)
1. the mounting method of heat preservation decoration integrative side fascia, is characterized in that, the method comprises the following steps:
The first step; process main body wall metope; check the situation of original facing tile; the part of hollowing is dug out; with oxalic acid or cleaning agent cleaning metope; guarantee tile surface cleans; free from smutting; then adhesion interface agent is adopted to brush metope; make its complete coverage rate brick wall, and guarantee that planeness reaches middle rank and to plaster standard, finally determine the crossbeam position of the main body steel work of main body wall; as not having main body steel work then at the metalwork of several proper alignment of main body wall metope pre-embedded, metalwork is fixed by chemical anchor bolts;
Second step, reference line product, on main body wall metope according to plan the reference line of vertical and horizontal with line of ink marker bullet on body of wall, each interconnective construction metope all wants snap the line, installs the effect of leveling to reach;
3rd step; keel are installed; like clockwork vertical square steel pipe steel angle hitch is weldingly fixed on the crossbeam of main body steel work by longitudinal snap the line position; as main body wall metope does not have main body steel work to be then weldingly fixed on pre-buried metalwork by vertical square steel pipe; absolute altitude and position of center line should be checked at any time during installation; then like clockwork horizontal square steel pipe is weldingly fixed on vertical square steel pipe by horizontal snap the line position, thus composition main body keel structure;
4th step; heat preservation decoration integrative side fascia is installed; heat preservation decoration integrative side fascia is neatly anchored on main body keel structure; concrete employing chromium plating is bored tail tapping screw and is screwed onto on vertical square steel pipe by the extension of decoration integrated for temperature side fascia bottom metal frame; the plate face of the decoration integrated side fascia of integral heat insulation is made to keep smooth after installation; and the dividing joint that aligns, stay gap between plate and plate, to adjust alignment error;
5th step; blind; polyurethane expansion glue is adopted to fill the gap existed between plate and plate; the mode that gap-filling glue is sprayed in direct employing inside gap is filled; or select the expansion fillet of suitable size to fill, to reach sealing, waterproof, antirust, insulation, fixing effect;
6th step, filling with sealant, again at gap-filling glue surface filling with sealant after gap-filling glue solidification, evenly stamps appropriate fluid sealant with glue sealing gun, then strikes off fluid sealant with flat scraper, for the cracking that expands with heat and contract with cold between waterproof, anti-plate in gap;
7th step, plate face is cleaned, and painting ash, dirt first on clean heat preservation decoration integrative side fascia edge, then tear diaphragm off, then removed by viscose glue legacy clean with clean towel.
2. mounting method according to claim 1, is characterized in that: in the third step, and vertical square steel pipe installed height mark deviation should not be greater than 3mm, and before and after reference line, deviation should not be greater than 2mm, and left-right deviation should not be greater than 3mm; The absolute altitude deviation of adjacent two vertical square steel pipes should not be greater than 3mm, and the maximum absolute altitude deviation with layer should not be greater than 5mm, and the range deviation of adjacent two vertical square steel pipes should not be greater than 2mm.
3. mounting method according to claim 1, is characterized in that: in the third step, in the square position weldable steel corner brace that horizontal square steel pipe and vertical square steel pipe intersect to form, for increasing the stability of main body keel.
4. the mounting method according to claims 1 to 3 any one, is characterized in that: in the 4th step, and when heat preservation decoration integrative side fascia is installed, left and right, upper and lower deviation should not be greater than 1mm.
5. the mounting method according to claims 1 to 3 any one, is characterized in that: in the 5th step, requires that the plate face degree of depth of gap-filling glue or fillet and heat preservation decoration integrative side fascia is 3 ~ 5mm after blind.
6. mounting method according to claim 5, is characterized in that: in the 5th step, after gap-filling glue solidification, from both sides, gap with 45 degree of gap-filling glues of cutting sth. askew.
7. the mounting method according to claim 1,2,3 or 6, it is characterized in that: in the 6th step, before filling with sealant, first gap both sides and U.S. line paper is sticked in the plate face being positioned at heat preservation decoration integrative side fascia, smooth vertical and horizontal to ensure, directly U.S. line paper is torn again after careful sealing to be filled.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510014680.7A CN104652740A (en) | 2015-01-13 | 2015-01-13 | Installation method for thermal insulation and decoration integrated facade panels |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510014680.7A CN104652740A (en) | 2015-01-13 | 2015-01-13 | Installation method for thermal insulation and decoration integrated facade panels |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104652740A true CN104652740A (en) | 2015-05-27 |
Family
ID=53244327
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510014680.7A Pending CN104652740A (en) | 2015-01-13 | 2015-01-13 | Installation method for thermal insulation and decoration integrated facade panels |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104652740A (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105239745A (en) * | 2015-10-23 | 2016-01-13 | 北京艺高世纪科技股份有限公司 | Integral wallboard and board seam processing method |
CN106592811A (en) * | 2016-12-09 | 2017-04-26 | 安徽省根源光大节能建材有限公司 | Construction method for heat preservation wall |
CN106760353A (en) * | 2017-01-05 | 2017-05-31 | 黎炜杰 | The fixed construction method of polyurethane wallboard splicing seams sealing, construction and dedicated fastener |
CN107143104A (en) * | 2017-06-06 | 2017-09-08 | 浙江舜江建设集团有限公司 | A kind of construction technology of steel structure heat-insulating decorative integrated plate exterior wall |
CN107605115A (en) * | 2017-09-29 | 2018-01-19 | 平果富邑智能板有限公司 | A kind of construction method of lightweight exterior wall Al alloy thermal insulation decorative panel |
CN108589973A (en) * | 2018-07-14 | 2018-09-28 | 青岛科瑞新型环保材料集团有限公司 | A kind of wet method filling steel construction assembling type outer wall system and making, installation method |
CN109707128A (en) * | 2018-11-30 | 2019-05-03 | 福建永筑信科技发展有限公司 | A kind of hollow light partition wall compact-panel dry hanging construction method |
CN109763592A (en) * | 2019-01-08 | 2019-05-17 | 深圳市瑞图工程咨询有限公司 | Stone outer wall decorating structure and its construction method |
CN110331830A (en) * | 2019-07-11 | 2019-10-15 | 杭州元创新型材料科技有限公司 | A kind of building exterior wall heat preserving decorative system rapid constructing method |
CN110469044A (en) * | 2019-08-12 | 2019-11-19 | 湖北飞虹钢结构工程有限责任公司 | A kind of assembly type compound external wall panel and construction method |
CN114135115A (en) * | 2020-12-24 | 2022-03-04 | 华鼎建筑装饰工程有限公司 | Construction method for connecting EPS (expandable polystyrene) component on outer wall body of color steel plate |
CN114263336A (en) * | 2021-10-29 | 2022-04-01 | 成都建工第二建筑工程有限公司 | Construction method of KTC plate composite outer wall decoration system |
CN115506603A (en) * | 2022-10-10 | 2022-12-23 | 中建八局第三建设有限公司 | Construction method of special-shaped steel skeleton high-performance concrete outer wall integrated heat insulation plate system |
CN110469044B (en) * | 2019-08-12 | 2024-10-25 | 湖北飞虹钢结构工程有限责任公司 | Assembled composite external wall panel and construction method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103806577A (en) * | 2012-11-06 | 2014-05-21 | 南通四建装饰工程有限公司 | Installation method for super-large-area unit type slabstone curtain wall |
CN203795662U (en) * | 2014-04-28 | 2014-08-27 | 贵州建工集团第三建筑工程有限责任公司 | Oversized fiber-reinforced silicate board firewall |
ES1120780U (en) * | 2014-07-22 | 2014-09-02 | Acieroid, S.A. | Perfect structure of acoustic closure (Machine-translation by Google Translate, not legally binding) |
-
2015
- 2015-01-13 CN CN201510014680.7A patent/CN104652740A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103806577A (en) * | 2012-11-06 | 2014-05-21 | 南通四建装饰工程有限公司 | Installation method for super-large-area unit type slabstone curtain wall |
CN203795662U (en) * | 2014-04-28 | 2014-08-27 | 贵州建工集团第三建筑工程有限责任公司 | Oversized fiber-reinforced silicate board firewall |
ES1120780U (en) * | 2014-07-22 | 2014-09-02 | Acieroid, S.A. | Perfect structure of acoustic closure (Machine-translation by Google Translate, not legally binding) |
Non-Patent Citations (4)
Title |
---|
刘建民: "《建筑装饰装修工长手册》", 31 July 2010 * |
江向东: "《建筑装饰工程施工工艺》", 31 July 2012 * |
江正荣: "《建筑分项施工工艺标准手册(第三版)》", 30 September 2009 * |
高富: "《方钢管龙骨幕墙的应用》", 《山西建筑》 * |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105239745A (en) * | 2015-10-23 | 2016-01-13 | 北京艺高世纪科技股份有限公司 | Integral wallboard and board seam processing method |
CN106592811A (en) * | 2016-12-09 | 2017-04-26 | 安徽省根源光大节能建材有限公司 | Construction method for heat preservation wall |
CN106760353A (en) * | 2017-01-05 | 2017-05-31 | 黎炜杰 | The fixed construction method of polyurethane wallboard splicing seams sealing, construction and dedicated fastener |
CN106760353B (en) * | 2017-01-05 | 2019-03-22 | 中海怡高建设集团股份有限公司 | Polyurethane wallboard splicing seams seal fixed construction method, construction and dedicated fastener |
CN107143104A (en) * | 2017-06-06 | 2017-09-08 | 浙江舜江建设集团有限公司 | A kind of construction technology of steel structure heat-insulating decorative integrated plate exterior wall |
CN107605115A (en) * | 2017-09-29 | 2018-01-19 | 平果富邑智能板有限公司 | A kind of construction method of lightweight exterior wall Al alloy thermal insulation decorative panel |
CN108589973A (en) * | 2018-07-14 | 2018-09-28 | 青岛科瑞新型环保材料集团有限公司 | A kind of wet method filling steel construction assembling type outer wall system and making, installation method |
CN109707128B (en) * | 2018-11-30 | 2020-12-22 | 福建永筑信科技发展有限公司 | Dry hanging construction method for hollow light partition wall anti-doubling plate |
CN109707128A (en) * | 2018-11-30 | 2019-05-03 | 福建永筑信科技发展有限公司 | A kind of hollow light partition wall compact-panel dry hanging construction method |
CN109763592A (en) * | 2019-01-08 | 2019-05-17 | 深圳市瑞图工程咨询有限公司 | Stone outer wall decorating structure and its construction method |
CN110331830A (en) * | 2019-07-11 | 2019-10-15 | 杭州元创新型材料科技有限公司 | A kind of building exterior wall heat preserving decorative system rapid constructing method |
CN110469044A (en) * | 2019-08-12 | 2019-11-19 | 湖北飞虹钢结构工程有限责任公司 | A kind of assembly type compound external wall panel and construction method |
CN110469044B (en) * | 2019-08-12 | 2024-10-25 | 湖北飞虹钢结构工程有限责任公司 | Assembled composite external wall panel and construction method |
CN114135115A (en) * | 2020-12-24 | 2022-03-04 | 华鼎建筑装饰工程有限公司 | Construction method for connecting EPS (expandable polystyrene) component on outer wall body of color steel plate |
CN114263336A (en) * | 2021-10-29 | 2022-04-01 | 成都建工第二建筑工程有限公司 | Construction method of KTC plate composite outer wall decoration system |
CN115506603A (en) * | 2022-10-10 | 2022-12-23 | 中建八局第三建设有限公司 | Construction method of special-shaped steel skeleton high-performance concrete outer wall integrated heat insulation plate system |
CN115506603B (en) * | 2022-10-10 | 2024-09-10 | 中建八局第三建设有限公司 | Construction method of special-shaped steel skeleton high-performance concrete outer wall integrated heat-insulation board system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104652740A (en) | Installation method for thermal insulation and decoration integrated facade panels | |
WO2021253808A1 (en) | Building technique for low-carbon society in high-technology era | |
CN207499403U (en) | A kind of FS composite thermal-insulating exterior formworks system | |
CN103866885B (en) | Construction method of energy-saving heat-insulating structure of lighting window | |
CN211286074U (en) | Self-heat-insulation system for prefabricated light high-strength foam concrete filled wallboard outer wall | |
CN106284706A (en) | The construction method of external wall outer insulation rock cotton board | |
CN102758456A (en) | Construction method of basement waterproofing projects | |
CN106836663B (en) | The construction method of water-proof insulating roof | |
CN113882562A (en) | Construction method of special-shaped double-sided wood grain fair-faced concrete wall | |
CN202324323U (en) | Outer wall plate | |
CN108894456B (en) | Prefabricated foaming ceramic frame exterior wall cladding and manufacturing method thereof | |
CN101858133B (en) | Wall connecting piece of plug-in type low-carbon heat preservation energy-saving board | |
CN202214829U (en) | Vertical seam of external wallboards | |
CN112726898B (en) | Water-proof heat-insulating system for exposed brick exterior wall and construction method | |
CN203856099U (en) | Green energy-saving cast-in-situ heat-insulating composite external wall system with windows | |
CN207176990U (en) | A kind of steel frame lightweight sandwich boards integrates wall | |
CN101892729A (en) | Finished heat-insulating decorative plate with invisible latch and installation method thereof | |
CN202520153U (en) | Door and window steel sub-frame installation and construction structure | |
CN101514580A (en) | A general cladding construction method of wall thermal insulation decoration | |
CN215331010U (en) | Block tile roofing wall limit movement joint structure | |
CN205663040U (en) | High -rise building ceramic tile wall surface cast in situs formula polyurethane rigid foam outer wall device that keeps warm outward | |
CN211143821U (en) | Anti-drop integral repairing structure for exterior wall tiles | |
CN210482788U (en) | Roof expansion joint structure | |
CN209907844U (en) | Bathroom falls board area and does wet subregion stagnant water steel sheet device futilely | |
CN201915557U (en) | Reinforced concrete beam slab based on preset cast-in-place construction of thermal-insulation plate at bottom of beam slab |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150527 |
|
WD01 | Invention patent application deemed withdrawn after publication |