CN104652493A - 深基坑抗浮锚索后防水施工方法 - Google Patents

深基坑抗浮锚索后防水施工方法 Download PDF

Info

Publication number
CN104652493A
CN104652493A CN201310591590.5A CN201310591590A CN104652493A CN 104652493 A CN104652493 A CN 104652493A CN 201310591590 A CN201310591590 A CN 201310591590A CN 104652493 A CN104652493 A CN 104652493A
Authority
CN
China
Prior art keywords
anchor cable
anchor
hole
metal bellows
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310591590.5A
Other languages
English (en)
Other versions
CN104652493B (zh
Inventor
梁勇
岳齐贤
温克斌
于青川
赵建立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CMTCC Shanghai Shisanye Construction Co Ltd filed Critical CMTCC Shanghai Shisanye Construction Co Ltd
Priority to CN201310591590.5A priority Critical patent/CN104652493B/zh
Publication of CN104652493A publication Critical patent/CN104652493A/zh
Application granted granted Critical
Publication of CN104652493B publication Critical patent/CN104652493B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明具体是一种深基坑抗浮锚索后防水施工方,它包括步骤:用潜孔钻机钻孔;安装锚索;对锚索锚固段进行注浆;用金属波纹管作为接段套管;金属波纹管周边做防水处理,金属波纹管埋入垫层厚度不小于20厘米;浇筑混凝土垫层;绑扎底板钢筋,并将金属波纹管与底板钢筋固定;安装锚垫板,浇筑底板混凝土,并预留锚索坑;安装锚具,进行锚索预应力张拉;锚索张拉完成后进行锚索自由段的注浆工作;切割锚索顶部多余的钢绞线;安装压浆管,从压浆孔进行压浆作业,浇筑锚索坑混凝土;从止水针管压注聚氨酯。本发明采用上述步骤,其施工方法简单、施工材料容易获得,采取多道防水技术,能够有效地防止抗浮锚索的渗水、漏水问题。

Description

深基坑抗浮锚索后防水施工方法
技术领域
本发明涉及基坑工程防水施工领域,具体是一种深基坑抗浮锚索后防水施工方法。
背景技术
    地下室抗浮措施通常有抗浮桩和抗浮锚杆两种形式。抗浮桩具有较强的适应性,其与土体接触面积大,可以提供较大的摩擦力,但是桩的数量相对较少,易造成地下室底板受力不均,引起地下室底板厚度和配筋较大。抗浮锚杆(索)由于施工方法简便,拉力容易控制,受力均匀等优点得到了广泛的应用;但是,抗渗防水问题一直没有很好地解决。
《抗浮锚杆防水施工技术》(中国建筑防水,2013年,第13期)一文中记载了“包裹防水卷材+浇灌密封材料”的做法,该法具有投入低、施工流程简单、缩短工期等优点,可为类似工程抗浮锚杆的防水施工提供参考;但是受密封材料性能和施工人员操作水平的影响,对于施工原因造成的渗水未能解决。
发明内容
本发明的目的在于,解决深基坑地下室抗浮锚索施工过程中由材料本身和施工原因造成的渗漏问题。
为了达到上述目的,本发明是这样实现的:
一种深基坑抗浮锚索后防水施工方法,它包括步骤:
步骤1,用潜孔钻机施工锚孔,施工完成后进行清孔;
步骤2,根据设计要求数量和尺寸安装锚索;
步骤3,对锚索锚固段进行注浆;
步骤4,选用金属波纹管作为锚索与底板连接段套管;金属波纹管外侧底部至底板底标高以上不小于10厘米范围内做防水处理,金属波纹管埋入垫层厚度不小于20厘米;
步骤5,浇筑混凝土垫层;
步骤6,绑扎底板钢筋,并将金属波纹管与底板钢筋固定;
步骤7,安装锚垫板,锚垫板顶部距底板顶标高不小于25厘米,所述的锚垫板其侧壁上开有压浆孔;
步骤8,浇筑底板混凝土,并预留锚索坑;浇筑混凝土时保证每根锚索周围均振捣密实,防止因混凝土振捣不实造成外侧渗水;
步骤9,混凝土达到设计强度后,安装锚具,进行锚索预应力张拉;锚索张拉完成后进行锚索自由段的注浆工作;注浆分两次进行,第一次注浆完成后半小时进行第二次注浆,确保套管内注浆饱满密实;
步骤10,切割锚索顶部多余的钢绞线,并清理锚固孔内的积水、杂物;
步骤11,在锚垫板压浆孔内安装压浆管,锚具中央位置预留灌浆孔,利用防水砂浆封闭锚垫板与锚具;
步骤12,砂浆养护完成后分两次从压浆孔进行压浆作业,待压浆到一定强度,在灌浆孔内埋设注聚氨酯止水针管(含止回阀);
步骤13,浇筑锚索坑混凝土;
步骤14,锚索坑混凝土强度达到要求后,从止水针管压注聚氨酯,封堵由材料收缩和施工因素造成的渗水点。
本发明采用上述结构,通过金属波纹管外侧防水涂料和控制底板混凝土密实度解决波纹管与底板混凝土之间的防水问题;通过锚索坑内防水砂浆解决锚索坑与锚垫板、锚具、锚索之间接缝的防水问题;通过压浆孔的两次注浆解决金属波纹管内的防水问题;通过止水针管压注聚氨酯解决上述防水施工及材料原因造成的渗水点以及锚索坑混凝土与底板混凝土之间的防水问题。
多道防水技术,解决抗浮锚索不同部位的防水问题,通过上述结构,形成了功能明确、多重保障的防水施工体系,确保抗浮锚索防水施工效果。。
附图说明
图1为抗浮锚索穿越底板做法示意图。
图2为锚垫板剖视图。
图3为锚垫板俯视图。
图4为锚索坑一次防水示意图。
图5为锚索坑二次防水示意图。
具体实施方式
第一步,选用潜孔钻机施工锚孔,孔径150毫米,施工完成后进行清孔;
如图1、图2和图3所示,
第二步,根据设计要求数量和尺寸安装锚索1;
第三步,对锚索锚固段进行注浆;
第四步,选用内径60毫米金属波纹管2作为锚索与底板3连接段套管。金属波纹管外侧底部至底板底标高以上10厘米范围内做防水处理,金属波纹管埋入垫层厚度不小于20厘米;
第五步,浇筑混凝土垫层4;
第六步,绑扎底板钢筋,并将金属波纹管与钢筋固定;
第七步,安装锚垫板5,锚垫板顶部距底板顶标高25厘米,,所述的锚垫板其侧壁上开有压浆孔;
第八步,浇筑底板混凝土,并预留锚索坑。锚索坑形状为圆台,顶部直径30厘米,底部直径20厘米,深度25厘米。浇筑混凝土时保证每根锚索周围均振捣密实,防止因混凝土振捣不实造成外侧渗水;
如图4所示,
第九步,混凝土达到设计强度后,安装锚具6,进行锚索预应力张拉,锚索张拉完成后进行锚索自由段的注浆工作,灌浆材料采用微膨胀水泥,抗压强度不低于30 兆帕。注浆分两次进行,第一次注浆完成后半小时进行第二次注浆,确保套管内注浆饱满密实;
第十步,切割露出的钢绞线、清理锚固孔积水、杂物,钢绞线剩余长度不超过30毫米;
第十一步,在锚垫板压浆孔7内安装压浆管8,锚具中央位置预留灌浆孔9,利用防水砂浆封闭锚垫板与锚具;
如图5所示,
第十二步,砂浆养护完成后分两次从压浆孔进行压浆作业,压浆材料由90%的混凝土构件压浆剂和10%的堵漏王加水搅拌而成。待压浆到一定强度(约72小时),在灌浆孔内埋设注聚氨酯止水针管(含止回阀)10;
第十三步,浇筑锚索坑混凝土;
第十四步,锚索坑混凝土强度达到要求后(约一周时间),从止水针管压注聚氨酯,封堵由材料收缩和施工因素造成的渗水点。
本发明采用上述结构,通过金属波纹管外侧防水涂料和控制底板混凝土密实度解决波纹管与底板混凝土之间的防水问题;通过锚索坑内防水砂浆解决锚索坑与锚垫板、锚具、锚索之间接缝的防水问题;通过压浆孔的两次注浆解决金属波纹管内的防水问题;通过止水针管压注聚氨酯解决上述防水施工及材料原因造成的渗水点以及锚索坑混凝土与底板混凝土之间的防水问题。
采用多道防水技术,解决抗浮锚索不同部位的防水问题,通过上述结构,形成了功能明确、多重保障的防水施工体系,确保抗浮锚索防水施工效果。

Claims (1)

1. 一种深基坑抗浮锚索后防水施工方法,其特征是,它包括步骤:
步骤1,用潜孔钻机施工锚孔,施工完成后进行清孔;
步骤2,根据设计要求数量和尺寸安装锚索;
步骤3,对锚索锚固段进行注浆;
步骤4,选用金属波纹管作为锚索与底板连接段套管;金属波纹管外侧底部至底板底标高以上不小于10厘米范围内做防水处理,金属波纹管埋入垫层厚度不小于20厘米;
步骤5,浇筑混凝土垫层;
步骤6,绑扎底板钢筋,并将金属波纹管与底板钢筋固定;
步骤7,安装锚垫板,锚垫板顶部距底板顶标高不小于25厘米,所述的锚垫板其侧壁上开有压浆孔;
步骤8,浇筑底板混凝土,并预留锚索坑;浇筑混凝土时保证每根锚索周围均振捣密实,防止因混凝土振捣不实造成外侧渗水;
步骤9,混凝土达到设计强度后,安装锚具,进行锚索预应力张拉;锚索张拉完成后进行锚索自由段的注浆工作;注浆分两次进行,第一次注浆完成后半小时进行第二次注浆,确保套管内注浆饱满密实;
步骤10,切割锚索顶部多余的钢绞线,并清理锚固孔内的积水、杂物;
步骤11,在锚垫板压浆孔内安装压浆管,锚具中央位置预留灌浆孔,利用防水砂浆封闭锚垫板与锚具;
步骤12,砂浆养护完成后分两次从压浆孔进行压浆作业,待压浆到一定强度,在灌浆孔内埋设注聚氨酯止水针管(含止回阀);
步骤13,浇筑锚索坑混凝土;
步骤14,锚索坑混凝土强度达到要求后,从止水针管压注聚氨酯,封堵由材料收缩和施工因素造成的渗水点。
CN201310591590.5A 2013-11-22 2013-11-22 深基坑抗浮锚索后防水施工方法 Active CN104652493B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310591590.5A CN104652493B (zh) 2013-11-22 2013-11-22 深基坑抗浮锚索后防水施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310591590.5A CN104652493B (zh) 2013-11-22 2013-11-22 深基坑抗浮锚索后防水施工方法

Publications (2)

Publication Number Publication Date
CN104652493A true CN104652493A (zh) 2015-05-27
CN104652493B CN104652493B (zh) 2017-01-18

Family

ID=53244087

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310591590.5A Active CN104652493B (zh) 2013-11-22 2013-11-22 深基坑抗浮锚索后防水施工方法

Country Status (1)

Country Link
CN (1) CN104652493B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862891A (zh) * 2016-04-20 2016-08-17 中铁建港航局集团路桥工程有限公司 对承台钢吊箱壁板与底板间隙止水的方法
CN107268617A (zh) * 2017-07-28 2017-10-20 中建四局第三建筑工程有限公司 一种抗浮锚杆后施工工艺及装置
CN108468356A (zh) * 2018-04-08 2018-08-31 安徽省建筑科学研究设计院 一种既有地下室底板加固的抗浮锚杆及其制备方法
CN117251992A (zh) * 2023-08-28 2023-12-19 华南理工大学 一种锚碇圆形基坑的浸润线的计算方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08226134A (ja) * 1991-09-27 1996-09-03 Maeda Corp 地下室遮水壁の築造工法
CN201137162Y (zh) * 2007-12-20 2008-10-22 青建集团股份公司 底板抗浮锚杆防水处理结构
CN101560777A (zh) * 2009-05-14 2009-10-21 湖南长大建设集团股份有限公司 一种带抗浮锚杆地下室底板防水施工方法
CN202466650U (zh) * 2011-12-28 2012-10-03 上海市政工程设计研究总院(集团)有限公司 在全包防水地下结构中利用坑底围护桩抗浮的结构

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08226134A (ja) * 1991-09-27 1996-09-03 Maeda Corp 地下室遮水壁の築造工法
CN201137162Y (zh) * 2007-12-20 2008-10-22 青建集团股份公司 底板抗浮锚杆防水处理结构
CN101560777A (zh) * 2009-05-14 2009-10-21 湖南长大建设集团股份有限公司 一种带抗浮锚杆地下室底板防水施工方法
CN202466650U (zh) * 2011-12-28 2012-10-03 上海市政工程设计研究总院(集团)有限公司 在全包防水地下结构中利用坑底围护桩抗浮的结构

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862891A (zh) * 2016-04-20 2016-08-17 中铁建港航局集团路桥工程有限公司 对承台钢吊箱壁板与底板间隙止水的方法
CN107268617A (zh) * 2017-07-28 2017-10-20 中建四局第三建筑工程有限公司 一种抗浮锚杆后施工工艺及装置
CN108468356A (zh) * 2018-04-08 2018-08-31 安徽省建筑科学研究设计院 一种既有地下室底板加固的抗浮锚杆及其制备方法
CN108468356B (zh) * 2018-04-08 2024-04-12 安徽省建筑科学研究设计院 一种既有地下室底板加固的抗浮锚杆及其制备方法
CN117251992A (zh) * 2023-08-28 2023-12-19 华南理工大学 一种锚碇圆形基坑的浸润线的计算方法

Also Published As

Publication number Publication date
CN104652493B (zh) 2017-01-18

Similar Documents

Publication Publication Date Title
CN103233454B (zh) 湿陷性黄土地基的砂桩浸水真空预压及注浆处理方法
CN102433876B (zh) 多隔室套管复合桩及其施工方法
CN102767173B (zh) 一种高聚物材料浆固散体材料桩复合地基及其施工方法
CN104846841B (zh) 一种无抗拔桩的地库抗浮施工方法
CN104452829B (zh) 一种桩筏基础抗浮结构及施工方法
CN104652493B (zh) 深基坑抗浮锚索后防水施工方法
CN103603379A (zh) 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系及其施工工艺
CN106759223A (zh) 可控刚性桩+排水体+加筋垫层组合型复合地基
CN107100160B (zh) 一种用于下水库拦沙坝振冲碎石桩的施工工艺
CN103410144B (zh) 预应力钢筋嵌岩灌注桩及施工方法
CN110847207A (zh) 地铁隧道穿越既有桥桩新建桥梁的构造及施工方法
JP5232285B2 (ja) 地盤改良ベタ基礎の液状化対策構造、及び地盤改良ベタ基礎工法
CN106480878A (zh) 一种上、下部扩大型水泥土复合管桩
CN203613568U (zh) 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系
CN103343534A (zh) 基坑施工封闭降水方法
CN105484270B (zh) 一种毗邻深基坑高陡老旧毛石挡土墙加固保护施工方法
CN106917402B (zh) 一种cfg桩预制桩头及cfg桩施工方法
CN104480945B (zh) 一种基坑逆作施工方法
CN108277800A (zh) 一种固结砂层钢筋混凝土管节碎石桩及其施工方法
CN210315518U (zh) 一种钢管微型桩
CN101793027B (zh) 一种桩心注浆静压锚杆桩
JPH11158820A (ja) 地中柱の耐震補強方法
CN111519647A (zh) 一种适用于海相软基地基处理及加固的新型基础及施工方法
CN106245641A (zh) Phc管桩后压浆施工工艺及phc管桩复合桩
CN201635072U (zh) 一种桩心注浆静压锚杆桩成桩装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee before: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee after: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee before: CMTCC Shanghai 13th Construction Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190815

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee before: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.