CN104631460A - 环切劈裂法整体破桩方法 - Google Patents
环切劈裂法整体破桩方法 Download PDFInfo
- Publication number
- CN104631460A CN104631460A CN201510020934.6A CN201510020934A CN104631460A CN 104631460 A CN104631460 A CN 104631460A CN 201510020934 A CN201510020934 A CN 201510020934A CN 104631460 A CN104631460 A CN 104631460A
- Authority
- CN
- China
- Prior art keywords
- pile
- pile crown
- girdling
- construction
- ring cutting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D9/00—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
- E02D9/005—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof removing the top of placed piles of sheet piles
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明公开了一种环切劈裂法整体破桩方法,包括如下步骤:1)破桩前将钢筋笼深入桩头的钢筋全部用PVC-U塑料管套住;2)破除桩头:①测定桩顶标高做好环切线标记;②在环切线标记处用小型切割机进行环切一周;③在桩头的标高对称位置处钻2个孔洞;④将2个液压劈裂机插入孔洞内进行劈裂;⑤将桩头混凝土吊出。所述PVC-U塑料管的内径为钢筋直径的1.2~1.3倍;所述孔洞直径为40mm、深度为200mm的孔洞。本发明的破桩方法桩基钢筋整齐,桩头较平整,为后续施工创造了有利条件,保证了桩头质量;同时提高了施工效率,大大降低劳动强度。
Description
技术领域
本发明涉及一种整体破桩方法,属于建筑施工技术领域。
背景技术
特大桥基础,通常采用桩基础承受上部结构传递下来的全部荷载。按照钻孔灌注桩的施工工艺,为保证桩头质量,通常在灌注混凝土时,顶面要超灌1.1-1.5m左右,待混凝土强度不低于10MPa,人工采用风镐将深入桩头的钢筋剥离后进行桩头吊除。这样做的原因是:在钻孔桩灌注混凝土时顶层约50cm厚的混凝土与泥浆混合,凝固后的混合体不能达到设计强度。为保证桩头混凝土质量,须超灌一定高度的混凝土。桩体满足强度要求后,在承台施工前将高出的桩头打掉(亦称破桩)。目前破桩的方法通常为人工用风镐剥离桩头钢筋后,再将剩余部分桩头进行吊装。这种施工方法易造成桩头不平整,桩头钢筋在剥离时易弯曲受损,影响桩头质量,并且存在着作业难度大,环境差,消耗时间长等问题。
发明内容
本发明所要解决的技术问题是针对现有技术存在的缺陷,提供一种高效破除桩头的施工方法。
为解决这一技术问题,本发明提供了一种环切劈裂法整体破桩方法,具体包括如下步骤:
1)破桩前准备:钻孔桩施工时将钢筋笼深入桩头的钢筋全部用PVC-U
塑料管套住,再进行灌注施工;
2)破除桩头:
①首先,基坑开挖后,测定桩顶标高位置,并做好环切线标记;
②然后,在测定好的环切线标记处用小型切割机进行环切一周;
③在桩头的标高对称位置处进行钻2个孔洞;
④将2个液压劈裂机对称插入桩头的孔洞内进行劈裂;
⑤将桩头混凝土吊出。
所述步骤1)中的PVC-U塑料管的内径为钢筋直径的1.2~1.3倍。
所述步骤2)之③所述的孔洞的直径满足液压劈裂机械头施工要求,直径为40mm、深度为200mm的孔洞。
有益效果:本发明的破桩方法桩基钢筋整齐,桩头较平整,为后续施工创造了有利条件,保证了桩头质量;同时提高了施工效率,大大降低劳动强度。
附图说明
图1为本发明钻孔桩施工时进行的破桩前准备施工示意图;
图2为本发明钻孔桩桩顶环切及钻孔施工示意图。
图中:1钢筋笼、2PVC-U塑料管、3桩头、4环切线、5孔洞。
具体实施方式
本发明整体破桩工艺,是在施工时即进行的,施工时将钢筋笼1深入桩头的钢筋全部用PVC-U塑料管2套住,进行灌桩施工,其目的是隔离了伸入桩头部分的钢筋与超灌混凝土粘结,为后续破桩做准备。
下面结合附图及实施例对本发明做具体描述。
图1所示为钻孔桩施工时进行的破桩前准备施工示意图。
图2所示为钻孔桩桩顶环切及钻孔施工示意图。
本发明具体包括如下步骤:
破桩前准备:钻孔桩施工时即将钢筋笼1深入桩头的钢筋全部用PVC-U塑料管2套住,进行灌桩施工(如图1所示),其目的是隔离伸入桩头部分的钢筋与超灌混凝土粘结;
进行破除桩头:
①首先,基坑开挖后,测定桩顶标高位置,确定出设计要求的桩顶位置,
做好环切线4标记;
②然后,在测定好的环切线4标记处用小型切割机进行环切一周;
③在桩头3的标高对称位置处进行钻2个孔洞5;
④用2个液压劈裂机对称插入桩头3的孔洞5内进行劈裂,由于钢筋与
桩头3混凝土无粘连,即可直接进行下一步⑤的施工;
⑤用吊装设备将桩头混凝土吊出。
所述步骤1)中的PVC-U塑料管2的内径为钢筋的1.2~1.3倍为宜,如钢筋笼1的主筋直径为16mm,PVC-U塑料管2的内径采用20mm。PVC-U塑料管2的内径过小不方便施工,在安装和拔出时困难,过大会影响灌桩施工质量。
所述步骤2)之③所述的孔洞5的直径满足液压劈裂机械头施工要求,直径为40mm、深度为200mm。
本发明的施工原理:
钢筋笼伸入桩头的钢筋全部用PVC-U塑料管套住,保证伸入桩头部分的钢筋不会与超灌混凝土粘结。在桩头破除时,首先采用小型切割机在桩头标高位置进行环切一周,保证了桩头较为平整;然后在桩头标高位置水平方向进行开设2个孔洞,然后用2个液压劈裂机械插入孔洞内将桩头劈开,因钢筋与桩头混凝土无粘结,桩头混凝土即可直接吊出。
本发明的破桩方法一方面保证了施工效率,同时施工后的桩头较平整。
本发明上述实施方案,只是举例说明,不是仅有的,所有在本发明范围内或等同本发明的范围内的改变均被本发明包围。
Claims (3)
1.一种环切劈裂法整体破桩方法,其特征在于,具体包括如下步骤:
1)破桩前准备:钻孔桩施工时即将钢筋笼(1)深入桩头的钢筋全部用PVC-U塑料管(2)套住,然后进行灌装施工;
2)破除桩头:
①首先,基坑开挖后,测定桩顶标高位置,并做好环切线(4)标记;
②然后,在测定好的环切线(4)标记处用小型切割机进行环切一周;
③在桩头(3)的标高对称位置处钻2个孔洞(5);
④将2个液压劈裂机对称插入桩头(3)的孔洞(5)内进行劈裂;
⑤将桩头混凝土吊出。
2.根据权利要求1所述的环切劈裂法整体破桩方法,其特征在于:所述步骤1)中的PVC-U塑料管(2)的内径为钢筋的1.2~1.3倍。
3.根据权利要求1所述的环切劈裂法整体破桩方法,其特征在于:所述步骤2)之③所述的孔洞(5)的直径满足液压劈裂机械头施工要求,直径为40mm、深度为200mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510020934.6A CN104631460A (zh) | 2015-01-15 | 2015-01-15 | 环切劈裂法整体破桩方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510020934.6A CN104631460A (zh) | 2015-01-15 | 2015-01-15 | 环切劈裂法整体破桩方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104631460A true CN104631460A (zh) | 2015-05-20 |
Family
ID=53210658
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510020934.6A Pending CN104631460A (zh) | 2015-01-15 | 2015-01-15 | 环切劈裂法整体破桩方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104631460A (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105756063A (zh) * | 2016-03-02 | 2016-07-13 | 华东交通大学 | 一种简易桩头破除辅助施工方法 |
CN106400803A (zh) * | 2016-10-31 | 2017-02-15 | 中国葛洲坝集团第六工程有限公司 | 一种钻孔灌注桩桩头整体破除工艺 |
CN106930289A (zh) * | 2017-03-10 | 2017-07-07 | 东南大学 | 一种无声破桩装置及破桩方法 |
CN106939603A (zh) * | 2016-01-03 | 2017-07-11 | 张新强 | 截桩头机 |
CN107034887A (zh) * | 2017-03-30 | 2017-08-11 | 河南大建桥梁钢构股份有限公司 | 钻孔桩桩头环切施工方法 |
CN107326905A (zh) * | 2017-06-30 | 2017-11-07 | 中国冶集团有限公司 | 便于剥离桩基密实混凝土钢护筒的施工方法 |
CN108952612A (zh) * | 2018-06-15 | 2018-12-07 | 上海二十冶建设有限公司 | 一种人工挖孔桩的快速入岩成孔施工方法 |
CN110485421A (zh) * | 2019-09-24 | 2019-11-22 | 中国五冶集团有限公司 | 一种桩头快速破除施工工艺 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101603313A (zh) * | 2009-07-01 | 2009-12-16 | 中铁十三局集团第三工程有限公司 | 一种灌注桩桩头凿除方法 |
CN201386279Y (zh) * | 2009-02-11 | 2010-01-20 | 中国建筑材料科学研究总院 | 一种混凝土灌注桩桩头静态切割装置 |
JP2013253455A (ja) * | 2012-06-08 | 2013-12-19 | Yokoyama Kiso Koji:Kk | ファーストチューブ及び地中障害物撤去工法 |
CN104234038A (zh) * | 2014-03-03 | 2014-12-24 | 王磊 | 一种灌注桩免破碎桩头施工工艺 |
-
2015
- 2015-01-15 CN CN201510020934.6A patent/CN104631460A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201386279Y (zh) * | 2009-02-11 | 2010-01-20 | 中国建筑材料科学研究总院 | 一种混凝土灌注桩桩头静态切割装置 |
CN101603313A (zh) * | 2009-07-01 | 2009-12-16 | 中铁十三局集团第三工程有限公司 | 一种灌注桩桩头凿除方法 |
JP2013253455A (ja) * | 2012-06-08 | 2013-12-19 | Yokoyama Kiso Koji:Kk | ファーストチューブ及び地中障害物撤去工法 |
CN104234038A (zh) * | 2014-03-03 | 2014-12-24 | 王磊 | 一种灌注桩免破碎桩头施工工艺 |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106939603A (zh) * | 2016-01-03 | 2017-07-11 | 张新强 | 截桩头机 |
CN106939603B (zh) * | 2016-01-03 | 2020-06-02 | 张新强 | 截桩头机 |
CN105756063A (zh) * | 2016-03-02 | 2016-07-13 | 华东交通大学 | 一种简易桩头破除辅助施工方法 |
CN105756063B (zh) * | 2016-03-02 | 2018-03-30 | 华东交通大学 | 一种简易桩头破除辅助施工方法 |
CN106400803A (zh) * | 2016-10-31 | 2017-02-15 | 中国葛洲坝集团第六工程有限公司 | 一种钻孔灌注桩桩头整体破除工艺 |
CN106930289A (zh) * | 2017-03-10 | 2017-07-07 | 东南大学 | 一种无声破桩装置及破桩方法 |
CN106930289B (zh) * | 2017-03-10 | 2019-03-12 | 东南大学 | 一种无声破桩装置及破桩方法 |
CN107034887A (zh) * | 2017-03-30 | 2017-08-11 | 河南大建桥梁钢构股份有限公司 | 钻孔桩桩头环切施工方法 |
CN107326905A (zh) * | 2017-06-30 | 2017-11-07 | 中国冶集团有限公司 | 便于剥离桩基密实混凝土钢护筒的施工方法 |
CN107326905B (zh) * | 2017-06-30 | 2019-10-18 | 中国一冶集团有限公司 | 便于剥离桩基密实混凝土钢护筒的施工方法 |
CN108952612A (zh) * | 2018-06-15 | 2018-12-07 | 上海二十冶建设有限公司 | 一种人工挖孔桩的快速入岩成孔施工方法 |
CN110485421A (zh) * | 2019-09-24 | 2019-11-22 | 中国五冶集团有限公司 | 一种桩头快速破除施工工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631460A (zh) | 环切劈裂法整体破桩方法 | |
CN102312429B (zh) | 混凝土灌注桩桩头快速分离与整体吊装方法 | |
CN106193141B (zh) | 一种地震受损桥墩基础补强加固方法 | |
CN106400803A (zh) | 一种钻孔灌注桩桩头整体破除工艺 | |
CN104631438B (zh) | 长螺旋钻孔压灌混凝土抗拔桩施工方法 | |
CN103628473A (zh) | 复合式组合桩及其施工方法 | |
CN108411918A (zh) | 成孔灌注桩桩头破除装置及其施工方法 | |
CN106120792A (zh) | 一种桩基础桩头混凝土预剥离组件及施工方法 | |
CN209444334U (zh) | 一种用于盾构机刀盘正面检修清理的玻璃纤维筋中孔桩 | |
CN107604920A (zh) | 一种快速破除灌注桩桩头的施工方法 | |
CN104652423B (zh) | 双向螺旋挤土灌注桩施工方法 | |
CN105421445A (zh) | 非预应力离心高强混凝土桩植桩施工方法 | |
CN109024721B (zh) | 一种加固基础及提高既有建筑刚性基础抗弯剪能力的方法 | |
CN106049563B (zh) | 地震受损桥墩基础补强加固系统 | |
CN202039368U (zh) | 预应力管桩桩芯补强简易手动螺旋取土装置 | |
CN108842792B (zh) | 一种分层内抬升卸荷式地拉锚杆及施工方法 | |
CN204510194U (zh) | 咬合式连桩墙施工用栗形钢筋笼及导模钢板 | |
CN108385686A (zh) | 一种钻孔灌注桩免剥离免环切截桩头工艺 | |
CN106939604A (zh) | 一种钢筋隔浆保护套管的混凝土桩头破除方法 | |
CN106638600A (zh) | 一种破除钻孔灌注桩桩头的施工方法 | |
CN203583501U (zh) | 一种抵抗岩体滑动的深层抗剪装置 | |
CN103911986B (zh) | 一种组合复打钢管桩的施工方法 | |
CN108086306A (zh) | 一种桩头混凝土施工及凿除方法 | |
CN104631458B (zh) | 一种静力压桩机扩孔沉桩工法 | |
CN107740592A (zh) | 一种预应力孔道成孔的保护装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150520 |