CN104631419B - 监测基坑顶部水平位移的方法 - Google Patents

监测基坑顶部水平位移的方法 Download PDF

Info

Publication number
CN104631419B
CN104631419B CN201510022876.0A CN201510022876A CN104631419B CN 104631419 B CN104631419 B CN 104631419B CN 201510022876 A CN201510022876 A CN 201510022876A CN 104631419 B CN104631419 B CN 104631419B
Authority
CN
China
Prior art keywords
point
monitoring
distance
foundation ditch
horizontal movement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510022876.0A
Other languages
English (en)
Other versions
CN104631419A (zh
Inventor
夏才初
白雪莹
陈忠清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI TONGJIAN BUILDING TECHNOLOGY Co Ltd
University of Shaoxing
Original Assignee
SHANGHAI TONGJIAN BUILDING TECHNOLOGY Co Ltd
University of Shaoxing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI TONGJIAN BUILDING TECHNOLOGY Co Ltd, University of Shaoxing filed Critical SHANGHAI TONGJIAN BUILDING TECHNOLOGY Co Ltd
Priority to CN201510022876.0A priority Critical patent/CN104631419B/zh
Publication of CN104631419A publication Critical patent/CN104631419A/zh
Application granted granted Critical
Publication of CN104631419B publication Critical patent/CN104631419B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Soil Sciences (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

本发明公开了一种监测基坑顶部水平位移的方法,包括纵向基坑边测点监测环节、横向基坑边测点监测环节,所述纵向基坑边测点监测环节包括以下步骤:(1)先选定基坑角部点B1为不动的基准点,分别在基坑的两个纵向边上设置监测点,开挖前的监测点分别为Bi、Ci+1(i=1,2,……n),开挖后相应的监测点变为Bˊi、Cˊi+1;(2)基坑开挖前,测得Bi与Bi+1之间的距离BiBi+1,Bi+1与Ci+1之间的距离Bi+1Ci+1;(3)基坑开挖后,测出Bˊi与Cˊi+1之间的距离Bˊii+1,Bˊi+1与Cˊi+1之间的距离Bˊi+1i+1;(4)根据上述测量出的BiBi+1、Bi+1Ci+1、Bˊii+1、Bˊi+1i+1的数值得出所述监测点Bi的水平位移及所述监测点Ci的水平位移。本发明所涉及的水平位移监测方法测量精度高,对监测人员专业技能要求低,且只需一人操作便可方便完成监测。

Description

监测基坑顶部水平位移的方法
技术领域
本发明涉及一种基坑监测方法,尤其是一种便于监测基坑顶部水平位移的方法。
背景技术
基坑工程施工过程中,围护结构顶部的水平位移是基坑工程安全性的主要评价指标,因而是基坑施工过程中主要且必须监测的项目。现有的基坑围护结构顶部水平位移监测方法主要有轴线法、小角度法、全站仪坐标变化法等,前两种方法采用经纬仪及钢尺进行测量,全站仪坐标变化法通过全站仪同时测定夹角与距离,利用换算公式计算得到位移值。以上各种监测方法都有一定的弊端,轴线法及小角度法对场地要求较高,其监测工作基点要选在距离基坑不远处在基坑开挖过程中基本不动的点,从经纬仪读取钢尺读数精度较低,尤其在距离较长时;全站仪坐标变化法测量精度也不高,但其测量过程繁琐,测量成本高,对监测人员的专业技能要求高,而且以上方法都需要两人及两人以上才能实施监测。
有专利文献中曾提及一种基坑位移测量方法,但该方法需要对每对水平位移监测点设置基准点,易受场地条件限制,实现难度大;尤其是对于长条形基坑的短边,因两边距离较远,采用该方法监测就非常困难,故急需寻求一种简单便捷的测量基坑水平位移的方法具有极实际的意义。
发明内容
为了解决上述现有问题,本发明提供了一种操作方便,测量精度高且测量成本低的监测基坑顶部水平位移的方法。
为实现上述目的,本发明采用的技术方案是一种监测基坑顶部水平位移的方法,包括纵向基坑边测点监测环节、横向基坑边测点监测环节,所述纵向基坑边测点监测环节包括以下步骤:
(1)先选定基坑角部点B1为不动的基准点,分别在基坑的两个纵向边上设置监测点,开挖前的监测点分别为Bi、Ci+1(i=1,2,……n),开挖后相应的监测点变为B'i、C'i+1
(2)基坑开挖前,测得Bi与Bi+1之间的距离BiBi+1,Bi+1与Ci+1之间的距离Bi+1Ci+1
(3)基坑开挖后,测出B'i与C'i+1之间的距离B'iC'i+1,B'i+1与C'i+1之间的距离B'i+1C'i+1
(4)根据上述测量出的BiBi+1、Bi+1Ci+1、B'iC'i+1、B'i+1C'i+1的数值得出所述监测点Bi的水平位移及所述监测点Ci的水平位移。
所述横向先选定基坑角部点B1为不动的基准点,监测环节包括以下步骤:
(1)在所述基坑的横向边上设置监测点,开挖前的检测点为Ai(i=1,2,……n),在两个纵向边上分别设置监测点M、N,开挖后相应地监测点变为Ai′、M'和N';
(2)基坑开挖前,分别测得M与N之间的距离MN,M与Ai之间的距离MAi,以及N与Ai之间的距离NAi
(3)基坑开挖后,分别测得M'与N'之间的距离M'N',M'与A'i之间的距离M'A'i,以及N'与A'i之间的距离N'A'i
(4)根据上述测量出的MN、MAi、NAi、M'N'、M'A'i及N'A'i的数值得出所述监测点Ai的水平位移。
作为优选,所述Bi+1的水平位移和所述Ci+1的水平位移的计算公式为:
δ B i + 1 C i + 1 = B i + 1 C i + 1 - B i + 1 ′ C i + 1 ′ - - - ( 1 )
δ C i + 1 = B i + 1 C i + 1 - B i ′ C i + 1 ′ 2 - B i B i + 1 2 - δ B i - - - ( 2 )
δ B i + 1 = δ B i + 1 C i + 1 - δ C i + 1 - - - ( 3 )
其中,当选定基坑角点B1为不动基准点时,即当i=1时,此时开挖后B1的水平位移 δ B 1 = 0 ;
式中:Bi+1Ci+1为基坑开挖前Bi+1、Ci+1之间的距离;
B'iC'i+1为基坑开挖后B'i与C'i+1之间的距离;
BiBi+1为基坑开挖前Bi与Bi+1之间的距离;
B'i+1C'i+1为基坑开挖后B'i+1与C'i+1间距离;
为Ci+1点的绝对位移;
为Bi+1点的绝对位移。。
作为优选,所述Ai的水平位移的计算公式为:
δ A i = h - h ′ = NA i s i n β - N ′ A i ′ sinβ ′ - - - ( 4 )
其中, β = a r c c o s NA i 2 + MN 2 - MA i 2 2 NA i · M N
β ′ = a r c c o s N ′ A i ′ 2 + M ′ N ′ 2 - M ′ A i ′ 2 2 N ′ A i ′ · M ′ N ′
式中:h为Ai到测线MN的距离;
h′为Ai′到测线M'N'的距离;
为Ai的绝对水平位移;
β为NAi、MN之间的夹角;
β'为N′Ai′、M'N'之间的夹角。
作为优选,所述不动基准点为基坑的一个角点,开挖前后所述角点的位置不变。
作为优选,在所述监测点Ci+1设置反光片,在所述监测点Bi在监测时依次快捷准确地安装能满足位移监测精度要求的便携式测距仪(精度±1mm,监测后取下来)。
作为优选,在Ai处设置反光片,在所述监测点M、N在监测时依次快捷准确地安装能满足位移监测精度要求的便携式测距仪(精度±1mm,监测后取下来)。
作为优选,所述监测点M、N可以是离所述监测点Ai距离最近的一组监测点C2、B2。为减少操作上的繁复,方便数据共用,选择两纵向边上离Ai最近的一组监测点放置检测仪,其中M点对应C2点,N点对应B2点。
本发明可以具有如下有益效果:通过选择基坑角点B1作为不动基准点,不受周围场地条件限制;设不动点B1的位移为0,测得基坑开挖前和基坑开挖后各数据,通过具体公式(1)-(4)计算出各个监测点的绝对水平位移;本发明所涉及的水平位移监测方法测量精度高,对监测人员专业技能要求低,且只需一人操作便可方便快捷地完成监测,安装及监测时均不影响基坑正常施工,节省了人员成本并提高了工效,具有很好的实用价值。
附图说明
图1是测基坑纵向边顶部水平位移的原理图;
图2是纵向边各测点顶部水平位移的计算方法示意图;
图3是横向边各测点顶部水平位移的计算方法示意图。
1、激光测距仪;2、基坑围护结构圈梁;3、基坑支撑;4、参考不动点;5、水平位移监测点。
具体实施方式
下面结合具体实施例及附图(图1、2、3),对本发明的实质作进一步的阐述。
1)监测纵向两长边的顶部水平位移
如图1所示,在长条形基坑的两条长对边分别依次设置水平位移监测点B1、B2、B3…,C2、C3…,其中B1为基坑角点,定时监测两个监测点之间的距离。测量中,以B1点作为参考不动点,在整个开挖过程中,不动点B1的位移为0。
当求B2、C2两点的绝对位移时,首先用测距仪测得基坑开挖前B1到B2,B2到C2间的距离,在基坑开挖后,再定期利用测距仪,从B1开始依次测得B1到C′2,B′2到C′2间的距离;利用基坑开挖后B1、C′2点间的距离B1C′2,用勾股定理计算△B1B2C2′中的B2C′2,B2C2与B2C′2的差值即为C2点的绝对位移用测距仪测得基坑开挖前B2、C2间距离B2C2和基坑开挖后B′2、C′2间距离B′2C′2,B2C2与B′2C′2的差值即为B2、C2两点间相对位移之间的差值即为B2的绝对位移
此时,具体计算公式如下:
δ B 2 C 2 = B 2 C 2 - B 2 ′ C 2 ′
B 2 C 2 ′ = B 1 C 2 ′ 2 - B 1 B 2 2
δ C 2 = B 2 C 2 - B 2 C 2 ′
δ B 2 = δ B 2 C 2 - δ C 2
式中:B2C2为基坑开挖前B2、C2间的距离;
B1C′2为基坑开挖后不动点B1、C′2间的距离;
B1B2为监测点B1、B2间的距离;
B′2C′2为基坑开挖后B′2、C′2间距离;
为C2点的绝对位移;
为B2点的绝对位移。
当以Bi(i≠1)为相对不动点(相对不动点是相对于不动角点B1而言的)监测Bi+1、Ci+1两点的绝对水平位移时,首先需要过B'i作Bi+1Ci+1所在边的高(如图2所示),O为垂足,在直角三角形△Bi′Ci+1′O中利用勾股定理求出直角边C'i+1O的长度,其中B'iO的长度等于BiBi+1的长度,再通过公式(1)~(3)即可得出所需结果。
所述Bi+1的水平位移和所述Ci+1的水平位移的计算公式为:
δ B i + 1 C i + 1 = B i + 1 C i + 1 - B i + 1 ′ C i + 1 ′ - - - ( 1 )
δ C i + 1 = B i + 1 C i + 1 - B i ′ C i + 1 ′ 2 - B i B i + 1 2 - δ B i - - - ( 2 )
δ B i + 1 = δ B i + 1 C i + 1 - δ C i + 1 - - - ( 3 )
式中:Bi+1Ci+1为基坑开挖前Bi+1、Ci+1之间的距离;
B'iC'i+1为基坑开挖后B'i与C'i+1之间的距离;
BiBi+1为基坑开挖前Bi与Bi+1之间的距离;
B'i+1C'i+1为基坑开挖后B'i+1与C'i+1间距离;
为Ci+1点的绝对位移;
为Bi+1点的绝对位移。。
2)监测横向边的顶部水平位移
本实施例中,M、N分别对应为离所述监测点Ai最近的一组监测点C2、B2。在基坑开挖前分别测得B2、C2与Ai之间的距离B2Ai和C2Ai,以及B2C2的距离,构成三角形△AiB2C2;基坑开挖后再用测距仪测得B′2与Ai′,C′2与Ai′点间的距离B2′Ai′和C2′Ai′,以及B′2C′2的距离构成三角形△Ai′B2′C2′,通过△AiB2C2与△Ai′B2′C2′间的几何关系,计算得到与两平行边相交的边上各监测点Ai的绝对水平位移以监测点A1为例(图3所示),计算的公式如下:
δ A 1 = h - h ′ = A 1 B 2 s i n β - A 1 ′ B 2 ′ sinβ ′ - - - ( 4 )
其中, β = a r c c o s A 1 B 2 2 + C 2 B 2 2 - A 1 C 2 2 2 A 1 B 2 · C 2 B 2
β ′ = a r c c o s A 1 ′ B 2 ′ 2 + C 2 ′ B 2 ′ 2 - A 1 ′ C 2 ′ 2 2 A 1 ′ B 2 ′ · C 2 ′ B 2 ′
式中:h′为A1′到测线C′2B′2的距离;
h为A1到测线C2B2的距离;
为A1的绝对水平位移。
3)本测量方法的技术实施条件
①测距仪应选用便携式快捷准确对中和微调对准装置的激光测距仪(一般精度要优于±1mm,监测后取下来),也可选用其它能够达到精度要求的测距仪器。
②基坑围护结构圈梁施工后,将基坑的一个角点选为不动点B1,在基坑围护结构圈梁顶部两根基坑支撑的中部设置监测点,没有基坑支撑时,每隔5-20米设置水平位移监测点;
③基坑纵向两长条边接近于平行,在基准点B1所在的边上,监测点B1、B2、B3……处,在监测时依次安装配有准确对中和微调对准装置的便携式激光测距仪(精度±1mm,监测后取下来),在另一边上,监测点C2、C3……处的基坑围护结构圈梁上设置反光片;
④基坑纵向两长条边处监测点B2、C2处,在监测时依次安装配有准确对中和微调对准装置的便携式激光测距仪(精度±1mm,监测后取下来),在基坑横向边上,监测点Ai处的基坑围护结构圈梁上设置反光片;
⑤基坑开挖后,按照规定的测量频率,测得B'iC'i+1,B'i+1C'i+1,B2′Ai′和C2′Ai′(i=1,2,……n)等的距离;
⑥利用公式(1)-(4)可以得出所监测各点的绝对水平位移。
上述具体实施例只是用来解释说明本发明,而非是对本发明进行限制,在本发明的宗旨和权利要求的保护范围内,对本发明做出的任何不付出创造性劳动的替换和改变,都将落入本发明的保护范围。

Claims (7)

1.一种监测基坑顶部水平位移的方法,其特征在于,包括纵向基坑边测点监测环节、横向基坑边测点监测环节,所述纵向基坑边测点监测环节包括以下步骤:
(1)先选定基坑角部点B1为不动的基准点,分别在基坑的两个纵向边上设置监测点,开挖前的监测点分别为Bi、Ci+1(i=1,2,……n),开挖后相应的监测点变为B'i、C'i+1
(2)基坑开挖前,测得Bi与Bi+1之间的距离BiBi+1,Bi+1与Ci+1之间的距离Bi+1Ci+1
(3)基坑开挖后,测出B'i与C'i+1之间的距离B'iC'i+1,B'i+1与C'i+1之间的距离B'i+1C'i+1
(4)根据上述测量出的BiBi+1、Bi+1Ci+1、B'iC'i+1、B'i+1C'i+1的数值得出所述监测点Bi的水平位移及所述监测点Ci的水平位移;
所述横向监测环节包括以下步骤:
(1)在所述基坑的横向边上设置监测点,开挖前的监测点为Ai(i=1,2,……n),在两个纵向边上分别设置监测点M、N,开挖后相应地监测点变为Ai′、M'和N';
(2)基坑开挖前,分别测得M与N之间的距离MN,M与Ai之间的距离MAi,以及N与Ai之间的距离NAi
(3)基坑开挖后,分别测得M'与N'之间的距离M'N',M'与A'i之间的距离M'A'i,以及N'与A'i之间的距离N'A'i
(4)根据上述测量出的MN、MAi、NAi、M'N'、M'A'i及N'A'i的数值得出所述监测点Ai的水平位移。
2.根据权利要求1所述的监测基坑顶部水平位移的方法,其特征在于,所述Bi+1的水平位移和所述Ci+1的水平位移的计算公式为:
其中,当i=1时,
式中:Bi+1Ci+1为基坑开挖前Bi+1、Ci+1之间的距离;
B'iC'i+1为基坑开挖后B'i与C'i+1之间的距离;
BiBi+1为基坑开挖前Bi与Bi+1之间的距离;
B'i+1C'i+1为基坑开挖后B'i+1与C'i+1间距离;
为Bi+1、Ci+1两点间的相对位移;
为Bi点的绝对水平位移;
为Ci+1点的绝对水平位移;
为Bi+1点的绝对水平位移。
3.根据权利要求1所述的监测基坑顶部水平位移的方法,其特征在于,所述Ai的水平位移的计算公式为:
其中,
式中:h为Ai到MN的距离;
h′为Ai′到M'N'的距离;
为Ai的绝对水平位移;
β为NAi、MN之间的夹角;
β'为N′Ai′、M'N'之间的夹角。
4.根据权利要求1所述的监测基坑顶部水平位移的方法,其特征在于,所述不动基准点为基坑的一个角点,开挖前后所述角点的位置基本不变。
5.根据权利要求1所述的监测基坑顶部水平位移的方法,其特征在于,在所述监测点Ci+1设置反光片,在所述监测点Bi安装激光测距仪。
6.根据权利要求1所述的监测基坑顶部水平位移的方法,其特征在于,在Ai处设置反光片,在所述监测点M、N安装激光测距仪。
7.根据权利要求1所述的监测基坑顶部水平位移的方法,其特征在于,所述监测点M、N可以是离所述监测点Ai距离最近的一组监测点C2、B2
CN201510022876.0A 2015-01-16 2015-01-16 监测基坑顶部水平位移的方法 Active CN104631419B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510022876.0A CN104631419B (zh) 2015-01-16 2015-01-16 监测基坑顶部水平位移的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510022876.0A CN104631419B (zh) 2015-01-16 2015-01-16 监测基坑顶部水平位移的方法

Publications (2)

Publication Number Publication Date
CN104631419A CN104631419A (zh) 2015-05-20
CN104631419B true CN104631419B (zh) 2016-02-17

Family

ID=53210620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510022876.0A Active CN104631419B (zh) 2015-01-16 2015-01-16 监测基坑顶部水平位移的方法

Country Status (1)

Country Link
CN (1) CN104631419B (zh)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105547243B (zh) * 2015-12-16 2018-10-09 中国科学院半导体研究所 激光直接测量路基沉降的方法
CN105586994A (zh) * 2016-01-04 2016-05-18 大连大学 一种基坑围护桩桩顶水平位移监测装置及监测方法
CN105839681A (zh) * 2016-05-13 2016-08-10 绍兴文理学院 用激光测距传感器监测基坑钢支撑轴力的方法
CN106767490A (zh) * 2017-03-22 2017-05-31 上海公路桥梁(集团)有限公司 一种用于支撑轴力伺服系统的位移测量装置及其方法
CN107478191B (zh) * 2017-09-12 2019-11-15 中铁四局集团市政工程有限公司 一种桥梁用波形钢腹板屈曲变形的监测方法
CN108755646A (zh) * 2018-05-02 2018-11-06 中铁大桥局第七工程有限公司 一种基坑围护结构的顶面位移监测装置及方法
CN108981665B (zh) * 2018-08-13 2020-03-31 山东大学 一种基于坐标测量的基坑顶部水平位移监测方法
CN109269434B (zh) * 2018-10-23 2020-02-07 四川大学 一种直贴式岩壁变形激光扫描系统及其使用方法
CN109813275A (zh) * 2019-01-30 2019-05-28 广州轨道交通建设监理有限公司 一种深基坑监测系统及监测方法
CN110130413A (zh) * 2019-05-09 2019-08-16 四川合众精准科技有限公司 基于地下基准点布置方式的基坑监测方法
CN111705851B (zh) * 2020-06-18 2021-08-17 深圳市蛇口招商港湾工程有限公司 一种深基坑支护结构顶部水平位移监测装置及使用方法
CN114373286B (zh) * 2021-11-30 2023-12-05 成都倍特建筑安装工程有限公司 一种基坑位移自动报警装置

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7024827B2 (en) * 2003-02-20 2006-04-11 Gregory Enterprises, Inc. Preconstruction anchoring system and method for buildings
CN101457533A (zh) * 2007-12-13 2009-06-17 上海隧道工程股份有限公司 基坑开挖实时检测方法
CN101644065B (zh) * 2009-08-25 2012-05-09 上海市第二市政工程有限公司 一种基坑安全状态监测方法
CN102628281A (zh) * 2012-04-10 2012-08-08 长沙理工大学 一种基坑工程中测点的水平位移监测方法
CN102620699A (zh) * 2012-04-13 2012-08-01 靳纪洲 定向垂距法测量变形监测定向水平位移的方法
CN103363904B (zh) * 2013-06-26 2015-12-16 同济大学 基坑围护结构分层水平位移的测量装置及测量方法
CN203420265U (zh) * 2013-07-30 2014-02-05 上海城建市政工程(集团)有限公司 一种基坑边缘变形的监测系统
CN103526783B (zh) * 2013-10-21 2015-11-04 中航勘察设计研究院有限公司 一种测量建筑基坑水平位移的方法
CN103981906B (zh) * 2014-05-17 2016-02-17 吴保全 预设测点式基坑支护变形测量方法

Also Published As

Publication number Publication date
CN104631419A (zh) 2015-05-20

Similar Documents

Publication Publication Date Title
CN104631419B (zh) 监测基坑顶部水平位移的方法
CN103090812A (zh) 一种隧道变形监测系统及方法
CN105735380A (zh) 一种基坑深层水平位移和竖向沉降的监测装置及方法
CN102589438A (zh) 一种隧道拱顶沉降及净空收敛的监测方法
EP3620746B1 (en) Traverse-type measurement method for dual-system bilateral-survey composite level
CN206670571U (zh) 一种利用激光测距计测量桥梁挠度的装置
CN205300569U (zh) 隧道变形监测设备和系统
CN105806310A (zh) 用激光测距仪监测隧道洞口边仰坡地表三维位移的方法
CN103453886A (zh) 一种测量既有建筑物不可触及测点垂直度的方法
CN106840129A (zh) 一种快速测量地铁管片中心三维坐标的方法
CN104567800A (zh) 一种跨海高程传递测量方法
JP2024060019A (ja) 測量システム、丁張設置支援方法、丁張設置支援プログラム
CN204142246U (zh) 一种靠尺坡度测量仪
CN104457565A (zh) 一种缺陷尺寸测量装置和方法
CN203443579U (zh) 一种基于单侧壁导坑法的隧道收敛监测系统
CN107386341A (zh) 一种基于视准线法的水平位移测量系统
CN105783849A (zh) 一种岩层真倾角和真走向的测量系统及方法
CN204575080U (zh) 一种垂线人工观测瞄准装置
CN104930991B (zh) 基于载波相位的位移监测方法和位移监测系统
CN108612075A (zh) 一种监测深基坑水平位移的方法
CN204753558U (zh) 一种基坑水平位移监测装置
CN206638155U (zh) 多尺度位移测量同步校准装置
CN105066943A (zh) 一种便携式反射镜面型检测装置及方法
CN104328777B (zh) 一种岩土工程边坡地表变形监测装置与方法
CN104032630A (zh) 一种基于角度传递的轨道沉降连续测量方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant