CN105586994A - 一种基坑围护桩桩顶水平位移监测装置及监测方法 - Google Patents

一种基坑围护桩桩顶水平位移监测装置及监测方法 Download PDF

Info

Publication number
CN105586994A
CN105586994A CN201610003999.4A CN201610003999A CN105586994A CN 105586994 A CN105586994 A CN 105586994A CN 201610003999 A CN201610003999 A CN 201610003999A CN 105586994 A CN105586994 A CN 105586994A
Authority
CN
China
Prior art keywords
foundation pit
monitoring
pile
laser generator
laser
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610003999.4A
Other languages
English (en)
Inventor
李金奎
李霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian University
Original Assignee
Dalian University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian University filed Critical Dalian University
Priority to CN201610003999.4A priority Critical patent/CN105586994A/zh
Publication of CN105586994A publication Critical patent/CN105586994A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Length Measuring Devices By Optical Means (AREA)

Abstract

本发明公开了一种基坑围护桩桩顶水平位移监测装置及监测方法;待测桩顶冠梁上设有固定锚栓,支架通过固定锚栓固定于待测桩顶冠梁上,所述支架上设有运算处理器,激光发生器和激光接收器通过夹具固定于支架上,待测桩顶冠梁位于待测基坑围护桩顶部;参考桩顶冠梁位于参考围护桩顶部,所述参考桩顶冠梁上以及参考围护桩上设有与激光发生器向配合的反射贴片。本发明的有益效果是:克服和避免常规的基坑水平位移测量过程中设置基准点困难、通视性差的难题,不受基坑周边环境限制,监测过程简单,监测精度高。

Description

一种基坑围护桩桩顶水平位移监测装置及监测方法
技术领域
本发明涉及一种监测装置及监测方法,尤其涉及一种基坑围护桩的位移监测装置及监测方法。
背景技术
目前,围护桩桩顶水平位移是深部基坑开挖及使用过程中的重要指标,直接影响着基坑壁、道路、管线的安全和稳定。由于新建基坑周围建筑物密集,采用常规的全站仪监测方法,由于监测基点、工作基点和监测测点建立困难和通视性差,很难获得满足精度的围护桩体的水平位移监测成果,难以及时准确地评价基坑壁及周边环境的稳定性和安全性。
发明内容
为解决现有技术存在的缺陷,本发明的目的是提供一种基坑围护桩桩顶水平位移监测装置及监测方法,解决现有的常规基坑围护桩桩顶水平位移监测方法中监测基点、工作基点和监测测点布设困难和通视性差的问题。
本发明的技术方案是:一种基坑围护桩桩顶水平位移监测装置,待测桩顶冠梁上设有固定锚栓,支架通过固定锚栓固定于待测桩顶冠梁上,所述支架上设有运算处理器,激光发生器和激光接收器通过夹具固定于支架上,待测桩顶冠梁位于待测基坑围护桩顶部;
参考桩顶冠梁位于参考围护桩顶部,所述参考桩顶冠梁上以及参考围护桩上设有与激光发生器向配合的反射贴片。
一种基坑围护桩桩顶水平位移监测方法,包括以下步骤:
a)在待测基坑围护桩的顶冠梁上安装激光发生器;
b)在参考围护桩的顶冠梁上与激光发生器同一高程内和参考围护桩上分别安装有与激光发生器相配合的反射贴片;
c)测量激光发生器到反射贴片间的距离:激光发生器产生高精度激光束,经反射贴片反射到激光接收器中,再传递到运算处理器,并记录距离测试结果;
d)根据基坑开挖深度,确定监测频率,重复步骤c),反复监测激光发生器到反射贴片间的距离,并记录测试结果;
e)比对相邻两次的监测结果,取最大差值作为位移测试结果。
本发明的有益效果是:在基坑灌注桩冠梁位置角点同一高程内设置位移监测点;水平面内,利用临两边和对边的围护桩桩顶的监测点,进行测试,得出监测距离;竖直平面内,利用基坑对面的围护桩纵向监测点,测试得出距离,通过比较,取得相对位移较大的作为该点的水平位移;由于各个监测点和固定支架直接安装在冠梁和围护桩上,可以在灌注施工时实现基准点留设,可以实现精准定位;监测过程在基坑冠梁上实现,不设置常规的监测基点,不存在通视问题,达到了准确测量基坑围护桩桩体水平位移的目的,克服和避免常规的基坑水平位移测量过程中设置基准点困难、通视性差的难题,不受基坑周边环境限制,监测过程简单,监测精度高。
附图说明
本发明共有附图4幅。
图1为本发明的原理图;
图2为本发明的局部放大图;
图3为实施例1的监测原理图;
图4为实施例2的监测原理图。
图中附图标记如下:1、待测基坑围护桩,2、待测桩顶冠梁,3、固定锚栓,4、支架,5、夹具,6、激光发生器,7、运算处理器,8、激光接收器,9、发生激光束,10、反射贴片,11、反射激光束,12、参考桩顶冠梁,13、参考围护桩。
具体实施方式
下面结合附图1-4对本发明做进一步说明:
如图1、2所示,一种基坑围护桩桩顶水平位移监测装置,待测桩顶冠梁2上设有固定锚栓3,支架4通过固定锚栓3固定于待测桩顶冠梁2上,所述支架4上设有运算处理器7,激光发生器6和激光接收器8通过夹具5固定于支架4上,待测桩顶冠梁2位于待测基坑围护桩1顶部;
参考桩顶冠梁12位于参考围护桩13顶部,所述参考桩顶冠梁12上以及参考围护桩13上设有与激光发生器6向配合的反射贴片10。
一种基坑围护桩桩顶水平位移监测方法,包括以下步骤:
a)在待测基坑围护桩1的顶冠梁上安装激光发生器6;
b)在参考桩顶冠梁12上与激光发生器6同一高程内和参考围护桩13上分别安装有与激光发生器6相配合的反射贴片10;
c)测量激光发生器6到反射贴片10间的距离:激光发生器6产生高精度激光束,经反射贴片10反射到激光接收器8中,再传递到运算处理器7,并记录距离测试结果;
d)根据基坑开挖深度,确定监测频率,重复步骤c,反复监测激光发生器6到反射贴片10间的距离,并记录测试结果;
e)比对相邻两次的监测结果,取最大差值作为位移测试结果。
所述监测频率具体为:基坑深度小于5米时,2天测一次,基坑深度大于等于5米且小于10米时,1天测一次,基坑深度大于等于10米时,1天测两次。
实施例1
如图3所示,将临近7米深基坑边缘的A、B、C、D四点上的围护桩作为参考围护桩13,H点的围护桩为待测基坑围护桩1,则H点的待测基坑围护桩水平位移监测方法如下:
a)在待测基坑围护桩1的顶冠梁上安装激光发生器6;
b)在参考桩顶冠梁12上与激光发生器6同一高程内和参考围护桩13上分别安装有与激光发生器6相配合的反射贴片10;
c)分别量测H点的激光发生器6到D、G、F、E、A的反射贴片10间的距离,再将数据信息传递到运算处理器7,并记录距离测试结果;
d)一天监测一次激光发生器6到个点反射贴片10间的距离,并记录测试结果;
e)比对相邻两次相应两点的监测结果,取最大差值作为位移测试结果。
实施例2
如图4所示,M、N两点相对位于12米深基坑边缘,N点上的围护桩作为参考围护桩13,M点的围护桩为待测基坑围护桩1,M点的待测基坑围护桩水平位移监测方法如下:
a)在待测基坑围护桩1的顶冠梁上安装激光发生器6;
b)参考桩顶冠梁12上与激光发生器6同一高程内的N点安装一个反射贴片10,参考围护桩上两个不同高度点I、J处分别安装反射贴片10;
c)分别量测M点的激光发生器6到I、J的反射贴片10间的距离,再将数据信息传递到运算处理器7,并记录距离测试结果;
d)一天监测两次激光发生器6到个点反射贴片10间的距离,并记录测试结果;
e)比对相邻两次相应两点的监测结果,取最大差值作为位移测试结果。
以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明技术原理的前提下,还可以做出若干改进和变型,这些改进和变型也应视为本发明的保护范围。

Claims (3)

1.一种基坑围护桩桩顶水平位移监测装置,其特征在于,待测桩顶冠梁(2)上设有固定锚栓(3),支架(4)通过固定锚栓(3)固定于待测桩顶冠梁(2)上,所述支架(4)上设有运算处理器(7),激光发生器(6)和激光接收器(8)通过夹具(5)固定于支架(4)上,待测桩顶冠梁(2)位于待测基坑围护桩(1)顶部;
参考桩顶冠梁(12)位于参考围护桩(13)顶部,所述参考桩顶冠梁(12)上以及参考围护桩(13)上设有与激光发生器(6)向配合的反射贴片(10)。
2.一种基坑围护桩桩顶水平位移监测方法,其特征在于,包括以下步骤:
a)在待测基坑围护桩(1)的顶冠梁上安装激光发生器(6);
b)在参考桩顶冠梁(12)上与激光发生器(6)同一高程内和参考围护桩(13)上分别安装有与激光发生器(6)相配合的反射贴片(10);
c)测量激光发生器(6)到反射贴片(10)间的距离:激光发生器(6)产生高精度激光束,经反射贴片(10)反射到激光接收器8中,再传递到运算处理器(7),并记录距离测试结果;
d)根据基坑开挖深度,确定监测频率,重复步骤c,反复监测激光发生器(6)到反射贴片(10)间的距离,并记录测试结果;
e)比对相邻两次的监测结果,取最大差值作为位移测试结果。
3.根据权利要求2所述的一种基坑围护桩桩顶水平位移监测方法,其特征在于,所述监测频率具体为:基坑深度小于5米时,2天测一次,基坑深度大于等于5米且小于10米时,1天测一次,基坑深度大于等于10米时,1天测两次。
CN201610003999.4A 2016-01-04 2016-01-04 一种基坑围护桩桩顶水平位移监测装置及监测方法 Pending CN105586994A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610003999.4A CN105586994A (zh) 2016-01-04 2016-01-04 一种基坑围护桩桩顶水平位移监测装置及监测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610003999.4A CN105586994A (zh) 2016-01-04 2016-01-04 一种基坑围护桩桩顶水平位移监测装置及监测方法

Publications (1)

Publication Number Publication Date
CN105586994A true CN105586994A (zh) 2016-05-18

Family

ID=55926878

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610003999.4A Pending CN105586994A (zh) 2016-01-04 2016-01-04 一种基坑围护桩桩顶水平位移监测装置及监测方法

Country Status (1)

Country Link
CN (1) CN105586994A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106403825A (zh) * 2016-11-30 2017-02-15 中国冶集团有限公司 一种基坑支护桩水平位移的激光监测系统及方法
CN106767490A (zh) * 2017-03-22 2017-05-31 上海公路桥梁(集团)有限公司 一种用于支撑轴力伺服系统的位移测量装置及其方法
CN108413880A (zh) * 2018-01-31 2018-08-17 乐清市建设监理有限公司 一种基坑位移自动监测系统及其方法
CN108917536A (zh) * 2018-04-20 2018-11-30 中国十七冶集团有限公司 一种深基坑水平位移监测报警装置及其操作方法
CN110533698A (zh) * 2019-09-05 2019-12-03 广东水电二局股份有限公司 一种基于视觉检测的基坑施工桩检测控制方法
CN111576507A (zh) * 2020-05-29 2020-08-25 海安东大岩土桩基工程检测有限公司 一种桩基位移和内力的测量方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102494619A (zh) * 2011-12-20 2012-06-13 中建八局第一建设有限公司 一种深基坑位移激光监测报警系统
CN102768018A (zh) * 2012-07-31 2012-11-07 大连海事大学 一种地下工程岩体位移激光测量装置
CN103363904A (zh) * 2013-06-26 2013-10-23 同济大学 基坑围护结构分层水平位移的测量装置及测量方法
CN103981906A (zh) * 2014-05-17 2014-08-13 吴保全 预设测点式基坑支护变形测量方法
CN104631419A (zh) * 2015-01-16 2015-05-20 绍兴文理学院 监测基坑顶部水平位移的方法
CN204530796U (zh) * 2015-01-28 2015-08-05 北京城建勘测设计研究院有限责任公司 一种用于基坑工程围护桩桩顶水平位移监测的系统

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102494619A (zh) * 2011-12-20 2012-06-13 中建八局第一建设有限公司 一种深基坑位移激光监测报警系统
CN102768018A (zh) * 2012-07-31 2012-11-07 大连海事大学 一种地下工程岩体位移激光测量装置
CN103363904A (zh) * 2013-06-26 2013-10-23 同济大学 基坑围护结构分层水平位移的测量装置及测量方法
CN103981906A (zh) * 2014-05-17 2014-08-13 吴保全 预设测点式基坑支护变形测量方法
CN104631419A (zh) * 2015-01-16 2015-05-20 绍兴文理学院 监测基坑顶部水平位移的方法
CN204530796U (zh) * 2015-01-28 2015-08-05 北京城建勘测设计研究院有限责任公司 一种用于基坑工程围护桩桩顶水平位移监测的系统

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106403825A (zh) * 2016-11-30 2017-02-15 中国冶集团有限公司 一种基坑支护桩水平位移的激光监测系统及方法
CN106767490A (zh) * 2017-03-22 2017-05-31 上海公路桥梁(集团)有限公司 一种用于支撑轴力伺服系统的位移测量装置及其方法
CN108413880A (zh) * 2018-01-31 2018-08-17 乐清市建设监理有限公司 一种基坑位移自动监测系统及其方法
CN108917536A (zh) * 2018-04-20 2018-11-30 中国十七冶集团有限公司 一种深基坑水平位移监测报警装置及其操作方法
CN108917536B (zh) * 2018-04-20 2020-08-21 中国十七冶集团有限公司 一种深基坑水平位移监测报警装置及其操作方法
CN110533698A (zh) * 2019-09-05 2019-12-03 广东水电二局股份有限公司 一种基于视觉检测的基坑施工桩检测控制方法
CN111576507A (zh) * 2020-05-29 2020-08-25 海安东大岩土桩基工程检测有限公司 一种桩基位移和内力的测量方法

Similar Documents

Publication Publication Date Title
CN105586994A (zh) 一种基坑围护桩桩顶水平位移监测装置及监测方法
CN104075696B (zh) 坐标测量方法
CN104060982B (zh) 测距式井下钻孔开孔方位角测量方法
CN104120656B (zh) 桥梁高墩施工垂直度自动控制方法
CN105043343A (zh) 基于激光位移传感器的自动化测量隧道拱顶沉降的方法
CN105798067A (zh) 轧机底座安装精确测量方法
CN104748695B (zh) 基于区段精细测量的大断面地下洞室早期变形监测方法
CN205300569U (zh) 隧道变形监测设备和系统
CN203824548U (zh) 一种桥梁结构砼表面观测区面积测定仪
CN102322854B (zh) 隧道监控量测点及tsp炮孔布设装置与方法
CN108303072A (zh) 一种用于闸门门槽安装过程中的测量装置以及测量方法
CN106289125B (zh) 一种船舶大合拢阶段模拟搭载的测量方法
CN204388845U (zh) 一种隧道快速超欠挖测定激光断面仪
CN104655092A (zh) 一种在地铁盾构施工中使用的三角形单井定向测量方法
CN103822613A (zh) 一种露天矿边坡角的非接触测量方法
CN103954197B (zh) 一种巷道表面位移、深部位移同位测量方法
CN109941309A (zh) 一种对桥式盾构产生横向平移的激光式检测法
CN106052507B (zh) 综合管廊内管线普查测量工具及方法
CN206638183U (zh) 一种便于高铁轨道变形监测的棱镜对中装置
CN109898523A (zh) 一种超深地连墙垂直度控制方法
CN202177380U (zh) 隧道监控量测点及tsp炮孔布设装置
CN104153353A (zh) 一种利用激光投线仪确定钻孔灌注桩标高的方法
CN114370897A (zh) 一种暗挖隧道爆破震动监测装置及方法
CN208792386U (zh) 一种加筋挡土墙侧向变形测试装置
CN104964635B (zh) 安装偏差转臂测量装置及转轴偏差测量方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160518

RJ01 Rejection of invention patent application after publication