CN104631232A - Integrated pouring device for installation of rail column type inspection pit fastening system - Google Patents

Integrated pouring device for installation of rail column type inspection pit fastening system Download PDF

Info

Publication number
CN104631232A
CN104631232A CN201510005837.XA CN201510005837A CN104631232A CN 104631232 A CN104631232 A CN 104631232A CN 201510005837 A CN201510005837 A CN 201510005837A CN 104631232 A CN104631232 A CN 104631232A
Authority
CN
China
Prior art keywords
aluminum alloy
rail
alloy pattern
pattern plate
sizing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510005837.XA
Other languages
Chinese (zh)
Inventor
邵冠慧
梁恒辉
袁宽瑶
靳永福
曹福全
施正城
莫振泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510005837.XA priority Critical patent/CN104631232A/en
Publication of CN104631232A publication Critical patent/CN104631232A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
    • E04H5/06Pits or building structures for inspection or services

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an integrated pouring device for installation of a rail column type inspection pit fastening system. The periphery of a stand column reserved steel bar is wrapped by shaping aluminum formworks, wherein the two shaping aluminum formworks parallel to a steel rail above the reserved steel bar are higher than the other two shaping aluminum formworks at the positions perpendicular to the steel rail, and the shaping aluminum formworks are used for fixing a matched pouring funnel. The invention further discloses a laying method of the integrated pouring device. The integrated pouring device replaces traditional woodworking operation wasting time and materials, solves the problems that the formwork supporting effect is slow and parts are prone to contamination in the pouring process, and is short in construction period, low in use cost, convenient to construct, high in efficiency, good in stability and wide in application range.

Description

Device is built in a kind of integration of installing for track column check pit fastener system
Technical field
The invention belongs to technical field of building construction, be specifically related to a kind of integration of installing for column check pit fastener system in the section of track specialty field and built device.
Background technology
The construction interface of current conventional civil engineering and track specialty is generally and checks and cheat 50cm under rail level, by the following reinforced concrete works of civil engineering unit construction interface and reserved steel bar, track erection more than interface, fastener system is installed, pouring concrete, orbit adjusting is completed by track specialty.And existing column check pit fastener system mounting technique processing step is generally as follows in railway or subway field section:
1, the first erection of rail and the assembling of the section of track;
2, according to the requirement of drawing of laying a railway track, rubber pad under iron chair, rail and fastener are assembled on rail by designing requirement, under iron chair, the plank of rubber mat plate condition of equivalent thickness replaces (main because rubber pad is flexible material, two is easily sagging, build rear easy-formation epirelief profile, very inconvenient during orbit adjusting, the general plank that waits replaces, ensure that rubber pad is placed in smooth concrete surface), alternative backing plate and service sleeve are firmly fixed on iron chair, prevent Concrete contamination with polybag parcel fastener system;
3, the adjustment of line status, is fine-tuning to design elevation;
4, column formwork (on-the-spot in the majority with wooden form), concreting, completes and vibrates, and after concrete setting, anchor bolt on iron chair is unclamped in form removal, and frame height rail, removes plank and change rubber pad;
5, tighten up bolt, local directed complete set completes accurate adjustment.
In actual field section during the installation of column check pit fastener system, be exactly under this rail level the quality of 50cm concreting be maximum when accounting in fastener system installation procedure, mainly there is following problem in and problem operation the most frequently:
1, need to protect fastener system, to fastener strip polybag, time-consumingly not say, and when concrete discharging is built or vibrate, easily destroy polybag, pollute fastener, stuck bolt;
2, rubber pad (plank) lower zone, because vibrating spear turning radius is larger, this region is easily leaked and is shaken, one causes floating oar many, low strength, two cause surface irregularity, are removing after plank changes rubber pad, produce gap between concrete finished surface rubber pad bottom surface layer, affect stressed transmission;
3, wooden model processing needs special cutting equipment, professional carpenter, also wants the auxiliary materials such as the lumps of wood, take people's time-consuming expense material during formwork;
4, column size is less, and be therefore generally cut to reduced size for assembled wooden model, recovery value is low, the many burning disposal of general unit in charge of construction, not environmentally.
Summary of the invention
Goal of the invention: the object of the invention is to for the deficiencies in the prior art, provides a kind of integration of installing for track column check pit fastener system to build device.
Another object of the present invention is to openly above-mentioned laying method of building device.
Technical scheme: in order to complete foregoing invention object, the present invention has specifically come like this: device is built in a kind of integration of installing for track column check pit fastener system, comprise the column with reserved steel bar and rail, reserved steel bar is positioned at below rail, fill out between reserved steel bar and rail and be provided with iron chair, rubber pad or plank, described column reserved steel bar surrounding is coated by aluminum alloy pattern plate of shaping, two pieces that wherein parallel with rail of square steel on reserved steel bar aluminum alloy pattern plate height of shaping are higher than the another two pieces of aluminum alloy pattern plates of shaping with rail upright position, supporting funnel is built in order to fixing.
Wherein, adjacent two pieces of sizing aluminum alloy pattern plates are fixed by connecting pin, described connecting pin is that cross comprises rotary head and the one group projection perpendicular with rotary head, distance between rotary head and projection is the thickness of two panels sizing aluminum alloy pattern plate, after the reserved rectangle bayonet socket of connecting pin through adjacent two pieces of sizing aluminum alloy pattern plates, turn clockwise and can engage two pieces of sizing aluminum alloy pattern plates.
Wherein, turn Fastener is provided with bottom described sizing aluminum alloy pattern plate.
Wherein, one piece of sizing aluminum alloy pattern plate that described height is low has and builds reserved opening of vibrating.
Wherein, the described two piece sizing aluminum alloy pattern plate tip shelfs parallel with rail are provided with depositing funnel, be the parabola shaped bottom surface of under shed, have two under sheds bottom this depositing funnel, and the both sides that bottom level is put down in rubber pad bottom, two under sheds are positioned at rail.
Lay the method that device is built in the integration of installing for track column check pit fastener system, comprise the following steps:
(1) the first erection of rail and the assembling of row's rail, rubber pad under iron chair, rail or plank, fastener, anchor bolt, service sleeve is assembled on rail;
(2) adjustment of line status, is fine-tuning to design elevation;
(3) sizing aluminum alloy pattern plate is enveloped the column of reserved steel bar from four sides, the sizing aluminum alloy pattern plate height of rail both sides is greater than rail height, and after fixing sizing aluminum alloy pattern plate adjacent between two with connecting pin, make Combined-type aluminium template clamp concrete column by the securing member of template bottom and depositing funnel hung on the raised sizing aluminum alloy pattern plate in both sides pour into concrete;
(4) position to rubber pad or plank bottom surface is built, vibrate with minor diameter vibrating spear, after completing the cast of column major part, that opens highly low sizing aluminum alloy pattern plate builds reserved opening of vibrating, by vibrating spear deeply narrow and small position to rubber pad, vibrated rear extraction vibrating spear, closes and build reserved opening.
Beneficial effect: compared with conventional art, the invention has the advantages that:
1, the woodworking operation that device replaces time-consuming expense material is built in the integration by installing for track column check pit fastener system, overcome that formwork work efficiency is comparatively slow, part such as easily to pollute at the problem when building, for in railway or subway field section, the track inspection hole column of the same size of constructing on a large scale is built has obvious advantage;
2, on-the-spot without the need to special cutting equipment, the wood chip produced when also can not produce template cutting, uses when building and supportingly builds funnel, avoid because the narrow and small concrete of casting space is dropped outside template, after construction form removal, on-the-spot without any rubbish, construction environment safety, clean and tidy;
3, sizing aluminum alloy pattern plate convenient and efficient is used, assembling is simple, convenient, the short template of whole one piece of fixative composition formula aluminum alloy pattern plate (for the thick 2mm of template), long template average weight about 1.8 kilograms, 2.4 kilograms, completely can by manually assembled, substantially without any need for the assistance of plant equipment.Contrast with wooden model, use sizing aluminum alloy pattern plate substantially not need carpenter, concrete worker only needs to carry out simple training and can operate, and reduces cooperation that is artificial and inter process, saves human cost and shorten man-hour;
4, the whole accessory of aluminum alloy building template system is all reusable, even if it is also higher to scrap recovery value.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is sizing aluminum alloy pattern plate assembling schematic diagram;
Fig. 3 is connecting pin enlarged diagram;
Fig. 4 is depositing funnel schematic diagram.
Detailed description of the invention
Embodiment 1:
As shown in figures 1-4, device is built in a kind of integration of installing for track column check pit fastener system, described column reserved steel bar 1 surrounding is coated by aluminum alloy pattern plate 2 of shaping, two pieces that parallel with rail of square steel 3 on reserved steel bar 1 aluminum alloy pattern plate 2 height of shaping are higher than the another two pieces of aluminum alloy pattern plates 2 of shaping with rail 3 upright position, supporting funnel 4 is built in order to fixing, be the parabola shaped bottom surface of under shed bottom this depositing funnel 4, there are two under sheds, and the both sides that bottom level flushes in rubber pad 5 bottom, two under sheds are positioned at rail 3; Described adjacent two pieces of sizing aluminum alloy pattern plates 2 are fixed by connecting pin 6, described connecting pin 6 comprises rotary head 61 and the one group projection 62 perpendicular with rotary head for cross, after the reserved rectangle bayonet socket 7 of connecting pin 6 through adjacent two pieces of sizing aluminum alloy pattern plates 2, turn clockwise and can engage two pieces of sizing aluminum alloy pattern plates 2; Turn Fastener 8 is provided with bottom described sizing aluminum alloy pattern plate 2; The sizing aluminum alloy pattern plate 2 that described height is low has and builds reserved opening 9 of vibrating.
Embodiment 2:
The method of device is built in a kind of laying for the integration that track column check pit fastener system is installed, comprise the following steps: the first erection of rail and the assembling of row's rail, rubber pad under iron chair, rail or plank and fastener, anchor bolt, service sleeve is assembled on rail, next carries out the adjustment of line status, is fine-tuning to design elevation, then sizing aluminum alloy pattern plate is enveloped the column of reserved steel bar from four sides, the sizing aluminum alloy pattern plate height of rail both sides is greater than rail height, and after fixing sizing aluminum alloy pattern plate adjacent between two with connecting pin, make Combined-type aluminium template clamp concrete column by the securing member of template bottom depositing funnel hung on the raised sizing aluminum alloy pattern plate in both sides to pour into concrete, build to rubber pad bottom surface position, vibrate with the minor diameter side that vibrates, after completing the cast of column major part, that opens highly low sizing aluminum alloy pattern plate builds reserved opening of vibrating, by vibrating spear deeply narrow and small position to rubber pad, vibrated rear extraction vibrating spear, close and build reserved opening, when intensity reaches design strength, loosening fasteners, be rotated counterclockwise connecting pin, complete form removal and reclaim sizing aluminum alloy pattern plate.

Claims (6)

1. device is built in an integration of installing for track column check pit fastener system, comprise the column with reserved steel bar and rail, reserved steel bar is positioned at below rail, fill out between reserved steel bar and rail and be provided with iron chair, rubber pad or plank, it is characterized in that, two pieces of aluminum alloy pattern plate height of shaping that described column reserved steel bar surrounding is coated by aluminum alloy pattern plate of shaping, wherein parallel with rail of square steel on reserved steel bar, higher than the another two pieces of aluminum alloy pattern plates of shaping with rail upright position, supporting build funnel in order to fixing.
2. device is built in integration of installing for track column check pit fastener system according to claim 1, it is characterized in that, adjacent two pieces of sizing aluminum alloy pattern plates are fixed by connecting pin, described connecting pin is that cross comprises rotary head and the one group projection perpendicular with rotary head, distance between rotary head and projection is the thickness of two panels sizing aluminum alloy pattern plate, after the reserved rectangle bayonet socket of connecting pin through adjacent two pieces of sizing aluminum alloy pattern plates, turn clockwise and can engage two pieces of sizing aluminum alloy pattern plates.
3. device is built in integration of installing for track column check pit fastener system according to claim 1 and 2, it is characterized in that, is provided with turn Fastener bottom described sizing aluminum alloy pattern plate.
4. device is built in integration of installing for track column check pit fastener system according to claim 1 and 2, it is characterized in that, one piece of sizing aluminum alloy pattern plate that described height is low has and builds reserved opening of vibrating.
5. device is built in integration of installing for track column check pit fastener system according to claim 1, it is characterized in that, the described two piece sizing aluminum alloy pattern plate tip shelfs parallel with rail are provided with depositing funnel, be the parabola shaped bottom surface of under shed bottom this depositing funnel, there are two under sheds, and the both sides that bottom level is put down in rubber pad bottom, two under sheds are positioned at rail.
6. lay the method that device is built in the integration of installing for track column check pit fastener system, it is characterized in that, comprise the following steps:
(1) the first erection of rail and the assembling of row's rail, rubber pad under iron chair, rail or plank, fastener, anchor bolt, service sleeve is assembled on rail;
(2) adjustment of line status, is fine-tuning to design elevation;
(3) sizing aluminum alloy pattern plate is enveloped the column of reserved steel bar from four sides, the sizing aluminum alloy pattern plate height of rail both sides is greater than rail height, and after fixing sizing aluminum alloy pattern plate adjacent between two with connecting pin, make Combined-type aluminium template clamp concrete column by the securing member of template bottom and depositing funnel hung on the raised sizing aluminum alloy pattern plate in both sides pour into concrete;
(4) position to rubber pad or plank bottom surface is built, vibrate with minor diameter vibrating spear, after completing the cast of column major part, that opens highly low sizing aluminum alloy pattern plate builds reserved opening of vibrating, by vibrating spear deeply narrow and small position to rubber pad, vibrated rear extraction vibrating spear, closes and build reserved opening.
CN201510005837.XA 2015-01-06 2015-01-06 Integrated pouring device for installation of rail column type inspection pit fastening system Pending CN104631232A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510005837.XA CN104631232A (en) 2015-01-06 2015-01-06 Integrated pouring device for installation of rail column type inspection pit fastening system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510005837.XA CN104631232A (en) 2015-01-06 2015-01-06 Integrated pouring device for installation of rail column type inspection pit fastening system

Publications (1)

Publication Number Publication Date
CN104631232A true CN104631232A (en) 2015-05-20

Family

ID=53210433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510005837.XA Pending CN104631232A (en) 2015-01-06 2015-01-06 Integrated pouring device for installation of rail column type inspection pit fastening system

Country Status (1)

Country Link
CN (1) CN104631232A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735063A (en) * 2016-03-29 2016-07-06 中铁城建集团第一工程有限公司 Construction method for laying inspection pit rail through gluing method and rail hanging method based on rail erecting tool
CN107268348A (en) * 2017-07-25 2017-10-20 中铁六局集团天津铁路建设有限公司 Subway column check pit construction method
CN107313314A (en) * 2017-07-19 2017-11-03 中铁上海工程局集团有限公司 A kind of metro depot reserves column inspection hole track construction method
CN107558313A (en) * 2017-09-26 2018-01-09 上海建工五建集团有限公司 Post and track monoblock type constructing structure and method are cheated in subway inspection
CN108331385A (en) * 2018-04-24 2018-07-27 建华建材(中国)有限公司 Prefabricated rod structure and its construction method are cheated in a kind of inspection
CN109112903A (en) * 2018-09-27 2019-01-01 中建安装工程有限公司 Solid concrete roabed trackless construction technology is cheated in a kind of phase library inner column formula inspection
CN110607926A (en) * 2019-09-06 2019-12-24 中铁上海工程局集团有限公司 Subway column type inspection pit upright column concrete pouring guide funnel and construction method thereof
CN111706128A (en) * 2020-06-17 2020-09-25 上海建科工程咨询有限公司 Prefabricated inspection pit stand column and construction method thereof
CN112761034A (en) * 2020-12-24 2021-05-07 成都市新筑路桥机械股份有限公司 Fluid material pouring trolley

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1837470A (en) * 2006-04-25 2006-09-27 中铁八局集团有限公司 Method for mounting rail fastening on track slab
KR100744175B1 (en) * 2005-12-07 2007-08-02 한국철도기술연구원 Precast concrete slab on ballast track and concrete ballast laying system and method using it
CN201401013Y (en) * 2009-04-15 2010-02-10 深圳市市政工程总公司 Silo pump pumping concrete dividing hopper in slipform construction
CN102505586A (en) * 2012-01-04 2012-06-20 中铁二局股份有限公司 Construction method of low-shrinkage and self-compacting concrete
CN203129605U (en) * 2013-02-26 2013-08-14 中国建筑第七工程局有限公司 Concrete pouring hopper for construction column

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100744175B1 (en) * 2005-12-07 2007-08-02 한국철도기술연구원 Precast concrete slab on ballast track and concrete ballast laying system and method using it
CN1837470A (en) * 2006-04-25 2006-09-27 中铁八局集团有限公司 Method for mounting rail fastening on track slab
CN201401013Y (en) * 2009-04-15 2010-02-10 深圳市市政工程总公司 Silo pump pumping concrete dividing hopper in slipform construction
CN102505586A (en) * 2012-01-04 2012-06-20 中铁二局股份有限公司 Construction method of low-shrinkage and self-compacting concrete
CN203129605U (en) * 2013-02-26 2013-08-14 中国建筑第七工程局有限公司 Concrete pouring hopper for construction column

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈光辉等: "谈柱式检查坑整体道床施工工艺", 《山西建筑》, vol. 35, no. 6, 28 February 2009 (2009-02-28) *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735063A (en) * 2016-03-29 2016-07-06 中铁城建集团第一工程有限公司 Construction method for laying inspection pit rail through gluing method and rail hanging method based on rail erecting tool
CN107313314A (en) * 2017-07-19 2017-11-03 中铁上海工程局集团有限公司 A kind of metro depot reserves column inspection hole track construction method
CN107268348A (en) * 2017-07-25 2017-10-20 中铁六局集团天津铁路建设有限公司 Subway column check pit construction method
CN107268348B (en) * 2017-07-25 2019-04-05 中铁六局集团天津铁路建设有限公司 Subway column check pit construction method
CN107558313A (en) * 2017-09-26 2018-01-09 上海建工五建集团有限公司 Post and track monoblock type constructing structure and method are cheated in subway inspection
CN108331385A (en) * 2018-04-24 2018-07-27 建华建材(中国)有限公司 Prefabricated rod structure and its construction method are cheated in a kind of inspection
CN108331385B (en) * 2018-04-24 2024-05-03 建华建材(中国)有限公司 Inspection pit precast column structure and construction method thereof
CN109112903A (en) * 2018-09-27 2019-01-01 中建安装工程有限公司 Solid concrete roabed trackless construction technology is cheated in a kind of phase library inner column formula inspection
CN110607926A (en) * 2019-09-06 2019-12-24 中铁上海工程局集团有限公司 Subway column type inspection pit upright column concrete pouring guide funnel and construction method thereof
CN111706128A (en) * 2020-06-17 2020-09-25 上海建科工程咨询有限公司 Prefabricated inspection pit stand column and construction method thereof
CN112761034A (en) * 2020-12-24 2021-05-07 成都市新筑路桥机械股份有限公司 Fluid material pouring trolley

Similar Documents

Publication Publication Date Title
CN104631232A (en) Integrated pouring device for installation of rail column type inspection pit fastening system
CN106320691B (en) Aluminum wood template construction method
CN110821156A (en) Sinking type toilet hanging die structure and construction method thereof
CN104846744A (en) Construction method for pouring and forming urban viaduct curve type pier stud in one-off mode
CN105755954B (en) A kind of construction technology of intercommunication clear-water concrete anticollision barrier
CN104372952A (en) Unstressed permeating washing scabbling technology
CN105952154B (en) A kind of concrete-pouring template stent
CN109680938A (en) A kind of nonstandard layer aluminum wood steel combination template and its construction method, building
CN110616838A (en) Assembled composite floor slab with height limiting device and production process thereof
CN109057339A (en) A kind of one-time-concreting construction method of the anti-bank in toilet
CN110439266A (en) Waterproof instead hangs mould along aluminium alloy and utilizes the method on the anti-edge of its construction waterproof
CN110158949A (en) A kind of bracket and mating aluminum dipping form early tear system and its construction method open
CN111663770B (en) Quick and easy combination and shaping mold for post-cast strip of cast-in-place slab and construction method of quick and easy combination and shaping mold
CN105696796A (en) Cantilever scaffold steel girder anchoring method
CN105804396B (en) A kind of non-type, template system precast stair bench and construction can be had enough to meet the need
CN204609293U (en) Portablely locate buttress casting mold
CN109457960B (en) Adjustable universal mold for integrally assembling cast-in-situ stair steps
CN110700573A (en) Construction method, device and application of formwork support system adopting steel beam
CN106522544A (en) Root-rotting-preventing compensating device for formwork
CN110439257A (en) A kind of high turnover rate fashioned iron of sectional-film coating plywood light-type template system construction method
CN207048309U (en) A kind of top plate Quick Release support system
CN212336719U (en) Sinking type toilet hanging mould structure
CN104453235A (en) Convertor station firewall construction technology
CN205476468U (en) Non - design, can all rotary die plate bodys be prefabricated staircase bench template
CN108193874A (en) A kind of stairway steel formwork for building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150520

WD01 Invention patent application deemed withdrawn after publication