CN104617667A - Hot standby protection method for single-set 110kV line protection for 220kV intelligent substation - Google Patents
Hot standby protection method for single-set 110kV line protection for 220kV intelligent substation Download PDFInfo
- Publication number
- CN104617667A CN104617667A CN201510027396.3A CN201510027396A CN104617667A CN 104617667 A CN104617667 A CN 104617667A CN 201510027396 A CN201510027396 A CN 201510027396A CN 104617667 A CN104617667 A CN 104617667A
- Authority
- CN
- China
- Prior art keywords
- protective devices
- stand
- line protective
- heat
- protection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The invention discloses a hot standby protection method for single-set 110kV line protection for a 220kV intelligent substation. The hot standby protection method for the single-set 110kV line protection for the 220kV intelligent substation includes that firstly, realizing dual-running for single-set line protection to be disabled, switching the fixed value of a hot standby line protection device B into a fixed value of a line protection device A to be disabled, accessing the corresponding current, voltage and switching value input into the line protection device A into the hot standby line protection device B, and tripping the hot standby line protection device B to access into corresponding primary equipment; secondly, after the hot standby protection sampling and running are normal, quitting the original running line protection to enable the line protection device A to quit a working state; thirdly, after the line protection device A which quits running finishes working, restoring a loop and a passage; fourthly, after the sampling and running states of the original line protection device A are normal, quitting the original running line protection, restoring the running of the line protection device A, and enabling the hot standby line protection device B to quit the working state.
Description
Technical field
The present invention relates to the guard method of a kind of 220kV intelligent substation list cover 110kV route protection stand-by heat.
Background technology
Along with the extensive foundation of intelligent substation, the popularization of new digital protective device and the requirement of more and more higher power supply reliability, bring challenge to traditional transforming plant protecting allocation plan and maintenance model.Especially, under guard mode maintenance model, protective device eliminates regular verification also may fault with serving burst.As a rule; the primary equipment of relevant protection and the correspondence of must stopping using when the enterprising line correlation work of protection, the process protective device defect of single cover configuration; tend causes the adjustment of operational mode, even causes the power failure of local, thus reduces power supply reliability.The application principle of present photo-electricity mutual-inductor and numerical protection; and protection adopts net to adopt net hop pattern all to provide a great convenience the alternative of former protection realizing stand-by heat protection, therefore becoming feasible a kind of pattern to the protection of intelligent substation stand-by heat is other for protection of the same type.
Summary of the invention
The invention provides the guard method of a kind of 220kV intelligent substation list cover 110kV route protection stand-by heat, it achieve stand-by heat route protection seamless switching when single cover route protection is stopped using, guarantee that corresponding primary equipment does not have a power failure.
Present invention employs following technical scheme: the guard method of a kind of 220kV intelligent substation list cover 110kV route protection stand-by heat, it comprises the following steps: step one, first realize dual to the list cover route protection preparing to stop using to run, stand-by heat line protective devices B definite value is switched to the definite value of the line protective devices A use preparing to stop using, by current/voltage corresponding for these cover line protective devices of input A and switching value, access in hot stand-by heat line protective devices B simultaneously; Stand-by heat line protective devices B tripping operation is outputed on primary equipment corresponding to access; Step 2, after checking stand-by heat protection sampling and normal operation, exits the route protection of former operation, simultaneously report regulation and control center, and line protective devices A is substituted by stand-by heat line protective devices B, and line protective devices A deactivates state; Step 3, line protective devices A out of service after end-of-job, then recovers loop and path; Step 4, check former line protective devices A sample and running status normal after, exit the route protection of former operation, simultaneously report regulation and control center, route protection A resumes operation, and stand-by heat route protection B deactivates state.
110kV circuit of the present invention is that net is when adopting net jumping mode, the stand-by heat line protective devices B set up in step one only needs with in All other routes protection access SV net and GOOSE net, increase stand-by heat protection B can gather All other routes protection input variable and jump the associated rights of respective switch and corresponding control word or soft pressing plate, need, by dropping into corresponding control word or pressing plate realizes protection dual configuration in configuration file, to need the definite value of preserving other all route protections simultaneously; Need to throw maintenance pressing plate to line protective devices A in step 2; In step 3, need the maintenance pressing plate exiting line protective devices A to be resumed operation by line protective devices A; The corresponding control word of relevant stand-by heat protection in configuration file or soft pressing plate is exited in step 4.
When 110kV circuit of the present invention is for directly adopting straight jumping mode, the stand-by heat line protective devices B that sets up needs to access an optical fiber from the intelligent merge cells of all 110kV circuits and intelligent terminal, all receive on the optical Fiber Closure of stand-by heat protection screen, at performing step for the moment, need the intelligent acess from line protective devices A on stand-by heat protective device, enable stand-by heat line protective devices B gather All other routes protection input variable and jump respective lines protective device A switch, be switched to the protection definite value of line protective devices A simultaneously thus realize protection dual configuration, at line protective devices A upslide maintenance pressing plate in step 2, in step 3, need the maintenance pressing plate exiting line protective devices A to be resumed operation by line protective devices A, in step 4, the optical fiber of circuit A merge cells and intelligent terminal is disconnected while exiting stand-by heat line protective devices B.
The present invention has following beneficial effect: after have employed above technical scheme; the route protection that the present invention can realize single cover configuration because of the other reasonses such as maintenance, fault stop using time; stand-by heat protection can be protected to inductive switch and circuit by the former protective device of the complete replacement of seamless switching under to inductive switch and circuit not power-off condition; avoid a large amount of primary equipment interruption durations; improve utilization rate of equipment and installations; reduce the professional indexs such as unplanned power failure ratio; improve the operational mode stability of network system, improve power supply reliability.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Fig. 2 is the intelligent station network structure figure of the present invention when adopting net to adopt net jumping mode.
To be the present invention adopt net hop pattern at net to Fig. 3 implements stand-by heat route protection used and install block diagram.
To be the present invention implement stand-by heat route protection used and install block diagram directly adopting straight hop pattern Fig. 4.
Embodiment
Embodiment one, in Fig. 1, Fig. 2 and Fig. 3, the invention provides the guard method of a kind of 220kV intelligent substation list cover 110kV route protection stand-by heat, described 110kV circuit is net guard method when adopting net jumping mode, it comprises the following steps: step one, first realize dual to the list cover route protection preparing to stop using to run, stand-by heat line protective devices B definite value is switched to the definite value of the line protective devices A use preparing to stop using, by current/voltage corresponding for these cover line protective devices of input A and switching value, access in hot stand-by heat line protective devices B simultaneously; Stand-by heat line protective devices B tripping operation is outputed on primary equipment corresponding to access, the stand-by heat line protective devices B set up only needs with in All other routes protection access SV net and GOOSE net, increase stand-by heat protection B can gather All other routes protection input variable and jump the associated rights of respective switch and corresponding control word or soft pressing plate, need, by dropping into corresponding control word or pressing plate realizes protection dual configuration in configuration file, to need the definite value of preserving other all route protections simultaneously; Step 2, after checking stand-by heat protection sampling and normal operation, exit the route protection of former operation, report regulation and control center simultaneously, line protective devices A is substituted by stand-by heat line protective devices B, line protective devices A deactivates state, needs to throw maintenance pressing plate to line protective devices A when exiting; Step 3, line protective devices A out of service after end-of-job, then recovers loop and path, needs the maintenance pressing plate exiting line protective devices A to be resumed operation by line protective devices A; Step 4; after checking that former line protective devices A sampling and running status are normally; exit the route protection of former operation; report regulation and control center simultaneously; route protection A resumes operation; stand-by heat route protection B deactivates state, and stand-by heat route protection B exits the corresponding control word of relevant stand-by heat protection in configuration file or soft pressing plate.
Embodiment one, in Fig. 1 and Fig. 4, the invention provides the guard method of a kind of 220kV intelligent substation list cover 110kV route protection stand-by heat, it comprises the following steps:
Step one, first realize dual to the list cover route protection preparing to stop using to run, stand-by heat line protective devices B definite value is switched to the definite value of the line protective devices A use preparing to stop using, by current/voltage corresponding for these cover line protective devices of input A and switching value, access in hot stand-by heat line protective devices B simultaneously, stand-by heat line protective devices B tripping operation is outputed on primary equipment corresponding to access, the stand-by heat line protective devices B that sets up needs to access an optical fiber from the intelligent merge cells of all 110kV circuits and intelligent terminal, all receive on the optical Fiber Closure of stand-by heat protection screen, at performing step for the moment, need the intelligent acess from line protective devices A on stand-by heat protective device, enable stand-by heat line protective devices B gather All other routes protection input variable and jump respective lines protective device A switch, be switched to the protection definite value of line protective devices A simultaneously thus realize protection dual configuration,
Step 2, after checking stand-by heat protection sampling and normal operation, exits the route protection of former operation, report regulation and control center simultaneously, line protective devices A is substituted by stand-by heat line protective devices B, and line protective devices A deactivates state, at line protective devices A upslide maintenance pressing plate;
Step 3, line protective devices A out of service after end-of-job, then recovers loop and path, needs the maintenance pressing plate exiting line protective devices A to be resumed operation by line protective devices A;
Step 4; after checking that former line protective devices A sampling and running status are normally; exit the route protection of former operation; report regulation and control center simultaneously; route protection A resumes operation; stand-by heat route protection B deactivates state, disconnects the optical fiber of circuit A merge cells and intelligent terminal while exiting stand-by heat line protective devices B.
Claims (3)
1. a 220kV intelligent substation list cover 110kV route protection stand-by heat guard method, it comprises the following steps:
Step one, first realize dual to the list cover route protection preparing to stop using to run, stand-by heat line protective devices B definite value is switched to the definite value of the line protective devices A use preparing to stop using, by current/voltage corresponding for these cover line protective devices of input A and switching value, access in hot stand-by heat line protective devices B simultaneously; Stand-by heat line protective devices B tripping operation is outputed on primary equipment corresponding to access;
Step 2, after checking stand-by heat protection sampling and normal operation, exits the route protection of former operation, simultaneously report regulation and control center, and line protective devices A is substituted by stand-by heat line protective devices B, and line protective devices A deactivates state;
Step 3, line protective devices A out of service after end-of-job, then recovers loop and path;
Step 4, check former line protective devices A sample and running status normal after, exit the route protection of former operation, simultaneously report regulation and control center, route protection A resumes operation, and stand-by heat route protection B deactivates state.
2. 220kV intelligent substation list cover 110kV route protection stand-by heat according to claim 1 guard method, it is characterized in that described 110kV circuit is that net is when adopting net jumping mode, the stand-by heat line protective devices B set up in step one only needs with in All other routes protection access SV net and GOOSE net, increase stand-by heat protection B can gather All other routes protection input variable and jump the associated rights of respective switch and corresponding control word or soft pressing plate, need by dropping into corresponding control word or pressing plate realizes protection dual configuration in configuration file, need the definite value of preserving other all route protections simultaneously, need to throw maintenance pressing plate to line protective devices A in step 2, in step 3, need the maintenance pressing plate exiting line protective devices A to be resumed operation by line protective devices A, the corresponding control word of relevant stand-by heat protection in configuration file or soft pressing plate is exited in step 4.
3. 220kV intelligent substation list cover 110kV route protection stand-by heat according to claim 1 guard method, when it is characterized in that described 110kV circuit for directly adopting straight jumping mode, the stand-by heat line protective devices B that sets up needs to access an optical fiber from the intelligent merge cells of all 110kV circuits and intelligent terminal, all receive on the optical Fiber Closure of stand-by heat protection screen, at performing step for the moment, need the intelligent acess from line protective devices A on stand-by heat protective device, enable stand-by heat line protective devices B gather All other routes protection input variable and jump respective lines protective device A switch, be switched to the protection definite value of line protective devices A simultaneously thus realize protection dual configuration, at line protective devices A upslide maintenance pressing plate in step 2, in step 3, need the maintenance pressing plate exiting line protective devices A to be resumed operation by line protective devices A, in step 4, the optical fiber of circuit A merge cells and intelligent terminal is disconnected while exiting stand-by heat line protective devices B.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510027396.3A CN104617667B (en) | 2014-01-21 | 2015-01-20 | A kind of 220kV intelligent substations list covers 110kV route protection stand-by heat guard methods |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2014100257025 | 2014-01-21 | ||
CN201410025702 | 2014-01-21 | ||
CN201510027396.3A CN104617667B (en) | 2014-01-21 | 2015-01-20 | A kind of 220kV intelligent substations list covers 110kV route protection stand-by heat guard methods |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104617667A true CN104617667A (en) | 2015-05-13 |
CN104617667B CN104617667B (en) | 2017-09-22 |
Family
ID=53152004
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510027396.3A Active CN104617667B (en) | 2014-01-21 | 2015-01-20 | A kind of 220kV intelligent substations list covers 110kV route protection stand-by heat guard methods |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104617667B (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101465851A (en) * | 2008-12-30 | 2009-06-24 | 上海市电力公司 | Fault information substation based on IEC 61850 and modeling approach thereof |
CN102280864A (en) * | 2011-08-10 | 2011-12-14 | 江苏省电力公司苏州供电公司 | Post-failure live treatment method for protection device of distribution network system and portable protection device |
CN102545379A (en) * | 2012-03-08 | 2012-07-04 | 华南理工大学 | Method for casting and canceling 10kV backup automatic switching adaptive up-grade safe and automatic device under unit connection |
-
2015
- 2015-01-20 CN CN201510027396.3A patent/CN104617667B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101465851A (en) * | 2008-12-30 | 2009-06-24 | 上海市电力公司 | Fault information substation based on IEC 61850 and modeling approach thereof |
CN102280864A (en) * | 2011-08-10 | 2011-12-14 | 江苏省电力公司苏州供电公司 | Post-failure live treatment method for protection device of distribution network system and portable protection device |
CN102545379A (en) * | 2012-03-08 | 2012-07-04 | 华南理工大学 | Method for casting and canceling 10kV backup automatic switching adaptive up-grade safe and automatic device under unit connection |
Also Published As
Publication number | Publication date |
---|---|
CN104617667B (en) | 2017-09-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103840439B (en) | Main website coordinates the power distribution automation guard method realized with distributed terminal | |
CN102270836B (en) | Wide-area over-current protection method and system for power distribution network | |
CN102386614B (en) | Method for sharing standby protecting device by power equipment in intelligent transformer substation | |
CN104518564A (en) | Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method | |
CN104810924B (en) | Intelligent substation circuit redundancy protecting networking mode implementation method | |
CN204928105U (en) | Power distribution terminal device with trip protections function of preventing bypassing immediate leadership | |
CN103022994A (en) | Method for achieving fault isolation and recovery of power distribution network with permeability distribution type power supply | |
CN204103598U (en) | A kind of redundancy protection systems of transformer station | |
CN103532096A (en) | Method for eliminating defect in 10kV feeder protection device without cutting off power | |
CN103560585B (en) | Digitized line protection measurement and control system suitable for metro industry | |
CN104810925A (en) | Intelligent substation line redundancy protection point-to-point manner implementation method | |
Jingbo et al. | Research on dynamic characteristics and countermeasures of AC-DC hybrid power system with large scale HVDC transmission | |
CN101895341A (en) | Terminal equipment and power failure alarm reporting method thereof | |
CN103825363A (en) | Wind-solar low voltage storage micro-grid group protection coordinating controller | |
CN104201767A (en) | Optimized switching-on/off control method for busbar automatic transfer switch pressure plate | |
CN103995227A (en) | Method for testing planning state of distribution network switch | |
CN104600833B (en) | Method and system for determining spare power automatic switching on-off combination | |
CN102868218A (en) | Transition method for improving monitoring system in intelligent improvement of ordinary transformer substation | |
Pimjaipong et al. | Blackout prevention plan-The stability, reliability and security enhancement in Thailand power grid | |
CN104617667A (en) | Hot standby protection method for single-set 110kV line protection for 220kV intelligent substation | |
CN104124749B (en) | The dual-ring network distribution line failure processing method that prepared auto restart coordinates with power distribution automation | |
CN103746354A (en) | Distribution network fault isolation method based on transformer substation overcurrent protection | |
CN108092259B (en) | Switching method of spare power automatic switching based on double-layer control | |
CN207459723U (en) | Spare phase transformer quickly puts into arrangement | |
CN104065096A (en) | Method for reducing total-stop risk of terminal substations under faults through direct-current transmission |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |