CN102280864A - Post-failure live treatment method for protection device of distribution network system and portable protection device - Google Patents

Post-failure live treatment method for protection device of distribution network system and portable protection device Download PDF

Info

Publication number
CN102280864A
CN102280864A CN2011102277833A CN201110227783A CN102280864A CN 102280864 A CN102280864 A CN 102280864A CN 2011102277833 A CN2011102277833 A CN 2011102277833A CN 201110227783 A CN201110227783 A CN 201110227783A CN 102280864 A CN102280864 A CN 102280864A
Authority
CN
China
Prior art keywords
protective
current
tripping
portable
distribution network
Prior art date
Application number
CN2011102277833A
Other languages
Chinese (zh)
Other versions
CN102280864B (en
Inventor
朱振亦
周文华
沈炯
顾建林
张曦
黄文辉
Original Assignee
江苏省电力公司苏州供电公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 江苏省电力公司苏州供电公司 filed Critical 江苏省电力公司苏州供电公司
Priority to CN201110227783.3A priority Critical patent/CN102280864B/en
Publication of CN102280864A publication Critical patent/CN102280864A/en
Application granted granted Critical
Publication of CN102280864B publication Critical patent/CN102280864B/en

Links

Abstract

The invention relates to a portable protection device for post-failure live treatment of a protection device of a distribution network system and a live treatment method thereof, and the portable protection device comprises a current clamp clamped on the connection line between the secondary side of a current transformer and a terminal block, a sampling module for collecting current on the current lamp, a control module connected with the output end of the sampling module and a tripping relay connected with the output end of the control module, wherein the tripping relay is used for connecting with a switch tripping control loop, when failure occurs in the protection device, the tripping relay is put into the connection with the switch tripping control loop under drive of the control module so as to enable the portable protection device to replace the protection device for being put into operation temporarily. As live working treatment is adopted during one equipment interval corresponding to the failure protection device, the workflow is simplified, the working efficiency is improved and the safe operation level of a power grid is not affected.

Description

Charged processing method and portable protective device after the distribution network systems protective device fault
?
Technical field
The present invention relates to the charged processing method after the protective device fault in a kind of distribution network systems; relate in particular to and utilize portable protective device to replace failure protecting device; the interim basic defencive function of realizing an operational outfit of failure protecting device institute correspondence, thus need not to take power down that failure protecting device is carried out charged processing to concrete primary equipment.
?
Background technology
Distribution system; especially for 35KV and following electric pressure system; it is usually by transformer station; the 10kV/20kV/35kV output bus, a plurality of primary equipments of carry on bus that are connected with transformer station are formed at interval; in order to monitor and protect primary equipment ruuning situation at interval; the at interval corresponding protective device of each primary equipment; protective device is in operation and self tends to occur following fault, as power panel fault, CPU board fault, open into leaving the plate fault, exchanging plate fault, sampling plate fault and liquid crystal board fault etc.
At present; after 35kV and the following electric pressure line protective devices fault; the concrete primary equipment that operating management department all needs earlier protective device to be protected is taked power down at interval; then failed equipment is taked to disappear and lack or the replacing processing; the main cause of its power failure is moved for primary equipment unprotect after avoiding the protective device fault; the potential power supply hidden danger that continues operation when a certain equipment interval unprotect is for when this interval outlet fault the time; the higher level protects overstep tripping, causes power supply area power failure in short-term or when long on a large scale.
According to DL/T 584-2007,3-110kV electric grid relay protection device moves the requirement of adjust regulation and State Grid Corporation of China's " power system relay protection device operational management regulation ", and any primary equipment all must not move under unshielded state.Mainly contain following shortcoming by the conventional treatment method that this requirement limited:
(1), need be to the operation that has a power failure at interval of the pairing primary equipment of failure protecting device, time and effort consuming, inefficiency;
(2), need have a power failure at interval to the pairing primary equipment of failure protecting device, if its power supply area in single power supply, then the power supply area power consumer must face the power failure risk, power supply enterprise faces liability for breach of contract equally;
(3), need have a power failure at interval to the pairing primary equipment of failure protecting device, if its be network system transformer station interconnection at interval, power system operating mode weakness then, the raising of electric power netting safe running risk.
?
Summary of the invention
The object of the invention provides and a kind ofly can replace failure protecting device; the interim basic defencive function of realizing an operational outfit of failure protecting device institute correspondence, thus need not the portable protective device of taking power down that failure protecting device is handled to concrete primary equipment.
In order to achieve the above object; the technical solution adopted in the present invention is: the portable protective device of charged processing after a kind of distribution network systems protective device fault; described distribution network systems comprises transformer station; export a plurality of primary equipments interval that bus is connected with transformer station; be used to monitor the corresponding primary equipment protective device of running status at interval; each described primary equipment comprises switch at interval; current transformer; the switch trip control loop; described current transformer primary side is associated with corresponding described switch outlet; its secondary side is connected with protective device by terminal board; described protective device output be connected with described switch trip control loop with output drive signal control described switch deciliter; described portable protective device comprises the electric current folder that is used to clamp on line between described Current Transformer Secondary side and the terminal board; be used to gather the sampling module that the electric current folder is gone up size of current; the control module that is connected with the sampling module output; the tripping relay that is connected with the control module output; described tripping relay is used for being connected with described switch trip control loop; when described protective device breaks down; described tripping relay drops under the driving of control module and being connected of switch trip control loop, so that portable protective device replaces described protective device to put into operation temporarily.
Optimally, it also comprises and is connected the tripping operation monitoring module that is used between described control module output and the switch trip control loop to monitor that described switch trip control loop is whether intact.Further, described tripping operation monitoring module by close a relay, with close the relay normally closed contact buzzer that is connected that is in series and form.
The present invention also provides a kind of charged processing method of above-mentioned portable protective device after distribution network systems protective device fault that adopt, and it comprises the steps:
(a), portable protective device is fed alternating current, carry out current ration and adjust, the current value of adjusting is consistent with the protective device current ration of circuit to be accessed;
(b), on the line between described Current Transformer Secondary side and the terminal board, pincers are gone into the electric current folder of described portable protective device, and current signal is introduced its sampling module;
(c), measure current signal with pincerlike phase meter and whether enter sampling module, if the tripping relay idle contact of portable protective device is inserted described switch trip control loop;
(d), confirm that tripping operation pressing plate two ends on the portable protective device do not have the heteropolarity current potential after, drop into this pressing plate, simultaneously the tripping operation pressing plate and the reclosing pressing plate of the protective device of disabling faulty;
(e), with primary equipment at interval in Current Transformer Secondary side protective current loop with measure current circuit short circuit on terminal board, and disconnect the brace in protective current loop;
(f), distribution network systems continues normal operation under portable protective device drops into, and overhaul, disappear scarce to failure protecting device.
After step (f); new protective device is inserted between terminal board and the brace; by importing test current to carry out fixed value adjusting to it; the corresponding short circuit sheet of the back dismounting Current Transformer Secondary side of adjusting; recover new protective device and the brace between the switch trip control loop, to introduce current signal to new protective device.
Measuring being connected between the tripping relay that disconnects portable protective device after tripping operation pressing plate, reclosing pressing plate two ends do not have the heteropolarity current potential and the switch trip control loop, so that portable protective device is out of service.
Owing to adopt technique scheme; the present invention has the following advantages: portable protective device of the present invention is after protective device breaks down; because the pairing primary equipment of failure protecting device has been taked the processing that do not have a power failure at interval; workflow is simplified; operating efficiency is improved, and the electric power netting safe running level is unaffected.
?
Description of drawings
Accompanying drawing 1 has the distribution network systems schematic diagram of portable protective device for the present invention;
Accompanying drawing 2 is the terminal board wiring schematic diagram between current transformer and the protective device;
Accompanying drawing 3 is tripping operation monitor module circuit theory diagrams;
Wherein: 11, transformer; 12, main transformer switch; 13, bus; 21, switch; 22, current transformer; 23, terminal board; 3, protective device; 4, switch trip control loop; 5, portable protective device; 51, current clamp; 52, sampling module; 53, control module; 54, tripping relay; 55, tripping operation monitor module; 551, close a relay; 552, buzzer;
Embodiment
Below in conjunction with accompanying drawing, the preferred specific embodiment of the present invention is described:
Distribution network systems as shown in Figure 1; it is mainly by substation level; primary equipment wall and protective device are formed; wherein; substation level is mainly by transformer 11; the main transformer switch 12 that is connected with transformer 11 outputs; bus 13 is formed; the primary equipment wall comprises a plurality of; its carry is on bus 13; output is used for being connected to realize power supply with user load; each primary equipment comprises switch 21 at interval; the current transformer 22 that primary side is connected with switch 21 outlets; the secondary side of current transformer 22 is connected with protective device 3 by terminal board 23; between protective device 3 and switch 21, also be provided with switch trip control loop 4; in normal operation; the current signal of protective device 3 sample rate current instrument transformers 22; and compare with the setting current value; if electric current output is greater than setting value, then the work of driving switch tripping operation control loop is with the tripping operation of control switch 21.
After protective device 3 self breaks down; because primary equipment must have protection equipment to carry out Stateful Inspection and protection at interval; otherwise when this line fault, will cause the expansion of accident by the main transformer protection tripping operation; therefore; the invention provides a kind of portable protective device; it can replace protective device temporarily after failed equipment breaks down, make to form path between current transformer 22, portable protective device 5, switch trip control loop 4, to realize the control to switch 21.
Described portable protective device 5 mainly is made up of current clamp 51, sampling module 52, control module 53, tripping relay 54, and described current clamp 51 is used at the corresponding protection device line of forceps major between current transformer 22 and terminal board 23 that break down.Described sampling module 52 is used to adopt the current value on the current clamp 51.Described control module 53 is used for the current value that receives is handled, and compares with the setting current value of setting.Described tripping relay 54 is used for being connected with switch trip control loop 4, between portable protective device 5 and switch trip control loop 4, forming the break-make road, thereby to switch 21 control of tripping.
In the present embodiment, portable protective device 5 also comprises tripping operation monitor module 55, described tripping operation monitor module 55 mainly by close a relay 551, with close the buzzer 552 that a relay 551 is in series and form, see shown in Figure 3.
Described sampling module 52, control module 53, tripping relay 54 and tripping operation monitor module 55 are packaged into an instrument, it possesses input/output ports such as of ac input, program, definite value, switching value input, switching value output, DC power supply, abnormal alarm, simple in structure, be convenient for carrying use.
Principle composition to portable protective device is illustrated above, will be introduced its charged processing method below:
If certain primary equipment pairing protective device at interval breaks down, under the situation that does not need to have a power failure, carry out charged processing according to following steps:
(1), mancarried device is fed ac charging power supply, carry out fixed value adjusting;
(2), on the line between current transformer and the terminal board, with three pincerlike electric currents folders respectively pincers go into A, B, C three-phase protective electricity consumption streamline, the sampling circuit of mancarried device is introduced current signal;
(3), survey electric current with pincerlike phase meter and confirm that protective current correctly enters mancarried device, the self-check of device program starts simultaneously;
(4), mancarried device tripping relay idle contact is inserted the switch trip control loop;
(5), primary equipment switch accumulation power supply is at interval stopped using;
(6), confirm that tripping operation pressing plate two ends on the mancarried device do not have the heteropolarity current potential after, drop into pressing plate, mancarried device enters operating state;
(7), the tripping operation pressing plate of disabling faulty protective device and reclosing pressing plate;
(8), Current Transformer Secondary side protective current loop and measure current circuit short circuit and disconnect the brace in protective current loop on terminal board in will be at interval so that the current circuit of failure protecting device (referring to Fig. 2) out of service;
(9), failure protecting device is in dead status, can overhaul or change failure protecting device;
(10), after failure protecting device disappears and lack, carry out fixed value adjusting, transmission again.Its correctness can be judged by tripping operation pressing plate and the monitoring of reclosing platen potential;
(11), recovery and protection current circuit and measure the brace of current circuit on terminal board, connect the corresponding short circuit sheet of running current instrument transformer secondary side, failure protecting device is introduced the equipment operation current signal after disappearing and lacking again;
(12), pressing plate is not recovered after having the heteropolarity current potential, recovery switch accumulation power supply, normally operation after failure protecting device disappears and lacks in measurement tripping operation, reclosing pressing plate two ends;
(13), portable protective device is out of service;
So far, the charged work of treatment after the protective device fault finishes.
Adopt above-mentioned processing method, the present invention has following advantage:
(1), because the pairing primary equipment of failure protecting device has been taked processings that do not have a power failure at interval, the workflow simplification has improved operating efficiency;
(2), because the pairing primary equipment of failure protecting device has been taked the processing that do not have a power failure at interval, its primary equipment power supply area user need not to face the power failure risk, power supply enterprise also need not to face liability for breach of contract;
(3), because the pairing primary equipment of failure protecting device has been taked processings that do not have a power failure at interval, 35kV of taking into account system transformer station and following electric pressure circuit need have each other the interconnector of confession fully, then the electric power netting safe running level is unaffected;
(4), for protective device edition upgrading, power panel fault, CPU board fault, open into leaving the plate fault, exchanging most common failures such as plate fault, sampling plate fault, liquid crystal board fault; and protective device changes definite value; processing all can not have a power failure; significantly reduced owing to the influence of protective relaying device fault to the user, its economic benefit and social benefit are obvious.

Claims (6)

1. the portable protective device of charged processing after the distribution network systems protective device fault; described distribution network systems comprises transformer station; export a plurality of primary equipments interval that bus is connected with transformer station; be used to monitor the corresponding primary equipment protective device of running status at interval; each described primary equipment comprises switch at interval; current transformer; the switch trip control loop; described current transformer primary side is associated with corresponding described switch outlet; its secondary side is connected with protective device by terminal board; described protective device output be connected with described switch trip control loop with output drive signal control described switch deciliter; it is characterized in that: described portable protective device comprises the electric current folder that is used to clamp on line between described Current Transformer Secondary side and the terminal board; be used to gather the sampling module that the electric current folder is gone up size of current; the control module that is connected with the sampling module output; the tripping relay that is connected with the control module output; described tripping relay is used for being connected with described switch trip control loop; when described protective device breaks down; described tripping relay drops under the driving of control module and being connected of switch trip control loop, so that portable protective device replaces described protective device to put into operation temporarily.
2. the portable protective device of charged processing after the distribution network systems protective device fault according to claim 1 is characterized in that: it also comprises and is connected the tripping operation monitoring module that is used between described control module output and the switch trip control loop to monitor that described switch trip control loop is whether intact.
3. the portable protective device of charged processing after the distribution network systems protective device fault according to claim 2 is characterized in that: described tripping operation monitoring module by close a relay, with close the buzzer that a relay normally closed contact is in series and is connected.
4. one kind is adopted the charged processing method of the described any portable protective device of claim 1~3 after distribution network systems protective device fault, and it is characterized in that: it comprises the steps:
(a), portable protective device is fed alternating current, carry out current ration and adjust, the current value of adjusting is consistent with the protective device current ration of circuit to be accessed;
(b), on the line between described Current Transformer Secondary side and the terminal board, pincers are gone into the electric current folder of described portable protective device, and current signal is introduced its sampling module;
(c), measure current signal with pincerlike phase meter and whether enter sampling module, if the tripping relay idle contact of portable protective device is inserted described switch trip control loop;
(d), confirm that tripping operation pressing plate two ends on the portable protective device do not have the heteropolarity current potential after, drop into this pressing plate, simultaneously the tripping operation pressing plate and the reclosing pressing plate of the protective device of disabling faulty;
(e), with primary equipment at interval in Current Transformer Secondary side protective current loop with measure current circuit short circuit on terminal board, and disconnect the brace in protective current loop;
(f), distribution network systems continues normal operation under portable protective device drops into, and overhaul, disappear scarce to failure protecting device.
5. the charged processing method after the distribution network systems protective device fault according to claim 4; it is characterized in that: after step (f); new protective device is inserted between terminal board and the brace; by importing test current to carry out fixed value adjusting to it; the corresponding short circuit sheet of the back dismounting Current Transformer Secondary side of adjusting; recover new protective device and the brace between the switch trip control loop, to introduce current signal to new protective device.
6. the charged processing method after the distribution network systems protective device fault according to claim 5; it is characterized in that: measuring being connected between the tripping relay that disconnects portable protective device after tripping operation pressing plate, reclosing pressing plate two ends do not have the heteropolarity current potential and the switch trip control loop, so that portable protective device is out of service.
CN201110227783.3A 2011-08-10 2011-08-10 Post-failure live treatment method for protection device of distribution network system and portable protection device CN102280864B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110227783.3A CN102280864B (en) 2011-08-10 2011-08-10 Post-failure live treatment method for protection device of distribution network system and portable protection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110227783.3A CN102280864B (en) 2011-08-10 2011-08-10 Post-failure live treatment method for protection device of distribution network system and portable protection device

Publications (2)

Publication Number Publication Date
CN102280864A true CN102280864A (en) 2011-12-14
CN102280864B CN102280864B (en) 2014-04-23

Family

ID=45106113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110227783.3A CN102280864B (en) 2011-08-10 2011-08-10 Post-failure live treatment method for protection device of distribution network system and portable protection device

Country Status (1)

Country Link
CN (1) CN102280864B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103454517A (en) * 2013-06-26 2013-12-18 广东电网公司佛山供电局 Method for online monitoring capacitive voltage transformers
CN103532096A (en) * 2013-10-18 2014-01-22 国家电网公司 Method for eliminating defect in 10kV feeder protection device without cutting off power
CN103887776A (en) * 2014-03-28 2014-06-25 国家电网公司 Protective device defect eliminating coordination instrument without circuit power outage
CN104617667A (en) * 2014-01-21 2015-05-13 国家电网公司 Hot standby protection method for single-set 110kV line protection for 220kV intelligent substation
CN108362962A (en) * 2018-02-05 2018-08-03 国网辽宁省电力有限公司 Preprocess method in a kind of data set of more measure and control devices fusion
CN108429231A (en) * 2018-03-27 2018-08-21 国网山东省电力公司郓城县供电公司 A kind of relay loop short circuit protection system
CN109491295A (en) * 2018-12-05 2019-03-19 岭澳核电有限公司 Control system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2832059A1 (en) * 1977-07-25 1979-02-15 Richard Gall Power supply overload protection - has current sensor and actuator disconnecting subsidiary loads if their current demands endanger supply
CN201504084U (en) * 2009-01-06 2010-06-09 牡丹江电业局 Portable digital protection and monitoring device
CN202206125U (en) * 2011-08-10 2012-04-25 江苏省电力公司苏州供电公司 Portable protection device for electrification process after distribution system protection device failure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2832059A1 (en) * 1977-07-25 1979-02-15 Richard Gall Power supply overload protection - has current sensor and actuator disconnecting subsidiary loads if their current demands endanger supply
CN201504084U (en) * 2009-01-06 2010-06-09 牡丹江电业局 Portable digital protection and monitoring device
CN202206125U (en) * 2011-08-10 2012-04-25 江苏省电力公司苏州供电公司 Portable protection device for electrification process after distribution system protection device failure

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103454517A (en) * 2013-06-26 2013-12-18 广东电网公司佛山供电局 Method for online monitoring capacitive voltage transformers
CN103454517B (en) * 2013-06-26 2016-05-11 广东电网公司佛山供电局 Capacitance type potential transformer on-line monitoring method
CN103532096A (en) * 2013-10-18 2014-01-22 国家电网公司 Method for eliminating defect in 10kV feeder protection device without cutting off power
CN103532096B (en) * 2013-10-18 2017-07-18 国家电网公司 10kV feeder protection equipments, which do not have a power failure, eliminates defect method
CN104617667A (en) * 2014-01-21 2015-05-13 国家电网公司 Hot standby protection method for single-set 110kV line protection for 220kV intelligent substation
CN103887776A (en) * 2014-03-28 2014-06-25 国家电网公司 Protective device defect eliminating coordination instrument without circuit power outage
CN108362962A (en) * 2018-02-05 2018-08-03 国网辽宁省电力有限公司 Preprocess method in a kind of data set of more measure and control devices fusion
CN108429231A (en) * 2018-03-27 2018-08-21 国网山东省电力公司郓城县供电公司 A kind of relay loop short circuit protection system
CN109491295A (en) * 2018-12-05 2019-03-19 岭澳核电有限公司 Control system
CN109491295B (en) * 2018-12-05 2020-06-16 岭澳核电有限公司 Control system

Also Published As

Publication number Publication date
CN102280864B (en) 2014-04-23

Similar Documents

Publication Publication Date Title
Mirsaeidi et al. An analytical literature review of the available techniques for the protection of micro-grids
Mulhausen et al. Anti-islanding today, successful islanding in the future
EP2565656A2 (en) Systems, methods, and apparatus for locating faults on an electrical distribution network
CN101563824B (en) System and method to determine the impedance of a disconnected electrical facility
RU2469342C1 (en) Method and apparatus for controlling secondary circuit measuring transformer in electric power system
CN101297448B (en) A converter station
CN102306953B (en) Test method for secondary injection of power distribution automatization system
CN104793148B (en) Distributed generator islanding detection method based on grid entry point characteristic harmonics voltage measurement
CN101483337B (en) Failure automatic diagnosis and separation apparatus and method for power distribution network overhead line
CN100570384C (en) Method for testing electric secondary AC loop
CN102279325B (en) Ultra high voltage direct current (UHVDC) transmission engineering station system debugging method
CN102668305B (en) Battery energy storage system with short circuit protection, and method
CN103576046A (en) Storage battery system having storage battery protector and diagnostic device, and diagnostic method thereof
CN102882227B (en) High-power photovoltaic grid-connected inverter
CN104953705B (en) Inner bridge spare power automatic switching control method based on incomplete primary main wiring
CN103155330A (en) Method and system for establishing a power feed to systems during operation
CN102055368A (en) 100-KVA micro-grid energy storage bidirectional converter
CN101981776A (en) System and method for ground fault detection and interruption
CN102255330A (en) Device and method for detecting island of micro power grid system
EP2912752B1 (en) Ups systems and methods using mode-dependent grounding
CN101777755A (en) High-voltage capacitor imbalance protecting method for high-voltage DC transmission system
CN101576601B (en) Hidden failure diagnostic method of digital transformer protector measuring loop
CN102520314A (en) Detection system and detection method for single-phase grounding fault line selection in small current grounding system
CN103217595B (en) A kind of detection method of one-phase island of three-phase grid-connected inverter, equipment and system
US10483754B2 (en) Fault detection and location in nested microgrids

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20121129

Address after: 215004 No. three Xiang Xiang Road, Suzhou, Jiangsu, 458

Applicant after: Suzhou Power Supply Co., Ltd. of Jiangsu Electric Power Company

Applicant after: Jiangsu Electric Power Company

Applicant after: State Grid Corporation of China

Address before: 215004 No. three Xiang Xiang Road, Suzhou, Jiangsu, 458

Applicant before: Suzhou Power Supply Co., Ltd. of Jiangsu Electric Power Company

C41 Transfer of patent application or patent right or utility model
ASS Succession or assignment of patent right

Owner name: JIANGSU ELECTRIC POWER COMPANY STATE GRID CORPORAT

Effective date: 20121129

GR01 Patent grant
C14 Grant of patent or utility model