Freezing pipe processing method at a kind of chamber Download PDFInfo
- Publication number
- CN104612694B CN104612694B CN201510004265.3A CN201510004265A CN104612694B CN 104612694 B CN104612694 B CN 104612694B CN 201510004265 A CN201510004265 A CN 201510004265A CN 104612694 B CN104612694 B CN 104612694B
- Authority
- CN
- China
- Prior art keywords
- pipe
- freezing pipe
- freezing
- quick coupling
- newborn
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000008014 freezing Effects 0.000 title claims abstract description 70
- 238000007710 freezing Methods 0.000 title claims abstract description 70
- 238000003672 processing method Methods 0.000 title claims abstract description 12
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 37
- 239000010959 steel Substances 0.000 claims abstract description 37
- 230000008878 coupling Effects 0.000 claims abstract description 30
- 238000010168 coupling process Methods 0.000 claims abstract description 30
- 238000005859 coupling reaction Methods 0.000 claims abstract description 30
- 210000004907 gland Anatomy 0.000 claims abstract description 19
- 238000004080 punching Methods 0.000 claims abstract description 19
- 206010055018 Gingival cyst Diseases 0.000 claims abstract description 18
- 239000004698 Polyethylene Substances 0.000 claims abstract description 11
- -1 polyethylene Polymers 0.000 claims abstract description 11
- 229920000573 polyethylene Polymers 0.000 claims abstract description 11
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 10
- 238000000034 method Methods 0.000 claims abstract description 9
- RSMUVYRMZCOLBH-UHFFFAOYSA-N metsulfuron methyl Chemical compound COC(=O)C1=CC=CC=C1S(=O)(=O)NC(=O)NC1=NC(C)=NC(OC)=N1 RSMUVYRMZCOLBH-UHFFFAOYSA-N 0.000 claims abstract description 4
- 239000011435 rock Substances 0.000 claims abstract description 4
- 238000003466 welding Methods 0.000 claims abstract description 3
- 238000010257 thawing Methods 0.000 claims description 6
- 238000007569 slipcasting Methods 0.000 claims description 4
- 229920003023 plastic Polymers 0.000 claims description 3
- 239000004033 plastic Substances 0.000 claims description 3
- 239000011800 void material Substances 0.000 claims description 3
- 230000000740 bleeding effect Effects 0.000 claims description 2
- 238000010276 construction Methods 0.000 description 16
- 238000005516 engineering process Methods 0.000 description 3
- 239000000243 solution Substances 0.000 description 2
- 206010011732 Cyst Diseases 0.000 description 1
- FAPWRFPIFSIZLT-UHFFFAOYSA-M Sodium chloride Chemical compound [Na+].[Cl-] FAPWRFPIFSIZLT-UHFFFAOYSA-M 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000012267 brine Substances 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 208000031513 cyst Diseases 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000011780 sodium chloride Substances 0.000 description 1
- HPALAKNZSZLMCH-UHFFFAOYSA-M sodium;chloride;hydrate Chemical compound O.[Na+].[Cl-] HPALAKNZSZLMCH-UHFFFAOYSA-M 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D1/00—Sinking shafts
- E21D1/10—Preparation of the ground
- E21D1/12—Preparation of the ground by freezing
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Civil Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The invention discloses freezing pipe processing method at a kind of chamber, after being drained by the water in freezing pipe, around the freezing pipe at excavated section 500mm, brush off rock with pneumatic pick, then cut off freezing pipe in excavated section position, in freezing pipe, put into polyethylene tube.The punching pipe of one band gingival cyst of mucous gland in the newborn of processing, by the punching pipe of band gingival cyst of mucous gland in the newborn and the following Plate Welding welding quick coupling I, and quick coupling I connection welded below with steel plate by the punching pipe of band gingival cyst of mucous gland in the newborn, welds a quick coupling II again in the side of freezing pipe.The punching pipe of band gingival cyst of mucous gland in the newborn is connected with the polyethylene tube putting into freezing pipe, then by moving on steel plate, with freezing pipe welded closure.Weld a steel pipe on steel plate outside freezing pipe, in the 200mm of steel pipe top, make floral tube, below steel plate, then weld the snap joint connected with steel pipe III, finally steel pipe is reached in the space of boring.This method has saved the sinking shaft duration, reduces security risk.
Description
Technical field
The present invention relates to the method that freezing pipe processes, be specifically related to freezing pipe processing method at a kind of chamber.
Background technology
Freezing shaft construction in the past does not the most use to be freezed entirely deeply, freezing pipe does not pass through the chamber relevant to pit shaft, therefore, in the past freezing pipe process general wait freeze to terminate after 3~in 5 months, carry out tube drawing and freezing pipe closure, closure typically uses injects the western dreg concrete of cement bonded sand pulp grinder in pipe on ground;As freezing pipe fails to extract, use carry out perforation slip casting closure in the face of freezing pipe.Along with the increasing of the shaft construction degree of depth, pit shaft discloses water-bearing layer to be increased, and the Northwest's Jurassic stratum is because containing pore water, grouting water blockoff difficulty, the most generally preferably freezing Jurassic stratum, therefore pit shaft deep freezeout entirely in the Northwest's is more.
Summary of the invention
The deficiency existed according to prior art, it is provided that one has saved the sinking shaft duration, reduces freezing pipe processing method at the chamber of security risk.
Technical solution of the present invention realizes by the following method:
Freezing pipe processing method at a kind of chamber, the method comprises the following steps:
A. after being drained by the water in freezing pipe, around the freezing pipe at 400mm~600mm at excavated section, brush off rock with pneumatic pick, then cut off freezing pipe in excavated section position, in freezing pipe, put into polyethylene tube.
B. the punching pipe of a band gingival cyst of mucous gland in the newborn is processed, by the punching pipe of band gingival cyst of mucous gland in the newborn and the following Plate Welding welding quick coupling I, and quick coupling I connection welded below with steel plate by the punching pipe of band gingival cyst of mucous gland in the newborn, welds a quick coupling II again in the side of freezing pipe.
C. the punching pipe of band gingival cyst of mucous gland in the newborn is connected with the polyethylene tube putting into freezing pipe, then by moving on steel plate, with freezing pipe welded closure.
D. weld a steel pipe on the steel plate outside freezing pipe, in mm~250mm of steel pipe top 150, make floral tube, below steel plate, then weld a quick coupling connected with steel pipe III, finally steel pipe is reached in the space of boring.
E. will be with joint, the mouth of pipe carries out after being connected with quick coupling equipped with the high-pressure hose of high-pressure ball valve pouring into a mould concrete.
F., after concrete cast, thaw from quick coupling I, quick coupling II below, by bleeding off with the water of pipe outer void in freezing pipe after defrosting, estimate grouting amount according to defrosting drillhole height, to Grouting Pipe and pipe outside borehole standoff slip casting reinforce.
A diameter of 75mm of described polyethylene tube, a length of 30mm.
The punching length of tube of described band gingival cyst of mucous gland in the newborn is 300mm.
Described steel plate thickness is 10mm.
Described quick coupling I is 3 cun of snap joints, and described quick coupling II is 3 cun of snap joints, and described quick coupling III is 2 cun of snap joints.
The a length of 200mm of described floral tube, wraps up filling with plastic bag under floral tube, prevents from being blocked by floral tube during cast.
The invention has the beneficial effects as follows:
By using this kind of construction method, successfully implement Chamber Construction during freezing and pass through freezing pipe, use down-hole treatment freezing pipe technology, saved the sinking shaft duration, reduced security risk.
Accompanying drawing explanation
Fig. 1 is skip bucket chamber freezing pipe distribution plane figure;
Fig. 2 is that freezing pipe processes schematic diagram;
1 skip loading pocket, 2 freezing pipes, 3 borings, 4 polyethylene tubes, the punching pipe of 5 band gingivals cyst of mucous gland in the newborn, 6 quick couplings II, 7 quick couplings I, 8 quick couplings III, 9 steel plates, 10 steel pipes, 11 floral tubes, 12 excavated sections.
Detailed description of the invention
Below in conjunction with accompanying drawing, by specific embodiment, technical solution of the present invention is described further.
As shown in Figure 1 and Figure 2, when using sequence construction method, i.e. shaft construction to chamber opening part when this pit shaft freezing degree of depth exceedes during skip loading pocket 1, shaft construction, proceed to Chamber Construction, after Chamber Construction, proceed to shaft construction again.Owing to lower wellbore freezes not yet to terminate during construction skip loading pocket 1, therefore tube drawing filling sealing of hole cannot be carried out as conventional after freezing to terminate.The arrangement and method for construction used is: the freezing pipe 2 in the range of Chamber Construction closes the brine recycling freezed, and after down-hole Chamber Construction exposure freezing pipe, the saline in blow-down pipe, cuts off freezing pipe, block freezing pipe 2 in down-hole.
Specifically comprise the following steps that
A. after being drained by the water in freezing pipe 2, around the freezing pipe 2 at the 500mm away from excavated section 12, brush off rock with pneumatic pick, then cut off freezing pipe 2 in excavated section 12 position, in freezing pipe 2, put into the polyethylene tube 4 of a diameter of 75mm, a length of 30mm.
B. the punching pipe 5 of the band gingival cyst of mucous gland in the newborn of one a length of 300mm of processing, the punching pipe 5 of band gingival cyst of mucous gland in the newborn is welded 3 cun of quick couplings I 7 with following, thickness is that the steel plate 9 of 10mm welds, and 3 cun of quick coupling I 7 connections welded below with steel plate 9 by the punching pipe 5 of band gingival cyst of mucous gland in the newborn, weld 3 cun of quick couplings II 6 again in the side of freezing pipe 2.
C. the punching pipe 5 of band gingival cyst of mucous gland in the newborn is connected with the polyethylene tube 4 putting into freezing pipe 2, then by moving on steel plate 9, with freezing pipe 2 welded closure.
D. weld a steel pipe 10 on the steel plate 9 outside freezing pipe 2, by making the floral tube 11 of a length of 200mm in steel pipe 10 top 200mm, under floral tube, wrap up filling with plastic bag, prevent from being blocked by floral tube during cast,
Then below steel plate 9, weld the 2 cun of snap joints III 8 connected with steel pipe 10, finally steel pipe 10 is reached in the space of boring 3.
E. will be with joint, the mouth of pipe carries out after being connected with quick coupling equipped with the high-pressure hose of high-pressure ball valve pouring into a mould concrete.
F. after concrete cast, thaw below I 7,3 cun of quick couplings II 6 of 3 cun of quick couplings, to bleed off with the water of pipe outer void in freezing pipe after defrosting, according to thawing, grouting amount is highly estimated in boring 3, to Grouting Pipe and pipe outside boring 3 gap slip casting reinforce.
By using this kind of construction method, successfully implement Chamber Construction during freezing and pass through freezing pipe, use down-hole treatment freezing pipe technology, saved the sinking shaft duration, reduced security risk.
Claims (6)
1. freezing pipe processing method at a chamber, it is characterised in that: the method comprises the following steps:
A. after being drained by the water in freezing pipe, around the freezing pipe at 400mm~600mm of excavated section, brush off rock with pneumatic pick, then cut off freezing pipe in excavated section position, in freezing pipe, put into polyethylene tube;
B. the punching pipe of a band gingival cyst of mucous gland in the newborn is processed, by the punching pipe of band gingival cyst of mucous gland in the newborn and the following Plate Welding welding quick coupling I, and quick coupling I connection welded below with steel plate by the punching pipe of band gingival cyst of mucous gland in the newborn, welds a quick coupling II again in the side of freezing pipe;
C. the punching pipe of band gingival cyst of mucous gland in the newborn is connected with the polyethylene tube putting into freezing pipe, then by moving on steel plate, with freezing pipe welded closure;
D. weld a steel pipe on the steel plate outside freezing pipe, in mm~250mm of steel pipe top 150, make floral tube, below steel plate, then weld the snap joint connected with steel pipe III, finally steel pipe is reached in the space of boring;
E. will be with joint, the mouth of pipe carries out after being connected with quick coupling equipped with the high-pressure hose of high-pressure ball valve pouring into a mould concrete;
F., after concrete cast, thaw from quick coupling I, quick coupling II below, by bleeding off with the water of pipe outer void in freezing pipe after defrosting, estimate grouting amount according to defrosting drillhole height, to Grouting Pipe and pipe outside borehole standoff slip casting reinforce.
Freezing pipe processing method at a kind of chamber, it is characterised in that: a diameter of 75mm of described polyethylene tube, a length of 30mm.
Freezing pipe processing method at a kind of chamber, it is characterised in that: the punching length of tube of described band gingival cyst of mucous gland in the newborn is 300mm.
Freezing pipe processing method at a kind of chamber, it is characterised in that: described steel plate thickness is 10mm.
Freezing pipe processing method at a kind of chamber, it is characterised in that: described quick coupling I is 3 cun of snap joints, and described quick coupling II is 3 cun of snap joints, and described snap joint III is 2 cun of snap joints.
Freezing pipe processing method at a kind of chamber, it is characterised in that: a length of 200mm of described floral tube, wraps up filling with plastic bag under floral tube, prevents from being blocked by floral tube during cast.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510004265.3A CN104612694B (en) | 2015-01-06 | 2015-01-06 | Freezing pipe processing method at a kind of chamber |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510004265.3A CN104612694B (en) | 2015-01-06 | 2015-01-06 | Freezing pipe processing method at a kind of chamber |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104612694A CN104612694A (en) | 2015-05-13 |
CN104612694B true CN104612694B (en) | 2017-01-04 |
Family
ID=53147319
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510004265.3A Expired - Fee Related CN104612694B (en) | 2015-01-06 | 2015-01-06 | Freezing pipe processing method at a kind of chamber |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104612694B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109577987B (en) * | 2018-11-30 | 2024-05-10 | 陕西中能煤田有限公司 | Construction method for penetrating freezing pipe of casing through inclined shaft wall |
CN111119952A (en) * | 2020-01-06 | 2020-05-08 | 中煤第一建设有限公司 | Reinforcing and waterproof method for inclined shaft wall jointing composite steel cylinder |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202187765U (en) * | 2011-08-17 | 2012-04-11 | 中煤矿山建设集团有限责任公司 | Head structure of local freezer for double plastic tube |
CN102418535A (en) * | 2011-10-09 | 2012-04-18 | 陕西彬长胡家河矿业有限公司 | Plugging and grouting method for exposing freezing pipes in underground engineering |
CN103277103A (en) * | 2013-05-20 | 2013-09-04 | 陕西彬长矿业集团有限公司 | None-full-depth freezing method for penetrating through ultra-thick water-rich bed rock in shaft deepening |
CN103912241A (en) * | 2014-04-10 | 2014-07-09 | 西安博深煤矿安全科技有限公司 | Refrigeration cooling system under mine |
-
2015
- 2015-01-06 CN CN201510004265.3A patent/CN104612694B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202187765U (en) * | 2011-08-17 | 2012-04-11 | 中煤矿山建设集团有限责任公司 | Head structure of local freezer for double plastic tube |
CN102418535A (en) * | 2011-10-09 | 2012-04-18 | 陕西彬长胡家河矿业有限公司 | Plugging and grouting method for exposing freezing pipes in underground engineering |
CN103277103A (en) * | 2013-05-20 | 2013-09-04 | 陕西彬长矿业集团有限公司 | None-full-depth freezing method for penetrating through ultra-thick water-rich bed rock in shaft deepening |
CN103912241A (en) * | 2014-04-10 | 2014-07-09 | 西安博深煤矿安全科技有限公司 | Refrigeration cooling system under mine |
Also Published As
Publication number | Publication date |
---|---|
CN104612694A (en) | 2015-05-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104675408B (en) | High hydraulic pressure extra long distance large cross-section tunnel liquid nitrogen freezing system and shield shield tail brush quick change method | |
CN107605498B (en) | Construction method for horizontal grouting reinforcement structure of end head of shield tunnel in water-rich sandy pebble stratum | |
CN107217691A (en) | For city underground leak stopping and the method for strengthening construction | |
CN104895098A (en) | Piping blocking structure outside deep foundation pit underground diaphragm wall and grouting treatment method thereof | |
CN104832196B (en) | Pipe curtain freezing process supporting construction and its construction method | |
CN107237650A (en) | A kind of drilling siphon drainage system and method for being used to handle the infiltration of Tunnel wall | |
CN205975649U (en) | Freezing pipe curtain steel pipe supporting construction | |
CN110318410A (en) | A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method | |
CN103883797A (en) | Construction method of steel wire mesh framework plastic composite pipe | |
CN104612694B (en) | Freezing pipe processing method at a kind of chamber | |
CN106677198A (en) | Well plugging method under dynamic water level state | |
CN109519150A (en) | One kind being directed to the biggish plugging dewatering well device and method of water yield | |
CN113404430A (en) | Safe embedding method of freezing pipe | |
CN204728353U (en) | Piping plugging structure outside deep foundation ditch diaphragm wall | |
JP5443200B2 (en) | Construction method of shaft | |
CN207862925U (en) | A kind of slip casting casing device | |
JP2009068213A (en) | Construction method for underground structure using caisson, and caisson with cut-off device | |
CN206800431U (en) | A kind of sealing bottom type caisson wall | |
CN205077502U (en) | A blowout preventer for holing gush sand and emit water | |
CN209444310U (en) | A kind of plugging dewatering well structure | |
CN103527205A (en) | Shield underwater oblique crossing hole entering construction method | |
CN207109745U (en) | Contain high water head plugging structure in a kind of dam foundation water delivery bottom | |
JP2007154635A (en) | Tunnel repairing method no. 2 | |
CN107313437A (en) | The shut-in well construction method of foundation ditch pressure-bearing dewatering well | |
CN205025499U (en) | Subway contact passageway freezes to excavate guard gate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |