CN104612330B - Embedded hat type pre-stressed steel pipe concrete component and its secondary position control on-load pressure method of forming - Google Patents
Embedded hat type pre-stressed steel pipe concrete component and its secondary position control on-load pressure method of forming Download PDFInfo
- Publication number
- CN104612330B CN104612330B CN201510005365.8A CN201510005365A CN104612330B CN 104612330 B CN104612330 B CN 104612330B CN 201510005365 A CN201510005365 A CN 201510005365A CN 104612330 B CN104612330 B CN 104612330B
- Authority
- CN
- China
- Prior art keywords
- concrete
- block
- load
- steel pipe
- tubular member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
Embedded hat type pre-stressed steel pipe concrete component and its secondary position control on-load pressure method of forming, when making concrete filled steel tubular member, appropriate concrete grout is first poured, block is then depressed into design attitude under the control loading of pressure seat in the plane, then block and steel-pipe welding are got up while sealing steam vent.The prestressing force size of concrete filled steel tube is determined by the ratio of volume of concrete and steel pipe volume.In pressure seat in the plane control loading procedure, if block does not have in place also, but the load that forcing press applies has been above prestressing force, illustrates that concrete grout is excessive, it is desirable to reduce grouting.If block is in place, but forcing press load is less than prestressing force, illustrates that concrete grout is few, it is necessary to increase grouting.Second load forming method is the precompression of default concrete filled steel tubular member;Loading Method is controlled with position to be loaded until preliminary dimension to concrete filled steel tubular member;Grouting quantity is adjusted in the loading procedure of second load forming method, when block is pressed onto predeterminated position, the load of forcing press is just preset pressure.
Description
Technical field
The present invention relates to a kind of embedded hat type pre-stressed steel pipe concrete component and its secondary position control on-load pressure method of forming,
Belong to prestressed concrete technology field.
Background technology
It is single at present mostly by pressure grouting concrete filled steel tube preparation method, but due to the mobility of concrete itself
Pure use concrete vibrating mode, one side corner narrow gap is still difficult to fill real, when on the other hand sealing between concrete grout and hush panel
Gap is easier, has caused its actual bearing capacity ratio design load to decrease.
The present invention solves the problem using embedded cap method, and penetration concrete slurry first is slightly more some more than amount of calculation, then with position
Control method control pressure machine is loaded onto the design height of concrete filled steel tubular member, while exhaust of the gas in steel pipe in block
Mouth discharge, in place rear welded still pipe and block seals exhaust outlet simultaneously.Side so can be as far as possible filled under pressure
Angular gap forms pre-stressed steel pipe concrete component, improves the bearing capacity of component.
The content of the invention
Add object of the present invention is to provide a kind of embedded hat type pre-stressed steel pipe concrete component and its control of secondary position
Compression moulding method is carried, the present invention controls lower loading welding block and steel pipe forming with embedded block and pressure seat in the plane, than commonly shaking
Smash method making concrete filled steel tube it is finer and close, be easier to fill corner gap, so as to improve bearing capacity.
To achieve the above object, the technical solution adopted by the present invention is a kind of embedded hat type pre-stressed steel pipe concrete component
And its secondary position control on-load pressure method of forming, hat type pre-stressed steel pipe concrete component is embedded including steel pipe, with steam vent
Embedded block, when making concrete filled steel tubular member, first pours appropriate concrete grout, then block under the control loading of pressure seat in the plane
Design attitude is depressed into, then block and steel-pipe welding are got up while sealing steam vent.The prestressing force size of concrete filled steel tube by
The ratio of volume of concrete and steel pipe volume is determined.In pressure seat in the plane control loading procedure, if block does not have in place also, but pressure
The load that machine applies has been above prestressing force, illustrates that concrete grout is excessive, it is desirable to reduce grouting.If block is in place, but
It is forcing press load less than prestressing force, illustrates that concrete grout is few, it is necessary to increase grouting.
Second load forming method is the precompression of concrete filled steel tubular member default first;Secondly Loading Method is controlled to steel with position
Pipe concrete component is loaded until preliminary dimension;Grouting quantity is adjusted in the loading procedure of last second load forming method, makes lid
When cap is pressed onto predeterminated position, the load of forcing press is just preset pressure.
Compared with prior art, the present invention has the advantages that.
1st, the prestressed concrete filled steel tubular member of accurate satisfaction setting can be manufactured.
2nd, than conventional method making of vibrating concrete filled steel tubular member even compact, gas hole defect are few.
3rd, than the concrete filled steel tubular member high capacity of conventional method making of vibrating.
Brief description of the drawings
Fig. 1 is the steel core concrete column under forcing press after the completion of being in the milk.
Fig. 2 is the steel core concrete column that prosecutor formula in place is issued to design height.
Specific embodiment
The present invention is described in further detail below in conjunction with drawings and Examples.
As shown in Figure 1-2, preset the precompression of steel core concrete column according to demand first, be then more than to being poured into steel pipe
The concrete grout of steel pipe volume, then covers block, now the total height of steel core concrete column L bigger than design height.
The component in making is loaded with displacement-controlled method control pressure machine, as block is moved down, component total height is gradually
Close to design height, the load that forcing press applies also constantly increases.If block does not have in place also, but the load that forcing press applies
Preset pressure is had been above, illustrates that concrete grout is excessive, it is desirable to reduce grouting, repeats bits control loading again removes slurry until block position
Move during for L, forcing press load is preset pressure.Welding block and steel pipe are while sealing exhaust outlet.
If block has been pressed onto position, but forcing press load still less than preset pressure, illustrate that concrete grout is few, it is necessary to increase
Plus grouting.When block displacement is L, forcing press load is preset pressure for re grouting, loading.Welding block and steel pipe are simultaneously
Sealing exhaust outlet.
In position control loading procedure, the gas in steel pipe is discharged by the exhaust outlet in block.
Claims (1)
1. the on-load pressure method of forming is controlled in a kind of secondary position of embedded hat type pre-stressed steel pipe concrete component, it is characterised in that:It is interior
Embedding hat type pre-stressed steel pipe concrete component includes steel pipe, the embedded block with steam vent, when making concrete filled steel tubular member,
Appropriate concrete grout is first poured, block is then depressed into design attitude under the control loading of pressure seat in the plane, then block and steel pipe
Weld sealing steam vent simultaneously;The prestressing force size of concrete filled steel tube is determined by the ratio of volume of concrete and steel pipe volume
It is fixed;In pressure seat in the plane control loading procedure, if block does not have in place also, but the load that forcing press applies has been above prestressing force,
Illustrate that concrete grout is excessive, it is desirable to reduce grouting;If block is in place, but forcing press load is less than prestressing force, explanation
Concrete grout is few, it is necessary to increase grouting;Second load forming method is the precompression of concrete filled steel tubular member default first;Secondly
Loading Method is controlled with position to be loaded until preliminary dimension to concrete filled steel tubular member;In the loading procedure of last second load forming method
Adjustment grouting quantity, when block is pressed onto predeterminated position, the load of forcing press is just preset pressure;In position control loading procedure, steel
Gas in pipe is discharged by the exhaust outlet in block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510005365.8A CN104612330B (en) | 2015-01-06 | 2015-01-06 | Embedded hat type pre-stressed steel pipe concrete component and its secondary position control on-load pressure method of forming |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510005365.8A CN104612330B (en) | 2015-01-06 | 2015-01-06 | Embedded hat type pre-stressed steel pipe concrete component and its secondary position control on-load pressure method of forming |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104612330A CN104612330A (en) | 2015-05-13 |
CN104612330B true CN104612330B (en) | 2017-06-20 |
Family
ID=53146957
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510005365.8A Expired - Fee Related CN104612330B (en) | 2015-01-06 | 2015-01-06 | Embedded hat type pre-stressed steel pipe concrete component and its secondary position control on-load pressure method of forming |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104612330B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110306726B (en) * | 2018-03-27 | 2022-03-18 | 王哲 | Composite structure and manufacturing method thereof |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1030411C (en) * | 1991-05-24 | 1995-11-29 | 钟莉 | Energy storing steel tube concrete making method and the members thereof |
JPH05171737A (en) * | 1991-12-25 | 1993-07-09 | Asahi Chem Ind Co Ltd | Filling type steel tube concrete pillar |
JPH10110531A (en) * | 1996-10-04 | 1998-04-28 | Nkk Corp | Concrete filling method in steel pipe concrete pole |
JP2003184100A (en) * | 2001-12-19 | 2003-07-03 | Yoshinori Matsuki | Preventive pile for preventing landslide, and increasing method of preventing and supporting force of support pile for structure foundation |
CN202324346U (en) * | 2011-11-21 | 2012-07-11 | 陕西建工集团第二建筑工程有限公司 | Concrete pumping and lifting construction device in concrete column pipe of steel pipe |
CN103240802B (en) * | 2013-05-16 | 2015-07-08 | 淮海工学院 | Production method of prestress concrete filled steel tube |
CN203320810U (en) * | 2013-07-09 | 2013-12-04 | 宏润建设集团股份有限公司 | Steel tube concrete structure |
CN203412195U (en) * | 2013-07-18 | 2014-01-29 | 杭州博数土木工程技术有限公司 | Concrete filled steel tube complete combination column |
-
2015
- 2015-01-06 CN CN201510005365.8A patent/CN104612330B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN104612330A (en) | 2015-05-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104074143B (en) | Prestressing force intelligent circulation mud jacking system and its control method | |
CN108301568A (en) | A kind of assembling structure of assembly concrete component | |
CN207260443U (en) | A kind of grout sleeve prefabricated for building structure | |
CN104612330B (en) | Embedded hat type pre-stressed steel pipe concrete component and its secondary position control on-load pressure method of forming | |
CN102817328B (en) | Method for heightening support | |
CN202809633U (en) | Connecting structure of pre-stressed high-strength concrete (PHC) pipe pile and bearing platform | |
CN208396278U (en) | A kind of overhanging U bolt built-in fitting | |
CN209115120U (en) | A kind of lining of hidden digging structure two concrete vault anticreep sky device | |
CN110644471B (en) | Connection structure of staple bolt formula precast tubular pile and prefabricated cushion cap | |
CN201056690Y (en) | Squeezing and expanding cast-in-place pile | |
CN112609986A (en) | Method for controlling pouring forming quality of concrete batter post | |
CN101158163B (en) | Pneumatic caisson bottom closing construction process | |
CN114319329B (en) | Anchor rod static pressure pipe pressing device and cast-in-place pile construction method | |
CN205077480U (en) | Double cannula bored concrete pile structure | |
CN213682685U (en) | Steel form shell concrete combination T type standard festival | |
CN114411700A (en) | Steel pile body for steel pipe grouting pile construction while sinking pipe and grouting | |
CN204645071U (en) | A kind of device utilizing soil bearing capacity between PHC pipe pile | |
CN214363666U (en) | Pile head reinforcing device for single-pile vertical compression-resistant static load experiment | |
CN207526119U (en) | A kind of reinforcement tools of regularization outer wall template | |
CN206396750U (en) | Pile foundation squeezing unit | |
CN104863172A (en) | Device and method for utilizing bearing force of between-pile soil of PHC pipe pile | |
CN112780026A (en) | Device and method for improving grouting fullness of sleeve | |
CN206545235U (en) | Reinforcing pile stake top stress bringing device | |
CN107794914B (en) | Prestressed concrete pipe pile combining post-grouting and diameter-expanding technology and manufacturing method thereof | |
CN109176838A (en) | Floor brick die and floor tile production method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170620 Termination date: 20200106 |
|
CF01 | Termination of patent right due to non-payment of annual fee |