CN104074143B CN201410338844.7A CN201410338844A CN104074143B CN 104074143 B CN104074143 B CN 104074143B CN 201410338844 A CN201410338844 A CN 201410338844A CN 104074143 B CN104074143 B CN 104074143B
Authority
CN
China
Prior art keywords
pressure
mud
mud jacking
pressurizer
piston
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410338844.7A
Other languages
Chinese (zh)
Other versions
CN104074143A (en
Inventor
姚永湖
杨国林
黄弘生
李伟
罗盛敏
仲智涛
罗梁
唐小丽
陈健生
黄新宇
李兰芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liuzhou Qiaoxia Technology Development Co ltd
Original Assignee
LIUZHOU QIAOSHA ENGINEERING TUBING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIUZHOU QIAOSHA ENGINEERING TUBING Co Ltd filed Critical LIUZHOU QIAOSHA ENGINEERING TUBING Co Ltd
Priority to CN201410338844.7A priority Critical patent/CN104074143B/en
Publication of CN104074143A publication Critical patent/CN104074143A/en
Application granted granted Critical
Publication of CN104074143B publication Critical patent/CN104074143B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A kind of prestressing force intelligent circulation mud jacking system and its control method, mud jacking pipeline between mudjack and stock inlet is provided with pressure compensator, described pressure compensator includes piston and elastic body, the piston termination and mud jacking pipeline communication, the elastic force of the elastic body are pressed into mud jacking pipeline for driving piston termination;Pressurizer is respectively arranged in stock inlet and grout outlet, the slurries amount and the slurries amount in discharge beam duct that control enters in beam duct respectively;Electromagnetic flowmeter is respectively arranged in stock inlet and grout outlet, measures the flow signal of stock inlet and grout outlet respectively;Mud jacking pump plunger is two groups, realizes that mud jacking acts using alternate mode is carried out, ratio of mud value rate-determining steps use closed-loop control, set effective circulating pressure value;Dwell pressure value:The lower limit of dwell pressure;The higher limit of dwell pressure;Dwell time value is controlled to component slurry.Its advantage is that slurry pressure is stable, and mud jacking is closely knit, and component quality is good.

Description

Prestressing force intelligent circulation mud jacking system and its control method
Technical field
The present invention relates to prestress engineering technical field, more particularly to a kind of prestressing force intelligent circulation mud jacking system and its control Method processed.
Background technology
In bridge construction process, the quality of inherent stress mud-jacking construction for pre-stressed bridge security and durability extremely Close it is important, therefore post-tensioned prestressing pipeline mud jacking construction turn into pre-stressed bridge construction critical process.
Chinese patent CN103711315 discloses entitled:" intelligent vacuum circulation mud jacking system " patent, the patent is solution The problem of certainly traditional mud jacking system grouting quality is unstable, the technical scheme of program control triple valve is set using in return pipe, though carry High grouting quality, but because slurry is in transmitting procedure, its pressure is change, causes the grouting quality of slurry fractions position It is unstable.
Chinese patent CN103711316 discloses entitled:" control method of intelligent pulping system ", the patent is to slurry Control be that major ingredient and auxiliary material are subjected to Weight control respectively, control process is opened loop control, and the final slurry ratio of mud can not Carry out finer control;And its mudjack only sets dwell pressure value only with one in automatic mud jacking step, uses If control method be pressurize during pressure value drop to below pressure criteria value, control centre send benefit slurry instruction, press again Slurry, carries out pressurize, this method, effectively squeezing quality can not be controlled, caused again after reaching pressure criteria value Grouting quality is unstable.
Traditional mud-jacking technology is due to the ratio of mud(The ratio of mud is slurries Specifeca tion speeification)There is no strict control, it is live past Toward by increasing water consumption mobile performance is improved, it is excessive to ultimately result in bleeding rate, formed in pipeline space and secreting come from by Water, accelerate steel strand wires corrosion.
These problems existing for above-mentioned traditional mud-jacking technology are by the durability of serious influence structure, first, losing steel strand wires Deprotection is easy to corrosion, and the corrosion of power muscle, which has, has further slackened cohesive force of the slurry to power muscle, causes effective prestress to decline. Cause steel strand wires and concrete to fail to form an overall collective effect second, cavity in pipeline be present, reduce the rigidity of structure with Bearing capacity.
The content of the invention
It is an object of the invention to provide a kind of pressure stability, and solving the pre- of above-mentioned pipeline pneumatic mortar leakiness technical problem should Power intelligent circulation mud jacking system and its control method.
The solution of the present invention is such:
A kind of prestressing force intelligent circulation mud jacking system, including homogenizer, electric cabinet, low speed slurry storing tank, mudjack, pressure Force snesor, electromagnetic flowmeter, water intaking valve, weighing sensor, pressurizer, it is characterised in that:Mudjack and stock inlet it Between mud jacking pipeline be provided with pressure compensator, described pressure compensator includes piston and elastic body, the piston Termination and mud jacking pipeline communication, the elastic force of the elastic body are pressed into mud jacking pipeline for driving piston termination.
More specifically technical scheme also includes:Described pressurizer is respectively arranged in stock inlet and grout outlet, controls respectively The slurries amount and the slurries amount in discharge beam duct that system enters in beam duct.
Further:Described electromagnetic flowmeter is respectively arranged in stock inlet and grout outlet, measures stock inlet respectively and goes out Starch the flow signal of mouth.
Further:The mudjack has two groups of mud jacking plungers, realizes that mud jacking moves using reciprocal alternate mode is carried out Make.
Further:Described elastic body includes the spring being arranged in piston-cylinder, the spring one end and piston Connection, its spring force ejector piston are protruding.
A kind of control method being controlled to prestressing force intelligent circulation mud jacking system described in claim 1, its feature exist In:Including step:
(1)Ratio of mud value rate-determining steps:Established standardses ratio of mud value is formulated according to construction, measures the water ash of homogenizer Ratio is compared with established standardses ratio of mud value, if the actual ratio of mud is less than standard glue ratio, system send a signal into Water valve, it is automatically replenished;If actual water-cement ratio is higher than standard glue ratio, cement, additive are added;Until system is real-time The water-cement ratio of detection reaches established standardses glue ratio;After system detectio water-cement ratio is qualified, dump valve is sent a control signal to, is sent out Send enabling signal to low speed slurry storing tank, dump valve to automatically open up, the qualified slurries of water-cement ratio are delivered to low speed slurry storing tank;
(2)Control mudjack alternation step:Mudjack uses two groups of mud jacking plungers, and control mode is:When first group When plunger will starch press-in duct, second group of plunger draws slurries in low speed slurry storing tank;When first group of plunger draws low speed slurry storing tank During interior slurries, slurries are pressed into duct by second group of plunger, and two groups of plunger alternating movements carry out mud jacking;
(3)Into and out of slurry mouth pressurizer job step:Pressurizer is installed respectively in stock inlet and grout outlet, using pressure Force snesor measures slurry pressure in beam duct, and sets:
A:Efficient Cycle pressure value;
B:Dwell pressure value:
C:The lower limit of dwell pressure;
D:The higher limit of dwell pressure;
E:Dwell time is worth;
When slurry pressure meets Efficient Cycle value in beam duct, system sends control signal, pulp to pressurizer Mouth pressurizer is closed, and mudjack continues slurries being pressed into duct, raises slurry pressure in duct;System acquisition pressure passes Sensor signal, after slurry pressure meets the dwell pressure value of setting in beam duct, system sends stop type to mudjack Number, control signal is sent to pressurizer, stock inlet pressurizer is closed, and automatic mud jacking program enters packing stage;When beam structure When slurry pressure is less than the lower limit of dwell pressure in part duct, system sends enabling signal to mudjack, is sent out to pressurizer Control signal is sent, stock inlet pressurizer is opened, and mudjack continues slurries being pressed into duct, makes slurry pressure liter in duct It is high;When pressure reaches the higher limit of setting dwell pressure in duct, system sends stop signal to mudjack, to pressurizer Control signal is sent, stock inlet pressurizer is closed, and after reaching dwell time value, system sends signal to each device, terminates Whole mud jacking process.
It is an advantage of the invention that slurry pressure is stable, mud jacking is closely knit, and component quality is good.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the structural representation of pressure compensator 8 of the present invention.
Fig. 3 is the control flow block diagram of control method of the present invention.
In accompanying drawing:1st, weighing sensor, 2, homogenizer, 3, water intaking valve, 4 dump valves, 5, low speed slurry storing tank, 6, mud jacking Pump, 7, electric cabinet, 8, pressure compensator, 9, device for quickly disassembling, 10, stock inlet pressurizer, 11, stock inlet electromagnetic flowmeter, 12nd, pressure sensor, 13, beam duct, 14, grout outlet electromagnetic flowmeter, 15, grout outlet pressurizer, 16, piston gas Cylinder, 17, spring, 18, piston, 19, three-way connection.
Embodiment
As shown in figure 1, the prestressing force intelligent circulation mud jacking system of the present invention, including homogenizer 2, electric cabinet 7, low speed Slurry storing tank 5, mudjack 6, pressure sensor 12, stock inlet electromagnetic flowmeter 11, grout outlet electromagnetic flowmeter 14, water intaking valve 3, title Retransmit sensor 1, air compressor machine, stock inlet pressurizer 10, grout outlet pressurizer 15, the mud jacking between mudjack and stock inlet Pipeline is provided with pressure compensator 8, and described pressure compensator 8 includes piston 18 and elastic body, the end of piston 18 Head and mud jacking pipeline communication, the elastic force of the elastic body are pressed into mud jacking pipeline for driving piston termination.
As shown in Fig. 2 described elastic body includes the spring 17 being arranged in piston-cylinder 16, described one end of spring 17 It is connected with piston 18, its spring force ejector piston is protruding, driving piston termination press-in mud jacking pipeline.
Stock inlet is provided with pressure sensor 12, stock inlet electromagnetic flowmeter 11, stock inlet pressurizer 10, grout outlet It is provided with grout outlet electromagnetic flowmeter 14, grout outlet pressurizer 15.
The plunger of mudjack 6 is two groups, realizes that mud jacking acts using alternate mode is carried out.
A kind of as shown in figure 3, controlling party being controlled to prestressing force intelligent circulation mud jacking system described in claim 1 Method, including step:
(1)Ratio of mud value rate-determining steps:, using close-loop control mode, established standardses ratio of mud value is formulated according to construction, is surveyed The grey value of water of homogenizer is taken, if the actual ratio of mud is less than standard ratio of mud value, to be compared with established standardses water ash value System sends a signal to water intaking valve, is automatically replenished;If actual water-cement ratio is higher than standard glue ratio, cement, addition are added Agent;Until the ratio of mud that system detects in real time reaches established standardses ratio of mud value;After the system detectio ratio of mud is qualified, control is sent Signal sends enabling signal to low speed slurry storing tank, dump valve and automatically opened up, the qualified slurries of the ratio of mud are delivered to dump valve Low speed slurry storing tank;
(2)Control mudjack alternation step:Mudjack uses two groups, and control mode is:When first group of mudjack will During slurry press-in duct, second group of plunger draws slurries in low speed slurry storing tank;When first group of plunger draws slurries in low speed slurry storing tank When, slurries are pressed into duct by second group of plunger, and two groups of plunger alternating movements carry out mud jacking;
(3)Into and out of slurry mouth pressurizer job step:Pressurizer is installed respectively in stock inlet and grout outlet, using pressure Force snesor measures slurry pressure in beam duct, and sets:
A:Efficient Cycle pressure value;
B:Dwell pressure value:
C:The lower limit of dwell pressure;
D:The higher limit of dwell pressure;
E:Dwell time is worth;
When slurry pressure meets Efficient Cycle value in beam duct, system sends control signal, pulp to pressurizer Mouth pressurizer is closed, and mudjack continues slurries being pressed into duct, raises slurry pressure in duct;System acquisition pressure passes Sensor signal, after slurry pressure meets the dwell pressure value of setting in beam duct 13, system is sent to mudjack to be stopped Model, control signal is sent to pressurizer, stock inlet pressurizer is closed, and automatic mud jacking program enters packing stage;Work as beam When slurry pressure is less than the lower limit of dwell pressure in member aperture, system sends enabling signal to mudjack, to pressurizer Control signal is sent, stock inlet pressurizer is opened, and mudjack continues slurries being pressed into duct, makes slurry pressure liter in duct It is high;When pressure reaches the higher limit of setting dwell pressure in duct, system sends stop signal to mudjack, to pressurizer Control signal is sent, stock inlet pressurizer is closed, and after reaching dwell time value, system sends signal to each device, terminates Whole mud jacking process.
The present embodiment operation principle is:
Parameter setting:According to practice of construction formula, standard glue ratio is inputted by touch-screen, setting adds the weight of water Amount, the mixing time of setting high-speed mixer 2, pressurize upper lower limit value is set, set the dwell time.
Slurries stir:By touch screen operation, start homogenizer 2, system, which is sent to homogenizer 2 and sent, to be started Signal, sent to water intaking valve 3 and add water signal, when addition water reaches setting value, add cement, additive, weighing sensor 1 The proportion of monitoring charging in real time in fill process, detection data are sent to the actual ratio of mud of system progress and calculated in real time, with setting The ratio of mud is compared, if the actual ratio of mud is less than setting value, system sends a signal to water intaking valve 3, is automatically replenished;It is if real The border ratio of mud is higher than setting value, then adds cement, additive;Until the ratio of mud that system detects in real time reaches the setting ratio of mud and closed Lattice scope.After the system detectio ratio of mud is qualified, dump valve 4 is sent a control signal to, send enabling signal to low speed slurry storing tank 5, Dump valve 4 is automatically opened up, and the qualified slurries of the ratio of mud are delivered into low speed slurry storing tank 5.
Automatic mud jacking:Slurries are delivered to low speed slurry storing tank 5, the electric motor starting of low speed slurry storing tank 5, stirring at low speed slurries, ensure Slurries do not precipitate, and system starts to perform automatic mud jacking program, and mudjack 6 carries out alternating movement by two groups of plungers and realizes that mud jacking moves Make, when slurries are pressed into duct by first group of plunger, second group of plunger draws slurries in low speed slurry storing tank 5;When first group of plunger When drawing slurries in low speed slurry storing tank 5, slurries are pressed into duct by second group of plunger, and two groups of plunger alternating movements carry out mud jacking, had Effect avoids the pulsation of slurry pressure in duct.Pressure compensator 8 is installed in pipeline, makes pressure and stability of flow.Stock inlet pressure Force snesor 12, stock inlet electromagnetic flowmeter 11, stock inlet pressurizer 10, grout outlet electromagnetic flowmeter 14, grout outlet pressurize Device 15, system acquisition stock inlet electromagnetic flowmeter 11, the signal of grout outlet electromagnetic flowmeter 14 are calculated, and meet Efficient Cycle After condition, system sends control signal to grout outlet pressurizer 15, and grout outlet pressurizer 15 is closed, and mudjack 6 continues will In slurries press-in duct, raise slurry pressure in duct, the signal of system acquisition pressure sensor 12, when slurry pressure in duct Control signal is sent after meeting the dwell pressure of setting, stock inlet pressurizer 10 is closed, and automatic mud jacking program enters pressurize rank Section, when slurry pressure is less than the lower limit for setting dwell pressure in duct, system sends enabling signal to mudjack 6, simultaneously Control signal is sent to stock inlet pressurizer 10, stock inlet pressurizer 10 is opened, and mudjack 6 continues slurries being pressed into duct It is interior, raise in duct slurry pressure, when pressure reaches the higher limit of setting dwell pressure in duct, system is to mudjack 6 Stop signal is sent, sends control signal to stock inlet pressurizer 10, stock inlet pressurizer 10 is closed, and reaches the dwell time Afterwards, system sends signal to each device, terminates whole mud jacking process.
Report output:System records mud jacking process data, including the actual ratio of mud, slurries mixing time, pressurize pressure automatically The data such as power, dwell time.All data can be exported in a manner of chart and form.Mud jacking process data is in mud jacking mistake Synchronous stored record in journey, prevent artificially to change completely.
Pressure compensator 8 is arranged on a joint of the three-way connection 19 of mud jacking pipeline, forms three-way connection connection The structure at cylinder piston end, when the pulp pressure oscillation of mudjack 6 is to peak, pressure in mud jacking pipeline is by cylinder piston 18 push away inward, compression spring 17, reduce the pressure in pipeline, when the pulp pressure oscillation of mudjack 6 is to minimum point, are pressed For contracting spring 17 because suffered external force reduces, spring 17 recovers original length by cylinder piston 18 toward extrapolating, and increases overpressure, Serve pressure compensated effect.

Claims (1)

1. the control method that a kind of prestressing force intelligent circulation mud jacking system is controlled, wherein, described prestressing force intelligent circulation Mud jacking system, including homogenizer, electric cabinet, low speed slurry storing tank, mudjack, pressure sensor, electromagnetic flowmeter, water inlet Valve, weighing sensor, pressurizer;Mud jacking pipeline between mudjack and stock inlet is provided with pressure compensator, described Pressure compensator include piston and elastic body, the piston termination and mud jacking pipeline communication, the bullet of the elastic body Power is pressed into mud jacking pipeline for driving piston termination;Pressure compensator is arranged on a joint of the three-way connection of mud jacking pipeline On, the structure that three-way connection connects cylinder piston end is formed, when the pulp pressure oscillation of mudjack is to peak, mud jacking pipeline Interior pressure pushes away cylinder piston inward, compression spring, when the pulp pressure oscillation of mudjack is to minimum point, by compression spring Because suffered external force reduces, spring recovers original length by the past extrapolation of cylinder piston;Described pressurizer be respectively arranged in into Mouth and grout outlet are starched, the slurries amount and the slurries amount in discharge beam duct that control enters in beam duct respectively;Described Electromagnetic flowmeter is respectively arranged in stock inlet and grout outlet, measures the flow signal of stock inlet and grout outlet respectively;The mud jacking Pump is two groups, realizes that mud jacking acts using alternate mode is carried out;Described elastic body includes being arranged in piston-cylinder Spring, the spring one end is connected with piston, and its spring force ejector piston is protruding;
Characterized in that, the control method that prestressing force intelligent circulation mud jacking system is controlled comprises the following steps:
(1)Ratio of mud rate-determining steps:Established standardses ratio of mud value is formulated according to construction, measures the ratio of mud of homogenizer with setting Calibrate the quasi- ratio of mud to be compared, if the actual ratio of mud is less than standard ratio of mud value, system sends a signal to water intaking valve, carries out certainly Dynamic moisturizing;If the actual ratio of mud is higher than standard ratio of mud value, cement, additive are added;Until the water ash that system detects in real time Than reaching established standardses ratio of mud value;After the system detectio ratio of mud is qualified, dump valve is sent a control signal to, sends enabling signal To low speed slurry storing tank, dump valve is automatically opened up, and the qualified slurries of the ratio of mud are delivered into low speed slurry storing tank;
(2)Control mud jacking pump piston alternation step:Mudjack uses two groups of pistons, and control mode is:When first group of mud jacking When slurries are pressed into duct by pump piston, second group of piston draws slurries in low speed slurry storing tank;When first group of piston draws low speed storage In slurry bucket during slurries, slurries are pressed into duct by second group of piston, and two groups of piston reciprocating alternating movements carry out mud jacking;
(3)Into and out of slurry mouth pressurizer job step:Pressurizer is installed respectively in stock inlet and grout outlet, passed using pressure Sensor measures slurry pressure in beam duct, and sets:
A:Efficient Cycle pressure value;
B:Dwell pressure value:
C:The lower limit of dwell pressure;
D:The higher limit of dwell pressure;
E:Dwell time is worth;
When slurry pressure meets Efficient Cycle value in beam duct, system sends control signal to pressurizer, and grout outlet is protected Pressure device is closed, and mudjack continues slurries being pressed into duct, raises slurry pressure in duct;System acquisition pressure sensor Signal, after slurry pressure meets the dwell pressure value of setting in beam duct, system is sent to mudjack stops model, to Pressurizer sends control signal, and stock inlet pressurizer is closed, and automatic mud jacking program enters packing stage;When beam duct When interior slurry pressure is less than the lower limit of dwell pressure, system sends enabling signal to mudjack, sends and controls to pressurizer Signal, stock inlet pressurizer are opened, and mudjack continues slurries being pressed into duct, raise slurry pressure in duct;Work as hole When pressure reaches the higher limit of setting dwell pressure in road, system sends stop signal to mudjack, sends and controls to pressurizer Signal processed, stock inlet pressurizer is closed, and after reaching dwell time value, system sends signal to each device, terminates whole pressure Slurry process.
CN201410338844.7A 2014-07-17 2014-07-17 Prestressing force intelligent circulation mud jacking system and its control method Active CN104074143B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410338844.7A CN104074143B (en) 2014-07-17 2014-07-17 Prestressing force intelligent circulation mud jacking system and its control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410338844.7A CN104074143B (en) 2014-07-17 2014-07-17 Prestressing force intelligent circulation mud jacking system and its control method

Publications (2)

Publication Number Publication Date
CN104074143A CN104074143A (en) 2014-10-01
CN104074143B true CN104074143B (en) 2018-03-09

Family

ID=51595719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410338844.7A Active CN104074143B (en) 2014-07-17 2014-07-17 Prestressing force intelligent circulation mud jacking system and its control method

Country Status (1)

Country Link
CN (1) CN104074143B (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104595174B (en) * 2014-12-01 2017-10-03 柳州市桥厦工程管材有限公司 A kind of stable-pressure device on slurry pump
CN104568642A (en) * 2014-12-26 2015-04-29 柳州黔桥工程材料有限公司 Method for automatically judging water-to-binder ratio of mudjacking slurry
CN104614271B (en) * 2014-12-26 2018-06-15 柳州黔桥工程材料有限公司 The device of automatic judgement mud jacking slurries water-cement ratio
CN104878697B (en) * 2015-06-03 2016-10-26 河北高达电子科技有限公司 A kind of squeezing trolley
CN106436582B (en) * 2016-10-15 2018-04-20 中国铁道科学研究院铁道建筑研究所 A kind of railway aids in the automatic mud jacking all-in-one machine of vacuum
CN106869029B (en) * 2017-01-17 2018-02-09 陈宇豪 Bridge prestress pipeline ftercompction sizing device and its construction method
CN106894637A (en) * 2017-04-18 2017-06-27 中国铁道科学研究院铁道建筑研究所 A kind of method and device that can measure duct entoplasm body weight
CN107489432A (en) * 2017-09-18 2017-12-19 山东科技大学 Tunnel support grouting equipment and its grouting method
CN108755759A (en) * 2018-07-12 2018-11-06 湘潭大学 The non-evaporating foster self-compaction UHPC pipe galleries forming technique of one kind and construction method
CN109795031B (en) * 2019-03-21 2024-05-17 中铁十四局集团第三工程有限公司 Automatic slurry supplementing device for post-tensioning prefabricated beam slab and application method of automatic slurry supplementing device
CN111827291A (en) * 2019-04-17 2020-10-27 中铁第五勘察设计院集团有限公司 Post-grouting integrated system and post-grouting method
CN111827292A (en) * 2019-04-22 2020-10-27 中铁第五勘察设计院集团有限公司 Intelligent grouting equipment and pile foundation construction method
CN111240372A (en) * 2020-01-15 2020-06-05 淮南东华欧科矿山支护设备有限责任公司 Water-cement ratio control device for mine
CN111650365B (en) * 2020-07-14 2021-05-07 清华大学 Intelligent grouting multifunctional test device
CN111877347B (en) * 2020-07-31 2021-08-10 南京地下空间高技术产业研究院有限公司 A slip casting device for underground continuous wall connects
CN114352328A (en) * 2022-01-06 2022-04-15 徐州徐工基础工程机械有限公司 Drilling and grouting anchor trolley grouting system and control method thereof

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2358306Y (en) * 1998-11-26 2000-01-12 何宝愚 Plunger-type compensation pressure valve
JP2004263542A (en) * 2003-02-12 2004-09-24 Anderson Technology Kk Device for injecting grout into cable sheath of pc structure and grout injection method
KR100555247B1 (en) * 2005-07-30 2006-03-03 노윤근 Cmputer-controlled lifting system for synchronous lifting of heavy structures at multi-point and lifting method of bridge using the system
CN102359072A (en) * 2011-08-03 2012-02-22 李跃军 Grouting quality control method and grouting quality control device for bridge prestressed pipeline based on density parameters
CN102505634A (en) * 2011-09-29 2012-06-20 桂岚 Prestress duct grouting quality control method based on double parameters including tube capacity and density
CN102704403B (en) * 2012-06-13 2014-09-17 湖南联智桥隧技术有限公司 Prestressed mud jacking trolley and circulating mud jacking method
CN204001775U (en) * 2014-07-17 2014-12-10 柳州市桥厦工程管材有限公司 Prestressing force intelligent circulation mud jacking system

Also Published As

Publication number Publication date
CN104074143A (en) 2014-10-01

Similar Documents

Publication Publication Date Title
CN104074143B (en) Prestressing force intelligent circulation mud jacking system and its control method
CN104329164B (en) Free piston engine
CN204001775U (en) Prestressing force intelligent circulation mud jacking system
CN102777364B (en) Pumping mechanism and control method thereof as well as concrete pumping equipment
CN103114983B (en) Pumping stroke control method for viscous material double-cylinder pump and pumping equipment for viscous material
CN102359280A (en) Intelligent mud jacking measurement and control system of large-circulation prestress pipeline
CN102493351B (en) Grouting construction method for circular prestressing pipeline and circular grouting system
CN105058554B (en) A kind of cylinder component and its full-automatic bidirectional pressurized hydraulic brick machine
CN105150356A (en) Hydraulic control system for brick machine and fully-automatic bidirectionally-pressing hydraulic control method of hydraulic control system
CN104818850B (en) Intelligent multi cycle slurrying mud jacking system
CN104196692B (en) Pumping equipment, pumping system and reversing control device and method of pumping system
CN103557149B (en) A kind of control apparatus of concrete piston, method, system and engineering machinery
CN104532752A (en) Intelligent dual-motor high-speed circulating stirring mortar preparing and pressing system
CN109795031B (en) Automatic slurry supplementing device for post-tensioning prefabricated beam slab and application method of automatic slurry supplementing device
CN104532844A (en) Anti-slurry-leakage circulating intelligent slurry making and pressing system
CN104652825B (en) Control method for multi-cycle intelligent slurrying and grouting system
CN101158163B (en) Pneumatic caisson bottom closing construction process
CN203452082U (en) Composite grout grouting device
CN102748340A (en) Method for analyzing energy loss of hydraulic system of loader working device
CN202440871U (en) Control system for preventing oil cylinder of hydraulic excavator from empty suction
CN204455828U (en) Bi-motor high-speed circulating stirs intelligent slurrying mud jacking system
CN205531373U (en) Mud jacking system
CN201679217U (en) Caulking machine
CN107119913A (en) A kind of secondary structure pumping installations for concreting secondary structure
CN201990986U (en) Synchronous control system for integrated headstock gear

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 545112 West plate of Sifang area, Xinxing Industrial Park, Liujiang District, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee after: Liuzhou qiaoxia Technology Development Co.,Ltd.

Address before: 545112, 17 industrial road, Xinxing Industrial Park, the Guangxi Zhuang Autonomous Region, Liuzhou

Patentee before: LIUZHOU CITY QIAOSHA ENGINEERING TUBE MATERIAL CO.,LTD.

CP03 Change of name, title or address