CN104612004A - Existing line D beam overall longitudinally-moving construction method - Google Patents

Existing line D beam overall longitudinally-moving construction method Download PDF

Info

Publication number
CN104612004A
CN104612004A CN201510036765.5A CN201510036765A CN104612004A CN 104612004 A CN104612004 A CN 104612004A CN 201510036765 A CN201510036765 A CN 201510036765A CN 104612004 A CN104612004 A CN 104612004A
Authority
CN
China
Prior art keywords
steel
large coaster
line
coaster
steel sleeper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510036765.5A
Other languages
Chinese (zh)
Other versions
CN104612004B (en
Inventor
谷金明
乔文禄
李平
李向宇
马炮胜
于开卉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Taiyuan Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Original Assignee
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP, China Railway Sixth Group Co Ltd filed Critical TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
Priority to CN201510036765.5A priority Critical patent/CN104612004B/en
Publication of CN104612004A publication Critical patent/CN104612004A/en
Application granted granted Critical
Publication of CN104612004B publication Critical patent/CN104612004B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/06Transporting, laying, removing or renewing sleepers
    • E01B29/09Transporting, laying, removing or renewing sleepers under, or from under, installed rails
    • E01B29/13Transporting, laying, removing or renewing sleepers under, or from under, installed rails for moving sleepers in a direction parallel to the rails, e.g. for spacing or aligning them

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The invention discloses an existing line D beam overall longitudinally-moving construction method. The lifting height of a D beam is calculated according to field D beam high-order arrangement, head blocks are placed on an existing line, a steel sleeper is placed on each head block, the steel sleepers are installed, upper brackets are connected, after the D beam is lifted in place, gaps between the steel sleepers above the head blocks and the head blocks are plugged through wooden footplates, wooden edges are tightly punched, the D beam is longitudinally moved to an existing line reinforced position, a jack falls back, the D beam falls to a required position, the head blocks and the steel sleepers above the line are removed, and the D beam is connected and fastened. By the adoption of the construction method, the D beam can be quickly and longitudinally moved, blocking key points and construction procedures are reduced, instability and the easy-to-topple risk in the D beam moving process are reduced, a contact net does not need to be powered off, the railway transport capacity is greatly released, station track limitation is avoided, the blocking key points are reduced, and construction time is saved.

Description

The overall longitudinal shift construction method of a kind of this line D beam
Technical field
The invention belongs to construction of railways field, particularly relate to the overall longitudinal shift construction method of a kind of this line D beam.
Background technology
The prefabricated D beam of diplopore is divided hole-specifically in strengthening construction at railway frame structure, D type just beam hardened link is adopted according to designing requirement, under the condition of not interrupting railways train operation, conventional construction method need adopt the large coaster of slide rail, and the defeated D beam of movement is to reinforcing position in length and breadth, and working procedure is loaded down with trivial details, construction " skylight point " time is short, and the monolithic beam center of gravity of D type just beam is higher, bottom surface is narrow, is easy to topple in movement, directly there is potential safety hazard and risk tearing open in assembling construction, there is no larger security reliability.
Summary of the invention
The object of the present invention is to provide the overall longitudinal shift construction method of a kind of this line D beam, be intended to solve traditional railway frame structure and divide diplopore prefabricated D beam hole-specifically strengthening construction operation is loaded down with trivial details, the engineering time is long, the problem of poor stability.
The present invention is achieved in that the overall longitudinal shift construction method of a kind of this line D beam comprises a little outer preparation and the interior operation of point, and concrete grammar comprises:
Step one, the outer preparation of point:
The first step, according to work business " taking out one every six " rule request, be steel sleeper by this line reinforcing place sleeper replacement;
Second step, within the scope of the vertical shift of this line D beam, clear up D beam walk row of channels;
3rd step, outside circuit, prepare large coaster, a steel sleeper placed by the large coaster of every platform, large coaster assorted sheeting caps, timber wedge, crowbar;
4th step, hydraulic jack is transported to circuit D beam two ends in advance, D beam two ends are installed steel and are shored, and install oil pipe and oil pump, jack withstands steel and shores;
Operation in step 2, point:
The first step, upper installation connect steel sleeper above former D beam hardened link;
Second step, D beam two ends steel shore below install hydraulic jack, overall jack-up D beam, make higher than flange of rail steel sleeper at the bottom of D beam, between large coaster and steel sleeper, sheeting caps is filled in space, the urgent large coaster travelling wheel of timber wedge;
3rd step, remove large coaster travelling wheel place timber wedge, promote large coaster simultaneously, the vertical shift of D beam is reinforced position to this line, the urgent large coaster travelling wheel of timber wedge;
4th step, falling D beam.
The first step, above described connection former D beam hardened link, the concrete grammar of steel sleeper is:
Artificial being lifted by D beam two ends respectively puts large coaster in circuit, is lifted by steel sleeper and puts on large coaster, promote large coaster respectively to specified location, the urgent large coaster travelling wheel of timber wedge, fixed lateral position, connection steel sleeper, fastening bracket.
4th step, the concrete grammar of described falling D beam is:
Shore below at D beam two ends steel and install hydraulic jack, overall jack-up D beam, makes large coaster not stress, and is extracted out by large coaster from steel sleeper above circuit, falls jack after rise, makes D beam entirety drop down onto D beam-ends requirement position, removes steel sleeper above circuit, reinforcement by connection D beam.
Construction method of the present invention can realize the quick vertical shift of D beam, reduces and blocks main points and working procedure, the unstability during reduction D beam moves and the risk of easily toppling over, have a power failure without the need to contact net, greatly release railway transport capacity, do not limit by station track, reduce and block main points, save the engineering time.
Accompanying drawing explanation
Fig. 1 is the overall longitudinal shift construction method flow chart of this line D beam that the embodiment of the present invention provides.
Detailed description of the invention
In order to make object of the present invention, technical scheme and advantage clearly understand, below in conjunction with embodiment, the present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
Below in conjunction with drawings and the specific embodiments, application principle of the present invention is further described.
In the 2-16m frame structure jacking construction of Xinzhou City peace East Street, divide holes prefabricated in existing railway west side, cross north with Pu up-downgoing, Xin river line, shunting neck, amount to 4 station tracks, 24m D beam hardened link is adopted in construction, arrange that calculating D beam need promote 45cm and exceed flange of rail steel sleeper according to on-the-spot D deck-molding position, existing line is put six large coasters, a steel sleeper placed by each large coaster, 2.01m is respectively apart from D beam two ends, 4.69m, steel sleeper is installed at 7.37m place, connect bracket, steel sleeper after D beam promotes and puts in place above large coaster and between large coaster with sheeting caps stuff up a crack and urgent timber wedge, vertical shift reinforces position to this line, slightly play D beam, remove large coaster, falling jack makes D beam drop down onto and requires position, remove steel sleeper above circuit, connect fastening D beam.Concrete grammar is as follows:
S101, according to work business " taking out one every six " rule request, be steel sleeper by this line reinforcing place sleeper replacement;
S102, within the scope of the vertical shift of this line D beam, clear up D beam walk row of channels;
S103, outside circuit prepare 6 large coasters, a steel sleeper placed by the large coaster of every platform, large coaster assorted sheeting caps, timber wedge, crowbar;
S104, hydraulic jack is transported to circuit D beam two ends in advance, D beam two ends are installed steel and are shored, and install oil pipe and oil pump, jack withstands steel and shores;
S105, artificial being lifted by D beam two ends respectively put large coaster in circuit, steel sleeper is lifted and puts on large coaster, promote large coaster respectively to distance 2.01m, 4.69m, 7.37m place, D beam two ends, the urgent large coaster travelling wheel of timber wedge, fixed lateral position, connection steel sleeper, fastening bracket;
S106, D beam two ends steel shore below install join 4 70cm stroke hydraulic jack, make 2 D beam Integral liftings, make higher than flange of rail steel sleeper 5cm at the bottom of D beam, between large coaster and circuit, sheeting caps is filled in space, the urgent large coaster travelling wheel of timber wedge;
S107, remove large coaster travelling wheel place timber wedge, promote large coaster simultaneously, the vertical shift of D beam is reinforced position to this line, and large coaster travelling wheel killed by timber wedge;
S108, D beam two ends steel shore below install hydraulic jack, overall jack-up D beam, makes large coaster not stress, large coaster is extracted out from steel sleeper above circuit, fall jack after rise, D beam entirety dropped down onto require position, remove steel sleeper above circuit, reinforcement by connection D beam.
Note in construction:
1. ensure that the large coaster wheel of every platform normally runs.
2. above circuit, steel sleeper requires to be connected fastening with D beam, adopts electric wrench fastening.
3. measure good large coaster in advance and fall position after rise, guarantee that contraposition is accurate, carry out next procedure fast.
When 4. adopting hydraulic jack jack-up D beam, require the overall jack-up of D beam, steady, safety.
5. after D back rises and is connected with steel sleeper above circuit, D beam lower end uses 4m they sup-port, does not conflict during to guarantee to fall D beam after rise with reinforcing position steel sleeper.
6. D back rises, slippage, whereabouts will assume unified command of, act in agreement and guarantee safety.
Conventional construction method need adopt the large coaster of slide rail, and the defeated D beam of movement is to reinforcing position in length and breadth, and working procedure is loaded down with trivial details, and construction " skylight point " time is short, and the monolithic beam center of gravity of D type just beam is higher, and bottom surface is narrow, is easy to topple in movement.Especially the D24m just long 24.5m of beam girder, wide 45cm, high 130cm, height is 3 times of bottom width, and such configuration is stability extreme difference in monolithic is directly mobile, directly there is potential safety hazard and risk tearing open in assembling construction, does not have larger security reliability.Adopt overall D beam to connect and coordinate large coaster straight skidding, the resistance to overturning of D beam can be ensured, save working procedure, ensure open-minded on schedule.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, all any amendments done within the spirit and principles in the present invention, equivalent replacement and improvement etc., all should be included within protection scope of the present invention.

Claims (3)

1. the overall longitudinal shift construction method of this line D beam, is characterized in that, described the overall longitudinal shift construction method of line D beam comprises:
Step one, the outer preparation of point:
The first step, be steel sleeper by this line reinforcing place sleeper replacement;
Second step, within the scope of the vertical shift of this line D beam, clear up D beam walk row of channels;
3rd step, outside circuit, prepare large coaster, a steel sleeper placed by the large coaster of every platform, large coaster assorted sheeting caps, timber wedge, crowbar;
4th step, hydraulic jack is transported to circuit D beam two ends in advance, D beam two ends are installed steel and are shored, and install oil pipe and oil pump, jack withstands steel and shores;
Operation in step 2, point:
The first step, upper installation connect steel sleeper above former D beam hardened link;
Second step, D beam two ends steel shore below install hydraulic jack, overall jack-up D beam, make higher than flange of rail steel sleeper at the bottom of D beam, between large coaster and steel sleeper, sheeting caps is filled in space, the urgent large coaster travelling wheel of timber wedge;
3rd step, remove large coaster travelling wheel place timber wedge, promote large coaster simultaneously, the vertical shift of D beam is reinforced position to this line, the urgent large coaster travelling wheel of timber wedge;
4th step, falling D beam.
2. the overall longitudinal shift construction method of this line D beam as claimed in claim 1, it is characterized in that, above described connection former D beam hardened link, the concrete grammar of steel sleeper is:
Artificial being lifted by D beam two ends respectively puts large coaster in circuit, is lifted by steel sleeper and puts on large coaster, promote large coaster respectively to specified location, the urgent large coaster travelling wheel of timber wedge, fixed lateral position, connection steel sleeper, fastening bracket.
3. the overall longitudinal shift construction method of this line D beam as claimed in claim 1, it is characterized in that, the concrete grammar of described falling D beam is:
Shore below at D beam two ends steel and install hydraulic jack, overall jack-up D beam, makes large coaster not stress, and is extracted out by large coaster from steel sleeper above circuit, falls jack after rise, makes D beam entirety drop down onto D beam-ends requirement position, removes steel sleeper above circuit, reinforcement by connection D beam.
CN201510036765.5A 2015-01-24 2015-01-24 Existing line D beam overall longitudinally-moving construction method Expired - Fee Related CN104612004B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510036765.5A CN104612004B (en) 2015-01-24 2015-01-24 Existing line D beam overall longitudinally-moving construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510036765.5A CN104612004B (en) 2015-01-24 2015-01-24 Existing line D beam overall longitudinally-moving construction method

Publications (2)

Publication Number Publication Date
CN104612004A true CN104612004A (en) 2015-05-13
CN104612004B CN104612004B (en) 2017-02-22

Family

ID=53146633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510036765.5A Expired - Fee Related CN104612004B (en) 2015-01-24 2015-01-24 Existing line D beam overall longitudinally-moving construction method

Country Status (1)

Country Link
CN (1) CN104612004B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113897822A (en) * 2021-11-13 2022-01-07 大同市陆宏铁路建设有限公司 Transverse and longitudinal moving device for construction based on D-shaped temporary beam and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101963061A (en) * 2010-10-19 2011-02-02 浙江省建工集团有限责任公司 Construction method for underground box culvert of existing railway line
CN102839578A (en) * 2012-08-30 2012-12-26 中铁十局集团有限公司 Construction method for manually longitudinally moving temporary beam in reinforcing multi-track line by use of D type temporary beam
CN202705829U (en) * 2012-08-30 2013-01-30 中铁十局集团有限公司 Convenient beam slider for manually and longitudinally moving D-shaped convenient beam
CN104213512A (en) * 2014-09-24 2014-12-17 中铁六局集团有限公司 Integrated trolley for transporting and erecting D beams of railway and method for mounting D beams

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101963061A (en) * 2010-10-19 2011-02-02 浙江省建工集团有限责任公司 Construction method for underground box culvert of existing railway line
CN102839578A (en) * 2012-08-30 2012-12-26 中铁十局集团有限公司 Construction method for manually longitudinally moving temporary beam in reinforcing multi-track line by use of D type temporary beam
CN202705829U (en) * 2012-08-30 2013-01-30 中铁十局集团有限公司 Convenient beam slider for manually and longitudinally moving D-shaped convenient beam
CN104213512A (en) * 2014-09-24 2014-12-17 中铁六局集团有限公司 Integrated trolley for transporting and erecting D beams of railway and method for mounting D beams

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
徐幼成: "营业线D梁便梁纵移、横移施工方法", 《上海铁道科技》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113897822A (en) * 2021-11-13 2022-01-07 大同市陆宏铁路建设有限公司 Transverse and longitudinal moving device for construction based on D-shaped temporary beam and construction method thereof

Also Published As

Publication number Publication date
CN104612004B (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN102182147B (en) Steel box girder erection method
CN103938538B (en) Railroad bridge evacuation platform
CN104631345A (en) Rapid replacing method of concrete bridge beam of dual-line electric railway
JP2009052306A (en) Construction method for replacing bridge girder
KR101269868B1 (en) A method for bridge improving
CN204825527U (en) Construction structures is moved to whole indulging of this line D roof beam
CN103277112A (en) Tunnel engineering train type rapid lifting and folding working platform
CN203321529U (en) Train type rapid lifting and folding work platform for tunnel engineering
KR101234090B1 (en) Method for changing girder of railway plate girder bridge
CN104612004A (en) Existing line D beam overall longitudinally-moving construction method
CN110055894A (en) A kind of flow type bridge erecting machine and its heavy grade erecting beam construction method
KR101187282B1 (en) Railway bridge constructing method using 2 post type abutment structure
CN209428958U (en) A kind of flow type bridge erecting machine
CN111705682A (en) Construction method and equipment for removing and rebuilding superstructure of widened bridge across electrified railway
CN105603878B (en) A kind of quick method for traversing in concrete box girder high-altitude
CN215591798U (en) Curtain wall plate traction transfer device for tower crane dismantling part
CN205836825U (en) Railway D type construction beam vertical shift accessory cart
CN213772957U (en) Artificial longitudinal moving stool beam device
CN104164838A (en) Light combined type beam moving trolley
CN103726449A (en) Automatic beam placement platform device and construction method of replacing railway beams thereby
CN110626943B (en) Special chassis of inverted gantry crane for single-line T-beam bridge and mounting method
KR100638578B1 (en) Method for carrying out replacement of an upper structure of a railway bridge
CN104213512B (en) Fortune frame railway D beam one chassis and D beam installation method
CN205062647U (en) Track top overpass abutment structure
CN113931074B (en) Construction method for rapidly paving frame of railway bridge girder erection machine in emergency limit state of business line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170222

Termination date: 20190124

CF01 Termination of patent right due to non-payment of annual fee