CN104213512A - Integrated trolley for transporting and erecting D beams of railway and method for mounting D beams - Google Patents

Integrated trolley for transporting and erecting D beams of railway and method for mounting D beams Download PDF

Info

Publication number
CN104213512A
CN104213512A CN201410492615.0A CN201410492615A CN104213512A CN 104213512 A CN104213512 A CN 104213512A CN 201410492615 A CN201410492615 A CN 201410492615A CN 104213512 A CN104213512 A CN 104213512A
Authority
CN
China
Prior art keywords
chassis
railway
beams
place
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410492615.0A
Other languages
Chinese (zh)
Other versions
CN104213512B (en
Inventor
樊俊停
高荣峰
韩士桥
武志华
尹国梁
张晋平
李向宇
李海峰
韩斌峰
王扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Original Assignee
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP, China Railway Sixth Group Co Ltd filed Critical TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
Priority to CN201410492615.0A priority Critical patent/CN104213512B/en
Publication of CN104213512A publication Critical patent/CN104213512A/en
Application granted granted Critical
Publication of CN104213512B publication Critical patent/CN104213512B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to an integrated trolley for transporting and erecting D beams of a railway and a method for mounting the D beams. A traveling system of the integrated trolley for transporting and erecting the D beams of the railway is divided into an upper trolley frame and a lower trolley frame, wherein the middles of the two trolley frames are connected through a pin; a traveling wheel is mounted on each trolley frame. A supporting system is composed of steel tube columns and a transverse beam, wherein the steel tube columns comprise a trolley steel tube column and supporting steel tube columns; the trolley steel tube column is fixedly arranged in the middle of the upper trolley frame; the supporting steel tube columns are arranged on two sides of the D beam reinforcement part of the railway, and each supporting steel tube column is arranged on one of both sides of the corresponding trolley; a pin is arranged in the middle of the transverse beam and is inserted into the top end of the trolley steel tube column. A hoisting system is composed of chain blocks and bracket lug rings. A sliding system is composed of sliding blocks and lever blocks. Two trolleys are configured for each group of beams, a group of D beams or two D beams can be erected or disassembled at a time by using one trolley, horizontal-longitudinal-horizontal sliding of the D beams can be realized, and the D beams can be hoisted, mounted or disassembled in place.

Description

Fortune frame railway D beam one chassis and D beam mounting method
Technical field
The D beam the present invention relates in a kind of railway construction field is installed, and particularly, is a kind of chassis and D beam method of transporting frame railway D beam.
Background technology
Along with the high speed development of railway, railway operation is more and more higher to the requirement of construction safety, and lower rail wear carries out bridges and culverts construction, no matter cast-in-place or jacking, and railway D beam is widely used in that railway is built on stilts to be reinforced more and more.
For guaranteeing existing railway operation and safety, under existing railway, when excavation of foundation pit, bridges and culverts cast-in-place construction, adopting railway D beam is a kind of conventional construction method to built on stilts reinforcing of railway, conventionally adopts mobile crane to carry out installation and the dismounting of D beam.For railway terminal area, station track is many, and contact net power failure influence basin is large, construction " skylight point " time is short, and traditional mobile crane cannot meet that span is large, the requirement of distance, and track crane needs contact net to have a power failure, dial and move cooperation, time is short, and complex procedures cannot meet construction demand.
During the southern station combined test of newly-built high ferro Taiyuan, opening operation, genuine at the newly-increased 1-6m synthetic job of southern throat, long 220m, under wear 22 station tracks, do not affecting under the condition of operation, to railway, adopt 24m D beam to carry out the built on stilts reinforcing of circuit, then below D beam, carry out excavation of foundation pit, the genuine cast-in-place construction of synthetic job.Because cross-line station track is many, the lifting of D beam has exceeded mobile crane boundary of works area, cannot carry out vapour and hang construction; Adopt railway electrification track operation car to carry out lifting construction, need contact net to have a power failure, simultaneously operation section need be to carrying out bracket dismounting in contact net point, netting twine is dialled to move and recover and constructed, contact net power failure range is large, large on hinge transportation impact, " skylight point " time short (1 hour), cannot meet construction demand.If contact net does not need to have a power failure, " skylight point " time can extend to 3 hours, and the engineering time increases greatly.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of fortune frame railway D beam one chassis, substitutes mobile crane, realizes " horizontal-vertical-horizontal stroke " slippage of D beam and D beam and lifts in groups.
For solving the above art problem of holding, the technical solution used in the present invention is:
A fortune frame railway D beam one chassis, comprises walking system, support system, Lift-on/Lift-off System and sliding system,
---walking system, minute upper strata vehicle frame and lower floor's vehicle frame, two-layer central frame beam connects by pin, and travelling wheel is all installed on vehicle frame;
---support system, is comprised of steel pipe column and crossbeam;
Wherein steel pipe column comprises two parts, and a part is chassis steel pipe column, is fixed on upper strata central frame beam; Another part is supporting steel tubing string, is located at D beam reinforcing place railway both sides, each 1 of each chassis both sides;
In the middle of crossbeam, be provided with pin, pin inserts chassis steel pipe column top;
---Lift-on/Lift-off System, is comprised of Chain block and bracket earrings;
2 groups of Chain blocks are installed on each chassis crossbeam, are located at respectively chassis steel pipe column both sides, 1 group of every side;
Bracket earrings is installed on the floor of D beam both sides lifting place, and 4, every beam, is connected with Chain block;
---sliding system, is comprised of slide block and Lever Blocks;
Two slide blocks are installed on each chassis crossbeam, are laid respectively at chassis steel pipe column both sides, slide block lower end is established Chain block suspension centre and is connected Chain block,
1 Lever Blocks is installed on each slide block top.
As a kind of preferred scheme, the two-layer chock of supporting steel tubing string underlay, 3 steel pipe bearing diagonals are established in each supporting steel tubing string outside, to guarantee supporting steel pipe column stability.
As a kind of preferred scheme, in slide block, establish polyvinyl fluoride plate, corrosion resistant plate is established on crossbeam top, spreads butter, to reduce frictional resistance during construction.
As a kind of preferred scheme, also comprise the accessory system being formed by jack, crossbeam steel tubular handrailing.
The present invention also provides a kind of method of utilizing fortune frame railway D beam one chassis that D beam is installed simultaneously, it is characterized in that comprising step:
(1) outer preparation
set up cross slide way: between spacious place, circuit outside and line, utilize sleeper to set up two row's horizontal sliding tracks;
installation exercise chassis: lay Mobile workbench on circuit outside, cross slide way, put a chassis on the per pass section of track, install crossbeam 5, slide block 10 and Chain block 8, Lever Blocks 11 on chassis;
d beam 13 hangs: adopt a mobile crane, two D beams 13 are hung on chassis, two D beams 13 lay respectively at chassis steel pipe column 6 both sides, and two D beam 13 two ends adopt stringing hoop to reinforce together, and every D beam 13 installs lifting bracket earrings 9 on Hoisting Position place floor;
steel pipe column is set up preparation: at D beam, reinforce circuit both sides, place, set up in advance supporting steel tubing string 7 bottom chocks 14, supporting steel tubing string 7 and bearing diagonal 12 transportations put in place;
jack is prepared: hydraulic jack is transported to circuit vertical shift place in advance, installs oil pipe and oil pump, hand-operated jack is fixed on chassis in advance;
(2) work flow in
traversing: cross slide way connects, follows closely solid rail → transverse-moving trolley to vertical shift circuit place → rotation lower floor vehicle frame 2, micro-chassis, the urgent lateral rows travelling wheel of adjustment wheel direction → timber wedge, fixed lateral position moved;
vertical shift: at the outer side-lower of upper strata vehicle frame 1, the jack-up chassis of hydraulic jack → is successively installed, extracted cross slide way, fall on vertical shift railway → vertical shift chassis to reinforcing place of D beam, the timber wedge that return back to top killed longitudinal road wheel, fixing lengthwise position;
horizontal sliding, whereabouts D beam 13: swing bolster 5 to horizontal path direction, untie the 13 two ends stringing hoop → reinforcings of D beam, connecting cross beam 5 and circuit supported on both sides steel pipe column 7 → moving slider 10, be connected Chain block 8, bracket earrings 9 → manually pull successively Chain block 8 hoists D beam 13, make 13 ends of D beam depart from chassis → manually pull on crossbeam 5 tops successively Lever Blocks 11 slippage D beams 13 to steel sleeper outside → manually draw Chain block 8, whereabouts D beam 13;
travelling backwards chassis: after D beam 13 is in place, travelling backwards slide block 10, swing bolster 5 to parallel circuit direction → fixed cross beam 5, install crossbeam steel tubular handrailing → vertical shift chassis to cross slide way place → establish special messenger hold up steady crossbeam steel tubular handrailing, utilize artificial jack-up chassis → installations of hand-operated jack, connect cross slide way → fallings jack, make fall on cross slide way → outside transverse-moving trolley of chassis to outside circuit, timber wedge kills, fixing chassis.
The present invention be railway D beam portable fortune, frame, tear institutional operation chassis open, 2 chassis of every group of beam, a chassis once sets up or removes one group or two D beams, can realize " horizontal-vertical-horizontal stroke " slippage of D beam, it is in place that (or dismounting) D beam is installed in lifting, cut down the number of intermediate links and operation, reduce the D beam unstable risk of easily toppling over of rising and falling, solved railway D girder span multiply road, terminals and reinforced difficult problem.Without contact net, have a power failure, greatly discharged railway transport capacity, not limited by station track, reduce constructor, save the engineering time.
The present invention is applicable to a station D beam strengthening construction, same applicable to interval single line construction, is particularly useful for station bottleneck district, and railway station track is many, and mobile crane cannot complete construction, and contact net has a power failure on the larger construction of transportation impact simultaneously.
Accompanying drawing explanation
Fig. 1 is the structural representation that the present invention transports frame railway D beam one chassis.
Fig. 2 is the A-A sectional view of Fig. 1.
In figure, 1-upper strata vehicle frame, 2-lower floor vehicle frame, 3-pin, 4-travelling wheel, 5-crossbeam, 6-chassis steel pipe column, 7-supporting steel tubing string, 8-Chain block, 9-bracket earrings, 10-slide block, 11-Lever Blocks, 12-bearing diagonal, 13-D beam, 14-chock.
The specific embodiment
Below in conjunction with accompanying drawing, the claimed technical scheme of the present invention is done to further clear, complete explanation.
Fortune frame railway D beam one chassis of the present invention, comprises walking system, support system, Lift-on/Lift-off System and sliding system.
One, walking system
Divide upper strata vehicle frame 1 and lower floor's vehicle frame 2, two-layer central frame beam connects by pin 3, and travelling wheel 4 is all installed on vehicle frame.Upper strata vehicle frame 1 is the horizontal running part of vertical railway, long (vertical railway direction) 3m, wide 1.6m.Lower floor's vehicle frame 2 is downline road vertical shift running part, long (rail track direction) 2.4m, wide 1.6m, upper and lower two-layer vehicle frame overall height 0.54m.Upper and lower two-layer central frame beam is established steel column pin 3 and is connected, so that upper and lower two-layer vehicle frame can rotate mutually, according to on-site actual situations, adjusts at any time direction.
Travelling wheel 4 adopts single-track wheel, and the horizontal walking rails wheel on upper strata vehicle frame 1 adopts Φ 325mm, and the longitudinal walking rails wheel on lower floor's vehicle frame 2 adopts Φ 200mm, and axletree is respectively Φ 80mm, Φ 70mm.
Two, support system
By steel pipe column and crossbeam 5, formed.
Wherein, steel pipe column comprises two parts, and a part is chassis steel pipe column 6, is fixed in the middle of upper strata vehicle frame 1, adopts flange to be connected with upper strata vehicle frame 1, and chassis steel pipe column 6 adopts Φ 320mm, high 1500 mm.Another part is supporting steel tubing string 7, is located at D beam reinforcing place railway both sides, each 1 of each chassis both sides, and totally 4, supporting steel tubing string 7 adopts Φ 320mm, height 2500 mm.The two-layer chock 14 of supporting steel tubing string 7 underlay, 3 Φ, 60 steel pipe bearing diagonals 12 are established in each supporting steel tubing string 7 outside, with true supporting steel pipe column stability.
Crossbeam adopts 2 soldered combining of I200mm i iron, long 7000mm, and wide 300mm, is provided with pin in the middle of crossbeam 5, and pin inserts chassis steel pipe column top, can all-direction rotation.
Three, Lift-on/Lift-off System
By Chain block 8 and bracket earrings 9, formed;
2 groups of 10T Chain blocks 8 are installed on each chassis crossbeam 5,2 every group, totally 4, are located at respectively chassis steel pipe column 6 both sides, 1 group of every side;
Make bracket earrings 9 for 8 liftings, bracket earrings 9 is installed on the floor of D beam both sides lifting place, and 4, every beam, is connected with Chain block 8;
Four, sliding system
By slide block 10 and Lever Blocks 11, formed;
Slide block is made with stainless steel, and two slide blocks 10 are installed on each chassis crossbeam 5, lays respectively at chassis steel pipe column 6 both sides, and slide block 10 lower ends are established Chain block suspension centre and connected Chain block 8, and each slide block is installed two Chain blocks 8.In slide block 10, establish polyvinyl fluoride plate, corrosion resistant plate is established on crossbeam 5 tops, spreads butter, to reduce frictional resistance during construction.
1 1.5T Lever Blocks 11 is installed on each slide block 10 top, by Lever Blocks 11 lateral pulls, makes slide block 10 slippages, thus transverse shifting D beam 13.
On the basis of above structure, the present invention is also provided with accessory system.
Five, accessory system
By hydraulic jack, hand-operated jack and crossbeam steel tubular handrailing, formed.
Hydraulic jack: after D beam is placed on chassis, chassis is traversing to vertical shift track place, and each chassis need adopt 2 hydraulic jack, and every jack is not less than 15T top power, and jack-up chassis and D beam, to extract or to set up cross slide way.
Hand-operated jack: empty chassis laterally into and out of time, each chassis need adopt 4 hand-operated jacks, every top power is not less than 1T, jack-up chassis, to extract (or setting up) cross slide way.
Crossbeam steel tubular handrailing: steel tubular handrailing blocks crossbeam i iron base plate, be mainly used in sky chassis laterally into and out of time, particularly during the empty chassis of hand-operated jack jack-up, for guaranteeing that chassis and crossbeam longitudinal stability establish.
The course of work below in conjunction with an example explanation chassis of the present invention.
The newly-increased DK219+219(1-6.0m of southern station, reconstructed railway hinge Taiyuan and southern station, correlation engineering Taiyuan south throat) synthetic job is genuine, cross stone too, large western two major station fields, amount to 22 station tracks, in construction, adopt 24m D beam hardened link.The installation D beam 13 of take is below example, is specifically described as follows:
(1) outer preparation
set up cross slide way: between spacious place, circuit outside and line, utilize sleeper to set up two row's horizontal sliding tracks, rail adopts 50kg/m, guide rail longitudinal pitch 12.06m.
installation exercise chassis: lay Mobile workbench on circuit outside, cross slide way, put a chassis on the per pass section of track.On chassis, install crossbeam 5, slide block 10 and Chain block 8, Lever Blocks 11.
d beam 13 hangs: adopt a 50T mobile crane, two D beams 13 are hung on chassis, two D beams 13 lay respectively at chassis steel pipe column 6 both sides, and two D beam 13 two ends adopt stringing hoop to reinforce together, and every D beam 13 installs lifting bracket earrings 9 on Hoisting Position place floor.
steel pipe column is set up preparation: at D beam, reinforce circuit both sides, place, set up in advance supporting steel tubing string 7 bottom chocks 14, supporting steel tubing string 7 and bearing diagonal 12 transportations put in place.
jack is prepared: hydraulic jack is transported to circuit vertical shift place in advance, installs oil pipe and oil pump, hand-operated jack is fixed on chassis in advance.
(2) work flow in
traversing: cross slide way connects, follows closely solid rail → transverse-moving trolley to vertical shift circuit place → rotation lower floor vehicle frame 2, micro-chassis, the urgent lateral rows travelling wheel of adjustment wheel direction → timber wedge, fixed lateral position moved;
vertical shift: at the outer side-lower of upper strata vehicle frame 1, the jack-up chassis of hydraulic jack → is successively installed, extracted cross slide way, fall on vertical shift railway → vertical shift chassis to reinforcing place of D beam, the timber wedge that return back to top killed longitudinal road wheel, fixing lengthwise position;
horizontal sliding, whereabouts D beam 13: swing bolster 5 to horizontal path direction, untie the 13 two ends stringing hoop → reinforcings of D beam, connecting cross beam 5 and circuit supported on both sides steel pipe column 7 → moving slider 10, be connected Chain block 8, bracket earrings 9 → manually pull successively Chain block 8 hoists D beam 13, make 13 ends of D beam depart from chassis → manually pull on crossbeam 5 tops successively Lever Blocks 11 slippage D beams 13 to steel sleeper outside → manually draw Chain block 8, whereabouts D beam 13;
travelling backwards chassis: after D beam 13 is in place, travelling backwards slide block 10, swing bolster 5 to parallel circuit direction → fixed cross beam 5, install crossbeam steel tubular handrailing → vertical shift chassis to cross slide way place → establish special messenger hold up steady crossbeam steel tubular handrailing, utilize artificial jack-up chassis → installations of hand-operated jack, connect cross slide way → fallings jack, make fall on cross slide way → outside transverse-moving trolley of chassis to outside circuit, timber wedge kills, fixing chassis.
(3) key points for operation and points for attention
cross slide way section of track spacing will accurately be fixed, and according to D beam lifting point, locates two root distances between plates, determines in advance section of track spacing, and corresponding with D beam suspension centre to guarantee chassis center, circuit both sides steel pipe column is corresponding with D beam suspension centre floor.
d beam 13 will synchronously, steadily, at a slow speed, be guaranteed safety during transverse-moving trolley on chassis.
measured in advance that chassis is traversing, vertical shift position, guaranteed that contraposition is accurate, carried out fast next procedure.
while adopting hydraulic jack jack-up D beam 13, two chassis can not be synchronous, first complete after a chassis, then carry out jack-up, the falling of another chassis, guarantees D beam 13 steady, safety.
because angle between cross slide way and vertical line is uncertain, therefore, after each transverse-moving trolley is located on vertical shift circuit, on chassis, make a check mark, determine the relative position relation of upper and lower chassis, the rapid-aligning when guaranteeing travelling backwards chassis.
when empty wagons vertical shift, traversing, jack-up, falling, chassis both sides must be established special messenger and be buttressed crossbeam steel tubular handrailing, guarantee that chassis is steady.
in 13 liftings of D beam, slippage, dropping process, whether firmly establish the steel pipe column bearing diagonal 12 that special messenger checks circuit both sides, guarantee that supporting steel tubing string 7 is firm.
will assume unified command of, act in agreement in 13 liftings of D beam, slippage, whereabouts, arrange special messenger two ends to hold up steady D beam 13 simultaneously, to reduce D beam 13, rock amplitude, guarantee safety.
before construction, check Chain block 8, Lever Blocks 11, guaranteed intactly, carried out emergent spare unit simultaneously.
In the genuine construction of southern station, Taiyuan synthetic job, this device security has successfully completed the installation and removal of 8 groups of D beams, and each engineering time basic controlling is between 1.5-2 hour.

Claims (5)

1. a fortune frame railway D beam one chassis, comprises walking system, support system, Lift-on/Lift-off System and sliding system,
---walking system, minute upper strata vehicle frame (1) and lower floor's vehicle frame (2), two-layer central frame beam connects by pin (3), and travelling wheel (4) is all installed on vehicle frame;
---support system, is comprised of steel pipe column and crossbeam (5);
Wherein steel pipe column comprises two parts, and a part is chassis steel pipe column (6), is fixed in the middle of upper strata vehicle frame (1); Another part is supporting steel tubing string (7), is located at D beam reinforcing place railway both sides, each 1 of each chassis both sides;
In the middle of crossbeam (5), be provided with pin, pin inserts chassis steel pipe column top;
---Lift-on/Lift-off System, is comprised of Chain block (8) and bracket earrings (9);
The upper 2 groups of Chain blocks (8) of installing of each chassis crossbeam (5), are located at respectively chassis steel pipe column (6) both sides, 1 group of every side;
Bracket earrings (9) is installed on the floor of D beam both sides lifting place, and 4, every beam, is connected with Chain block (8);
---sliding system, is comprised of slide block (10) and Lever Blocks (11);
Upper two slide blocks (10) of installing of each chassis crossbeam (5), lay respectively at chassis steel pipe column (6) both sides, and slide block (10) lower end is established Chain block suspension centre and connected Chain block (8),
1 Lever Blocks (11) is installed on each slide block top.
2. fortune frame railway D beam one chassis according to claim 1, is characterized in that: the two-layer chock of supporting steel tubing string (7) underlay (14), 3 steel pipe bearing diagonals (12) are established in each supporting steel tubing string (7) outside.
3. fortune frame railway D beam one chassis according to claim 1 and 2, is characterized in that: slide block is established polyvinyl fluoride plate in (10), and corrosion resistant plate is established on crossbeam (5) top.
4. fortune frame railway D beam one chassis according to claim 1, is characterized in that: also comprise the accessory system being comprised of jack and crossbeam steel tubular handrailing.
5. a method of utilizing fortune frame railway D beam one chassis that D beam is installed, is characterized in that comprising step:
(1) outer preparation
set up cross slide way: between spacious place, circuit outside and line, utilize sleeper to set up two row's horizontal sliding tracks;
installation exercise chassis: lay Mobile workbench on circuit outside, cross slide way, put a chassis on the per pass section of track, install crossbeam (5), slide block (10) and Chain block (8), Lever Blocks (11) on chassis;
d beam 13 hangs: adopt a mobile crane, two D beams 13 are hung on chassis, two D beams (13) lay respectively at chassis steel pipe column (6) both sides, two D beams (13) two ends adopt stringing hoop to reinforce together, and every D beam (13) installs lifting bracket earrings (9) on Hoisting Position place floor;
steel pipe column is set up preparation: at D beam, reinforce circuit both sides, place, set up in advance supporting steel tubing string (7) bottom chock (14), supporting steel tubing string (7) and bearing diagonal (12) transportation put in place;
jack is prepared: hydraulic jack is transported to circuit vertical shift place in advance, installs oil pipe and oil pump, hand-operated jack is fixed on chassis in advance;
(2) work flow in
traversing: cross slide way connects, follows closely solid rail → transverse-moving trolley to vertical shift circuit place → rotation lower floor vehicle frame 2, micro-chassis, the urgent lateral rows travelling wheel of adjustment wheel direction → timber wedge, fixed lateral position moved;
vertical shift: side-lower is installed the jack-up chassis of hydraulic jack → successively, extracted cross slide way outside upper strata vehicle frame (1), fall on vertical shift railway → vertical shift chassis to reinforcing place of D beam, the timber wedge that return back to top killed longitudinal road wheel, fixing lengthwise position;
horizontal sliding, whereabouts D beam (13): swing bolster (5) to horizontal path direction, untie the stringing hoop → reinforcing of D beam (13) two ends, connecting cross beam (5) and circuit supported on both sides steel pipe column (7) → moving slider (10), be connected Chain block (8), bracket earrings (9) → manually pull successively Chain block (8) hoists D beam (13), make D beam (13) end depart from chassis → manually pull on crossbeam (5) top successively Lever Blocks (11) slippage D beam (13) to steel sleeper outside → manually draw Chain block (8), whereabouts D beam (13);
travelling backwards chassis: after D beam (13) is in place, travelling backwards slide block (10), swing bolster (5) to parallel circuit direction → fixed cross beam (5) → vertical shift chassis to cross slide way place → utilize the artificial jack-up chassis → installation of hand-operated jack, connect cross slide way → fallings jack, make chassis fall on cross slide way → outwards transverse-moving trolley to outside circuit, timber wedge kills, fixing chassis.
CN201410492615.0A 2014-09-24 2014-09-24 Fortune frame railway D beam one chassis and D beam installation method Expired - Fee Related CN104213512B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410492615.0A CN104213512B (en) 2014-09-24 2014-09-24 Fortune frame railway D beam one chassis and D beam installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410492615.0A CN104213512B (en) 2014-09-24 2014-09-24 Fortune frame railway D beam one chassis and D beam installation method

Publications (2)

Publication Number Publication Date
CN104213512A true CN104213512A (en) 2014-12-17
CN104213512B CN104213512B (en) 2016-06-08

Family

ID=52095395

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410492615.0A Expired - Fee Related CN104213512B (en) 2014-09-24 2014-09-24 Fortune frame railway D beam one chassis and D beam installation method

Country Status (1)

Country Link
CN (1) CN104213512B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612004A (en) * 2015-01-24 2015-05-13 中铁六局集团有限公司 Existing line D beam overall longitudinally-moving construction method
CN106743260A (en) * 2017-01-20 2017-05-31 中国葛洲坝集团机电建设有限公司 Conveying arrangement and the method using its transport that climb in hole in penstock hole

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201704633U (en) * 2010-03-05 2011-01-12 北京万桥兴业机械有限公司 Mountainous multifunctional beam carrying and erecting machine
CN201770947U (en) * 2010-05-19 2011-03-23 北京万桥兴业机械有限责任公司 Displacement platform carrying and erecting integrated machine
JP2014080807A (en) * 2012-10-17 2014-05-08 Kajima Corp Frame structure of rear tower of girder erection device
JP2014145231A (en) * 2013-01-30 2014-08-14 Kajima Corp Girder suspension structure
CN204224995U (en) * 2014-09-24 2015-03-25 中铁六局集团有限公司 Fortune frame railway D beam one chassis

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201704633U (en) * 2010-03-05 2011-01-12 北京万桥兴业机械有限公司 Mountainous multifunctional beam carrying and erecting machine
CN201770947U (en) * 2010-05-19 2011-03-23 北京万桥兴业机械有限责任公司 Displacement platform carrying and erecting integrated machine
JP2014080807A (en) * 2012-10-17 2014-05-08 Kajima Corp Frame structure of rear tower of girder erection device
JP2014145231A (en) * 2013-01-30 2014-08-14 Kajima Corp Girder suspension structure
CN204224995U (en) * 2014-09-24 2015-03-25 中铁六局集团有限公司 Fortune frame railway D beam one chassis

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612004A (en) * 2015-01-24 2015-05-13 中铁六局集团有限公司 Existing line D beam overall longitudinally-moving construction method
CN104612004B (en) * 2015-01-24 2017-02-22 中铁六局集团有限公司 Existing line D beam overall longitudinally-moving construction method
CN106743260A (en) * 2017-01-20 2017-05-31 中国葛洲坝集团机电建设有限公司 Conveying arrangement and the method using its transport that climb in hole in penstock hole
CN106743260B (en) * 2017-01-20 2022-12-02 中国葛洲坝集团股份有限公司 Pressure steel pipe hole transportation device and method for hole climbing transportation by using same

Also Published As

Publication number Publication date
CN104213512B (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN100441779C (en) Space-precasting translation-emplacing method for bridge construction
CN102979041B (en) Soft overhead reinforcing jacking method for construction of span box bridge of jacking block of underpass turnout group of railway
CN108374296B (en) The construction method of straddle type monorail rail tracks installation
CN101666068B (en) Method for hoisting and mounting stiff girder of suspension bridge in mountain areas
CN103669216A (en) Steel box girder scattered-splicing sliding device and installation method
CN105781590B (en) TBM bears ring with reception hole and removes technique
CN106192755A (en) A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation
CN109208471A (en) A kind of bridge maintenance nacelle construction platform
CN102134832A (en) Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane
JP4559370B2 (en) Girder erection method by erection gutter from the side of bridge
CN201330609Y (en) Inside-tunnel steel support mechanical lifting device of shallow-tunneling cavern
CN204224995U (en) Fortune frame railway D beam one chassis
CN207987749U (en) Ride cable-styled erection crane
CN104213512B (en) Fortune frame railway D beam one chassis and D beam installation method
CN105019357B (en) The installation method of abnormity prefabricated bridge on a kind of arch bridge uncovered lattice girder steel
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN105544406A (en) Sliding-type Bailey beam dismantling device and dismantling method thereof
CN111705682A (en) Construction method and equipment for removing and rebuilding superstructure of widened bridge across electrified railway
KR101234090B1 (en) Method for changing girder of railway plate girder bridge
CN105714691B (en) A kind of curve low-pylon cable-stayed bridge Hanging Basket interlaced arrangement and traversing construction method
CN215104790U (en) Reinforced structure for existing railway underpass frame bridge construction
CN111877165B (en) Bailey beam translation device in limited space and construction method thereof
CN110552294B (en) Reverse girder erection construction platform of bridge girder erection machine and construction method thereof
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN204530506U (en) End bay closing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160608

Termination date: 20210924

CF01 Termination of patent right due to non-payment of annual fee