CN104588951B - Positioning tool and welding device for tower top lug plate of upper supporting base on tower crane - Google Patents
Positioning tool and welding device for tower top lug plate of upper supporting base on tower crane Download PDFInfo
- Publication number
- CN104588951B CN104588951B CN201410780483.1A CN201410780483A CN104588951B CN 104588951 B CN104588951 B CN 104588951B CN 201410780483 A CN201410780483 A CN 201410780483A CN 104588951 B CN104588951 B CN 104588951B
- Authority
- CN
- China
- Prior art keywords
- upper bracket
- otic placode
- threaded mandrel
- crossbeam
- flatbed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
- B23K37/0461—Welding tables
Landscapes
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
The invention relates to a positioning tool and welding device for a tower top lug plate of an upper supporting base on a tower crane, and belongs to the technical field of tower cranes. The positioning tool and welding device comprises a platform tool base, the supporting base, a threaded mandrel, a threaded platform, a beam, a positioning base, an upper supporting base box and the lug plate. The supporting base is arranged on the platform tool base, the threaded mandrel is arranged on the supporting base, the threaded platform is connected with the threaded mandrel, the beam is connected with the threaded mandrel, the positioning base is connected with the beam, the upper supporting base box is arranged on the platform tool base, and the lug plate is connected with the upper supporting base box. The positioning tool and welding device is reasonable in structure, the lug plate can be quickly positioned and conveniently welded during feeding, and stability is high.
Description
Technical field
The present invention relates to a kind of positioning tool and welder, especially relate to a kind of tower top of tower crane upper bracket upper bracket
Otic placode positioning tool and welder, it belongs to derrick crane field.
Background technology
Derrick crane abbreviation tower crane, tower top is arranged on upper bracket it is ensured that derrick crane raising when steel wire rope
Discharge and shrink stable, upper bracket is be combined with each other by pivoting support with undersetting, and this is heavy to carry tower crane rotation
Want function, be the centre of tower crane.
At present, when welding otic placode on upper bracket, the feeding of otic placode mainly passes through to join to be soldered into, the same upper bracket to tower top
Taking one-to-one principle, during to welding otic placode on each upper bracket, will lift to above upper bracket with the tower top that it matches, people
Work centering, manual feeding, and in upper manual clamping, positioning, then unloaded using manual point postwelding and carry out artificial full weld again, or
Directly automatically carry out the welding manner of full weld.
The welding of the otic placode of existing upper bracket relies on to join and is soldered into, and its positioning relies primarily on the technical merit of workman to ensure
Product Precision, and organize the spacing between the end face plane degree of otic placode, adjacent sets otic placode by the making precision of the tower top joining weldering, assembling
Precision and welding deformation state three together decide on.
Because tower top manufacture is uneven, workman's technical merit differs, and the body structure of upper bracket is due to welding change simultaneously
Shape whole height differs it is impossible to make compensation to welding deformation, can lead to increasing uncontrollable systematic error, will result in
Upper bracket cannot be realized exchanging with tower top, when otic placode being carried out with positioning clamping and welding, takes artificial loading, clamping operation,
And formerly point postwelding unloads in the mode carrying out artificial full weld more manually, low production efficiency, personnel labor intensity is high, artificial behaviour
The secondary welding made also increases welding deformation and error, and the welding precision ultimately resulting in otic placode is not high, simultaneously manual positioning, dress
Folder is also the factor of restriction Automation of Welding.
Publication date is on December 17th, 2008, in the Chinese patent of Publication No. 101323071, discloses a kind of entitled
The patent of invention of " complete interchanging quick fix tower section jacking eared ".This patent includes frame and positioner, above frame
It is provided with positioner, positioner includes box-shaped plate, strengthens steel plate, jacking ear plate location-plate, main chord tube location-plate, positioning
Ring, opening-closing clamp, box-shaped plate is arranged in frame, box-shaped plate both sides respectively organize weldering a pair of opening-closing clamp, box-shaped plate both sides upper
End with strengthen that steel plate is vertical is connected, jacking ear plate location-plate is welded to connect with strengthening steel plate, and reinforcement steel plate and jacking ear plate position
Hole is provided with plate, jacking ear plate location-plate and locating ring are welded to connect, the box-shaped plate of both sides outer end is provided with main chord tube positioning
Plate.Although this patent can improve assembling quality, reduction deformation is overproof, solve transport difficult, the welding precision of otic placode is not high,
Low production efficiency, personnel labor intensity is high, therefore it still has drawbacks described above.
Content of the invention
It is an object of the invention to overcoming above-mentioned deficiency present in prior art, and provide a kind of reasonable in design,
The tower top otic placode that the tower crane upper bracket upper bracket that otic placode quickly positions, convenient welding, stability are high can be made in feeding positions
Frock and welder.
The present invention solves the above problems and be the technical scheme is that the tower top otic placode positioning of this tower crane upper bracket upper bracket
Frock and welder, including flatbed tooling base and bearing, described bearing is arranged on flatbed tooling base, its feature
It is: also include threaded mandrel, screw thread platform, crossbeam, positioning seat, upper bracket casing and otic placode, described threaded mandrel is located at props up
On seat, described screw thread platform is connected with threaded mandrel, and described crossbeam is connected with threaded mandrel, and described positioning seat is connected with crossbeam,
Described upper bracket casing is located on flatbed tooling base, and described otic placode is connected with upper bracket casing;Rational in infrastructure, for ear
Plate can quickly be positioned, and is adjusted up and down by the rotation of screw thread platform, and adjustable otic placode, with the height of upper bracket casing, is protected
Demonstrate,prove end face flatness on upper bracket casing for four groups of otic placodes, and welding deformation is compensated.
Preferably, bearing of the present invention is four, this four bearings are each attached on flatbed tooling base.
Preferably, crossbeam of the present invention is two, the two ends of this two crossbeams are all connected with threaded mandrel, described every
Two positioning seats are equipped with individual crossbeam;Crossbeam is fixed with respect to the position of flatbed tooling base, and crossbeam is in use with fixed
Position seat matches use.
Preferably, threaded mandrel of the present invention is provided with fixing bolt, described crossbeam passes through this fixing bolt and spiral shell
Stricture of vagina mandrel connects;Fixing bolt is used for crossbeam is locked at the length direction of threaded mandrel, to control the same flatbed of crossbeam
The relative altitude of tooling base.
Preferably, being provided with boss on base of the present invention, the shape phase of the shape of this boss and upper bracket casing
Coupling;Upper bracket body structure is enable to be accurately positioned on flatbed tooling base, on flatbed tooling base, proper site sets
Put required fast-holding fixture it is ensured that after upper bracket body structure compression, lower plane can be parallel to determining of arranging on crossbeam
Hole system plane on the seat of position.
Preferably, positioning seat of the present invention is connected with crossbeam by bearing pin.
Preferably, otic placode of the present invention is fixed with positioning seat by alignment pin;So that otic placode is accurately positioned at horizontal stroke
Liang Shang.
Preferably, the quantity of threaded mandrel of the present invention is matched with the quantity of bearing.
Preferably, threaded mandrel of the present invention adopts multidiameter;Just it is connected with when being positioned on bearing or weld
Connect in succession, and center, perpendicular to flatbed tooling base, enables crossbeam smoothly freely to adjust height in threaded mandrel.
The present invention compared with prior art, has advantages below and effect: reasonable in design, and otic placode can be carried out soon
Speed positioning, the welding deformation rule according to upper bracket body structure adjusts the height of screw thread platform, and deformation ruler cun is compensated,
And then ensure that positional precision between four groups of otic placodes, the use of this frock simultaneously can improve upper bracket making precision it is ensured that
The exchange with tower top for the upper bracket casing.
Brief description
Fig. 1 is the main structure diagram of the embodiment of the present invention.
Fig. 2 is the structural representation of upper bracket casing in the embodiment of the present invention.
Fig. 3 is the side structure schematic view of embodiment of the present invention middle cross beam.
Fig. 4 is the structural representation that in the embodiment of the present invention, threaded mandrel is connected with bearing.
Fig. 5 is the overlooking the structure diagram of flatbed tooling base in the embodiment of the present invention.
In figure: flatbed tooling base 1, bearing 2, crossbeam 3, positioning seat 4, screw thread platform 5, threaded mandrel 6, upper bracket case
Body 7, otic placode 8, fixing bolt 9, bearing pin 10, alignment pin 11.
Specific embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings and by embodiment, and following examples are to this
Bright explanation and the invention is not limited in following examples.
Embodiment.
Referring to Fig. 1 to Fig. 5, the tower top otic placode positioning tool of the present embodiment tower crane upper bracket upper bracket and welder are main
Including flatbed tooling base 1, bearing 2, crossbeam 3, positioning seat 4, screw thread platform 5, threaded mandrel 6, upper bracket casing 7, otic placode
8th, fixing bolt 9, bearing pin 10 and alignment pin 11.
Bearing 2 in the present embodiment is fixed on flatbed tooling base 1, and bearing 2 sets threaded mandrel 6, threaded mandrel 6
Quantity and the quantity of bearing 2 match identical, threaded mandrel 6 is provided with screw thread platform 5 and fixing bolt 9, and screw thread platform 5 is used
In bearing cross beam 3, to adjust the relative altitude with flatbed tooling base 1 for the crossbeam 3, fixing bolt 9 is used for locking crossbeam 3
It is ensured that crossbeam 3 will not move axially in threaded mandrel 6 on the length direction of threaded mandrel 6, crossbeam 3 is by this fixing spiral shell
Bolt 9 is connected with threaded mandrel 6.
Positioning seat 4 in the present embodiment is accurately positioned on crossbeam 3 by bearing pin 10, during use, otic placode 8 is used alignment pin
Axle 11 is fixing with positioning seat 4, so that otic placode 8 is accurately positioned on crossbeam 3, upper bracket casing 7 is contained in flatbed tooling base 1
On, otic placode 8 is connected with upper bracket casing 7, and positioning seat 4 is coordinated with otic placode 8 with bearing pin 10 respectively, so that otic placode 8 is accurately positioned in
On bearing casing 7, just otic placode 8 can be carried out human weld or adopts automatic welding.
The present embodiment is adjusted up and down by the rotation of screw thread platform 5, and adjustable otic placode 8, with the height of upper bracket casing 7, is protected
Demonstrate,prove end face flatness on upper bracket casing 7 for four groups of otic placodes 8, and welding deformation is compensated.
The central plane of the flatbed tooling base 1 in the present embodiment is provided with boss, the shape of boss and upper bracket case
The mating shapes of body 7, on boss, the position according to four groups of bearings 2 arranges alignment pin 11, to guarantee upper bracket casing 7 convex
Do not rotate on platform, meanwhile, on flatbed tooling base 1, proper site is provided with required fast-holding fixture it is ensured that upper bracket
After casing 7 compression, lower plane can be parallel to the hole system plane on the positioning seat 4 of setting on crossbeam 3.
Bearing 2 in the present embodiment is four, and four bearings 2 are each attached on flatbed tooling base 1, and crossbeam 3 is two
Individual, the two ends of two crossbeams 3 are all connected with threaded mandrel 6, so that crossbeam 3 is fixed with respect to the position of flatbed tooling base 1, and
Reach requirement, each crossbeam 3 is equipped with two positioning seats 4.
Otic placode 8 in the present embodiment passes through alignment pin 11 to be fixed with positioning seat 4, and threaded mandrel 6 adopts multidiameter.
By above-mentioned elaboration, those skilled in the art can implement.
Furthermore, it is necessary to explanation, the specific embodiment described in this specification, the shape of its parts and components, it is named
Title etc. can be different, and the above content described in this specification is only to present configuration example explanation.All according to
The equivalence changes done according to the construction described in inventional idea of the present invention, feature and principle or simple change, are all included in this
In the protection domain of bright patent.Those skilled in the art can do various to described specific embodiment
The modification of various kinds or supplement or substituted using similar mode, the structure without departing from the present invention or surmount present claims
Scope defined in book, all should belong to protection scope of the present invention.
Claims (5)
1. a kind of tower top otic placode positioning tool of tower crane upper bracket upper bracket and welder, including flatbed tooling base and
Seat, described bearing be arranged on flatbed tooling base it is characterised in that: also include threaded mandrel, screw thread platform, crossbeam, fixed
Position seat, upper bracket casing and otic placode, described threaded mandrel is located on bearing, and described screw thread platform is connected with threaded mandrel, described
Crossbeam is connected with threaded mandrel, and described positioning seat is connected with crossbeam, and described upper bracket casing is located on flatbed tooling base, institute
State otic placode to be connected with upper bracket casing;Threaded mandrel is provided with fixing bolt, and described crossbeam passes through this fixing bolt and thread core
Axle connects;It is provided with boss, the mating shapes of the shape of this boss and upper bracket casing, on boss on flatbed tooling base
Position according to bearing arranges alignment pin;Positioning seat is connected with crossbeam by bearing pin;Otic placode passes through alignment pin and positioning seat
Fixing.
2. the tower top otic placode positioning tool of tower crane upper bracket upper bracket according to claim 1 and welder, its feature
It is: described bearing is four, and this four bearings are each attached on flatbed tooling base.
3. the tower top otic placode positioning tool of tower crane upper bracket upper bracket according to claim 1 and welder, its feature
It is: described crossbeam is two, and the two ends of this two crossbeams are all connected with threaded mandrel, and two crossbeams are equipped with two positioning
Seat.
4. the tower top otic placode positioning tool of tower crane upper bracket upper bracket according to claim 1 and welder, its feature
It is: the quantity of described threaded mandrel is matched with the quantity of bearing.
5. the tower top otic placode positioning tool of tower crane upper bracket upper bracket according to claim 4 and welder, its feature
It is: described threaded mandrel adopts multidiameter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410780483.1A CN104588951B (en) | 2014-12-17 | 2014-12-17 | Positioning tool and welding device for tower top lug plate of upper supporting base on tower crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410780483.1A CN104588951B (en) | 2014-12-17 | 2014-12-17 | Positioning tool and welding device for tower top lug plate of upper supporting base on tower crane |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104588951A CN104588951A (en) | 2015-05-06 |
CN104588951B true CN104588951B (en) | 2017-02-01 |
Family
ID=53115189
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410780483.1A Active CN104588951B (en) | 2014-12-17 | 2014-12-17 | Positioning tool and welding device for tower top lug plate of upper supporting base on tower crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104588951B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104972252A (en) * | 2015-07-02 | 2015-10-14 | 重庆永钢橡塑有限责任公司 | Assembly welding tool for tower crane main beams |
CN105081642A (en) * | 2015-08-13 | 2015-11-25 | 重庆永钢橡塑有限责任公司 | Welding tool for cargo boom of tower crane |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1317107C (en) * | 2005-05-26 | 2007-05-23 | 上海交通大学 | Flexible device for multipoint clamping and positioning spatial 3D thin wall part |
CN102601567B (en) * | 2012-03-27 | 2014-11-26 | 宜昌船舶柴油机有限公司 | Method for welding special-shaped flange pipelines and welding tool |
CN202517215U (en) * | 2012-03-27 | 2012-11-07 | 宜昌船舶柴油机有限公司 | Special-shaped flange pipeline assembly welding fixture |
CN203227957U (en) * | 2013-04-08 | 2013-10-09 | 江苏海鹏特种车辆有限公司 | Trapezoidal beam welding fixture |
CN103302435B (en) * | 2013-06-09 | 2015-08-12 | 秦皇岛北方管业有限公司 | A kind of metal compensator common group Welding device |
CN204413447U (en) * | 2014-12-17 | 2015-06-24 | 浙江省建设机械集团有限公司 | The tower top otic placode positioning tool of tower crane upper bracket upper bracket and welder |
-
2014
- 2014-12-17 CN CN201410780483.1A patent/CN104588951B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104588951A (en) | 2015-05-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205967913U (en) | Pipe flange welding position frock | |
CN102161144B (en) | Welding supporting table for joints | |
CN102581536B (en) | Single boom section molding tool for crane booms and single boom section production technology | |
CN204413447U (en) | The tower top otic placode positioning tool of tower crane upper bracket upper bracket and welder | |
CN109689264A (en) | System and method for separate tubular component | |
CN105312798A (en) | Steel structure numerical control assembly center | |
CN104588951B (en) | Positioning tool and welding device for tower top lug plate of upper supporting base on tower crane | |
CN106239407A (en) | A kind of web secondary cemented in place fitting device and the method installing web | |
CN203583901U (en) | Universal assembling jig frame for any trusses | |
CN110449785A (en) | The manufacture system and manufacturing process of the truss of escalator or moving sidewalk | |
CN103231213A (en) | Manufacturing method of high-altitude operation mechanical arm support | |
CN103071958B (en) | Welding fixture for upper chord and bi-lug plate of cargo boom and single-section molding method for cargo boom | |
CN205989155U (en) | The pipeline assembling device that use can be combined | |
CN104816111B (en) | The adjustment frock of nuclear boiler main pump pump case welding use | |
CN205132972U (en) | Top of tower group frame frock for tower crane | |
CN209223426U (en) | Steel pipe column group Splicing welding machine | |
CN206425721U (en) | Semi-automatic frock and welder for derrick crane pull bar | |
CN206263487U (en) | Fulcrum bearing positioning group mounted welder is turned round under derrick crane | |
CN214958579U (en) | GIS aluminum alloy bus shell fast assembly device | |
CN210254630U (en) | Gas cutting compasses | |
CN211249746U (en) | Welding deformation detection tool for crane boom | |
CN203712132U (en) | Workpiece welding device | |
CN210818193U (en) | Block assembly tool for block-type steel pipe ring | |
CN208430637U (en) | Device for two sections of vertical steel pipe column connection positioning | |
CN204975763U (en) | Adjustment frock of nuclear steam generator main pump pump case welding usefulness |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: The city of Hangzhou city of Zhejiang province Zhaohui road 310014 No. 175 under Lian Jin building block A Patentee after: Zhejiang Construction Engineering Machinery Group Co.,Ltd. Address before: The city of Hangzhou city of Zhejiang province Zhaohui road 310014 No. 175 under Lian Jin building block A Patentee before: ZHEJIANG CONSTRUCTION MACHINERY GROUP Co.,Ltd. |