CN104579165A - Photovoltaic power station dynamic reactive response performance site testing method - Google Patents
Photovoltaic power station dynamic reactive response performance site testing method Download PDFInfo
- Publication number
- CN104579165A CN104579165A CN201510031603.2A CN201510031603A CN104579165A CN 104579165 A CN104579165 A CN 104579165A CN 201510031603 A CN201510031603 A CN 201510031603A CN 104579165 A CN104579165 A CN 104579165A
- Authority
- CN
- China
- Prior art keywords
- voltage
- power
- reactive
- station
- power station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02S—GENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES
- H02S50/00—Monitoring or testing of PV systems, e.g. load balancing or fault identification
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Control Of Electrical Variables (AREA)
Abstract
本发明涉及一种光伏电站动态无功响应性能的现场测试方法,其测试点选定在光伏电站并网点处;所述光伏电站内母线电压变化通过调节主变抽头实现;所述方法为:测量光伏电站有功功率和无功功率的输出;确认检测装置;调整有载变压器抽头,使得并网点电压应符合电压偏差要求;记录照度保持在400瓦/平方米的当前电站输出有功功率为P0;设定光伏电站工作在端电压控制方式下;调节有载变压器抽头,观察电站无功动作;分析测试结果,计算光伏电站动态响应性能指标。本发明解决光伏电站动态无功响应测量时,测试装置容量有限以及建模测试方法过于复杂的问题,完善了目前光伏电站站级无功响应能力测试方法体系。
The invention relates to an on-site testing method for the dynamic reactive power response performance of a photovoltaic power station. The test point is selected at the grid connection point of the photovoltaic power station; the voltage change of the busbar in the photovoltaic power station is realized by adjusting the tap of the main transformer; the method is: measuring The output of active power and reactive power of the photovoltaic power station; confirm the detection device; adjust the taps of the on-load transformer so that the voltage of the grid-connected point should meet the voltage deviation requirements; record the output active power of the current power station whose illuminance is kept at 400 watts/square meter as P 0 ; Set the photovoltaic power station to work in the terminal voltage control mode; adjust the taps of the on-load transformer to observe the reactive power action of the power station; analyze the test results and calculate the dynamic response performance index of the photovoltaic power station. The invention solves the problems of limited capacity of the test device and too complicated modeling and testing methods when measuring the dynamic reactive power response of the photovoltaic power station, and improves the current test method system of the station-level reactive power response capability of the photovoltaic power station.
Description
技术领域:Technical field:
本发明涉及一种光伏电站动态无功响应性能的现场测试方法,更具体涉及一种利用站级有载调压变和电站AVC系统协调配合进行光伏电站动态无功响应性能的现场测试方法。The invention relates to an on-site test method for the dynamic reactive power response performance of a photovoltaic power station, and more particularly to an on-site test method for the dynamic reactive power response performance of a photovoltaic power station by utilizing the coordination and cooperation of a station-level on-load tap changer and a power station AVC system.
背景技术:Background technique:
当光伏电站并网点电压出现较大扰动,电压幅值跌落至90%Un~0%Un时,光伏逆变器需要具有低电压穿越能力,并且希望光伏电站能够迅速进行无功响应,补偿相应的无功电流,实现并网点电压支撑能力。目前,国内外标准均针对低电压穿越期间的动态无功响应做出了规定。正常运行工况下,由于受太阳辐照强度波动性、不稳定性等的影响,光伏电站输出功率波动性较大。随着光伏电站接入容量的增加,输出功率波动引起线路电压超限的现象逐步加剧,希望光伏发电站具备常规能力调节电压的能力,维持并网点压稳定。When the grid-connected point voltage of the photovoltaic power station is greatly disturbed and the voltage amplitude drops to 90% U n ~ 0% U n , the photovoltaic inverter needs to have low voltage ride-through capability, and it is hoped that the photovoltaic power station can quickly respond to reactive power and compensate The corresponding reactive current realizes the voltage support capability of the grid-connected point. At present, domestic and foreign standards have made regulations on the dynamic reactive power response during low voltage ride through. Under normal operating conditions, due to the influence of fluctuations and instability of solar radiation intensity, the output power of photovoltaic power plants fluctuates greatly. With the increase of the access capacity of photovoltaic power stations, the phenomenon of line voltage exceeding the limit caused by output power fluctuations is gradually intensified. It is hoped that photovoltaic power stations have the ability to regulate voltage with conventional capabilities and maintain the stability of grid-connected point voltage.
光伏电站中除集中加装的静态无功补偿装置或动态无功补偿装置外,光伏逆变器也具有无功调节能力。光伏电站无功控制系统框图如附图1所示,通常可分为无功整定层和无功分配层。其中,上层(整定层)根据并网点低压侧偏差整定计算电网对光伏电站的无功需求,并根据光伏电站的运行约束对整定的无功需求进行校验,最终给出合理的无功需求值,此外,还能够直接接受调度下发的无功功率调节指令;下层(分配层)根据光伏发电单元的运行约束和实际运行状态,根据一定的分配原则,对上层计算的无功需求值进行分配,经过校验后输出作为光伏发电单元的无功调节目标指令。因此厂站级无功补偿配置情况相对复杂,需制定详尽的无功支撑能力的检测条件、检测方法,正确反应光伏电站的真实无功支撑能力。In addition to the centrally installed static reactive power compensation device or dynamic reactive power compensation device in the photovoltaic power station, the photovoltaic inverter also has reactive power adjustment capabilities. The block diagram of the reactive power control system of a photovoltaic power station is shown in Figure 1, which can usually be divided into a reactive power setting layer and a reactive power distribution layer. Among them, the upper layer (setting layer) calculates the reactive power demand of the photovoltaic power station by the grid according to the low-voltage side deviation setting of the grid-connected point, and verifies the reactive power demand set according to the operating constraints of the photovoltaic power station, and finally gives a reasonable reactive power demand value , in addition, it can also directly accept the reactive power adjustment command issued by the dispatcher; the lower layer (allocation layer) distributes the reactive power demand value calculated by the upper layer according to the operating constraints and actual operating status of the photovoltaic power generation unit according to a certain allocation principle , output after verification as the reactive power adjustment target command of the photovoltaic power generation unit. Therefore, the configuration of reactive power compensation at the plant level is relatively complicated, and it is necessary to formulate detailed testing conditions and testing methods for reactive power support capacity to correctly reflect the real reactive power support capacity of photovoltaic power plants.
GB/T 29321-2012《光伏发电站无功补偿技术规定》中对光伏电站动态无功响应时间进行了定义,即光伏发电站动态无功响应时间(response timeof PV station dynamic reactive power)是指光伏发电站自并网点电压异常升高或者降低达到触发设定值开始,直到光伏发电站并网点无功功率实际输出变化量(目标值与初始值之差)达到变化量目标值的90%所需的时间。要求光伏发电站的无功电源应能够跟踪光伏出力的波动快速响应,以满足电压调节要求。规定光伏发电站动态无功响应时间应不大于30ms。GB/T 29321-2012 "Technical Regulations on Reactive Power Compensation of Photovoltaic Power Stations" defines the dynamic reactive power response time of photovoltaic power stations, that is, the response time of PV station dynamic reactive power (response time of PV station dynamic reactive power) refers to the From the time when the voltage at the grid-connected point of the power station rises or falls abnormally and reaches the trigger set value, until the actual output variation of reactive power at the grid-connected point of the photovoltaic power station (the difference between the target value and the initial value) reaches 90% of the target value of the variation time. It is required that the reactive power source of the photovoltaic power station should be able to track the fluctuation of photovoltaic output and respond quickly to meet the voltage regulation requirements. It is stipulated that the dynamic reactive power response time of the photovoltaic power station should not be greater than 30ms.
动态无功的测试需要并网点电压异常升高或者降低作为实验条件,由于测试装置容量远小于大规模的光伏电站容量,试验现场无法模拟电网大扰动工况,当前一般通过电站建模方法对低电压穿越期间动态无功电流进行评估,但是该方法实施步骤复杂,且评估结果精度依赖评测机构技术水平。对于正常运行工况下,电压波动范围为10%Un以内时,需要一种简单易操作的测试方法对光伏发电站动态无功响应性能的评估,正确反应光伏电站的真实动态无功支撑能力。The test of dynamic reactive power requires an abnormal increase or decrease in the voltage of the grid-connected point as the experimental condition. Since the capacity of the test device is much smaller than that of a large-scale photovoltaic power station, the test site cannot simulate the large disturbance condition of the power grid. The dynamic reactive current is evaluated during the voltage ride-through period, but the implementation steps of this method are complicated, and the accuracy of the evaluation results depends on the technical level of the evaluation institution. Under normal operating conditions, when the voltage fluctuation range is within 10% U n , a simple and easy-to-operate test method is needed to evaluate the dynamic reactive power response performance of the photovoltaic power station and correctly reflect the real dynamic reactive power support capability of the photovoltaic power station .
发明内容:Invention content:
本发明的目的是提供一种光伏电站动态无功响应性能的现场测试方法,所述方法解决了光伏电站动态无功响应测量时,测试装置容量有限以及建模测试方法过于复杂的问题,完善了目前光伏电站站级无功响应能力测试方法体系。The purpose of the present invention is to provide a field test method for the dynamic reactive power response performance of a photovoltaic power station. The method solves the problems of limited capacity of the test device and too complicated modeling and testing methods when measuring the dynamic reactive power response of a photovoltaic power station. At present, there is a test method system for the reactive power response capability of photovoltaic power stations at the station level.
为实现上述目的,本发明采用以下技术方案:一种光伏电站动态无功响应性能的现场测试方法,所述光伏电站中包括无功补偿装置和光伏逆变器;其测试点选定在光伏电站并网点处;所述光伏电站内母线电压变化通过调节主变抽头实现;所述方法包括以下步骤:In order to achieve the above object, the present invention adopts the following technical solutions: a field test method for the dynamic reactive power response performance of a photovoltaic power station, which includes a reactive power compensation device and a photovoltaic inverter; the test point is selected in the photovoltaic power station At the grid connection point; the bus voltage change in the photovoltaic power station is realized by adjusting the tap of the main transformer; the method includes the following steps:
(1)测量所述光伏电站有功功率输出和无功功率输出;确认检测装置与控制室同步;(1) Measure the active power output and reactive power output of the photovoltaic power station; confirm that the detection device is synchronized with the control room;
(2)调整有载变压器抽头,使得并网点电压应符合GB/T 12325电压偏差要求;(2) Adjust the taps of the on-load transformer so that the grid-connected point voltage should meet the voltage deviation requirements of GB/T 12325;
(3)记录测试照度保持在400瓦/平方米的当前电站输出有功功率为P0;(3) The output active power of the current power station whose illuminance is maintained at 400 watts/square meter for the record test is P 0 ;
(4)设定光伏电站工作在端电压控制方式下;(4) Set the photovoltaic power station to work in the terminal voltage control mode;
(5)调节有载变压器抽头,观察电站无功动作;(5) Adjust the taps of the on-load transformer and observe the reactive action of the power station;
(6)测试结束,保存数据;(6) After the test is over, save the data;
(7)分析测试结果,计算光伏电站动态响应性能指标。(7) Analyze the test results and calculate the dynamic response performance index of the photovoltaic power station.
本发明提供的一种光伏电站动态无功响应性能的现场测试方法,所述步骤(1)通过在所述光伏电站二次侧接入功率检测装置,测量电站有功功率输出和无功功率输出。The present invention provides an on-site testing method for dynamic reactive power response performance of a photovoltaic power station. The step (1) measures the active power output and reactive power output of the photovoltaic power station by connecting a power detection device to the secondary side of the photovoltaic power station.
本发明提供的一种光伏电站动态无功响应性能的现场测试方法,分别检查电能质量分析仪和功率分析仪的电压、电流、有功功率和无功功率是否和电站控制室一致;检查所述功率检测装置的时间是否和电站控制室保持同步。The present invention provides an on-site testing method for the dynamic reactive power response performance of a photovoltaic power station, respectively checking whether the voltage, current, active power and reactive power of the power quality analyzer and the power analyzer are consistent with the control room of the power station; checking the power Check whether the time of the device is synchronized with that of the control room of the power station.
本发明提供的另一优选的一种光伏电站动态无功响应性能的现场测试方法,所述步骤(2)将变压器抽头调整到中间位置。Another preferred on-site testing method of the dynamic reactive power response performance of the photovoltaic power plant provided by the present invention, the step (2) adjusts the tap of the transformer to the middle position.
本发明提供的再一优选的一种光伏电站动态无功响应性能的现场测试方法,通过将10kV或6kV电压等级接入公共电网的光伏发电站,其并网点电压偏差为相应电力系统标称电压的±7%;Another preferred field test method for the dynamic reactive power response performance of a photovoltaic power station provided by the present invention is to connect a photovoltaic power station with a voltage level of 10kV or 6kV to the public power grid, and the voltage deviation of the grid-connected point is the nominal voltage of the corresponding power system ±7% of
通过将35kV~110kV电压等级接入公共电网的光伏发电站,其并网点电压偏差为相应电力系统标称电压的‐3%~+7%;事故后恢复电压为电力系统标称电压的±10%;By connecting the 35kV~110kV voltage level to the photovoltaic power station of the public grid, the voltage deviation of the grid connection point is -3%~+7% of the nominal voltage of the corresponding power system; the recovery voltage after the accident is ±10% of the nominal voltage of the power system %;
通过将220kV电压等级接入公共电网的光伏发电站,其并网点电压偏差为相应电力系统标称电压的0%~+10%;事故后恢复电压为电力系统标称电压的‐5%~+10%;By connecting the 220kV voltage level to the photovoltaic power station of the public grid, the voltage deviation of the grid-connected point is 0%~+10% of the nominal voltage of the corresponding power system; the recovery voltage after the accident is -5%~+ of the nominal voltage of the power system 10%;
通过将330kV及以上电压等级接入公共电网的光伏发电站,正常运行方式下,其并网点最高运行电压不得超过电力系统标称电压的+110%;最低运行电压不影响电力系统同步稳定、电压稳定、厂用电的正常使用及下一级电压的调节。By connecting photovoltaic power stations with a voltage level of 330kV and above to the public grid, under normal operation, the maximum operating voltage of the grid-connected point shall not exceed +110% of the nominal voltage of the power system; the minimum operating voltage does not affect the synchronous stability of the power system, voltage Stability, normal use of factory power and adjustment of the next level of voltage.
本发明提供的又一优选的一种光伏电站动态无功响应性能的现场测试方法,在所述步骤(3)中的测试中,不限制光伏发电站的无功功率变化速度;确保集中无功补偿装置处于正常运行状态,所有光伏逆变器的输出无功功率接近于0。Another preferred on-site testing method of the dynamic reactive power response performance of a photovoltaic power station provided by the present invention, in the test in the step (3), does not limit the reactive power change speed of the photovoltaic power station; The compensation device is in normal operation, and the output reactive power of all photovoltaic inverters is close to zero.
本发明提供的又一优选的一种光伏电站动态无功响应性能的现场测试方法,所述步骤(4)通过电站AVC系统设定光伏电站工作在端电压控制方式下,定义动作阈值上下限±U%,即实际电压偏差绝对值|ΔU%|>±|U%|时AVC系统将进行电压调节,直到|ΔU%|<±|U%|。实验时,一般设定电压动作阈值±U%<(2~4)×调压步长Utap%。其中,调压步长Utap%为有载抽头变压器改变一级后电压变化的百分比。电压越界后发出反向最大无功功率Qmax,抑制电压波动。Another preferred on-site testing method for the dynamic reactive power response performance of a photovoltaic power station provided by the present invention, the step (4) sets the photovoltaic power station to work in the terminal voltage control mode through the AVC system of the power station, and defines the upper and lower limits of the action threshold ± U%, that is, when the absolute value of the actual voltage deviation |ΔU%|>±|U%|, the AVC system will regulate the voltage until |ΔU%|<±|U%|. During the experiment, generally set voltage action threshold ±U%<(2~4)×voltage regulation step size U tap %. Wherein, the voltage regulation step length U tap % is the percentage of voltage change after the on-load tap transformer changes one stage. After the voltage crosses the limit, it sends out the reverse maximum reactive power Q max to suppress the voltage fluctuation.
本发明提供的又一优选的一种光伏电站动态无功响应性能的现场测试方法,所述步骤(5)中根据光伏电站的电压调节曲线,调节有载变压器抽头,逐级升高并网点电压对电站并网点电压进行扰动,观察到电站无功动作后,恢复有载调压变压器抽头至实验初始的中间位置;逐级降低并网点电压对电站并网点电压进行扰动,观察到电站无功动作后,恢复抽头至实验初始的中间位置。Another preferred field test method for the dynamic reactive power response performance of a photovoltaic power station provided by the present invention, in the step (5), adjust the taps of the on-load transformer according to the voltage regulation curve of the photovoltaic power station, and gradually increase the grid-connected point voltage Disturb the voltage of the grid-connected point of the power station, and after observing the reactive power action of the power station, restore the tap of the on-load tap changer to the initial middle position of the experiment; gradually reduce the voltage of the grid-connected point to disturb the voltage of the grid-connected point of the power station, and observe the reactive power action of the power station After that, restore the tap to the middle position at the beginning of the experiment.
本发明提供的又一优选的一种光伏电站动态无功响应性能的现场测试方法,所述步骤(6)中测试结束,恢复电压抽头位置,光伏电站恢复正常运行状态,保存仪器测试数据,拆除仪器接线。Another preferred on-site testing method for the dynamic reactive power response performance of a photovoltaic power station provided by the present invention, the test in the step (6) is completed, the position of the voltage tap is restored, the photovoltaic power station returns to the normal operating state, the instrument test data is saved, and the Instrument wiring.
本发明提供的又一优选的一种光伏电站动态无功响应性能的现场测试方法,所述步骤(7)中的指标包括:所述光伏电站发出感性无功功率时,动态无功电流建立时间Δt1L、动态无功电流响应时间Δt2L;所述光伏电站发出容性无功功率时,动态无功电流建立时间Δt1C、动态无功电流响应时间Δt2C、感性无功功率响应值和容性无功功率响应值Another preferred on-site test method for the dynamic reactive power response performance of a photovoltaic power station provided by the present invention, the indicators in the step (7) include: when the photovoltaic power station sends inductive reactive power, the dynamic reactive current establishment time Δt 1L , dynamic reactive current response time Δt 2L ; when the photovoltaic power station emits capacitive reactive power, dynamic reactive current establishment time Δt 1C , dynamic reactive current response time Δt 2C , inductive reactive power response value and capacitance Reactive power response value
本发明提供的又一优选的一种光伏电站动态无功响应性能的现场测试方法:Another preferred field test method for dynamic reactive power response performance of photovoltaic power plants provided by the present invention:
所述动态无功电流建立时间Δt1L通过下式确定:The dynamic reactive current establishment time Δt 1L is determined by the following formula:
Δt1L=|t1L-t0L| (1)Δt 1L = |t 1L -t 0L | (1)
其中,t1L为电压变化绝对值超过调整目标值10%时刻,记为电压变化起始时刻;t0L为无功电流到达稳态值90%时刻,记为响应结束时刻;Among them, t 1L is the moment when the absolute value of the voltage change exceeds 10% of the adjustment target value, which is recorded as the start time of voltage change; t 0L is the time when the reactive current reaches 90% of the steady-state value, which is recorded as the end time of the response;
所述动态无功电流建立时间Δt1C通过下式确定:The dynamic reactive current establishment time Δt 1C is determined by the following formula:
Δt1C=|t1C-t0C| (2)Δt 1C = |t 1C -t 0C | (2)
其中,t1C为电压变化绝对值超过调整目标值10%时刻,记为电压变化起始时刻;t0C为无功电流到达稳态值90%时刻,记为响应结束时刻;Among them, t 1C is the moment when the absolute value of the voltage change exceeds 10% of the adjustment target value, which is recorded as the start time of voltage change; t 0C is the time when the reactive current reaches 90% of the steady-state value, which is recorded as the end time of the response;
所述动态无功电流响应时间Δt2L通过下式确定:The dynamic reactive current response time Δt 2L is determined by the following formula:
Δt2L=|t2L-t0L| (3)Δt 2L = |t 2L -t 0L | (3)
其中,t2L为电压变化绝对值超过调整目标值10%时刻,记为电压变化起始时刻;Among them, t 2L is the moment when the absolute value of the voltage change exceeds the adjustment target value by 10%, which is recorded as the starting time of the voltage change;
所述动态无功电流响应时间Δt2C通过下式确定:The dynamic reactive current response time Δt 2C is determined by the following formula:
Δt2C=|t2C-t0C| (4)Δt 2C = |t 2C -t 0C | (4)
其中,t2C为电压变化绝对值超过调整目标值10%时刻,记为电压变化起始时刻;Among them, t2C is the moment when the absolute value of the voltage change exceeds the adjustment target value by 10%, which is recorded as the starting time of the voltage change;
感性或容性无功功率响应值为达到稳态后电站无功输出值Q与AVC设定目标值Qset的比值。The inductive or capacitive reactive power response value is the ratio of the reactive power output value Q of the power station to the AVC set target value Qset after reaching a steady state.
和最接近的现有技术比,本发明提供技术方案具有以下优异效果Compared with the closest prior art, the technical solution provided by the present invention has the following excellent effects
1、本发明的方法通过利用站级有载调压变的抽头调节和电站AVC响应阈值调整实现电站出口侧电压波动;1. The method of the present invention realizes the voltage fluctuation at the outlet side of the power station by using the tap adjustment of the station-level OLTC and the adjustment of the AVC response threshold of the power station;
2、本发明的方法监测电站集中无功补偿及逆变器的动态无功响应能力并依据标准进行评价;2. The method of the present invention monitors the centralized reactive power compensation of the power station and the dynamic reactive power response capability of the inverter and evaluates it according to the standard;
3、本发明的方法解决了光伏电站动态无功响应测量时,测试装置容量有限以及建模测试方法过于复杂的问题;3. The method of the present invention solves the problems of limited capacity of the test device and too complicated modeling and testing methods during the measurement of the dynamic reactive power response of the photovoltaic power station;
4、本发明的方法完善了目前光伏电站站级无功响应能力测试方法体系。4. The method of the present invention improves the current method system for testing the reactive power response capability of the photovoltaic power station.
附图说明Description of drawings
图1为本发明的光伏电站无功控制系统框图;Fig. 1 is the block diagram of reactive power control system of photovoltaic power plant of the present invention;
图2为本发明的光伏电站动态无功测试点图;Fig. 2 is a dynamic reactive power test point diagram of a photovoltaic power station of the present invention;
图3为本发明的光伏电站电压调节曲线图;Fig. 3 is the curve diagram of the voltage regulation of the photovoltaic power plant of the present invention;
图4为本发明的无功功率动态响应判断法示意图;Fig. 4 is the schematic diagram of reactive power dynamic response judging method of the present invention;
图5为本发明的某集中接入式30MW电压、无功电流变化趋势图;Fig. 5 is a centralized access type 30MW voltage and reactive current variation trend diagram of the present invention;
图6为本发明的某集中接入式30MW电压、无功电流变化趋势图;Fig. 6 is a centralized access type 30MW voltage and reactive current variation trend diagram of the present invention;
图7为本发明的某集中接入式30MW有功功率,无功功率响应特性图;Fig. 7 is a certain centralized access type 30MW active power of the present invention, reactive power response characteristic figure;
图8为本发明的某集中接入式30MW容性动态电压、无功电流有效值图。Fig. 8 is a diagram of effective values of dynamic voltage and reactive current of a centralized access type 30MW capacitive device according to the present invention.
具体实施方式Detailed ways
下面结合实施例对发明作进一步的详细说明。Below in conjunction with embodiment the invention is described in further detail.
实施例1:Example 1:
如图1-8所示,本例的发明提供了光伏电站动态无功响应性能的现场测试方法;测试点应选定在光伏电站并网点处,站内母线电压变化通过调节主变抽头实现,调压范围为±N级,调压步长为Utap%。As shown in Figure 1-8, the invention of this example provides an on-site test method for the dynamic reactive power response performance of photovoltaic power plants; The pressure range is ±N level, and the pressure regulation step is U tap %.
测试方法步骤如下The test method steps are as follows
(1)按照附图2,在电站二次侧接入功率检测装置,测量电站有功功率输出和无功功率输出;检查电能质量分析仪以及功率分析仪的电压、电流、有功功率和无功功率是否和电站控制室一致;检查功率检测装置的时间是否和电站控制室保持同步。(1) According to Figure 2, connect the power detection device on the secondary side of the power station to measure the active power output and reactive power output of the power station; check the voltage, current, active power and reactive power of the power quality analyzer and power analyzer Whether it is consistent with the control room of the power station; check whether the time of the power detection device is synchronized with the control room of the power station.
(2)调整有载变压器抽头,将变压器抽头调整到中间位置,此时并网点电压应符合GB/T 12325电压偏差要求:(2) Adjust the on-load transformer taps, and adjust the transformer taps to the middle position. At this time, the grid-connected point voltage should meet the voltage deviation requirements of GB/T 12325:
通过10(6)kV电压等级接入公共电网的光伏发电站,其并网点电压偏差为相应系统标称电压的±7%。 For photovoltaic power stations connected to the public grid through a 10(6)kV voltage level, the voltage deviation of the grid-connected point is ±7% of the nominal voltage of the corresponding system.
通过35kV~110kV电压等级接入公共电网的光伏发电站,其并网点电压偏差为相应系统标称电压的‐3%~+7%;事故后恢复电压为系统标称电压的±10%。 For photovoltaic power stations connected to the public grid through a voltage level of 35kV to 110kV, the voltage deviation of the grid connection point is -3% to +7% of the nominal voltage of the corresponding system; the recovery voltage after the accident is ±10% of the nominal voltage of the system.
通过220kV电压等级接入公共电网的光伏发电站,其并网点电压偏差为相应系统标称电压的0%~+10%;事故后恢复电压为系统标称电压的‐5%~+10%。 For photovoltaic power stations that are connected to the public grid through a 220kV voltage level, the voltage deviation of the grid-connected point is 0% to +10% of the nominal voltage of the corresponding system; the recovery voltage after the accident is -5% to +10% of the nominal voltage of the system.
通过330kV及以上电压等级接入公共电网的光伏发电站,正常运行方式下,其并网点最高运行电压不得超过系统标称电压的+110%;最低运行电压不应影响电力系统同步稳定、电压稳定、厂用电的正常使用及下一级电压的调节。 For photovoltaic power stations that are connected to the public grid through a voltage level of 330kV and above, under normal operation, the maximum operating voltage of the grid-connected point shall not exceed +110% of the system's nominal voltage; the minimum operating voltage shall not affect the synchronous stability and voltage stability of the power system , The normal use of factory power and the regulation of the next level of voltage.
(3)测试时照度应保持在400W/m2以上;记录电站当前输出有功功率为P0;不限制光伏发电站的无功功率变化速度;确保集中无功补偿装置处于正常运行状态,所有逆变器输出无功功率接近于0。(3) The illuminance should be kept above 400W/ m2 during the test; record the current output active power of the power station as P 0 ; do not limit the reactive power change speed of the photovoltaic power station; ensure that the centralized reactive power compensation device is in normal operation, and all inverters The output reactive power of the converter is close to 0.
(4)通过电站AVC系统设定光伏电站工作在端电压控制方式下,电压动作阈值为±U%<(2~4)×Utap%,电压越界后发出反向最大无功功率Qmax,抑制电压波动;(4) Set the photovoltaic power station to work in the terminal voltage control mode through the AVC system of the power station, the voltage action threshold is ±U%<(2~4)×U tap %, and the reverse maximum reactive power Q max is issued after the voltage exceeds the limit. suppress voltage fluctuations;
(5)按照附图3所示电压曲线,调节有载变压器抽头,逐级升高并网点电压对电站并网点电压进行扰动,观察到电站无功动作后,恢复有载调压变压器抽头至实验初始的中间位置;逐级降低并网点电压对电站并网点电压进行扰动,观察到电站无功动作后,恢复抽头至实验初始的中间位置。(5) According to the voltage curve shown in Figure 3, adjust the taps of the on-load transformer, and gradually increase the voltage of the grid-connected point to disturb the voltage of the grid-connected point of the power station. The initial intermediate position; the voltage of the grid-connected point is lowered step by step to disturb the voltage of the grid-connected point of the power station. After observing the reactive power action of the power station, restore the tap to the initial intermediate position of the experiment.
(6)测试结束,恢复电压抽头位置,电站恢复正常运行状态,保存仪器测试数据,拆除仪器接线。(6) After the test, the position of the voltage tap is restored, the power station returns to normal operation, the test data of the instrument is saved, and the wiring of the instrument is removed.
(7)分析测试结果,计算光伏电站动态响应性能指标:发出感性无功时,动态无功电流建立时间Δt1L,动态无功电流响应时间Δt2L;发出容性无功时,动态无功电流建立时间Δt1C,动态无功电流响应时间Δt2C,感性无功功率响应值,容性无功功率响应值。(7) Analyze the test results and calculate the dynamic response performance index of the photovoltaic power station: when sending inductive reactive power, the dynamic reactive current establishment time Δt 1L , and the dynamic reactive current response time Δt 2L ; when sending capacitive reactive power, the dynamic reactive current Establishment time Δt 1C , dynamic reactive current response time Δt 2C , inductive reactive power response value, and capacitive reactive power response value.
所述动态无功电流建立时间Δt1L通过下式确定:The dynamic reactive current establishment time Δt 1L is determined by the following formula:
Δt1L=|t1L-t0L| (1)Δt 1L = |t 1L -t 0L | (1)
其中,t1L为电压变化绝对值超过调整目标值10%时刻,记为电压变化起始时刻;t0L为无功电流到达稳态值90%时刻,记为响应结束时刻;Among them, t 1L is the moment when the absolute value of the voltage change exceeds 10% of the adjustment target value, which is recorded as the start time of voltage change; t 0L is the time when the reactive current reaches 90% of the steady-state value, which is recorded as the end time of the response;
所述动态无功电流建立时间Δt1C通过下式确定:The dynamic reactive current establishment time Δt 1C is determined by the following formula:
Δt1C=|t1C-t0C| (2)Δt 1C = |t 1C -t 0C | (2)
其中,t1C为电压变化绝对值超过调整目标值10%时刻,记为电压变化起始时刻;t0C为无功电流到达稳态值90%时刻,记为响应结束时刻;Among them, t 1C is the moment when the absolute value of the voltage change exceeds 10% of the adjustment target value, which is recorded as the start time of voltage change; t 0C is the time when the reactive current reaches 90% of the steady-state value, which is recorded as the end time of the response;
所述动态无功电流响应时间Δt2L通过下式确定:The dynamic reactive current response time Δt 2L is determined by the following formula:
Δt2L=|t2L-t0L| (3)Δt 2L = |t 2L -t 0L | (3)
其中,t2L为电压变化绝对值超过调整目标值10%时刻,记为电压变化起始时刻;Among them, t 2L is the moment when the absolute value of the voltage change exceeds the adjustment target value by 10%, which is recorded as the starting time of the voltage change;
所述动态无功电流响应时间Δt2C通过下式确定:The dynamic reactive current response time Δt 2C is determined by the following formula:
Δt2C=|t2C-t0C| (4)Δt 2C = |t 2C -t 0C | (4)
其中,t2C为电压变化绝对值超过调整目标值10%时刻,记为电压变化起始时刻;Among them, t2C is the moment when the absolute value of the voltage change exceeds the adjustment target value by 10%, which is recorded as the starting time of the voltage change;
感性/容性无功功率响应值为达到稳态后电站无功输出值Q与AVC设定目标值Qset的比值。The inductive/capacitive reactive power response value is the ratio of the reactive power output value Q of the power station after reaching a steady state and the AVC set target value Q set .
图4中,Iq1为光伏电站无功电流初始运行值;Iq2为光伏电站无功电流动态响应幅值;Iq为光伏电站动态无功电流响应幅值;In Figure 4, Iq 1 is the initial operating value of the reactive current of the photovoltaic power station; Iq 2 is the dynamic response amplitude of the reactive current of the photovoltaic power station; Iq is the dynamic reactive current response amplitude of the photovoltaic power station;
为了分析不同时间长度对测试结果分布的影响,下面以某集中接入式30MW动态无功测试结果为例。感性动态无功测试结果如图5-6所示,感性无功设定值为8Mvar。In order to analyze the impact of different time lengths on the distribution of test results, the following is an example of a centralized access 30MW dynamic reactive power test result. The test results of inductive dynamic reactive power are shown in Figure 5-6, and the set value of inductive reactive power is 8Mvar.
经过计算,感性无功响应性能指标如表1所示:After calculation, the performance index of inductive reactive power response is shown in Table 1:
表1电压恢复后电站功率变化趋势Table 1 Power change trend of power station after voltage recovery
容性动态无功测试结果如图8所示,感性无功设定值为4Mvar。经过计算,容性无功响应性能指标如表1所示:Capacitive dynamic reactive power test results are shown in Figure 8, and the set value of inductive reactive power is 4Mvar. After calculation, the capacitive reactive power response performance index is shown in Table 1:
表2电压恢复后电站功率变化趋势Table 2 Power change trend of power station after voltage recovery
根据申请中描述的方法,该电站动态无功测试结果如下:According to the method described in the application, the dynamic reactive power test results of the power station are as follows:
电站发出感性无功功率时,该电站动态无功电流建立时间Δt1L为40ms,动态无功电流动态响应时间Δt2L为1920ms;电站发出容性无功功率时,动态无功电流建立时间Δt1C为90ms,动态无功电流动态响应时间Δt2C为2520ms。感性无功功率响应值93%Qset,容性无功功率响应值67.2%Qset。When the power station sends inductive reactive power, the dynamic reactive current establishment time Δt1L of the power station is 40ms, and the dynamic reactive current dynamic response time Δt2L is 1920ms; when the power station sends capacitive reactive power, the dynamic reactive current establishment time Δt1C is 90ms, The dynamic reactive current dynamic response time Δt2C is 2520ms. The response value of inductive reactive power is 93% Q set , and the response value of capacitive reactive power is 67.2% Q set .
最后应当说明的是:以上实施例仅用以说明本发明的技术方案而非对其限制,所属领域的普通技术人员尽管参照上述实施例应当理解:依然可以对本发明的具体实施方式进行修改或者等同替换,这些未脱离本发明精神和范围的任何修改或者等同替换,均在申请待批的本发明的权利要求保护范围之内。Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Those of ordinary skill in the art should understand with reference to the above embodiments that the specific implementation methods of the present invention can still be modified or equivalent. Replacement, any modifications or equivalent replacements that do not depart from the spirit and scope of the present invention are within the protection scope of the claims of the present invention pending application.
Claims (11)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510031603.2A CN104579165B (en) | 2015-01-22 | 2015-01-22 | A kind of on-the-spot test method of photovoltaic plant dynamic reactive response performance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510031603.2A CN104579165B (en) | 2015-01-22 | 2015-01-22 | A kind of on-the-spot test method of photovoltaic plant dynamic reactive response performance |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104579165A true CN104579165A (en) | 2015-04-29 |
CN104579165B CN104579165B (en) | 2018-07-13 |
Family
ID=53094534
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510031603.2A Active CN104579165B (en) | 2015-01-22 | 2015-01-22 | A kind of on-the-spot test method of photovoltaic plant dynamic reactive response performance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104579165B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105356476A (en) * | 2015-11-09 | 2016-02-24 | 中国电力科学研究院 | Photovoltaic power station power testing method based on simulation scheduling |
CN105445539A (en) * | 2015-11-24 | 2016-03-30 | 中国电力科学研究院 | Photovoltaic power station dynamic wattless performance test method and system |
CN105445580A (en) * | 2015-11-18 | 2016-03-30 | 中国电力科学研究院 | Test method of reactive power compensation device response time |
CN105811426A (en) * | 2015-12-24 | 2016-07-27 | 国网甘肃省电力公司电力科学研究院 | Photovoltaic grid connected inverter reactive output control method |
CN106026166A (en) * | 2016-06-24 | 2016-10-12 | 中国电力科学研究院 | Reactive capacity detection method for new energy power station accessed to weak power grid |
CN106712041A (en) * | 2016-12-14 | 2017-05-24 | 云南电网有限责任公司电力科学研究院 | Higher and lower class voltage coordination control method of 220kV collection substation |
CN110034584A (en) * | 2019-04-30 | 2019-07-19 | 东南大学 | A kind of meter and the idle adaptive reactive voltage control method of abundance photovoltaic plant |
CN110266012A (en) * | 2019-05-29 | 2019-09-20 | 华电电力科学研究院有限公司 | A kind of photovoltaic plant dynamic reactive response time test method |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101867192A (en) * | 2009-12-24 | 2010-10-20 | 浙江省电力试验研究院 | Reactive power compensation control simulation test system |
CN104050366A (en) * | 2014-06-13 | 2014-09-17 | 国家电网公司 | Dynamic reactive power compensation device response time test method |
-
2015
- 2015-01-22 CN CN201510031603.2A patent/CN104579165B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101867192A (en) * | 2009-12-24 | 2010-10-20 | 浙江省电力试验研究院 | Reactive power compensation control simulation test system |
CN104050366A (en) * | 2014-06-13 | 2014-09-17 | 国家电网公司 | Dynamic reactive power compensation device response time test method |
Non-Patent Citations (3)
Title |
---|
中国国家标准化管理委员会: "GB/T 29321-2012 光伏发电站无功补偿技术规范", 《中华人民共和国国家标准》 * |
国家能源局: "光伏发电站功率控制能力检测技术规程", 《中国人民共和国能源行业标准》 * |
董开松 等: "光伏电站有功/无功控制能力现场测试及分析", 《电网与清洁能源》 * |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105356476B (en) * | 2015-11-09 | 2019-08-06 | 中国电力科学研究院 | A method for testing the power of photovoltaic power plants based on simulation scheduling |
CN105356476A (en) * | 2015-11-09 | 2016-02-24 | 中国电力科学研究院 | Photovoltaic power station power testing method based on simulation scheduling |
CN105445580A (en) * | 2015-11-18 | 2016-03-30 | 中国电力科学研究院 | Test method of reactive power compensation device response time |
CN105445539A (en) * | 2015-11-24 | 2016-03-30 | 中国电力科学研究院 | Photovoltaic power station dynamic wattless performance test method and system |
CN105445539B (en) * | 2015-11-24 | 2021-04-30 | 中国电力科学研究院 | Method and system for testing dynamic reactive performance of photovoltaic power station |
CN105811426A (en) * | 2015-12-24 | 2016-07-27 | 国网甘肃省电力公司电力科学研究院 | Photovoltaic grid connected inverter reactive output control method |
CN106026166A (en) * | 2016-06-24 | 2016-10-12 | 中国电力科学研究院 | Reactive capacity detection method for new energy power station accessed to weak power grid |
CN106026166B (en) * | 2016-06-24 | 2021-10-29 | 中国电力科学研究院 | A method for detecting reactive power capacity of a new energy power station connected to a weak power grid |
CN106712041B (en) * | 2016-12-14 | 2019-06-07 | 云南电网有限责任公司电力科学研究院 | 220kV collects the step voltage control method for coordinating up and down of substation |
CN106712041A (en) * | 2016-12-14 | 2017-05-24 | 云南电网有限责任公司电力科学研究院 | Higher and lower class voltage coordination control method of 220kV collection substation |
CN110034584A (en) * | 2019-04-30 | 2019-07-19 | 东南大学 | A kind of meter and the idle adaptive reactive voltage control method of abundance photovoltaic plant |
CN110034584B (en) * | 2019-04-30 | 2022-06-03 | 东南大学溧阳研究院 | An adaptive reactive power and voltage control method for photovoltaic power plants considering reactive power sufficiency |
CN110266012A (en) * | 2019-05-29 | 2019-09-20 | 华电电力科学研究院有限公司 | A kind of photovoltaic plant dynamic reactive response time test method |
Also Published As
Publication number | Publication date |
---|---|
CN104579165B (en) | 2018-07-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104579165B (en) | A kind of on-the-spot test method of photovoltaic plant dynamic reactive response performance | |
CN202503293U (en) | Dynamic reactive power compensation device for long-distance transmission lines of power grid | |
González et al. | Impact of grid connected photovoltaic system in the power quality of a distribution network | |
CN104167739A (en) | Four-bridge arm thyristor switch voltage-regulating circuit and voltage-regulating method | |
CN107994587A (en) | A kind of high permeability photovoltaic power distribution network voltage control method on the spot | |
CN104701856B (en) | A kind of wind farm grid-connected reactive voltage control method | |
CN103278717A (en) | New energy integrated grid-connected testing device | |
CN104319775A (en) | Reactive power voltage control method applicable to large-scale wind power integration | |
CN107658909A (en) | A kind of low and medium voltage distribution network voltage lifting suppressing method of the access containing photovoltaic | |
CN111614117A (en) | Rapid response control method for transient voltage disturbance in centralized photovoltaic power station | |
CN102738807B (en) | All-station reactive optimal control method for intensively integrating wind farms into public transformer substation | |
CN103457270A (en) | Central dynamic reactive compensation device for transformers | |
CN108964120B (en) | Optimal control method for low-voltage distributed photovoltaic access capacity | |
CN106610456A (en) | Grid-connected performance test method for wind power plant reactive power compensation device | |
CN105470973A (en) | Improved low-voltage line voltage regulating device | |
CN103427427B (en) | Power grid source steady state voltage regulating optimization method for improving transient voltage support capability of power grid | |
CN105356477A (en) | Reactive voltage integrated control method for large-sized wind power cluster and send-out channel thereof | |
CN102868177B (en) | Automatic identification and correction method of grid-connected point system impedance of wind farm | |
CN107910868A (en) | Outdoor series voltage quality regulating device | |
CN104348162B (en) | 330kV wind energy turbine set collects control method of transformer station voltage | |
CN105262112A (en) | Control method for wind power plant cluster-type static var compensator | |
CN102593842A (en) | Distributive flexible reactive compensation configuration method of provincial power grid | |
CN204008910U (en) | The band of automatic Regulation loading capacitance-regulating distribution transformer carries detection system | |
CN112531722B (en) | Reactive voltage control method and system | |
CN103050979A (en) | Calculation method of voltage of connecting bus of static var compensator of power grid |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |