CN106712041A - Higher and lower class voltage coordination control method of 220kV collection substation - Google Patents
Higher and lower class voltage coordination control method of 220kV collection substation Download PDFInfo
- Publication number
- CN106712041A CN106712041A CN201611150190.0A CN201611150190A CN106712041A CN 106712041 A CN106712041 A CN 106712041A CN 201611150190 A CN201611150190 A CN 201611150190A CN 106712041 A CN106712041 A CN 106712041A
- Authority
- CN
- China
- Prior art keywords
- voltage
- station
- collects
- collection bus
- transformer station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/16—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by adjustment of reactive power
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/30—Reactive power compensation
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention provides a higher and lower class voltage coordination control method of a 220kV collection substation, comprising the following steps: acquiring the current voltage of a 110kV collection bus of the ith 220kV collection substation in a regional power grid, judging whether the voltage is out of limit; if the voltage is out of limit, calculating the ability of all low class 110kV regenerative energy terminal yards carried by the 110kV collection bus of the ith 220kV collection substation to regulate the voltage of the 110kV collection bus; evaluating whether the voltage regulating ability is sufficient; if the voltage regulating ability is sufficient, regulating the voltage of the 110kV collection bus by using the low class 110kV regenerative energy terminal yards; and if the voltage regulating ability is insufficient, regulating the voltage of the 110kV collection bus by using reactive power equipment of the ith 220kV collection substation. The method provided by the invention can give full play to the reactive power regulating ability of the regenerative energy stations, and avoid a great deal of excess reactive power generated by excessive capacitors or reactors.
Description
Technical field
Collect change the present invention relates to regenerative resource collection region voltage control technology field, more particularly to a kind of 220kV
The step voltage control method for coordinating up and down in power station.
Background technology
In recent years, influenceed by global warming and energy crisis, the importance of clean energy resource is increasingly highlighted, its apoplexy
Power generates electricity and the regenerative resource such as photovoltaic generation is due to its huge potentiality to be exploited and the development technique of relative maturity, by generation
The extensive concern of various countries of boundary, and got up with a kind of unprecedented speed fast development.
What China was taken regenerative resource is the development mode of extensive centralization, as shown in figure 1, at present China can
Regenerated energy source station is all that several 110kV stations are linked into power network by a 220kV transformer station, and this 220kV transformer station is referred to as converging
Collection station, the 110kV renewable energies source station for collecting station and following band is referred to as a new energy collection region.Because regenerative resource is solid
The intermittent feature having, extensive regenerative resource is grid-connected to bring greatly challenge to operation of power networks scheduling.Again because can be again
Simultaneously web area often lacks local load to the raw energy, and the electric energy that regenerative resource sends is needed by voltage levels, transmission of electricity long
Circuit, delivers to the load center in a distant place, and these regenerative resource transfer passages often lack conventional extreme misery power plant carry out it is active,
Idle support, system short circuit capacity is smaller, and this change for resulting in renewable energy source capability can trigger larger voltage pulsation,
Voltage pulsation in 110kV collection bus especially as shown in Figure 1, can even cause extensive chain off-grid when serious.
In the prior art, in order to avoid the voltage pulsation in 110kV collection bus, often in ground state by collecting
Transformer station sets multiple capacitors or reactor, and 110kV collection bus voltages are adjusted by the switching of capacitor or reactor,
But excessive capacitor or reactor can cause to produce substantial amounts of superfluous reactive power.
The content of the invention
In order to overcome problem present in correlation technique, the present invention to provide the superior and the subordinate's electricity that a kind of 220kV collects transformer station
Pressure control method for coordinating, 110kV buses are adjusted by preferential using the Reactive-power control ability of subordinate's renewable energy source station itself
Voltage so that the Reactive-power control ability of renewable energy source station itself is not fully exerted.When subordinate's regenerative resource station itself
Reactive-power control scarce capacity when, just by switching higher level 220kV collect station in capacitor, reactor, it is ensured that renewable energy
Source station collection bus voltage is in N-1 security domains.Such upper and lower step voltage control method for coordinating can give full play in ground state
The Reactive-power control ability of renewable energy source station itself, substitution static capacitors or reactor play voltage support effect, it is to avoid
Excessive capacitor or reactor cause to be produced during fault disturbance excessive idle under ground state.
One side according to embodiments of the present invention, there is provided the step voltage up and down that a kind of 220kV collects transformer station is coordinated
Control method, it is characterised in that 220kV collects transformer station and connects subordinate 110kV regenerative resources by 110kV collection bus
Stand, methods described is included in when controlling cycle arrives and performs following steps:Step S1, i-th 220kV converges in obtaining area power grid
Collect the current voltage value of the 110kV collection bus of transformer station, judge the current voltage value whether in control bound scope
Interior, wherein i is natural number, and 220kV collects the sum of transformer station in 1≤i≤area power grid;Step S2, if the current electricity
Pressure value is within the scope of the control bound, then make i=i+1, is returned and is performed step S1;Step S3, if described current
Magnitude of voltage calculates the 110kV collection bus institute band that i-th 220kV collects transformer station beyond the control bound scope
Whole subordinate 110kV regenerative resources stations to the voltage regulation capability of 110kV collection bus;Step S4, under assessment whole
Whether the voltage regulation capability of level 110kV regenerative resources station is enough by the voltage Tiao Jiedao institutes of corresponding 110kV collection bus
State in the range of control bound;Step S5, if the voltage regulation capability of whole subordinate 110kV regenerative resources stations enough will
Controlled in the range of bound described in the voltage Tiao Jiedao of 110kV collection bus, then adjusted using subordinate 110kV regenerative resources station
Save the voltage of 110kV collection bus;Step S6, if the voltage regulation capability of whole subordinate 110kV regenerative resources stations is not
Be enough to be controlled in the range of bound described in the voltage Tiao Jiedao by 110kV collection bus, then can except using whole subordinate 110kV
Outside the voltage of renewable sources of energy station regulation 110kV collection bus, also collect the idle of transformer station using i-th 220kV
The voltage of equipment supplement regulation 110kV collection bus;Step S7, makes i=i+1, performs step S1.
Preferably, the step S1 includes:
Step S11, obtain in real time i-th 220kV collect transformer station 110kV collection bus current voltage value and
Control upper lower limit value, wherein, current voltage value is denoted as being Vi cur, lower control limit value is denoted as Vi min, upper control limit value is denoted as Vi max;
Step S12, checks 110kV collection bus current voltages Vi curWhether in the range of control bound:
Vi min+Vi dead< Vi cur< Vi max-Vi dead (1)
Wherein, Vi deadFor 110kV collection bus voltage out-of-limit judges dead band threshold value;
If formula (1) is set up, it is determined that the 110kV collection bus voltage that i-th 220kV collects transformer station is in control
Within the scope of bound processed;If above formula is invalid, it is determined that i-th 220kV collects the 110kV collection bus of transformer station
Voltage is beyond control bound scope.
Preferably, step S3 includes:
Step S31, i-th 220kV described in real-time reception collects the jZuo subordinates 110kV regenerative resources in transformer station
Increasing for being sent on station is idle and can subtract idle, and according to the idle to corresponding of jZuo subordinates 110kV regenerative resources station
The voltage sensibility of 110kV collection bus, calculates jZuo subordinate 110kV regenerative resources stations and collects mother to corresponding 110kV
The voltage of line increases regulating powerRegulating power is reduced with voltage
WhereinThe jZuo subordinates 110kV collected for i-th 220kV in transformer station is renewable
Increasing for being sent on energy station is real-time is idle and can subtract idle,It is the jZuo subordinates 110kV regenerative resources station
The idle sensitivity to 110kV collection bus up voltages,It is the nothing of the jZuo subordinates 110kV regenerative resources station
The sensitivity of voltage drops to 110kV collection bus in work(, and j is natural number, and 1≤j≤the i-th 220kV collects subordinate in transformer station
The sum of 110kV regenerative resources station;
Step S32, makes j=j+1, returns and performs step S31;
Step S33, i-th 220kV is collected whole subordinate 110kV regenerative resources stations pair of transformer station
The voltage regulation capability of 110kV collection bus adds up, and show that i-th 220kV collects the 110kV collection bus institute of transformer station
Voltage regulation capability of the whole subordinate 110kV regenerative resources stations of band to 110kV collection bus:
Preferably, step S4 includes:
Step S41, assesses i-th 220kV and collects whole subordinate 110kV regenerative resources stations pair in transformer station
Whether the voltage of 110kV collection bus reduces regulating power sufficient:
IfThen i-th 220kV has collected in transformer station 110kV collection bus or has connect
The upper limit closely is crossed, it is necessary to be depressured, then judge whether following equation is set up:
Vi max-Vi cur< Vi Down (4)
If formula (4) is set up, judge that i-th 220kV collects whole subordinate 110kV renewable energies of substation's band
Source station voltage reduces that regulating power is not enough, it is necessary to the reactive apparatus that i-th 220kV collects transformer station coordinate step-down,
Wherein:Vi deadFor 110kV collection bus voltage out-of-limit judges threshold value, Vi curFor 110kV collection bus are currently electric
Pressure value, Vi maxIt is 110kV collection bus voltage upper control limit values, Vi DownFor i-th 220kV collects in transformer station all
Regulating power is reduced 110kV regenerative resources station to the voltage of 110kV collection bus;
Step S42, assesses i-th 220kV and collects whole subordinate 110kV regenerative resources stations pair in transformer station
Whether the voltage of 110kV collection bus increases regulating power sufficient:
IfThen i-th 220kV has collected in transformer station 110kV collection bus or has connect
Lower limit closely is crossed, it is necessary to boost, then judge whether following equation is set up:
Vi min-Vi cur> Vi Up (5)
If formula (5) is set up, judge that i-th 220kV collects whole subordinate 110kV renewable energies of substation's band
Source station voltage increases that regulating power is not enough, it is necessary to the reactive apparatus that i-th 220kV collects transformer station coordinate boosting,
Wherein:Vi deadFor 110kV collection bus voltage out-of-limit judges threshold value, Vi curFor 110kV collection bus are currently electric
Pressure value, Vi minIt is 110kV collection bus voltage lower control limit values, Vi UpFor i-th 220kV collects in transformer station all
110kV regenerative resources station increases regulating power to the voltage of 110kV collection bus.
Preferably, step S6 includes:
Step S61, if step S41 judges that the reactive apparatus for needing i-th 220kV to collect transformer station coordinate drop
Pressure, then:If i-th 220kV collects the capacitor that transforming plant main transformer low-pressure side has operation, a reactor is cut off;
Otherwise put into a reactor;
Step S62, if step S42 judges that the reactive apparatus for needing i-th 220kV to collect transformer station are coordinated to rise
Pressure, then:If i-th 220kV collects the reactor that transforming plant main transformer low-pressure side has operation, a reactor is cut off;
Otherwise put into a capacitor.
Preferably, the subordinate 110kV regenerative resources station is wind power station or photo-voltaic power generation station.
Preferably, it was a controlling cycle every 5 minutes.
As described above, the invention provides the step voltage control method for coordinating up and down that a kind of 220kV collects transformer station, it is special
Levy and be, 220kV collects transformer station and connects subordinate 110kV regenerative resources station, methods described bag by 110kV collection bus
Include and perform following steps when controlling cycle arrives:Step S1, i-th 220kV collects transformer station in obtaining area power grid
Whether the current voltage value of 110kV collection bus, judges the current voltage value in the range of control bound, and wherein i is
Natural number, 220kV collects the sum of transformer station in 1≤i≤area power grid;Step S2, if the current voltage value is in institute
State within the scope of control bound, then make i=i+1, return and perform step S1;Step S3, if the current voltage value exceeds
The control bound scope, calculates whole subordinates that i-th 220kV collects the 110kV collection bus institute band of transformer station
Voltage regulation capability of the 110kV regenerative resources station to 110kV collection bus;Step S4, assessment whole subordinate 110kV can be again
Whether the voltage regulation capability of raw energy station will control bound described in the voltage Tiao Jiedao of corresponding 110kV collection bus enough
In the range of;Step S5, if 110kV is collected mother by the voltage regulation capability of whole subordinate 110kV regenerative resources stations enough
Controlled in the range of bound described in the voltage Tiao Jiedao of line, then collected using subordinate's 110kV regenerative resources station regulation 110kV
The voltage of bus;Step S6, if the voltage regulation capability of whole subordinate 110kV regenerative resources stations is not enough to 110kV
Controlled in the range of bound described in the voltage Tiao Jiedao of collection bus, then except using whole subordinate 110kV regenerative resources
Stand outside the voltage of regulation 110kV collection bus, the reactive apparatus for also collecting transformer station using i-th 220kV are supplemented to be adjusted
Save the voltage of 110kV collection bus;Step S7, makes i=i+1, performs step S1.220kV of the invention collects the upper of transformer station
Subordinate voltage control method for coordinating adjusts 110kV by preferential using the Reactive-power control ability of subordinate's renewable energy source station itself
The voltage of bus so that the Reactive-power control ability of renewable energy source station itself is not fully exerted.When new energy collection region
During Reactive-power control scarce capacity, capacitor, the reactor in station are just collected by switching 220kV, it is ensured that renewable energy source station is female
Line voltage is in N-1 security domains.Such upper and lower step voltage control method for coordinating can give full play to regenerative resource in ground state
Stand the Reactive-power control ability of itself, substitution static capacitors or reactor play voltage support effect, it is to avoid excessive under ground state
Capacitor or reactor cause to be produced during fault disturbance it is excessive idle.Therefore, the present invention realizes higher level
220kV collects transformer station and coordinates control with the reactive voltage of subordinate's 110kV renewable energies source station, when subordinate's 110kV renewable energies
When source station is not enough to the voltage regulation capability of 110kV busbar voltages, ensure renewable by switching substation capacitors, reactor
Energy source station busbar voltage is in N-1 security domains, it is to avoid regenerative resource Voltage Drop causes the chain off-grid in regenerative resource station,
Improve Network Voltage Stability and quality of voltage.
It should be appreciated that the general description of the above and detailed description hereinafter are only exemplary and explanatory, not
Can the limitation present invention.
Brief description of the drawings
Accompanying drawing herein is merged in specification and constitutes the part of this specification, shows and meets implementation of the invention
Example, and be used to explain principle of the invention together with specification.
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, for those of ordinary skill in the art
Speech, without having to pay creative labor, can also obtain other accompanying drawings according to these accompanying drawings.
Fig. 1 is new energy collection region power grid architecture schematic diagram;
Fig. 2 is the flow of the control method for coordinating of step voltage up and down that 220kV provided in an embodiment of the present invention collects transformer station
Schematic diagram.
Specific embodiment
Here exemplary embodiment will be illustrated in detail, its example is illustrated in the accompanying drawings.Following description is related to
During accompanying drawing, unless otherwise indicated, the same numbers in different accompanying drawings represent same or analogous key element.Following exemplary embodiment
Described in implementation method do not represent and the consistent all implementation methods of the present invention.Conversely, they be only with it is such as appended
The example of the consistent apparatus and method of some aspects being described in detail in claims, of the invention.
Generally, area power grid new energy collection region generally includes a 220kV and collects transformer station and multiple subordinate 110kV
Regenerative resource station, these subordinates 110kV regenerative resources station is collected transformer station and is linked into power network by 220kV,
The 110kV collection bus that 220kV collects transformer station connect these subordinates 110kV regenerative resources station.In new energy pooling zone
The voltage in domain is coordinated in control, in order to avoid occurring, due to the extensive chain off-grid that voltage is caused, should fully being sent out in ground state
The Reactive-power control ability of renewable energy source station itself is waved, is acted on replacing direct capacitance to play voltage support, it is to avoid under ground state
Excessive input capacitor causes to be produced during fault disturbance excessive idle.Therefore, in the present invention, regenerative resource
Stand as follows with the reactive voltage coordination principle for collecting station transformer station:
1st, the preferential Reactive-power control ability using renewable energy source station under ground state.
When the renewable energy source station in new energy collection region has Reactive-power control ability, regenerative resource is preferentially used
Stand the Reactive-power control ability of itself, the voltage limits that it collects transformer station are using plan limit value so that renewable energy source station bus
Voltage is in N-1 security domains.
2nd, when the Reactive-power control scarce capacity of new energy collection region, entered using the low-pressure side reactive apparatus collected in station
Row new energy collection region voltage-regulation.
When renewable energy source station Reactive-power control scarce capacity and can not in the N-1 security domains when, by switching 220kV
Collect capacitor, the reactor in station, it is ensured that renewable energy source station busbar voltage is in N-1 security domains.
Coordinate control original with the reactive voltage of subordinate's 110kV regenerative resources station to realize that above-mentioned 220kV collects station
Then, the present invention is proposed and realizes a kind of method for coordinating control.As shown in Fig. 2 220kV collects the step voltage up and down of transformer station
Control method for coordinating is included in when controlling cycle (being a controlling cycle every 5 minutes) arrives and performs following steps:
Step S1, obtains the current voltage value that i-th 220kV in area power grid collects the 110kV collection bus of transformer station,
Whether current voltage value is judged in the range of control bound, and wherein i is natural number, and 220kV converges in 1≤i≤area power grid
Collect the sum of transformer station.
Step S2, if current voltage value is within the scope of control bound, makes i=i+1, returns and performs step
S1, that is to say, that obtain the current voltage value that next 220kV collects the 110kV collection bus of transformer station.
Step S3, if current voltage value is beyond control bound scope, calculates i-th 220kV and collects transformer station
Voltage regulation capability of the whole subordinate 110kV regenerative resources stations of 110kV collection bus institute band to 110kV collection bus.
Step S4, whether the voltage regulation capability of the whole subordinate 110kV regenerative resources stations of assessment enough will be corresponding
In the range of the voltage Tiao Jiedao control bounds of 110kV collection bus.
Step S5, if 110kV is collected mother by the voltage regulation capability of whole subordinate 110kV regenerative resources stations enough
In the range of the voltage Tiao Jiedao control bounds of line, then using subordinate 110kV regenerative resources station regulation 110kV collection bus
Voltage.
Step S6, if the voltage regulation capability of whole subordinate 110kV regenerative resources stations is not enough to collect 110kV
Controlled in the range of bound described in the voltage Tiao Jiedao of bus, then except being adjusted using whole subordinate 110kV regenerative resources stations
Save outside the voltage of 110kV collection bus, the reactive apparatus for also collecting transformer station using i-th 220kV supplement regulation
The voltage of 110kV collection bus.
Step S7, makes i=i+1, performs step S1.That is, collecting transformer station to next 220kV carries out voltage association
Regulation and control system.
Embodiments in accordance with the present invention, subordinate's 110kV regenerative resources station can be wind power station or photovoltaic generation
Stand.
According to one embodiment of present invention, above-mentioned steps S1 can specifically include:
Step S11, obtain in real time i-th 220kV collect transformer station 110kV collection bus current voltage value and
Control bound scope, wherein current voltage value is designated as Vi cur, lower control limit value is denoted as Vi min, upper control limit value is denoted as Vi max。
Step S12, checks 110kV collection bus current voltages Vi curWhether in the range of control bound:
Vi min+Vi dead< Vi cur< Vi max-Vi dead (1)
Wherein, Vi deadFor 110kV collection bus voltage out-of-limit judges dead band threshold value.
If formula (1) is set up, it is determined that the 110kV collection bus voltage that i-th 220kV collects transformer station is in control
Within the scope of bound processed;If above formula is invalid, it is determined that i-th 220kV collects the 110kV collection bus of transformer station
Voltage is beyond control bound scope.
According to one embodiment of present invention, above-mentioned steps S3 can specifically include:
Step S31, i-th 220kV described in real-time reception collects the jZuo subordinates 110kV regenerative resources in transformer station
Increasing for being sent on station is idle and can subtract idle, and according to the idle to corresponding of jZuo subordinates 110kV regenerative resources station
The voltage sensibility of 110kV collection bus, calculates jZuo subordinate 110kV regenerative resources stations and collects mother to corresponding 110kV
The voltage of line increases regulating powerRegulating power is reduced with voltage
WhereinThe jZuo subordinates 110kV collected for i-th 220kV in transformer station is renewable
Increasing for being sent on energy station is real-time is idle and can subtract idle,It is the jZuo subordinates 110kV regenerative resources station
The idle sensitivity to 110kV collection bus up voltages,It is the nothing of the jZuo subordinates 110kV regenerative resources station
The sensitivity of voltage drops to 110kV collection bus in work(, and j is natural number, and 1≤j≤the i-th 220kV collects subordinate in transformer station
The sum of 110kV regenerative resources station.
Step S32, makes j=j+1, returns and performs step S31.That is, reception i-th 220kV collects in transformer station
Next subordinate's 110kV regenerative resources station increases idle and can subtract idle.
Step S33, i-th 220kV is collected whole subordinate 110kV regenerative resources stations pair of transformer station
The voltage regulation capability of 110kV collection bus adds up, and show that i-th 220kV collects the 110kV collection bus institute of transformer station
Voltage regulation capability of the whole subordinate 110kV regenerative resources stations of band to 110kV collection bus:
According to one embodiment of present invention, above-mentioned steps S4 can specifically include:
Step S41, assesses i-th 220kV and collects whole subordinate 110kV regenerative resources stations pair in transformer station
Whether the voltage of 110kV collection bus reduces regulating power sufficient:
IfThen i-th 220kV has collected in transformer station 110kV collection bus or has connect
The upper limit closely is crossed, it is necessary to be depressured, then judge whether following equation is set up:
Vi max-Vi cur< Vi Down (4)
If formula (4) is set up, judge that i-th 220kV collects whole subordinate 110kV renewable energies of substation's band
Source station voltage reduces that regulating power is not enough, it is necessary to the reactive apparatus that i-th 220kV collects transformer station coordinate step-down,
Wherein:Vi deadFor 110kV collection bus voltage out-of-limit judges threshold value, Vi curFor 110kV collection bus are currently electric
Pressure value, Vi maxIt is 110kV collection bus voltage upper control limit values, Vi DownFor i-th 220kV collects in transformer station all
Regulating power is reduced 110kV regenerative resources station to the voltage of 110kV collection bus.
Step S42, assesses i-th 220kV and collects whole subordinate 110kV regenerative resources stations pair in transformer station
Whether the voltage of 110kV collection bus increases regulating power sufficient:
If Vi cur< Vi min+Vi dead, then i-th 220kV collected in transformer station 110kV collection bus or connect
Lower limit closely is crossed, it is necessary to boost, then judge whether following equation is set up:
Vi min-Vi cur> Vi Up (5)
If formula (5) is set up, judge that i-th 220kV collects whole subordinate 110kV renewable energies of substation's band
Source station voltage increases that regulating power is not enough, it is necessary to the reactive apparatus that i-th 220kV collects transformer station coordinate boosting,
Wherein:Vi deadFor 110kV collection bus voltage out-of-limit judges threshold value, Vi curFor 110kV collection bus are currently electric
Pressure value, Vi minIt is 110kV collection bus voltage lower control limit values, Vi UpFor i-th 220kV collects in transformer station all
110kV regenerative resources station increases regulating power to the voltage of 110kV collection bus.
According to one embodiment of present invention, above-mentioned steps S6 can specifically include:
Step S61, if step S41 judges that the reactive apparatus for needing i-th 220kV to collect transformer station coordinate drop
Pressure, then:If i-th 220kV collects the capacitor that transforming plant main transformer low-pressure side has operation, a capacitor is cut off;
Otherwise put into a reactor.
Step S62, if step S42 judges that the reactive apparatus for needing i-th 220kV to collect transformer station are coordinated to rise
Pressure, then:If i-th 220kV collects the reactor that transforming plant main transformer low-pressure side has operation, a reactor is cut off;
Otherwise put into a capacitor.
The description 220kV of the invention that illustrated with reference to Fig. 1 collects the step voltage control method for coordinating up and down of transformer station.
Fig. 1 is the new energy collection region power grid architecture schematic diagram of area power grid.As shown in figure 1, area power grid new energy collection region
Collect transformer station and three subordinate 110kV wind power station B, 110kV wind power station C and 110kV photovoltaic station D including a 220kV, this three
Individual subordinate 110kV regenerative resources station is collected transformer station and is linked into power network by 220kV, and 220kV collects transformer station
110kV collection bus connect these three subordinates 110kV regenerative resources station.SVC is provided with each regenerative resource station
(Static Var Compensator, SVC).
For the area power grid shown in Fig. 1,220kV of the invention collects station with subordinate's 110kV regenerative resources station
Voltage control method for coordinating, then, to perform following steps in controlling cycle (being a controlling cycle every 5 minutes):
Wherein, the current voltage that 220kV collects station 110kV collection bus is 117.62kV, upper control limit value is
117.50kV, lower control limit value is 110.70kV, and the method presets controlling cycle T, specifically includes following steps:
Come interim in each controlling cycle T (every 5 minutes being a controlling cycle), perform following steps:
1) check that the 220kV of i-th regenerative resource station in area power grid collects the electricity of the 110kV collection bus in station
Pressure situation, execution is calculated as below:
Current voltage value, the control upper lower limit value of 110kV collection bus 1-1) are obtained in real time, and wherein current voltage value is designated as
Vi cur, lower control limit value is denoted as Vi min, upper control limit value is denoted as Vi max.Wherein, Vi cur=117.62kV, Vi max=117.50kV,
Vi min=110.70kV, Vi dead=0.5kV;
1-2) check 110kV collection bus current voltages Vi curWhether in the range of control bound:
Due to Vi cur>Vi max-Vi dead, the 110kV collection bus voltages of 110kV regenerative resources station have got over the upper limit, have entered
Enter next step 2);
2) the subordinate's 110kV regenerative resources station for collecting the 110kV collection bus institute band at station to 220kV performs following meter
Calculate:
That 2-1) is sent on wind power plant B, C and photovoltaic station D in real-time reception collection region increases idle and can subtract idle, and root
According to the idle voltage sensibility to 110kV collection bus of renewable sources of energy station, calculate the renewable sources of energy station and 110kV is collected
The voltage increase and decrease regulating power of bus.
Wind power plant B:
Upward adjustable voltage:
Downward adjustable voltage:
Wind power plant C:
Upward adjustable voltage:
Downward adjustable voltage:
Photovoltaic station D:
Upward adjustable voltage:
Downward adjustable voltage:
The voltage regulation capability of wind power plant B, C and photovoltaic station D 2-2) is accumulated to the total voltage regulation capability of collection region
In:
Vi Up=0.0, Vi Down=0.0.
3) assessment 220kV collects the interior regenerative resource station in station to collecting the voltage-regulation energy of 110kV collection bus in station
Power, method is as follows:
3-1) current Vi cur=117.62kV, Vi max=117.50kV, takesCurrent Vi cur> Vi max-
Vi dead(117.62>117.50-0.50), then 110kV collection bus voltage has got over the upper limit;
ΔVi=Vi max-Vi cur=-0.12, Δ Vi< Vi Down(-0.12<0.0), then judge that 220kV collects and stand interior renewable
It is not enough, it is necessary to coordinate step-down that the voltage of energy station reduces regulating power.
4) according to step 3) to 220kV collect station in renewable sources of energy station voltage regulation capability assessment result, calculate
220kV collects the reactive apparatus Switching Strategy of transformer station.
4-1) pass through 3-1) judge to be currently needed for coordinating step-down, if 220kV collects the electricity that station owner's low pressure side has operation
Container, then cut off a capacitor;Otherwise put into a reactor.
5) return to step 1), the 220kV for continuing with next renewable sources of energy station collects transformer station, until complete in power network
The 220kV of portion renewable sources of energy station collects transformer station's treatment to be completed.
In sum, 220kV of the invention collects the control method for coordinating of step voltage up and down of transformer station by preferential utilization
The Reactive-power control ability of subordinate's renewable energy source station itself adjusts the voltage of 110kV buses so that renewable energy source station itself
Reactive-power control ability be not fully exerted.When the Reactive-power control scarce capacity of new energy collection region, just by switching
220kV collects capacitor, the reactor in station, it is ensured that renewable energy source station busbar voltage is in N-1 security domains.It is such upper and lower
Step voltage control method for coordinating can give full play to the Reactive-power control ability of renewable energy source station itself in ground state, and substitution is static
Capacitor or reactor play voltage support effect, it is to avoid excessive capacitor or reactor cause in fault disturbance under ground state
During produce it is excessive idle.Therefore, the present invention realizes higher level 220kV to collect transformer station renewable with subordinate 110kV
The reactive voltage of energy source station coordinates control, is preferentially adjusted using the Reactive-power control ability of subordinate's renewable energy source station itself
The voltage of 110kV collection bus, when subordinate's 110kV renewable energies source station is to the voltage regulation capability of 110kV collection bus voltages
When not enough, ensure renewable energy source station collection bus voltage in N-1 security domains by switching higher level substation capacitors, reactor
In, it is to avoid regenerative resource station Voltage Drop causes the chain off-grid in regenerative resource station, improves Network Voltage Stability
And quality of voltage.
Those skilled in the art considering specification and practice here after disclosure of the invention, will readily occur to it is of the invention its
Its embodiment.The application is intended to any modification of the invention, purposes or adaptations, these modifications, purposes or
Person's adaptations follow general principle of the invention and including undocumented common knowledge in the art of the invention
Or conventional techniques.Description and embodiments are considered only as exemplary, and true scope and spirit of the invention are by following
Claim is pointed out.
It should be appreciated that the invention is not limited in the precision architecture being described above and be shown in the drawings, and
And can without departing from the scope carry out various modifications and changes.The scope of the present invention is only limited by appended claim.
Claims (7)
1. a kind of 220kV collects the step voltage control method for coordinating up and down of transformer station, it is characterised in that 220kV collects transformer station
Subordinate 110kV regenerative resources station is connected by 110kV collection bus, methods described is included in when controlling cycle arrives and performs
Following steps:
Step S1, obtains the current voltage value that i-th 220kV in area power grid collects the 110kV collection bus of transformer station, judges
Whether in the range of control bound, wherein i is natural number to the current voltage value, and 220kV converges in 1≤i≤area power grid
Collect the sum of transformer station;
Step S2, if the current voltage value is within the scope of the control bound, makes i=i+1, and return performs step
Rapid S1;
Step S3, if the current voltage value calculates i-th 220kV and collect change beyond the control bound scope
Voltage-regulation of the whole subordinate 110kV regenerative resources stations of the 110kV collection bus institute band in power station to 110kV collection bus
Ability;
Whether step S4, the voltage regulation capability of the whole subordinate 110kV regenerative resources stations of assessment enough converges corresponding 110kV
Collect in the range of control bound described in the voltage Tiao Jiedao of bus;
Step S5, if the voltage regulation capability of whole subordinate 110kV regenerative resources stations is enough by 110kV collection bus
Controlled in the range of bound described in voltage Tiao Jiedao, then using subordinate 110kV regenerative resources station regulation 110kV collection bus
Voltage;
Step S6, if the voltage regulation capability of whole subordinate 110kV regenerative resources stations is not enough to 110kV collection bus
Voltage Tiao Jiedao described in the range of control bound, then except using whole subordinate 110kV regenerative resources stations regulations
Outside the voltage of 110kV collection bus, the reactive apparatus supplement regulation 110kV of transformer station is also collected using i-th 220kV
The voltage of collection bus;
Step S7, makes i=i+1, performs step S1.
2. 220kV according to claim 1 collects the step voltage control method for coordinating up and down of transformer station, it is characterised in that
The step S1 includes:
Step S11, obtain in real time i-th 220kV collect transformer station 110kV collection bus current voltage value and control
Upper lower limit value, wherein current voltage value are designated asLower control limit value is denoted asUpper control limit value is denoted asStep S12,
Check 110kV collection bus current voltagesWhether in the range of control bound:
Vi min+Vi dead< Vi cur< Vi max-Vi dead (1)
Wherein,For 110kV collection bus voltage out-of-limit judges dead band threshold value;
If formula (1) is set up, it is determined that the 110kV collection bus voltage that i-th 220kV collects transformer station is in control
Within lower range;If above formula is invalid, it is determined that i-th 220kV collects the 110kV collection bus voltages of transformer station
Beyond control bound scope.
3. 220kV according to claim 2 collects the step voltage control method for coordinating up and down of transformer station, it is characterised in that
Step S3 includes:
Step S31, i-th 220kV described in real-time reception collects the jZuo subordinates 110kV regenerative resources station in transformer station
On send increase it is idle and can subtract idle, and according to the idle to corresponding of jZuo subordinates 110kV regenerative resources station
The voltage sensibility of 110kV collection bus, calculates jZuo subordinate 110kV regenerative resources stations and collects mother to corresponding 110kV
The voltage of line increases regulating powerRegulating power is reduced with voltage
WhereinCollect the jZuo subordinates 110kV regenerative resources in transformer station for i-th 220kV
Increasing for being sent on station is real-time is idle and can subtract idle,It is idle for the jZuo subordinates 110kV regenerative resources station
Sensitivity to 110kV collection bus up voltages,It is idle right for the jZuo subordinates 110kV regenerative resources station
The sensitivity of voltage drops in 110kV collection bus, and j is natural number, and subordinate 110kV can during 1≤j≤the i-th 220kV collects transformer station
The sum of renewable sources of energy station;
Step S32, makes j=j+1, returns and performs step S31;
Step S33, whole subordinate 110kV regenerative resources stations that i-th 220kV collects transformer station are converged to 110kV
The voltage regulation capability for collecting bus adds up, and show that i-th 220kV collects the complete of the 110kV collection bus institute band of transformer station
Voltage regulation capability of the subordinate level 110kV regenerative resources station to 110kV collection bus:
4. 220kV according to claim 3 collects the step voltage control method for coordinating up and down of transformer station, it is characterised in that
Step S4 includes:
Step S41, assesses i-th 220kV and collects in transformer station whole subordinate 110kV regenerative resources stations to 110kV
Whether the voltage of collection bus reduces regulating power sufficient:
IfThen i-th 220kV has collected in transformer station 110kV collection bus or close to more
The upper limit is crossed, it is necessary to be depressured, then judges whether following equation is set up:
Vi max-Vi cur< Vi Down (4)
If formula (4) is set up, judge that i-th 220kV collects whole subordinate 110kV regenerative resources of substation's band
Voltage of standing reduces that regulating power is not enough, it is necessary to the reactive apparatus that i-th 220kV collects transformer station coordinate step-down,
Wherein:For 110kV collection bus voltage out-of-limit judges threshold value,It is 110kV collection bus current voltage values,It is 110kV collection bus voltage upper control limit values,For i-th 220kV collects whole subordinates in transformer station
Regulating power is reduced 110kV regenerative resources station to the voltage of 110kV collection bus;
Step S42, assesses i-th 220kV and collects in transformer station whole subordinate 110kV regenerative resources stations to 110kV
Whether the voltage of collection bus increases regulating power sufficient:
IfWhether control bus then judge following equation or close to more lower limit, it is necessary to boost
Set up:
Vi min-Vi cur> Vi Up (5)
If formula (5) is set up, judge that i-th 220kV collects whole subordinate 110kV regenerative resources of substation's band
Voltage of standing increases that regulating power is not enough, it is necessary to the reactive apparatus that i-th 220kV collects transformer station coordinate boosting,
Wherein:For 110kV collection bus voltage out-of-limit judges threshold value,It is 110kV collection bus current voltage values,It is 110kV collection bus voltage lower control limit values,For i-th 220kV collects whole subordinates in transformer station
110kV regenerative resources station increases regulating power to the voltage of 110kV collection bus.
5. 220kV according to claim 4 collects the step voltage control method for coordinating up and down of transformer station, it is characterised in that
Step S6 includes:
Step S61, if step S41 judges that the reactive apparatus for needing i-th 220kV to collect transformer station coordinate step-down,:
If i-th 220kV collects the capacitor that transforming plant main transformer low-pressure side has operation, a capacitor is cut off;Otherwise throw
Enter a reactor;
Step S62, if step S42 judges that the reactive apparatus for needing i-th 220kV to collect transformer station coordinate boosting,:
If i-th 220kV collects the reactor that transforming plant main transformer low-pressure side has operation, a reactor is cut off;Otherwise throw
Enter a capacitor.
6. 220kV according to claim 1 collects the step voltage control method for coordinating up and down of transformer station, it is characterised in that
The subordinate 110kV regenerative resources station is wind power station or photo-voltaic power generation station.
7. 220kV according to claim 1 collects the step voltage control method for coordinating up and down of transformer station, it is characterised in that
It was a controlling cycle every 5 minutes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611150190.0A CN106712041B (en) | 2016-12-14 | 2016-12-14 | 220kV collects the step voltage control method for coordinating up and down of substation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611150190.0A CN106712041B (en) | 2016-12-14 | 2016-12-14 | 220kV collects the step voltage control method for coordinating up and down of substation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106712041A true CN106712041A (en) | 2017-05-24 |
CN106712041B CN106712041B (en) | 2019-06-07 |
Family
ID=58937544
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611150190.0A Active CN106712041B (en) | 2016-12-14 | 2016-12-14 | 220kV collects the step voltage control method for coordinating up and down of substation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106712041B (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104579165A (en) * | 2015-01-22 | 2015-04-29 | 国家电网公司 | Photovoltaic power station dynamic reactive response performance site testing method |
CN105140964A (en) * | 2015-09-24 | 2015-12-09 | 中国南方电网有限责任公司 | 10kV power distribution network power coordination control method with photovoltaic power supply |
CN105914797A (en) * | 2015-12-24 | 2016-08-31 | 国网甘肃省电力公司电力科学研究院 | Large-scale photovoltaic power station reactive voltage sequential coordination control technology |
-
2016
- 2016-12-14 CN CN201611150190.0A patent/CN106712041B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104579165A (en) * | 2015-01-22 | 2015-04-29 | 国家电网公司 | Photovoltaic power station dynamic reactive response performance site testing method |
CN105140964A (en) * | 2015-09-24 | 2015-12-09 | 中国南方电网有限责任公司 | 10kV power distribution network power coordination control method with photovoltaic power supply |
CN105914797A (en) * | 2015-12-24 | 2016-08-31 | 国网甘肃省电力公司电力科学研究院 | Large-scale photovoltaic power station reactive voltage sequential coordination control technology |
Also Published As
Publication number | Publication date |
---|---|
CN106712041B (en) | 2019-06-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ding et al. | A review on China׳ s large-scale PV integration: Progress, challenges and recommendations | |
CN103515967B (en) | The collocation method of Reactive Compensation in Wind Farm | |
Rahimi et al. | Effects of photovoltaic systems on power quality | |
CN105375513B (en) | A kind of 110 kilovolts of wind power field automatic voltage controls based on real-time on-line equivalent | |
CN103532148B (en) | The reactive coordination control method of a kind of wind energy turbine set and area power grid | |
CN107834567A (en) | The reactive voltage control method for coordinating of UHVDC converter station and near region power plant | |
CN105262098B (en) | The quick automatic voltage control method assessed based on the fluctuation of wind power plant generated output | |
CN107134785B (en) | Power transmission network voltage coordination optimization control method considering network structure optimization | |
CN103580030A (en) | Reactive voltage control method and system for grid-connected photovoltaic power station | |
CN104158198A (en) | Optimization trend control apparatus and method for power distribution network | |
CN103956750B (en) | Wind-powered electricity generation is concentrated and is sent the idle work optimization system and method controlling voltage pulsation under pattern | |
CN104269855B (en) | Rapid site reactive voltage adjusting method adaptable to multiple energy accesses | |
CN105162129B (en) | Meter and the distribution reactive voltage control method of distributed power source allocation optimum | |
CN109524988A (en) | A kind of wind-powered electricity generation based on total active power trend prediction collects station voltage control method | |
CN105490279B (en) | A kind of local voltage control method of the distributed power source based on dichotomy | |
CN108539757A (en) | The reactive power dispatching method of power distribution network light accumulation | |
Kazari et al. | Voltage stability improvement through centralized reactive power management on the Smart Grid | |
CN110365023A (en) | A kind of automatic voltage control method considering bulk power grid stable voltage control limit value | |
CN106532729B (en) | It saves ground and coordinates the method that control 220kV collects substation's high voltage bus voltage | |
CN107516901A (en) | Coordinating voltage control method between 500kV transformer stations in automatism voltage control | |
CN106655257A (en) | New energy hybrid power supply-based energy management system and method of port shore power | |
CN105811435A (en) | Reactive compensation method for intelligent energy accumulation power generating system | |
CN105610175A (en) | Wide-area reactive power coordinated control method for FACTS equipment | |
CN106712041A (en) | Higher and lower class voltage coordination control method of 220kV collection substation | |
CN110137994A (en) | A kind of distributed control method of direct-current grid interconnection energy-storage system energy management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |