CN106712041B - 220kV collects the step voltage control method for coordinating up and down of substation - Google Patents

220kV collects the step voltage control method for coordinating up and down of substation Download PDF

Info

Publication number
CN106712041B
CN106712041B CN201611150190.0A CN201611150190A CN106712041B CN 106712041 B CN106712041 B CN 106712041B CN 201611150190 A CN201611150190 A CN 201611150190A CN 106712041 B CN106712041 B CN 106712041B
Authority
CN
China
Prior art keywords
voltage
substation
renewable energy
collection bus
collects
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611150190.0A
Other languages
Chinese (zh)
Other versions
CN106712041A (en
Inventor
陆海
苏适
汤磊
严玉廷
廖小梦
杨家全
王志南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Yunnan Power System Ltd
Original Assignee
Electric Power Research Institute of Yunnan Power System Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Yunnan Power System Ltd filed Critical Electric Power Research Institute of Yunnan Power System Ltd
Priority to CN201611150190.0A priority Critical patent/CN106712041B/en
Publication of CN106712041A publication Critical patent/CN106712041A/en
Application granted granted Critical
Publication of CN106712041B publication Critical patent/CN106712041B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/16Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by adjustment of reactive power
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention provides a kind of 220kV step voltage control method for coordinating up and down for collecting substation, comprising: obtains the current voltage value that i-th 220kV in area power grid collects the 110kV collection bus of substation, judges whether out-of-limit;If out-of-limit, calculate i-th 220kV collect substation 110kV collection bus institute band whole junior 110kV renewable energy stations to the voltage regulation capability of 110kV collection bus;Whether enough assess voltage regulation capability;If voltage regulation capability is enough, the voltage of 110kV collection bus is adjusted using junior 110kV renewable energy station;If voltage regulation capability is insufficient, the voltage of 110kV collection bus is adjusted using the reactive apparatus supplement that i-th 220kV collects substation.The method of the present invention can give full play to the Reactive-power control ability of renewable energy source station itself, avoid excessive capacitor or reactor cause to generate it is excessive idle.

Description

220kV collects the step voltage control method for coordinating up and down of substation
Technical field
The present invention relates to renewable energy collection region voltage control technology fields more particularly to a kind of 220kV to collect change The step voltage control method for coordinating up and down in power station.
Background technique
In recent years, it is influenced by global warming and energy crisis, the importance of clean energy resource is increasingly prominent, apoplexy The renewable energy such as power power generation and photovoltaic power generation are due to its huge potentiality to be exploited and the development technique of relative maturity, by generation The extensive concern of various countries, boundary, and grow rapidly with a kind of unprecedented speed.
China to renewable energy take be extensive centralization development mode, as shown in Figure 1, at present China can Regenerated energy source station is all that several stations 110kV are linked into power grid by a 220kV substation, this 220kV substation is known as converging Collection station, the 110kV renewable energy source station for collecting station and following band are known as a new energy collection region.Since renewable energy is solid The intermittent feature having, extensive renewable energy is grid-connected to bring great challenge to operation of power networks scheduling.It again because can be again The raw energy and web area often lack local load, and the electric energy that renewable energy issues is needed by voltage levels, long transmission of electricity Route, send load center afield, and these renewable energy transfer passages often lack conventional extreme misery power plant carry out it is active, Idle support, system short circuit capacity is smaller, this variation for resulting in renewable energy source capability can cause biggish voltage fluctuation, Voltage fluctuation in 110kV collection bus especially as shown in Figure 1 even will cause extensive chain off-grid when serious.
In the prior art, in order to avoid the voltage fluctuation in 110kV collection bus, often in ground state by collecting Multiple capacitors or reactor is arranged in substation, and 110kV collection bus voltage is adjusted by the switching of capacitor or reactor, But excessive capacitor or reactor will lead to a large amount of superfluous reactive power of generation.
Summary of the invention
In order to overcome the problems, such as present in the relevant technologies, it is electric that the present invention provides a kind of the superior and the subordinate that 220kV collects substation Control method for coordinating is pressed, by preferentially adjusting 110kV bus using the Reactive-power control ability of junior's renewable energy source station itself Voltage so that the Reactive-power control ability of renewable energy source station itself is not fully exerted.When junior's renewable energy station itself Reactive-power control scarce capacity when, just by switching higher level 220kV collect station in capacitor, reactor, guarantee renewable energy Source station collection bus voltage is in N-1 security domain.Such step voltage control method for coordinating up and down can give full play in ground state The Reactive-power control ability of renewable energy source station itself replaces static capacitors or reactor to play voltage support effect, avoids Excessive capacitor or reactor cause to generate during fault disturbance excessive idle under ground state.
According to an aspect of an embodiment of the present invention, it provides a kind of 220kV and collects the step voltage up and down of substation and coordinate Control method, which is characterized in that 220kV collects substation and connects junior 110kV renewable energy field by 110kV collection bus Stand, the method includes executing following steps when controlling period arrival: step S1 obtains i-th 220kV in area power grid and converges The current voltage value for collecting the 110kV collection bus of substation, judges whether the current voltage value is in control upper and lower limits Interior, wherein i is natural number, and 220kV collects the sum of substation in 1≤i≤area power grid;Step S2, if the current electricity Pressure value is within the control upper and lower limits, then makes i=i+1, return to step S1;Step S3, if described current Voltage value exceeds the control upper and lower limits, calculates the 110kV collection bus institute band that i-th 220kV collects substation Whole junior 110kV renewable energy stations to the voltage regulation capability of 110kV collection bus;Step S4 is assessed under whole Whether the voltage regulation capability of grade 110kV renewable energy station is enough adjusted the voltage of corresponding 110kV collection bus to institute It states in control upper and lower limits;Step S5, if the voltage regulation capability of whole junior 110kV renewable energy station enough will The voltage of 110kV collection bus is adjusted into the control upper and lower limits, then utilizes junior 110kV renewable energy station tune Save the voltage of 110kV collection bus;Step S6, if the voltage regulation capability of whole junior 110kV renewable energy station is not Be enough to adjust the voltage of 110kV collection bus into the control upper and lower limits, then it can in addition to using whole junior 110kV Renewable sources of energy station is adjusted except the voltage of 110kV collection bus, also collects the idle of substation using i-th 220kV Equipment supplement adjusts the voltage of 110kV collection bus;Step S7 makes i=i+1, executes step S1.
Preferably, the step S1 includes:
Step S11, obtain in real time i-th 220kV collect substation 110kV collection bus current voltage value and Control upper lower limit value, wherein current voltage value is denoted as Vi cur, lower control limit value is denoted as Vi min, upper control limit value is denoted as Vi max
Step S12 checks 110kV collection bus current voltage Vi curWhether in control upper and lower limits:
Vi min+Vi dead< Vi cur< Vi max-Vi dead (1)
Wherein, Vi deadDead zone threshold value is determined for 110kV collection bus voltage out-of-limit;
If formula (1) is set up, it is determined that the 110kV collection bus voltage that i-th 220kV collects substation is in control Within upper and lower limits processed;If above formula is invalid, it is determined that i-th 220kV collects the 110kV collection bus of substation Voltage is beyond control upper and lower limits.
Preferably, step S3 includes:
Step S31, i-th 220kV described in real-time reception collect the jZuo junior 110kV renewable energy in substation Sent on station increase it is idle and can subtract it is idle, and according to the idle to corresponding of jZuo junior 110kV renewable energy station The voltage sensibility of 110kV collection bus calculates jZuo junior 110kV renewable energy station and collects mother to corresponding 110kV The voltage of line increases regulating powerRegulating power is reduced with voltage
WhereinIt is renewable to collect the jZuo junior 110kV in substation for i-th 220kV Sent on energy station is real-time increase it is idle and can subtract it is idle,For the jZuo junior 110kV renewable energy station The idle sensitivity to 110kV collection bus up voltage,For the nothing of the jZuo junior 110kV renewable energy station Sensitivity of the function to 110kV collection bus drop voltage, j is natural number, and 1≤j≤the i-th 220kV collects junior in substation The sum of 110kV renewable energy station;
Step S32, makes j=j+1, returns to step S31;
I-th 220kV is collected whole junior 110kV renewable energy stations pair of substation by step S33 The voltage regulation capability of 110kV collection bus is cumulative, show that i-th 220kV collects the 110kV collection bus institute of substation Voltage regulation capability of the whole junior 110kV renewable energy stations of band to 110kV collection bus:
Preferably, step S4 includes:
Step S41 assesses i-th 220kV and collects whole junior 110kV renewable energy station pair in substation Whether the voltage of 110kV collection bus reduces regulating power sufficient:
IfThen i-th 220kV has collected in substation 110kV collection bus or has connect The upper limit closely is crossed, needs to be depressured, then judges whether following equation is true:
Vi max-Vi cur< Vi Down (4)
If formula (4) is set up, determine that i-th 220kV collects whole junior 110kV renewable energies of substation's band Source station voltage reduces regulating power deficiency, and the reactive apparatus for needing i-th 220kV to collect substation coordinates decompression,
Wherein: Vi deadThreshold value, V are determined for 110kV collection bus voltage out-of-limiti curIt is currently electric for 110kV collection bus Pressure value, Vi maxFor 110kV collection bus voltage upper control limit value, Vi DownCollect in substation all for i-th 220kV Regulating power is reduced 110kV renewable energy station to the voltage of 110kV collection bus;
Step S42 assesses i-th 220kV and collects whole junior 110kV renewable energy station pair in substation Whether the voltage of 110kV collection bus increases regulating power sufficient:
IfThen i-th 220kV has collected in substation 110kV collection bus or has connect Lower limit closely is crossed, needs to boost, then judges whether following equation is true:
Vi min-Vi cur> Vi Up (5)
If formula (5) is set up, determine that i-th 220kV collects whole junior 110kV renewable energies of substation's band Source station voltage increases regulating power deficiency, and the reactive apparatus for needing i-th 220kV to collect substation coordinates boosting,
Wherein: Vi deadThreshold value, V are determined for 110kV collection bus voltage out-of-limiti curIt is currently electric for 110kV collection bus Pressure value, Vi minFor 110kV collection bus voltage lower control limit value, Vi UpCollect in substation all for i-th 220kV 110kV renewable energy station increases regulating power to the voltage of 110kV collection bus.
Preferably, step S6 includes:
Step S61, if step S41 determines that the reactive apparatus for needing i-th 220kV to collect substation coordinates drop Pressure, then: if i-th 220kV collects the capacitor that transforming plant main transformer low-pressure side has operation, cutting off a reactor; Otherwise a reactor is put into;
Step S62, if step S42 determines that the reactive apparatus for needing i-th 220kV to collect substation is coordinated to rise Pressure, then: if i-th 220kV collects the reactor that transforming plant main transformer low-pressure side has operation, cutting off a reactor; Otherwise a capacitor is put into.
Preferably, the junior 110kV renewable energy station is wind power station or photo-voltaic power generation station.
It preferably, was a control period every 5 minutes.
As described above, the present invention provides the step voltage control method for coordinating up and down that a kind of 220kV collects substation, it is special Sign is that 220kV collects substation and connects junior 110kV renewable energy station, the method packet by 110kV collection bus Include and execute following steps when controlling period arrival: step S1 obtains i-th 220kV in area power grid and collects substation The current voltage value of 110kV collection bus, judges whether the current voltage value is in control upper and lower limits, and wherein i is Natural number, 220kV collects the sum of substation in 1≤i≤area power grid;Step S2, if the current voltage value is in institute It states within control upper and lower limits, then makes i=i+1, return to step S1;Step S3, if the current voltage value exceeds The control upper and lower limits calculate whole juniors that i-th 220kV collects the 110kV collection bus institute band of substation Voltage regulation capability of the 110kV renewable energy station to 110kV collection bus;Step S4, assessment whole junior 110kV can be again Whether the voltage regulation capability of raw energy station is enough adjusted the voltage of corresponding 110kV collection bus to the control bound In range;Step S5, if 110kV is collected mother enough by the voltage regulation capability of whole junior 110kV renewable energy station The voltage of line is adjusted into the control upper and lower limits, then adjusts 110kV using junior's 110kV renewable energy station and collect The voltage of bus;Step S6, if the voltage regulation capability of whole junior 110kV renewable energy station is not enough to 110kV The voltage of collection bus is adjusted into the control upper and lower limits, then in addition to utilizing whole junior 110kV renewable energy field It stands except the voltage for adjusting 110kV collection bus, is also adjusted using the reactive apparatus supplement that i-th 220kV collects substation Save the voltage of 110kV collection bus;Step S7 makes i=i+1, executes step S1.220kV of the invention collects the upper of substation Subordinate voltage control method for coordinating is by preferentially adjusting 110kV using the Reactive-power control ability of junior's renewable energy source station itself The voltage of bus, so that the Reactive-power control ability of renewable energy source station itself is not fully exerted.When new energy collection region When Reactive-power control scarce capacity, capacitor, reactor in station are just collected by switching 220kV, guarantee that renewable energy source station is female Line voltage is in N-1 security domain.Such step voltage control method for coordinating up and down can give full play to renewable energy in ground state It stands itself Reactive-power control ability, replaces static capacitors or reactor to play voltage support effect, avoid excessive under ground state Capacitor or reactor cause to generate during fault disturbance it is excessive idle.Therefore, the present invention realizes higher level 220kV collects the reactive voltage coordinated control of substation Yu junior 110kV renewable energy source station, when junior's 110kV renewable energy When source station is to the voltage regulation capability deficiency of 110kV busbar voltage, guaranteed by switching substation capacitors, reactor renewable Energy source station busbar voltage avoids renewable energy Voltage Drop from causing the chain off-grid in renewable energy station in N-1 security domain, Improve Network Voltage Stability and quality of voltage.
It should be understood that above general description and following detailed description be only it is exemplary and explanatory, not It can the limitation present invention.
Detailed description of the invention
The drawings herein are incorporated into the specification and forms part of this specification, and shows and meets implementation of the invention Example, and be used to explain the principle of the present invention together with specification.
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, for those of ordinary skill in the art Speech, without any creative labor, is also possible to obtain other drawings based on these drawings.
Fig. 1 is new energy collection region power grid architecture schematic diagram;
Fig. 2 is the process for the control method for coordinating of step voltage up and down that 220kV provided in an embodiment of the present invention collects substation Schematic diagram.
Specific embodiment
Example embodiments are described in detail here, and the example is illustrated in the accompanying drawings.Following description is related to When attached drawing, unless otherwise indicated, the same numbers in different drawings indicate the same or similar elements.Following exemplary embodiment Described in embodiment do not represent all embodiments consistented with the present invention.On the contrary, they be only with it is such as appended The example of device and method being described in detail in claims, some aspects of the invention are consistent.
In general, area power grid new energy collection region, which generally includes a 220kV, collects substation and multiple junior 110kV Renewable energy station, these juniors 110kV renewable energy station are collected substation by 220kV and are linked into power grid, The 110kV collection bus that 220kV collects substation connects these juniors 110kV renewable energy station.In new energy pooling zone In the voltage coordinated control in domain, in order to avoid there is the extensive chain off-grid as caused by voltage, should sufficiently it be sent out in ground state The Reactive-power control ability of renewable energy source station itself is waved, to replace direct capacitance to play voltage support effect, is avoided under ground state Excessive investment capacitor causes to generate during fault disturbance excessive idle.Therefore, in the present invention, renewable energy The reactive voltage coordination principle stood and collect station substation is as follows:
1, the Reactive-power control ability of renewable energy source station is preferentially used under ground state.
When the renewable energy source station in new energy collection region has Reactive-power control ability, renewable energy is preferentially used It stands itself Reactive-power control ability, collects the voltage limits of substation using plan limit value, so that renewable energy source station bus Voltage is in N-1 security domain.
2, when the Reactive-power control scarce capacity of new energy collection region, using collect station in low-pressure side reactive apparatus into Row new energy collection region voltage is adjusted.
When renewable energy source station Reactive-power control scarce capacity and cannot be in the N-1 security domain when, pass through switching 220kV Collect capacitor, the reactor in station, guarantees renewable energy source station busbar voltage in N-1 security domain.
In order to realize that above-mentioned 220kV collects the reactive voltage coordinated control original of station and junior 110kV renewable energy station Then, a kind of method that the present invention proposes and realizes coordinated control.As shown in Fig. 2, 220kV collects the step voltage up and down of substation Control method for coordinating executes following steps when being included in control period (being a control period every 5 minutes) arrival:
Step S1 obtains the current voltage value that i-th 220kV in area power grid collects the 110kV collection bus of substation, Judge whether current voltage value is in control upper and lower limits, wherein i is natural number, and 220kV converges in 1≤i≤area power grid Collect the sum of substation.
Step S2 makes i=i+1, returns to step if current voltage value is within control upper and lower limits S1, that is to say, that obtain the current voltage value that next 220kV collects the 110kV collection bus of substation.
Step S3, if current voltage value calculates i-th 220kV and collect substation beyond control upper and lower limits Voltage regulation capability of the whole junior 110kV renewable energy stations of 110kV collection bus institute band to 110kV collection bus.
Step S4, whether the voltage regulation capability for assessing whole junior 110kV renewable energy station enough will be corresponding The voltage of 110kV collection bus is adjusted into control upper and lower limits.
Step S5, if 110kV is collected mother enough by the voltage regulation capability of whole junior 110kV renewable energy station The voltage of line is adjusted into control upper and lower limits, then adjusts 110kV collection bus using junior 110kV renewable energy station Voltage.
Step S6, if the voltage regulation capability of whole junior 110kV renewable energy station is not enough to collect 110kV The voltage of bus is adjusted into the control upper and lower limits, then in addition to utilizing whole junior 110kV renewable energy station tune Except the voltage for saving 110kV collection bus, also adjusted using the reactive apparatus supplement that i-th 220kV collects substation The voltage of 110kV collection bus.
Step S7 makes i=i+1, executes step S1.That is, collecting substation to next 220kV carries out voltage association Regulation system.
According to an embodiment of the invention, junior's 110kV renewable energy station can be wind power station or photovoltaic power generation It stands.
According to one embodiment of present invention, above-mentioned steps S1 can specifically include:
Step S11, obtain in real time i-th 220kV collect substation 110kV collection bus current voltage value and Upper and lower limits are controlled, wherein current voltage value is denoted as Vi cur, lower control limit value is denoted as Vi min, upper control limit value is denoted as Vi max
Step S12 checks 110kV collection bus current voltage Vi curWhether in control upper and lower limits:
Vi min+Vi dead< Vi cur< Vi max-Vi dead (1)
Wherein, Vi deadDead zone threshold value is determined for 110kV collection bus voltage out-of-limit.
If formula (1) is set up, it is determined that the 110kV collection bus voltage that i-th 220kV collects substation is in control Within upper and lower limits processed;If above formula is invalid, it is determined that i-th 220kV collects the 110kV collection bus of substation Voltage is beyond control upper and lower limits.
According to one embodiment of present invention, above-mentioned steps S3 can specifically include:
Step S31, i-th 220kV described in real-time reception collect the jZuo junior 110kV renewable energy in substation Sent on station increase it is idle and can subtract it is idle, and according to the idle to corresponding of jZuo junior 110kV renewable energy station The voltage sensibility of 110kV collection bus calculates jZuo junior 110kV renewable energy station and collects mother to corresponding 110kV The voltage of line increases regulating powerRegulating power is reduced with voltage
WhereinIt is renewable to collect the jZuo junior 110kV in substation for i-th 220kV Sent on energy station is real-time increase it is idle and can subtract it is idle,For the jZuo junior 110kV renewable energy station The idle sensitivity to 110kV collection bus up voltage,For the nothing of the jZuo junior 110kV renewable energy station Sensitivity of the function to 110kV collection bus drop voltage, j is natural number, and 1≤j≤the i-th 220kV collects junior in substation The sum of 110kV renewable energy station.
Step S32, makes j=j+1, returns to step S31.Collect in substation that is, receiving i-th 220kV Next junior's 110kV renewable energy station increases idle and can subtract idle.
I-th 220kV is collected whole junior 110kV renewable energy stations pair of substation by step S33 The voltage regulation capability of 110kV collection bus is cumulative, show that i-th 220kV collects the 110kV collection bus institute of substation Voltage regulation capability of the whole junior 110kV renewable energy stations of band to 110kV collection bus:
According to one embodiment of present invention, above-mentioned steps S4 can specifically include:
Step S41 assesses i-th 220kV and collects whole junior 110kV renewable energy station pair in substation Whether the voltage of 110kV collection bus reduces regulating power sufficient:
IfThen i-th 220kV has collected in substation 110kV collection bus or has connect The upper limit closely is crossed, needs to be depressured, then judges whether following equation is true:
Vi max-Vi cur< Vi Down (4)
If formula (4) is set up, determine that i-th 220kV collects whole junior 110kV renewable energies of substation's band Source station voltage reduces regulating power deficiency, and the reactive apparatus for needing i-th 220kV to collect substation coordinates decompression,
Wherein: Vi deadThreshold value, V are determined for 110kV collection bus voltage out-of-limiti curIt is currently electric for 110kV collection bus Pressure value, Vi maxFor 110kV collection bus voltage upper control limit value, Vi DownCollect in substation all for i-th 220kV Regulating power is reduced 110kV renewable energy station to the voltage of 110kV collection bus.
Step S42 assesses i-th 220kV and collects whole junior 110kV renewable energy station pair in substation Whether the voltage of 110kV collection bus increases regulating power sufficient:
If Vi cur< Vi min+Vi dead, then i-th 220kV has collected in substation 110kV collection bus or has connect Lower limit closely is crossed, needs to boost, then judges whether following equation is true:
Vi min-Vi cur> Vi Up (5)
If formula (5) is set up, determine that i-th 220kV collects whole junior 110kV renewable energies of substation's band Source station voltage increases regulating power deficiency, and the reactive apparatus for needing i-th 220kV to collect substation coordinates boosting,
Wherein: Vi deadThreshold value, V are determined for 110kV collection bus voltage out-of-limiti curIt is currently electric for 110kV collection bus Pressure value, Vi minFor 110kV collection bus voltage lower control limit value, Vi UpCollect in substation all for i-th 220kV 110kV renewable energy station increases regulating power to the voltage of 110kV collection bus.
According to one embodiment of present invention, above-mentioned steps S6 can specifically include:
Step S61, if step S41 determines that the reactive apparatus for needing i-th 220kV to collect substation coordinates drop Pressure, then: if i-th 220kV collects the capacitor that transforming plant main transformer low-pressure side has operation, cutting off a capacitor; Otherwise a reactor is put into.
Step S62, if step S42 determines that the reactive apparatus for needing i-th 220kV to collect substation is coordinated to rise Pressure, then: if i-th 220kV collects the reactor that transforming plant main transformer low-pressure side has operation, cutting off a reactor; Otherwise a capacitor is put into.
It illustrates below with reference to Fig. 1 and describes the step voltage control method for coordinating up and down that 220kV of the invention collects substation. Fig. 1 is the new energy collection region power grid architecture schematic diagram of area power grid.As shown in Figure 1, area power grid new energy collection region Collect substation and three junior 110kV wind power station B, 110kV wind power station C and 110kV photovoltaic station D including a 220kV, this three A junior 110kV renewable energy station is collected substation by 220kV and is linked into power grid, and 220kV collects substation 110kV collection bus connects these three juniors 110kV renewable energy station.SVC is equipped in each renewable energy station (Static Var Compensator, Static Var Compensator).
For area power grid shown in FIG. 1,220kV of the invention collects station and junior 110kV renewable energy station Voltage control method for coordinating then, to execute following steps in the control period (being a control period every 5 minutes):
Wherein, 220kV collect station 110kV collection bus current voltage be 117.62kV, upper control limit value is 117.50kV, lower control limit value are 110.70kV, and this method presets control cycle T, specifically comprises the following steps:
Carry out interim, execution following steps in each control cycle T (every 5 minutes are a control period):
1) check that the 220kV of i-th renewable energy station in area power grid collects the electricity of the 110kV collection bus in station Situation is pressed, following calculate is executed:
Current voltage value, the control upper lower limit value of 110kV collection bus 1-1) are obtained in real time, and wherein current voltage value is denoted as Vi cur, lower control limit value is denoted as Vi min, upper control limit value is denoted as Vi max.Wherein, Vi cur=117.62kV, Vi max=117.50kV, Vi min=110.70kV, Vi dead=0.5kV;
1-2) check 110kV collection bus current voltage Vi curWhether in control upper and lower limits:
Due to Vi cur>Vi max-Vi dead, the 110kV collection bus voltage of 110kV renewable energy station got over the upper limit, into Enter next step 2);
2) the junior's 110kV renewable energy station for collecting the 110kV collection bus institute band at station to 220kV executes following meter It calculates:
That 2-1) send on wind power plant B, C and photovoltaic station D in real-time reception collection region increases idle and can subtract idle, and root According to the idle voltage sensibility to 110kV collection bus of renewable sources of energy station, calculates the renewable sources of energy station and 110kV is collected The voltage of bus increases and decreases regulating power.
Wind power plant B:
Upward adjustable voltage:
Downward adjustable voltage:
Wind power plant C:
Upward adjustable voltage:
Downward adjustable voltage:
Photovoltaic station D:
Upward adjustable voltage:
Downward adjustable voltage:
The voltage regulation capability of wind power plant B, C and photovoltaic station D 2-2) is accumulated to the total voltage regulation capability of collection region In:
Vi Up=0.0, Vi Down=0.0.
3) it assesses 220kV and collects interior renewable energy station of standing to the voltage adjusting energy for collecting interior 110kV collection bus of standing Power, the method is as follows:
3-1) current Vi cur=117.62kV, Vi max=117.50kV, takesCurrent Vi cur> Vi max- Vi dead(117.62 > 117.50-0.50), then 110kV collection bus voltage has got over the upper limit;
ΔVi=Vi max-Vi cur=-0.12, Δ Vi< Vi Down(- 0.12 < 0.0) it is renewable in station then to determine that 220kV collects The voltage of energy station reduces regulating power deficiency, needs to coordinate to be depressured.
4) assessment result for collecting the renewable sources of energy station voltage regulation capability in station to 220kV according to step 3), calculates 220kV collects the reactive apparatus switching strategy of substation.
4-1) pass through 3-1) determine that current needs coordinate decompression, if 220kV collects the electricity that station owner's low pressure side has operation Container then cuts off a capacitor;Otherwise a reactor is put into.
5) return step 1), the 220kV for continuing with next renewable sources of energy station collects substation, until complete in power grid The 220kV of portion renewable sources of energy station, which collects substation's processing, to be completed.
In conclusion 220kV of the invention collects the control method for coordinating of step voltage up and down of substation by preferentially utilizing The Reactive-power control ability of junior's renewable energy source station itself adjusts the voltage of 110kV bus, so that renewable energy source station itself Reactive-power control ability be not fully exerted.When the Reactive-power control scarce capacity of new energy collection region, just pass through switching 220kV collects capacitor, reactor in station, guarantees renewable energy source station busbar voltage in N-1 security domain.Above and below such Step voltage control method for coordinating can give full play to the Reactive-power control ability of renewable energy source station itself in ground state, replace static Capacitor or reactor play voltage support effect, and capacitor or reactor excessive under ground state is avoided to cause in fault disturbance It generates in the process excessive idle.Therefore, the present invention realizes that higher level 220kV collects substation and junior 110kV is renewable The reactive voltage coordinated control of energy source station is preferentially adjusted using the Reactive-power control ability of junior's renewable energy source station itself The voltage of 110kV collection bus, when junior's 110kV renewable energy source station is to the voltage regulation capability of 110kV collection bus voltage When insufficient, guarantee renewable energy source station collection bus voltage in N-1 security domain by switching higher level substation capacitors, reactor In, it avoids renewable energy station Voltage Drop from causing the chain off-grid in renewable energy station, improves Network Voltage Stability And quality of voltage.
Those skilled in the art will readily occur to of the invention its after considering specification and the disclosure invented here of practice Its embodiment.This application is intended to cover any variations, uses, or adaptations of the invention, these modifications, purposes or Person's adaptive change follows general principle of the invention and including the undocumented common knowledge in the art of the present invention Or conventional techniques.The description and examples are only to be considered as illustrative, and true scope and spirit of the invention are by following Claim is pointed out.
It should be understood that the present invention is not limited to the precise structure already described above and shown in the accompanying drawings, and And various modifications and changes may be made without departing from the scope thereof.The scope of the present invention is limited only by the attached claims.

Claims (6)

1. the step voltage control method for coordinating up and down that a kind of 220kV collects substation, which is characterized in that 220kV collects substation Junior 110kV renewable energy station is connected by 110kV collection bus, the method includes executing when controlling period arrival Following steps:
Step S1 obtains the current voltage value that i-th 220kV in area power grid collects the 110kV collection bus of substation, judgement Whether the current voltage value is in control upper and lower limits, and wherein i is natural number, and 220kV converges in 1≤i≤area power grid Collect the sum of substation;
Step S2 makes i=i+1 if the current voltage value is within the control upper and lower limits, and return executes step Rapid S1;
Step S3 calculates i-th 220kV and collects change if the current voltage value exceeds the control upper and lower limits Whole junior 110kV renewable energy stations of the 110kV collection bus institute band in power station adjust the voltage of 110kV collection bus Ability, wherein the step S3 includes:
Step S31, i-th 220kV described in real-time reception collect the jZuo junior 110kV renewable energy station in substation On send increase it is idle and can subtract it is idle, and according to the idle to corresponding of jZuo junior 110kV renewable energy station The voltage sensibility of 110kV collection bus calculates jZuo junior 110kV renewable energy station and collects mother to corresponding 110kV The voltage of line increases regulating powerRegulating power is reduced with voltage
WhereinCollect the jZuo junior 110kV renewable energy in substation for i-th 220kV Sent on station is real-time increase it is idle and can subtract it is idle,For the idle of the jZuo junior 110kV renewable energy station Sensitivity to 110kV collection bus up voltage,For the idle right of the jZuo junior 110kV renewable energy station The sensitivity of voltage drops in 110kV collection bus, and j is natural number, and 1≤j≤the i-th 220kV collects in substation that junior 110kV can The sum of renewable sources of energy station;
Step S32, makes j=j+1, returns to step S31;
Step S33 converges the whole junior 110kV renewable energy stations for collecting substation i-th 220kV to 110kV The voltage regulation capability for collecting bus is cumulative, show that i-th 220kV collects the complete of the 110kV collection bus institute band of substation Voltage regulation capability of the subordinate grade 110kV renewable energy station to 110kV collection bus:
Whether step S4, the voltage regulation capability for assessing whole junior 110kV renewable energy station enough converge corresponding 110kV The voltage for collecting bus is adjusted into the control upper and lower limits;
Step S5, if the voltage regulation capability of whole junior 110kV renewable energy station is enough by 110kV collection bus Voltage is adjusted into the control upper and lower limits, then adjusts 110kV collection bus using junior 110kV renewable energy station Voltage;
Step S6, if the voltage regulation capability of whole junior 110kV renewable energy station is not enough to 110kV collection bus Voltage adjust in the control upper and lower limits, then in addition to utilizing whole junior 110kV renewable energy stations adjustings Except the voltage of 110kV collection bus, 110kV also is adjusted using the reactive apparatus supplement that i-th 220kV collects substation The voltage of collection bus;
Step S7 makes i=i+1, executes step S1.
2. the step voltage control method for coordinating up and down that 220kV according to claim 1 collects substation, which is characterized in that The step S1 includes:
Step S11, obtain in real time i-th 220kV collect substation 110kV collection bus current voltage value and control Upper lower limit value, wherein current voltage value is denoted asLower control limit value is denoted asUpper control limit value is denoted as
Step S12 checks 110kV collection bus current voltageWhether in control upper and lower limits:
Vi min+Vi dead< Vi cur< Vi max-Vi dead (1)
Wherein,Dead zone threshold value is determined for 110kV collection bus voltage out-of-limit;
If formula (1) is set up, it is determined that the 110kV collection bus voltage that i-th 220kV collects substation is in control Within lower range;If above formula is invalid, it is determined that i-th 220kV collects the 110kV collection bus voltage of substation Beyond control upper and lower limits.
3. the step voltage control method for coordinating up and down that 220kV according to claim 1 collects substation, which is characterized in that Step S4 includes:
Step S41 assesses i-th 220kV and collects in substation whole junior 110kV renewable energy station to 110kV Whether the voltage of collection bus reduces regulating power sufficient:
IfThen i-th 220kV collects in substation 110kV collection bus or close to more The upper limit is crossed, needs to be depressured, then judges whether following equation is true:
Vi max-Vi cur< Vi Down (4)
If formula (4) is set up, determine that i-th 220kV collects whole junior 110kV renewable energy fields of substation's band Voltage of standing reduces regulating power deficiency, and the reactive apparatus for needing i-th 220kV to collect substation coordinates decompression,
Wherein:Threshold value is determined for 110kV collection bus voltage out-of-limit,For 110kV collection bus current voltage value,For 110kV collection bus voltage upper control limit value,Collect whole juniors in substation for i-th 220kV Regulating power is reduced 110kV renewable energy station to the voltage of 110kV collection bus;
Step S42 assesses i-th 220kV and collects in substation whole junior 110kV renewable energy station to 110kV Whether the voltage of collection bus increases regulating power sufficient:
IfControl bus needs to boost, then whether judges following equation or close to more lower limit It sets up:
If formula (5) is set up, determine that i-th 220kV collects whole junior 110kV renewable energy fields of substation's band Voltage of standing increases regulating power deficiency, and the reactive apparatus for needing i-th 220kV to collect substation coordinates boosting,
Wherein:Threshold value is determined for 110kV collection bus voltage out-of-limit,For 110kV collection bus current voltage value,For 110kV collection bus voltage lower control limit value,Collect whole juniors in substation for i-th 220kV 110kV renewable energy station increases regulating power to the voltage of 110kV collection bus.
4. the step voltage control method for coordinating up and down that 220kV according to claim 1 collects substation, which is characterized in that Step S6 includes:
Step S61, if step S41 determines that the reactive apparatus for needing i-th 220kV to collect substation coordinates decompression: If i-th 220kV collects the capacitor that transforming plant main transformer low-pressure side has operation, a capacitor is cut off;Otherwise it throws Enter a reactor;
Step S62, if step S42 determines that the reactive apparatus for needing i-th 220kV to collect substation coordinates boosting: If i-th 220kV collects the reactor that transforming plant main transformer low-pressure side has operation, a reactor is cut off;Otherwise it throws Enter a capacitor.
5. the step voltage control method for coordinating up and down that 220kV according to claim 1 collects substation, which is characterized in that The junior 110kV renewable energy station is wind power station or photo-voltaic power generation station.
6. the step voltage control method for coordinating up and down that 220kV according to claim 1 collects substation, which is characterized in that It was a control period every 5 minutes.
CN201611150190.0A 2016-12-14 2016-12-14 220kV collects the step voltage control method for coordinating up and down of substation Active CN106712041B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611150190.0A CN106712041B (en) 2016-12-14 2016-12-14 220kV collects the step voltage control method for coordinating up and down of substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611150190.0A CN106712041B (en) 2016-12-14 2016-12-14 220kV collects the step voltage control method for coordinating up and down of substation

Publications (2)

Publication Number Publication Date
CN106712041A CN106712041A (en) 2017-05-24
CN106712041B true CN106712041B (en) 2019-06-07

Family

ID=58937544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611150190.0A Active CN106712041B (en) 2016-12-14 2016-12-14 220kV collects the step voltage control method for coordinating up and down of substation

Country Status (1)

Country Link
CN (1) CN106712041B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104579165A (en) * 2015-01-22 2015-04-29 国家电网公司 Photovoltaic power station dynamic reactive response performance site testing method
CN105140964A (en) * 2015-09-24 2015-12-09 中国南方电网有限责任公司 10kV power distribution network power coordination control method with photovoltaic power supply
CN105914797A (en) * 2015-12-24 2016-08-31 国网甘肃省电力公司电力科学研究院 Large-scale photovoltaic power station reactive voltage sequential coordination control technology

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104579165A (en) * 2015-01-22 2015-04-29 国家电网公司 Photovoltaic power station dynamic reactive response performance site testing method
CN105140964A (en) * 2015-09-24 2015-12-09 中国南方电网有限责任公司 10kV power distribution network power coordination control method with photovoltaic power supply
CN105914797A (en) * 2015-12-24 2016-08-31 国网甘肃省电力公司电力科学研究院 Large-scale photovoltaic power station reactive voltage sequential coordination control technology

Also Published As

Publication number Publication date
CN106712041A (en) 2017-05-24

Similar Documents

Publication Publication Date Title
CN103515967B (en) The collocation method of Reactive Compensation in Wind Farm
CN103532148B (en) The reactive coordination control method of a kind of wind energy turbine set and area power grid
CN107834567A (en) The reactive voltage control method for coordinating of UHVDC converter station and near region power plant
CN105762838B (en) A kind of wind-powered electricity generation cluster reactive voltage multi objective control method
CN104362680B (en) With the active power of wind power field auto-allocation method of the minimum target of active loss
CN103475027B (en) Wind farm and junction station time series coordination control method during concentrated wind power access
CN110086181A (en) Power adaptive cooperative control method in electric-thermal alliance micro-capacitance sensor when a kind of off-grid operation
CN105356480B (en) A kind of photovoltaic plant static reactive control method
CN104810840A (en) Full-network voltage and reactive power optimization control system and control method thereof
CN103490426A (en) Comprehensive control method for voltage stabilization of large-scale wind electricity switching-in weak sending end electrical power system
CN105720585A (en) Reactive power control method and reactive power control system for wind farm clusters
CN104269855B (en) Rapid site reactive voltage adjusting method adaptable to multiple energy accesses
CN105529720A (en) Dynamic reactive power priority based automatic switching method of capacitor of wind power plant
CN104158198A (en) Optimization trend control apparatus and method for power distribution network
CN105375513A (en) Automatic 110kV wind power field voltage control method based on real-time online equivalence
CN109524988A (en) A kind of wind-powered electricity generation based on total active power trend prediction collects station voltage control method
CN105896550A (en) Monitoring method of intelligent reactive power compensation system
CN105552926B (en) The Non Power Compensation Process and system of electric field
Kazari et al. Voltage stability improvement through centralized reactive power management on the Smart Grid
CN105490279B (en) A kind of local voltage control method of the distributed power source based on dichotomy
CN110365023A (en) A kind of automatic voltage control method considering bulk power grid stable voltage control limit value
CN103812133B (en) Grid-connected photovoltaic power station power control system and remote control method thereof
CN105958530A (en) Microgrid system with reactive power automatic compensation function
CN109193820A (en) For carrying out method, system and the storage medium of idle work optimization to photo-voltaic power generation station
CN106532729B (en) It saves ground and coordinates the method that control 220kV collects substation&#39;s high voltage bus voltage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant