CN104574476A - 一种基于bim模型的地下室净空检测方法 - Google Patents

一种基于bim模型的地下室净空检测方法 Download PDF

Info

Publication number
CN104574476A
CN104574476A CN201510028834.8A CN201510028834A CN104574476A CN 104574476 A CN104574476 A CN 104574476A CN 201510028834 A CN201510028834 A CN 201510028834A CN 104574476 A CN104574476 A CN 104574476A
Authority
CN
China
Prior art keywords
basement
bim model
detection method
bim
processor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510028834.8A
Other languages
English (en)
Inventor
周培珊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201510028834.8A priority Critical patent/CN104574476A/zh
Publication of CN104574476A publication Critical patent/CN104574476A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/30Circuit design
    • G06F30/36Circuit design at the analogue level
    • G06F30/367Design verification, e.g. using simulation, simulation program with integrated circuit emphasis [SPICE], direct methods or relaxation methods
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T13/00Animation
    • G06T13/203D [Three Dimensional] animation

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • Processing Or Creating Images (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开了一种基于BIM模型的地下室净空检测方法,该方法包括以下步骤:处理器从BIM数据库调取BIM模型信息;处理器根据模型信息建立系统;通过NavisWorks平台处理系统数据,形成三维可视动画视图;根据需要设定行人身高,模拟在地下室模型内进行行走,如不能正常通过,系统会检查碰撞点,并进行记录;根据记录,修改管线图纸,确保净空满足要求。本发明的优点是:简单、使用方便;通过BIM的应用,帮助建筑工程提高设计图纸检查效率、降低风险;提高建筑工程施工管理及运维管理水平。

Description

一种基于BIM模型的地下室净空检测方法
技术领域
本发明涉及一种地下室净空检测方法,更具体的说,是涉及一种基于BIM模型的三维可视化动态行走对地下室净空的检测方法。
背景技术
目前大多数建筑工程都设计地下室,作为车库及人防工程使用,建筑的综合管线也集中设置在地下室内,包括通风、消防、给排水、弱电、强电等,这些管线是保证建筑工程正常使用的关键,但这些管线设计来自不同的部门,管线安装的也是错综复杂。在管线安装完毕后,经常会发现行人行走至管线集中处,由于净空不足造成正常通过比较困难,需弯腰低头方可通过,此类缺陷虽不影响正常使用,但也是建筑工程设计施工的一种缺陷,若要消除这种缺陷需要通过人工审图检查,检查时需调阅各种专业图纸,劳动量大,而且效率低下。
发明内容
本发明的目的在于提供一种基于BIM的地下室净空检测方法,实现三维可视化动态行走对地下室净空的智能检测。
本发明的一种基于BIM模型的地下室净空检测方法,包括以下步骤:
步骤1:处理器从BIM数据库调取BIM模型信息;
步骤2:处理器根据BIM模型信息建立系统;
步骤3:处理器处理系统数据,形成三维可视动画视图;
步骤4:根据行人身高设定动画视图参数,模拟行人在地下室模型内进行行走,如不能正常通过,系统会检查碰撞点并记录数据;
步骤5:根据记录数据修改管线图纸,确保地下室净空满足要求。
所述步骤2中的系统包括地下室内的通风、消防、给排水、弱电、强电系统。
所述步骤3处理器是基于NavisWorks平台处理系统数据,形成三维可视动画视图。
所述步骤4中根据行人身高设定动画视图参数时,参数可自由设定。
本发明的有益效果是:(1)本发明的检测方法简单,使用方便;(2)通过BIM的应用,帮助建筑工程提高设计图纸检查效率,降低风险;(3)提高建筑工程施工管理、运行及维护的管理水平。
具体实施方式
下面对本发明作进一步的描述。
一种基于BIM模型的地下室净空检测方法,包括以下步骤:
步骤1:处理器从BIM数据库调取BIM模型信息;
步骤2:处理器根据BIM模型信息建立地下室内的通风、消防、给排水、弱电、强电系统;
步骤3:处理器基于NavisWorks平台处理处理系统数据,形成三维可视动画视图;
步骤4:根据行人身高设定动画视图参数,模拟行人在地下室模型内进行行走,如不能正常通过,系统会检查碰撞点并记录数据;根据行人身高设定动画视图参数时,参数可自由设定;
步骤5:根据记录数据修改管线图纸,确保地下室净空满足要求。、
本发明的检测方法简单,使用方便快捷;通过BIM模型的应用,帮助建筑工程提高设计图纸检查效率、降低风险;能提高建筑工程施工管理、运行及维护管理水平。

Claims (4)

1.一种基于BIM模型的地下室净空检测方法,该方法包括以下步骤:
步骤1:处理器从BIM数据库调取BIM模型信息;
步骤2:处理器根据BIM模型信息建立系统;
步骤3:处理器处理系统数据,形成三维可视动画视图;
步骤4:根据行人身高设定动画视图参数,模拟行人在地下室模型内进行行走,如不能正常通过,系统会检查碰撞点并记录数据;
步骤5:根据记录数据修改管线图纸,确保地下室净空满足要求。
2.根据权利要求1所述的一种基于BIM模型的地下室净空检测方法,其特征在于,所述步骤2中的系统包括地下室内的通风、消防、给排水、弱电、强电系统。
3.根据权利要求1所述的一种基于BIM模型的地下室净空检测方法,其特征在于,所述步骤3处理器是基于NavisWorks平台处理系统数据,形成三维可视动画视图。
4.根据权利要求1所述的一种基于BIM模型的地下室净空检测方法,其特征在于,所述步骤4中根据行人身高设定动画视图参数时,参数可自由设定。
CN201510028834.8A 2015-01-21 2015-01-21 一种基于bim模型的地下室净空检测方法 Pending CN104574476A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510028834.8A CN104574476A (zh) 2015-01-21 2015-01-21 一种基于bim模型的地下室净空检测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510028834.8A CN104574476A (zh) 2015-01-21 2015-01-21 一种基于bim模型的地下室净空检测方法

Publications (1)

Publication Number Publication Date
CN104574476A true CN104574476A (zh) 2015-04-29

Family

ID=53090442

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510028834.8A Pending CN104574476A (zh) 2015-01-21 2015-01-21 一种基于bim模型的地下室净空检测方法

Country Status (1)

Country Link
CN (1) CN104574476A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107679322A (zh) * 2017-09-29 2018-02-09 中国电建集团贵阳勘测设计研究院有限公司 一种交通隧洞断面及轴线设置方法
CN108133081A (zh) * 2017-12-04 2018-06-08 中国建筑第八工程局有限公司 基于bim技术的检验立体车库的方法及系统
CN110118751A (zh) * 2019-05-24 2019-08-13 无锡佶达德光电子技术有限公司 自适应调节监测频率的激光探测系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101783195A (zh) * 2009-12-15 2010-07-21 中广核工程有限公司 控制室布置设计的虚拟人验证方法及系统
KR20110068397A (ko) * 2009-12-16 2011-06-22 버츄얼빌더스 주식회사 Bim 정보를 이용한 지능형 시설물 관리 장치 및 방법
CN102819623A (zh) * 2011-06-10 2012-12-12 上海市电力公司 一种通过bim检测碰撞位置的方法
CN102867076A (zh) * 2012-07-05 2013-01-09 西安理工大学 基于bim的地铁综合管线净空检测方法
CN103093061A (zh) * 2013-02-07 2013-05-08 中铁二十二局集团电气化工程有限公司 一种地铁机电工程综合管线碰撞优化方法
CN103473412A (zh) * 2013-09-11 2013-12-25 中铁上海工程局第二工程有限公司 基于虚拟和现实场景的地铁车站漫游方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101783195A (zh) * 2009-12-15 2010-07-21 中广核工程有限公司 控制室布置设计的虚拟人验证方法及系统
KR20110068397A (ko) * 2009-12-16 2011-06-22 버츄얼빌더스 주식회사 Bim 정보를 이용한 지능형 시설물 관리 장치 및 방법
CN102819623A (zh) * 2011-06-10 2012-12-12 上海市电力公司 一种通过bim检测碰撞位置的方法
CN102867076A (zh) * 2012-07-05 2013-01-09 西安理工大学 基于bim的地铁综合管线净空检测方法
CN103093061A (zh) * 2013-02-07 2013-05-08 中铁二十二局集团电气化工程有限公司 一种地铁机电工程综合管线碰撞优化方法
CN103473412A (zh) * 2013-09-11 2013-12-25 中铁上海工程局第二工程有限公司 基于虚拟和现实场景的地铁车站漫游方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
范少兵等: "BIM技术在某机电安装工程应用全过程分析", 《安装》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107679322A (zh) * 2017-09-29 2018-02-09 中国电建集团贵阳勘测设计研究院有限公司 一种交通隧洞断面及轴线设置方法
CN107679322B (zh) * 2017-09-29 2021-02-12 中国电建集团贵阳勘测设计研究院有限公司 一种交通隧洞断面及轴线设置方法
CN108133081A (zh) * 2017-12-04 2018-06-08 中国建筑第八工程局有限公司 基于bim技术的检验立体车库的方法及系统
CN108133081B (zh) * 2017-12-04 2022-06-10 中国建筑第八工程局有限公司 基于bim技术的检验立体车库的方法及系统
CN110118751A (zh) * 2019-05-24 2019-08-13 无锡佶达德光电子技术有限公司 自适应调节监测频率的激光探测系统

Similar Documents

Publication Publication Date Title
CN111145479B (zh) 基于bim定位技术的施工危险环境实时预警平台与方法
CN204303029U (zh) 用于地铁管线碰撞检测及后期运营维护的bim数据库系统
CN105586995A (zh) 基于bim的深基坑变形监测方法
CN105930973A (zh) 基于bim的施工现场网格化管理系统及其控制方法
CN104574476A (zh) 一种基于bim模型的地下室净空检测方法
Kim et al. Temporary facility planning of a construction project using BIM (Building Information Modeling)
EP2801060A2 (en) Methods and apparatus for high performance design of a project
CN103886139A (zh) 一种基于建筑信息模型的事件交互方法
CN112906248A (zh) 一种基于bim技术的大型钢结构建筑施工安全管理方法
CN105260491A (zh) 管道综合布管建模方法
CN111914332A (zh) 一种基于bim+ar技术地下管线识别和警示方法
CN109711076A (zh) Bim模型在施工过程中的应用方法
CN113269529A (zh) 一种基于bim模型的建筑工程造价成本的控制系统
CN111597637A (zh) 一种动车现场部件的故障检测方法、装置、服务器及系统
Abdelhady et al. Probabilistic quantification of hurricane resilience of communities through a distributed simulation platform
CN116070336B (zh) 基于建筑设计防火规范的建筑图纸智能审查方法及系统
Gersonius et al. Adaptation of flood risk nfrastructure to climate resilience
CN116310521A (zh) 异常检测方法、装置、存储介质、电子设备及系统
CN104775844A (zh) 一种用于地铁车站敞开楼梯防火防烟分隔空气风幕的设计方法
CN114021238A (zh) 一种基于bim技术的复杂管综排布方法
DK200900162A (en) A new type of technical indicators called probability indicators
CN103246512A (zh) 一种将VG图形转换为Visio图形的方法
CN102446240A (zh) 一种地铁站火灾数值模拟中隧道口边界条件等效算法
Donath et al. Plausibility in early stages of architectural design: a new tool for high-rise residential buildings
영삼이 A Study on the Improvement Method of the Fire Department Connection for Fire Suppression at the Apartment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150429