CN104573987B - One realizes PCS and electrical network multi-source operation system interoperability integrated approach - Google Patents
One realizes PCS and electrical network multi-source operation system interoperability integrated approach Download PDFInfo
- Publication number
- CN104573987B CN104573987B CN201510041618.7A CN201510041618A CN104573987B CN 104573987 B CN104573987 B CN 104573987B CN 201510041618 A CN201510041618 A CN 201510041618A CN 104573987 B CN104573987 B CN 104573987B
- Authority
- CN
- China
- Prior art keywords
- pcs
- interoperability
- ems
- das
- cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000013459 approach Methods 0.000 title claims abstract description 13
- 238000012544 monitoring process Methods 0.000 claims abstract description 101
- 238000004458 analytical method Methods 0.000 claims abstract description 52
- 101100508071 Solanum lycopersicum PIIF gene Proteins 0.000 claims abstract description 30
- 230000036760 body temperature Effects 0.000 claims abstract description 23
- 238000004891 communication Methods 0.000 claims abstract description 18
- 238000000034 method Methods 0.000 claims description 31
- 239000010410 layer Substances 0.000 claims description 27
- 238000011160 research Methods 0.000 claims description 24
- 230000003993 interaction Effects 0.000 claims description 17
- 230000007613 environmental effect Effects 0.000 claims description 14
- 238000012423 maintenance Methods 0.000 claims description 13
- 238000010276 construction Methods 0.000 claims description 10
- 230000008569 process Effects 0.000 claims description 8
- 239000002346 layers by function Substances 0.000 claims description 6
- 238000013439 planning Methods 0.000 claims description 6
- 239000000203 mixture Substances 0.000 description 16
- 238000005516 engineering process Methods 0.000 description 8
- 230000000694 effects Effects 0.000 description 7
- 230000002452 interceptive effect Effects 0.000 description 6
- 238000007726 management method Methods 0.000 description 6
- 238000004519 manufacturing process Methods 0.000 description 6
- 230000000007 visual effect Effects 0.000 description 6
- 230000005540 biological transmission Effects 0.000 description 4
- 230000004927 fusion Effects 0.000 description 4
- 238000010223 real-time analysis Methods 0.000 description 4
- 230000011664 signaling Effects 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 230000010354 integration Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 241000931705 Cicada Species 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Marketing (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention discloses one and realize PCS and electrical network multi-source operation system interoperability integrated approach comprises: plan as a whole PCS and EMS based on PIIF framework interoperability level, between DAS, GIS and PMS, types of applications is integrated, PCS is realized to cable system operating condition conduct monitoring at all levels by the interoperability between system, release cable network operation and management for environment monitor information support for EMS, DAS provide to apply simultaneously, PCS is realized by interoperability and between EMS, DAS, the artwork of cross-safety zone is unified or unifies artwork with GIS, applying flexible variation; PCS can the operation of power networks remote measure and communication information that gathers of Real-time Obtaining EMS, DAS, and as PCS to one of main criterion of power cable operating condition assistant analysis, and then auxiliary PCS analyzes cable line running temperature and load running level; Otherwise EMS, DAS can run the real-time monitoring of body temperature, running environment and Real-time Alarm information auxiliary electrical network operation by interoperability Real-time Obtaining cable system.
Description
Technical field
The present invention relates to power distribution network information integerated field, particularly relate to one and realize PCS and electrical network multi-source operation system interoperability integrated approach.
Background technology
For a long time, owing to there is no unified information integerated standard and the logical architecture of pool, in electric system, each service technique support system is independently built, business integration degree is not high, identical information existence repeats to safeguard more frequently, reusable information can not get maximized sharing, the independent not easily extensible of business of different levels, and limited information integerated still adopts the mutual architectural framework of traditional non-international standard, originally the complementary information that can be combined with each other can not get efficient fusion, cause that the information of power distribution network different angles is natural isolates, limit power business to promote further.
Cable system comprehensive monitoring system (PCS) and EMS gather the running environment such as body temperature, gas concentration information and real-time power cable operating condition information respectively for same power cable model, but these information fail to carry out effective information integerated due to existing technical limitation, limit the lifting of enterprise in cable system management, fault analysis repairing ability.
By the analysis and summary inventor of problem is analyzed existing electrical network multi-source business fail organically blend, information interaction all adopts the Interface integration specification of privatization, the source identical power cable not being realized to equipment is safeguarded, the monitoring of PCS running environment fails to combine with the cable real-time information complementation of EMS, and technology does not carry out visual analyzing intuitively.
In sum, present inventor, in the process realizing invention technical scheme in the embodiment of the present application, finds that above-mentioned technology at least exists following technical matters:
In the prior art, it is lower to there is integrated level in existing electric system, and the failing of business organically blends, can not the omnibearing monitoring of cable system integrated operation operating mode and analysis, the technical matters that cable network fault treatment effeciency is lower.
Summary of the invention
The invention provides one and realize PCS and electrical network multi-source operation system interoperability integrated approach, solving existing electric system, to there is integrated level lower, the failing of business organically blends, can not the omnibearing monitoring of cable system integrated operation operating mode and analysis, the technical matters that cable network fault treatment effeciency is lower, achieve electric system integrated level higher, business organically blends, realize the omnibearing monitoring of cable system integrated operation operating mode and analysis, improve the treatment effeciency of cable network fault, ensure the technique effect of the power cable circuit more operation of stability and high efficiency.
For solving the problems of the technologies described above, the embodiment of the present application provides one and realizes PCS and electrical network multi-source operation system interoperability integrated approach based on PIIF framework, and described method comprises:
Step one: based on PIIF framework interoperability step analysis PCS(cable comprehensive monitoring platform), EMS(dispatch automated system), DAS(electrical power distribution automatization system) and GIS(Geographic Information System) between operation flow between cable system operating condition conduct monitoring at all levels business, the function use-case of described operation flow links, standard interaction models that each described function use-case is corresponding, the communication protocol of standard and the interface module of corresponding function use-case between system;
Step 2: PCS by interoperability cross-safety zone integrating EMS major network artwork, DAS distribution artwork, or by the main distribution artwork of the integrated GIS of interoperability and space information resource, selects the integrated object of interoperability according to Automation Construction level;
Step 3: PCS obtains EMS, DAS electrical network real time execution monitoring information by interoperability, and as the criterion of PCS to power cable operating condition assistant analysis, auxiliary PCS analyzes cable line running temperature and load running level;
Step 4: EMS and DAS obtains PCS cable system by interoperability and runs body temperature, running environment and Real-time Alarm information, realizes monitoring the real time execution of electric parameters and non-electric quantity simultaneously.
Further, described based on PIIF framework interoperability step analysis PCS(cable comprehensive monitoring platform), EMS(dispatch automated system), DAS(electrical power distribution automatization system) and GIS(Geographic Information System) between operation flow between cable system operating condition monitoring business, the function use-case of described operation flow links, the standard interaction models that each described function use-case is corresponding, between system, the communication protocol of standard and the interface module of corresponding function use-case are specially: based on PIIF framework interoperability level by PCS and EMS, between DAS and GIS, cable system operating condition conduct monitoring at all levels service application decomposes operation layer, functional layer, Information Level, communication layers and component layer, the protocol specification that unified planning is mutual and service regulation.
Further, based on PIIF framework interoperability level, cable system operating condition conduct monitoring at all levels service application between PCS and EMS, DAS and GIS is decomposed operation layer, functional layer, Information Level, communication layers and component layer, the protocol specification that unified planning is mutual and service regulation, specifically comprise;
(1) this kind of service application of combing cable system operating condition conduct monitoring at all levels, forms data flowchart;
(2) step that flow process relates to is decomposed the function use-case of correspondence system, and interoperability analysis is carried out to each function use-case;
(3) according to the interoperability analysis result between function use-case, the standard interaction models of definition interoperability;
(4) according to the interoperability analysis result between function use-case, the standard interaction protocol of definition interoperability;
(5) for different function use-cases, corresponding interface module is researched and developed, thus the interoperability between practical function use-case.
Further, described PCS is by interoperability cross-safety zone integrating EMS major network artwork, DAS distribution artwork, or by the main distribution artwork of the integrated GIS of interoperability and space information resource, the integrated object of interoperability is selected according to Automation Construction level, be specially: PCS obtains the main distribution artwork of EMS, DAS through place of safety by interoperability, on the basis that GIS and EMS main distribution artwork is consistent, or by interoperability by directly all being obtained by GIS.
Further, described PCS obtains the main distribution artwork of EMS, DAS through place of safety by interoperability, on the basis that GIS and EMS main distribution artwork is consistent, or by interoperability by directly all being obtained by GIS, specifically comprises:
(1) EMS, DAS research and develop the interface module of artwork maintenance function use-case, issue main distribution artwork; PCS researches and develops the interface module of artwork maintenance function use-case, subscribes to main distribution artwork;
(2) if this ground Automation Construction level is very high, achieve the main distribution artwork of GIS and EMS, DAS consistent, then can realize main distribution artwork in the following way integrated: GIS researches and develops the interface module of artwork maintenance function use-case, issues main distribution artwork; PCS researches and develops the interface module of artwork maintenance function use-case, subscribes to main distribution artwork.
Further, described PCS obtains EMS, DAS electrical network real time execution monitoring information by interoperability, as the criterion of PCS to power cable operating condition assistant analysis, auxiliary PCS analyzes cable line running temperature and load running level is specially: the electrical network real time execution monitoring information that PCS Real-time Obtaining EMS, DAS gather, cable system operating mode electrical data being joined PCS is studied and judged in logic, as the criterion of PCS to power cable operating condition assistant analysis, and then auxiliary PCS analyzes cable line running temperature and load running level.
Further, the electrical network real time execution monitoring information that described PCS Real-time Obtaining EMS, DAS gather, cable system operating mode electrical data being joined PCS is studied and judged in logic, as the criterion of PCS to power cable operating condition assistant analysis, and then auxiliary PCS analyzes cable line running temperature and load running level, specifically comprises:
(1) EMS, DAS research and develop the interface module of grid operating monitoring function use-case, issue main distribution real time execution monitoring information; PCS researches and develops the interface module of cable system operation monitoring function use-case, subscribes to main distribution real time execution monitoring information;
(2) cable system operating mode electrical network real-time running data being joined PCS is studied and judged in logic and is supported power cable operating condition assistant analysis, and then auxiliary PCS analyzes cable line running temperature and load running level.
Further, described EMS and DAS obtains PCS cable system by interoperability and runs body temperature, running environment and Real-time Alarm information, realize monitoring the real time execution of electric parameters and non-electric quantity being specially: EMS, DAS run body temperature, running environment and Real-time Alarm information by interoperability Real-time Obtaining cable system simultaneously, environmental data and operation of power networks data are organically blended, the real-time monitoring of auxiliary electrical network operation.
Further, described EMS, DAS run body temperature, running environment and Real-time Alarm information by interoperability Real-time Obtaining cable system, and environmental data and operation of power networks data are organically blended, the real-time monitoring of auxiliary electrical network operation, specifically comprises:
(1) PCS researches and develops the interface module of cable system operation monitoring function use-case, release cable network operation body temperature, running environment and Real-time Alarm information; EMS, DAS research and develop the interface module of grid operating monitoring function use-case, subscribe to cable system and run body temperature, running environment and Real-time Alarm information;
(2), on the basis that EMS, DAS and PCS artwork is unified, environmental data and operation of power networks data are organically blended, the real-time monitoring of auxiliary electrical network operation.
The one or more technical schemes provided in the embodiment of the present application, at least have following technique effect or advantage:
PCS will be realized based on PIIF framework and electrical network multi-source operation system interoperability integrated approach is designed to comprise: step one: based on PIIF framework interoperability step analysis PCS(cable comprehensive monitoring platform) owing to have employed, EMS(dispatch automated system), DAS(electrical power distribution automatization system) and GIS(Geographic Information System) between operation flow between cable system operating condition conduct monitoring at all levels business, the function use-case of described operation flow links, the standard interaction models that each described function use-case is corresponding, the communication protocol of standard and the interface module of corresponding function use-case between system, step 2: PCS by interoperability cross-safety zone integrating EMS major network artwork, DAS distribution artwork, or by the main distribution artwork of the integrated GIS of interoperability and space information resource, selects the integrated object of interoperability according to Automation Construction level, step 3: PCS obtains EMS, DAS electrical network real time execution monitoring information by interoperability, and as the criterion of PCS to power cable operating condition assistant analysis, auxiliary PCS analyzes cable line running temperature and load running level, step 4: EMS and DAS obtains PCS cable system by interoperability and runs body temperature, running environment and Real-time Alarm information, realize the technical scheme that the real time execution of electric parameters and non-electric quantity is monitored simultaneously, namely, first cable comprehensive monitoring platform, production management system, produce repairing maneuvering platform, the source of unification and equipment that Dispatching monitor and control system and Geographic Information System realize coding based on PIIF framework by information interactive bus is safeguarded, and the seamless fusion that comprises between all kinds of business of transregional business is realized by the service of registered standard, by the running temperature of cable system, the environmental factors such as gas concentration, the real-time telemetry remote signalling information of power cable and fault warning organically blend, real-time analysis is carried out to the load running level of cable line, and the visual presentation of various dimensions is carried out based on geographic map, so, efficiently solving existing electric system, to there is integrated level lower, the failing of business organically blends, can not the omnibearing monitoring of cable system integrated operation operating mode and analysis, the technical matters that cable network fault treatment effeciency is lower, and then it is higher to achieve electric system integrated level, business organically blends, realize the omnibearing monitoring of cable system integrated operation operating mode and analysis, improve the treatment effeciency of cable network fault, ensure the technique effect of the power cable circuit more operation of stability and high efficiency.
Accompanying drawing explanation
Fig. 1 is the process flow diagram realizing PCS and electrical network multi-source operation system interoperability integrated approach in the embodiment of the present application one based on PIIF framework;
Fig. 2 is PIIF framework three-dimensional model schematic diagram in the embodiment of the present application one;
Fig. 3 is PIIF framework integrated technology methodology schematic diagram in the embodiment of the present application one;
Fig. 4 is PCS business datum flow process figure in the embodiment of the present application one.
Embodiment
The invention provides one and realize PCS and electrical network multi-source operation system interoperability integrated approach, solving existing electric system, to there is integrated level lower, the failing of business organically blends, can not the omnibearing monitoring of cable system integrated operation operating mode and analysis, the technical matters that cable network fault treatment effeciency is lower, achieve electric system integrated level higher, business organically blends, realize the omnibearing monitoring of cable system integrated operation operating mode and analysis, improve the treatment effeciency of cable network fault, ensure the technique effect of the power cable circuit more operation of stability and high efficiency.
Technical scheme during the application implements is for solving the problems of the technologies described above.General thought is as follows:
Have employed and will realize PCS based on PIIF framework and electrical network multi-source operation system interoperability integrated approach is designed to comprise: step one: based on PIIF framework interoperability step analysis PCS(cable comprehensive monitoring platform), EMS(dispatch automated system), DAS(electrical power distribution automatization system) and GIS(Geographic Information System) between operation flow between cable system operating condition conduct monitoring at all levels business, the function use-case of described operation flow links, the standard interaction models that each described function use-case is corresponding, the communication protocol of standard and the interface module of corresponding function use-case between system, step 2: PCS by interoperability cross-safety zone integrating EMS major network artwork, DAS distribution artwork, or by the main distribution artwork of the integrated GIS of interoperability and space information resource, selects the integrated object of interoperability according to Automation Construction level, step 3: PCS obtains EMS, DAS electrical network real time execution monitoring information by interoperability, and as the criterion of PCS to power cable operating condition assistant analysis, auxiliary PCS analyzes cable line running temperature and load running level, step 4: EMS and DAS obtains PCS cable system by interoperability and runs body temperature, running environment and Real-time Alarm information, realize the technical scheme that the real time execution of electric parameters and non-electric quantity is monitored simultaneously, namely, first cable comprehensive monitoring platform, production management system, produce repairing maneuvering platform, the source of unification and equipment that Dispatching monitor and control system and Geographic Information System realize coding based on PIIF framework by information interactive bus is safeguarded, and the seamless fusion that comprises between all kinds of business of transregional business is realized by the service of registered standard, by the running temperature of cable system, the environmental factors such as gas concentration, the real-time telemetry remote signalling information of power cable and fault warning organically blend, real-time analysis is carried out to the load running level of cable line, and the visual presentation of various dimensions is carried out based on geographic map, so, efficiently solving existing electric system, to there is integrated level lower, the failing of business organically blends, can not the omnibearing monitoring of cable system integrated operation operating mode and analysis, the technical matters that cable network fault treatment effeciency is lower, and then it is higher to achieve electric system integrated level, business organically blends, realize the omnibearing monitoring of cable system integrated operation operating mode and analysis, improve the treatment effeciency of cable network fault, ensure the technique effect of the power cable circuit more operation of stability and high efficiency.
In order to better understand technique scheme, below in conjunction with Figure of description and concrete embodiment, technique scheme is described in detail.
Embodiment one:
In embodiment one, provide one and realize PCS and electrical network multi-source operation system interoperability integrated approach, please refer to Fig. 1-Fig. 4, described method comprises:
Step one: based on PIIF framework interoperability step analysis PCS(cable comprehensive monitoring platform), EMS(dispatch automated system), DAS(electrical power distribution automatization system) and GIS(Geographic Information System) between operation flow between cable system operating condition conduct monitoring at all levels business, the function use-case of described operation flow links, standard interaction models that each described function use-case is corresponding, the communication protocol of standard and the interface module of corresponding function use-case between system;
Step 2: PCS by interoperability cross-safety zone integrating EMS major network artwork, DAS distribution artwork, or by the main distribution artwork of the integrated GIS of interoperability and space information resource, selects the integrated object of interoperability according to Automation Construction level;
Step 3: PCS obtains EMS, DAS electrical network real time execution monitoring information by interoperability, and as the criterion of PCS to power cable operating condition assistant analysis, auxiliary PCS analyzes cable line running temperature and load running level;
Step 4: EMS and DAS obtains PCS cable system by interoperability and runs body temperature, running environment and Real-time Alarm information, realizes monitoring the real time execution of electric parameters and non-electric quantity simultaneously.
Wherein, in the embodiment of the present application, described PIIF framework is specially: PIIF framework is three classes (tissue class, info class, technology type), the eight layers of interoperability generic principles electric system interoperability interactive frame proposed intelligent grid based on international intelligent grid interoperability expert consulting group (SGIP) harpoon, framework is by too many levels flow of power, and multi-layer production run, many interoperability layer three-dimensional model form.Wherein too many levels flow of power comprises generating, transmission of electricity, distribution, distributed power source and electricity consumption five layers; Multi-layer production run comprises enterprise-level information management, real time execution control, substation automation, on-the-spot robotization and primary equipment Pyatyi; Many interoperability layer comprises business interoperability, function interoperability, Information Interoperability, communication interoperability and component interoperability five layers, the interoperability of five classifications such as the corresponding service interaction of difference, systemic-function combination, Semantic Discrimination, protocol communication and assembly realization.The framework provides a kind of logical organization of standard, ensure the interoperability between intelligent grid element, achieve the interoperability on the multiple level of electric power enterprise core business.
Wherein, in the embodiment of the present application, described based on PIIF framework interoperability step analysis PCS(cable comprehensive monitoring platform), EMS(dispatch automated system), DAS(electrical power distribution automatization system) and GIS(Geographic Information System) between operation flow between cable system operating condition monitoring business, the function use-case of described operation flow links, the standard interaction models that each described function use-case is corresponding, between system, the communication protocol of standard and the interface module of corresponding function use-case are specially: based on PIIF framework interoperability level by PCS and EMS, between DAS and GIS, cable system operating condition conduct monitoring at all levels service application decomposes operation layer, functional layer, Information Level, communication layers and component layer, the protocol specification that unified planning is mutual and service regulation.
Wherein, in the embodiment of the present application, based on PIIF framework interoperability level, cable system operating condition conduct monitoring at all levels service application between PCS and EMS, DAS and GIS is decomposed operation layer, functional layer, Information Level, communication layers and component layer, the protocol specification that unified planning is mutual and service regulation, specifically comprise;
(1) this kind of service application of combing cable system operating condition conduct monitoring at all levels, forms data flowchart;
(2) step that flow process relates to is decomposed the function use-case of correspondence system, and interoperability analysis is carried out to each function use-case;
(3) according to the interoperability analysis result between function use-case, the standard interaction models of definition interoperability;
(4) according to the interoperability analysis result between function use-case, the standard interaction protocol of definition interoperability;
(5) for different function use-cases, corresponding interface module is researched and developed, thus the interoperability between practical function use-case.
Wherein, in the embodiment of the present application, described PCS is by interoperability cross-safety zone integrating EMS major network artwork, DAS distribution artwork, or by the main distribution artwork of the integrated GIS of interoperability and space information resource, the integrated object of interoperability is selected according to Automation Construction level, be specially: PCS obtains EMS by interoperability through place of safety, the main distribution artwork of DAS, on the basis that GIS and EMS main distribution artwork is consistent, or by interoperability by directly all being obtained by GIS, for not building EMS, the place of DAS is adopted in this way, if do not set up GIS, then can manually draw.
Wherein, in the embodiment of the present application, described PCS obtains the main distribution artwork of EMS, DAS through place of safety by interoperability, on the basis that GIS and EMS main distribution artwork is consistent, or by interoperability by directly all being obtained by GIS, specifically comprises:
(1) EMS, DAS research and develop the interface module of artwork maintenance function use-case, issue main distribution artwork; PCS researches and develops the interface module of artwork maintenance function use-case, subscribes to main distribution artwork;
(2) GIS researches and develops the interface module of artwork maintenance function use-case, issues main distribution artwork; PCS researches and develops the interface module of artwork maintenance function use-case, subscribes to main distribution artwork.
Wherein, in the embodiment of the present application, described PCS obtains EMS, DAS electrical network real time execution monitoring information by interoperability, as the criterion of PCS to power cable operating condition assistant analysis, auxiliary PCS analyzes cable line running temperature and load running level is specially: the electrical network real time execution monitoring information that PCS Real-time Obtaining EMS, DAS gather, cable system operating mode electrical data being joined PCS is studied and judged in logic, as the criterion of PCS to power cable operating condition assistant analysis, and then auxiliary PCS analyzes cable line running temperature and load running level.
Wherein, in the embodiment of the present application, the electrical network real time execution monitoring information that described PCS Real-time Obtaining EMS, DAS gather, cable system operating mode electrical data being joined PCS is studied and judged in logic, as the criterion of PCS to power cable operating condition assistant analysis, and then auxiliary PCS analyzes cable line running temperature and load running level, specifically comprises:
(1) EMS, DAS research and develop the interface module of grid operating monitoring function use-case, issue main distribution real time execution monitoring information; PCS researches and develops the interface module of cable system operation monitoring function use-case, subscribes to main distribution real time execution monitoring information;
(2) cable system operating mode electrical network real-time running data being joined PCS is studied and judged in logic and is supported power cable operating condition assistant analysis, and then auxiliary PCS analyzes cable line running temperature and load running level.
Wherein, in the embodiment of the present application, described EMS and DAS obtains PCS cable system by interoperability and runs body temperature, running environment and Real-time Alarm information, realize monitoring the real time execution of electric parameters and non-electric quantity being specially: EMS, DAS run body temperature, running environment and Real-time Alarm information by interoperability Real-time Obtaining cable system simultaneously, environmental data and operation of power networks data are organically blended, the real-time monitoring of auxiliary electrical network operation.
Wherein, in the embodiment of the present application, described EMS, DAS run body temperature, running environment and Real-time Alarm information by interoperability Real-time Obtaining cable system, environmental data and operation of power networks data are organically blended, the real-time monitoring of auxiliary electrical network operation, specifically comprises:
(1) PCS researches and develops the interface module of cable system operation monitoring function use-case, release cable network operation body temperature, running environment and Real-time Alarm information; EMS, DAS research and develop the interface module of grid operating monitoring function use-case, subscribe to cable system and run body temperature, running environment and Real-time Alarm information;
(2), on the basis that EMS, DAS and PCS artwork is unified, environmental data and operation of power networks data are organically blended, the real-time monitoring of auxiliary electrical network operation.
Wherein, in the embodiment of the present application, relate to business to operation system each in the present embodiment to be below described further respectively:
Cable comprehensive monitoring platform carries out Real-Time Monitoring to tunnel inner cable running status (comprising the information such as temperature, environment), and setting threshold value carries out Real-time Alarm to out-of-limit information as required, this respect information the load running level of auxiliary dispatching person to cable system can be monitored and analyze simultaneously.
Dispatching monitor and control system contains dispatch automated system, electrical power distribution automatization system two real-time monitoring systems, system mainly monitors the real time execution operating mode of transmission and distribution network cable, and this respect information can carry out omnibearing analysis monitoring as important assistant criteria carrying cable comprehensive monitoring platform to the operating condition of power cable simultaneously.
According to the integral principle of " source is safeguarded, data sharing ", unusual fluctuation flow process completes the equipment files of each operation system information integerated, the maintenance of graphical model is shared based on newly throwing for production management system, Geographic Information System.
Produce repairing maneuvering platform and formulate special fault layer based on geographic map for cable network fault alarm, that supports alarm pushes away screen in real time, cable comprehensive monitoring platform, Dispatching monitor and control system are all played to the supporting role of visual analyzing intuitively to the analysis of cable system real-time status, geo-location accurately can be carried out in real time to trouble spot simultaneously, improve the repairing dispatching efficiency of fault.
As shown in Fig. 4 picture group, the present embodiment invention is realizing in the information integerated process at multi-system information integrated environment, based on method of service and the message flow of PIIF framework codes and standards, bus can carry out real-time verification to registered service transmission message, if there is any one situation of non-compliant method of service, non-compliant message header, non-compliant message body, all error reporting can be returned and end transmission.
As shown in Figure 3, in the present embodiment, role A is for serving sender, role B is service beneficiaries, information integerated is carried out by the service of the information interactive bus registered standard based on PIIF framework between each operation system, for cable system running environment information distribution service, cable comprehensive monitoring platform release cable network operation environmental information is to bus, bus is to service call mode, the structure of this informational message head and message body verifies, if meet, news release success, Dispatching monitor and control system can successful subscription relevant information, in like manner other has the operation system of demand directly directly can also subscribe to related news by bus according to this unified standard to cable system running environment information.
The present embodiment invention realizes cross-safety zone Technique of Information Integration in service broker's mode, can shield actual Physical layer in transregional integrated environment, realizes the transregional of message mechanism and shares.
As shown in Figure 3, in the present embodiment invention, cable integrated monitoring platform, Regulation and monitoring system completes cable machinery coding and produces the unification of encode and quasi real time subscribe to new unusual fluctuation incremental message of throwing based on information interactive bus to update the equipment model by producing, ensure Unified Model, thus by the running temperature of cable system, the environmental factors such as gas concentration, the real-time telemetry remote signalling information of power cable and fault warning organically blend, real-time analysis is carried out to the load running level of cable line, and the visual presentation of various dimensions is carried out based on geographic map, the quick reparation of carrying cable net fault.
Technical scheme in above-mentioned the embodiment of the present application, at least has following technique effect or advantage:
PCS will be realized based on PIIF framework and electrical network multi-source operation system interoperability integrated approach is designed to comprise: step one: based on PIIF framework interoperability step analysis PCS(cable comprehensive monitoring platform) owing to have employed, EMS(dispatch automated system), DAS(electrical power distribution automatization system) and GIS(Geographic Information System) between operation flow between cable system operating condition conduct monitoring at all levels business, the function use-case of described operation flow links, the standard interaction models that each described function use-case is corresponding, the communication protocol of standard and the interface module of corresponding function use-case between system, step 2: PCS by interoperability cross-safety zone integrating EMS major network artwork, DAS distribution artwork, or by the main distribution artwork of the integrated GIS of interoperability and space information resource, selects the integrated object of interoperability according to Automation Construction level, step 3: PCS obtains EMS, DAS electrical network real time execution monitoring information by interoperability, and as the criterion of PCS to power cable operating condition assistant analysis, auxiliary PCS analyzes cable line running temperature and load running level, step 4: EMS and DAS obtains PCS cable system by interoperability and runs body temperature, running environment and Real-time Alarm information, realize the technical scheme that the real time execution of electric parameters and non-electric quantity is monitored simultaneously, namely, first cable comprehensive monitoring platform, production management system, produce repairing maneuvering platform, the source of unification and equipment that Dispatching monitor and control system and Geographic Information System realize coding based on PIIF framework by information interactive bus is safeguarded, and the seamless fusion that comprises between all kinds of business of transregional business is realized by the service of registered standard, by the running temperature of cable system, the environmental factors such as gas concentration, the real-time telemetry remote signalling information of power cable and fault warning organically blend, real-time analysis is carried out to the load running level of cable line, and the visual presentation of various dimensions is carried out based on geographic map, so, efficiently solving existing electric system, to there is integrated level lower, the failing of business organically blends, can not the omnibearing monitoring of cable system integrated operation operating mode and analysis, the technical matters that cable network fault treatment effeciency is lower, and then it is higher to achieve electric system integrated level, business organically blends, realize the omnibearing monitoring of cable system integrated operation operating mode and analysis, improve the treatment effeciency of cable network fault, ensure the technique effect of the power cable circuit more operation of stability and high efficiency.
Although describe the preferred embodiments of the present invention, those skilled in the art once obtain the basic creative concept of cicada, then can make other change and amendment to these embodiments.So claims are intended to be interpreted as comprising preferred embodiment and falling into all changes and the amendment of the scope of the invention.
Obviously, those skilled in the art can carry out various change and modification to the present invention and not depart from the spirit and scope of the present invention.Like this, if these amendments of the present invention and modification belong within the scope of the claims in the present invention and equivalent technologies thereof, then the present invention is also intended to comprise these change and modification.
Claims (7)
1. realize PCS and an electrical network multi-source operation system interoperability integrated approach, it is characterized in that, described method comprises:
Step one: based on the communication protocol of standard and the interface module of corresponding function use-case between the function use-case of the operation flow between the step analysis of PIIF framework interoperability PCS, EMS, DAS and GIS between cable system operating condition conduct monitoring at all levels business, described operation flow links, standard interaction models that each described function use-case is corresponding, system, wherein, described PCS is cable comprehensive monitoring platform, described EMS is dispatch automated system, described DAS is electrical power distribution automatization system, and described GIS is Geographic Information System;
Step 2: PCS by interoperability cross-safety zone integrating EMS major network artwork, DAS distribution artwork, or by the main distribution artwork of the integrated GIS of interoperability and space information resource, selects the integrated object of interoperability according to Automation Construction level;
Step 3: PCS obtains EMS, DAS electrical network real time execution monitoring information by interoperability, and as the criterion of PCS to power cable operating condition assistant analysis, auxiliary PCS analyzes cable line running temperature and load running level;
Step 4: EMS and DAS obtains PCS cable system by interoperability and runs body temperature, running environment and Real-time Alarm information, realizes monitoring the real time execution of electric parameters and non-electric quantity simultaneously;
Wherein, described based on PIIF framework interoperability step analysis PCS, EMS, operation flow between DAS and GIS between cable system operating condition monitoring business, the function use-case of described operation flow links, the standard interaction models that each described function use-case is corresponding, between system, the communication protocol of standard and the interface module of corresponding function use-case are specially: based on PIIF framework interoperability level by PCS and EMS, between DAS and GIS, cable system operating condition conduct monitoring at all levels service application decomposes operation layer, functional layer, Information Level, communication layers and component layer, the protocol specification that unified planning is mutual and service regulation,
Further, based on PIIF framework interoperability level, cable system operating condition conduct monitoring at all levels service application between PCS and EMS, DAS and GIS is decomposed operation layer, functional layer, Information Level, communication layers and component layer, the protocol specification that unified planning is mutual and service regulation, specifically comprise;
(1) this kind of service application of combing cable system operating condition conduct monitoring at all levels, forms data flowchart;
(2) step that flow process relates to is decomposed the function use-case of correspondence system, and interoperability analysis is carried out to each function use-case;
(3) according to the interoperability analysis result between function use-case, the standard interaction models of definition interoperability;
(4) according to the interoperability analysis result between function use-case, the standard interaction protocol of definition interoperability;
(5) for different function use-cases, corresponding interface module is researched and developed, thus the interoperability between practical function use-case.
2. method according to claim 1, it is characterized in that, described PCS is by interoperability cross-safety zone integrating EMS major network artwork, DAS distribution artwork, or by the main distribution artwork of the integrated GIS of interoperability and space information resource, the integrated object of interoperability is selected according to Automation Construction level, be specially: PCS obtains the main distribution artwork of EMS, DAS through place of safety by interoperability, on the basis that GIS and EMS main distribution artwork is consistent, or by interoperability by directly all being obtained by GIS.
3. method according to claim 2, it is characterized in that, described PCS obtains the main distribution artwork of EMS, DAS through place of safety by interoperability, on the basis that GIS and EMS main distribution artwork is consistent, or by interoperability by directly all being obtained by GIS, specifically comprise:
(1) EMS, DAS research and develop the interface module of artwork maintenance function use-case, issue main distribution artwork; PCS researches and develops the interface module of artwork maintenance function use-case, subscribes to main distribution artwork;
(2) GIS researches and develops the interface module of artwork maintenance function use-case, issues main distribution artwork; PCS researches and develops the interface module of artwork maintenance function use-case, subscribes to main distribution artwork.
4. method according to claim 1, it is characterized in that, described PCS obtains EMS by interoperability, DAS electrical network real time execution monitoring information, as the criterion of PCS to power cable operating condition assistant analysis, auxiliary PCS analyzes cable line running temperature and load running level is specially: PCS Real-time Obtaining EMS, the electrical network real time execution monitoring information that DAS gathers, cable system operating mode electrical data being joined PCS is studied and judged in logic, as the criterion of PCS to power cable operating condition assistant analysis, and then auxiliary PCS analyzes cable line running temperature and load running level.
5. method according to claim 4, it is characterized in that, the electrical network real time execution monitoring information that described PCS Real-time Obtaining EMS, DAS gather, cable system operating mode electrical data being joined PCS is studied and judged in logic, as the criterion of PCS to power cable operating condition assistant analysis, and then auxiliary PCS analyzes cable line running temperature and load running level, specifically comprises:
(1) EMS, DAS research and develop the interface module of grid operating monitoring function use-case, issue main distribution real time execution monitoring information; PCS researches and develops the interface module of cable system operation monitoring function use-case, subscribes to main distribution real time execution monitoring information;
(2) cable system operating mode electrical network real-time running data being joined PCS is studied and judged in logic and is supported power cable operating condition assistant analysis, and then auxiliary PCS analyzes cable line running temperature and load running level.
6. method according to claim 1, it is characterized in that, described EMS and DAS obtains PCS cable system by interoperability and runs body temperature, running environment and Real-time Alarm information, realize monitoring the real time execution of electric parameters and non-electric quantity being specially: EMS, DAS run body temperature, running environment and Real-time Alarm information by interoperability Real-time Obtaining cable system simultaneously, environmental data and operation of power networks data are organically blended, the real-time monitoring of auxiliary electrical network operation.
7. method according to claim 6, it is characterized in that, described EMS, DAS run body temperature, running environment and Real-time Alarm information by interoperability Real-time Obtaining cable system, environmental data and operation of power networks data are organically blended, the real-time monitoring of auxiliary electrical network operation, specifically comprises:
(1) PCS researches and develops the interface module of cable system operation monitoring function use-case, release cable network operation body temperature, running environment and Real-time Alarm information; EMS, DAS research and develop the interface module of grid operating monitoring function use-case, subscribe to cable system and run body temperature, running environment and Real-time Alarm information;
(2), on the basis that EMS, DAS and PCS artwork is unified, environmental data and operation of power networks data are organically blended, the real-time monitoring of auxiliary electrical network operation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510041618.7A CN104573987B (en) | 2015-01-28 | 2015-01-28 | One realizes PCS and electrical network multi-source operation system interoperability integrated approach |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510041618.7A CN104573987B (en) | 2015-01-28 | 2015-01-28 | One realizes PCS and electrical network multi-source operation system interoperability integrated approach |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104573987A CN104573987A (en) | 2015-04-29 |
CN104573987B true CN104573987B (en) | 2015-08-19 |
Family
ID=53089996
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510041618.7A Active CN104573987B (en) | 2015-01-28 | 2015-01-28 | One realizes PCS and electrical network multi-source operation system interoperability integrated approach |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104573987B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105162645A (en) * | 2015-07-24 | 2015-12-16 | 国家电网公司 | Interoperability test method based on PIIF configuration |
CN106708162A (en) * | 2017-01-18 | 2017-05-24 | 温州博远工业设计有限公司 | Static resource separation technology based on web request |
CN113064868A (en) * | 2021-03-19 | 2021-07-02 | 广东科诺勘测工程有限公司 | Submarine cable detection data automatic publishing and updating method |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101799681A (en) * | 2010-02-10 | 2010-08-11 | 刘文祥 | Intelligent grid |
CN102735966A (en) * | 2012-06-12 | 2012-10-17 | 燕山大学 | Power transmission line evaluation and diagnosis system and power transmission line evaluation and diagnosis method |
CN103326462B (en) * | 2013-02-22 | 2015-03-04 | 成都宝利信通科技有限公司 | Double-vision online monitoring intelligent pre-warning system of transformer substation |
CN103259335B (en) * | 2013-04-11 | 2015-05-13 | 国家电网公司 | Intelligent demand response and demand side optimizing operation system |
CN103559562A (en) * | 2013-11-20 | 2014-02-05 | 贵州电网公司电力调度控制中心 | Power grid intelligent operation system and achieving method thereof |
-
2015
- 2015-01-28 CN CN201510041618.7A patent/CN104573987B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104573987A (en) | 2015-04-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9941696B2 (en) | Establishing communication and power sharing links between components of a distributed energy system | |
CN101917237B (en) | Railway signal monitoring method and system | |
US20150193558A1 (en) | Method and device for generating engineering topology of digital substation | |
CN104601383B (en) | A kind of power telecom network fault piecewise analysis method | |
CN112698953A (en) | Power grid intelligent operation and detection platform based on micro-service | |
CN105373655A (en) | Method for organically correlating primary and secondary system connection diagrams of intelligent substation | |
CN104156822A (en) | SOA-based comprehensive enterprise level information system operation and maintenance management method | |
CN103632312A (en) | Power grid resource module building method based on GIS (geographic information system) | |
CN102800033A (en) | Distribution production and marketing business integration system | |
CN104573987B (en) | One realizes PCS and electrical network multi-source operation system interoperability integrated approach | |
CN103237077B (en) | A kind of electric network model based on cloud computing technology is unified to be safeguarded and shares method as required | |
CN109933634B (en) | Power system graph drawing method based on power radiation range | |
CN103246630A (en) | Distribution network integrated platform information integration method based on model data center | |
CN103955865A (en) | Scheduled and faulted power outage range visualization method based on information interaction | |
CN104104146A (en) | On-line monitoring data modeling method of bulk grid transformer equipment | |
CN106685759A (en) | High-efficiency and zero-error updating and upgrading verification test method for scheduling main station | |
CN104966137A (en) | Smart power grid project optimizing method | |
US8779624B2 (en) | Methods and systems for branch encoding in an electric network | |
CN104518918B (en) | A kind of power telecom network fault locating analysis method | |
CN112486666A (en) | Model-driven reference architecture method and platform | |
CN104573986B (en) | One realizes GCRMS and electrical network multi-source operation system interoperability integrated approach | |
TW201824166A (en) | Service assembly system of software-defined drive cloud computing network component being worn by a client end for operation and establishing respective oriented input and output port interfaces and links | |
CN103379097B (en) | CDN business automatic configuration system and method | |
CN101452637B (en) | Centralized monitoring system and method for high-tension cable net | |
CN103955761B (en) | A kind of low-carbon (LC) schedule information platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |