CN104156822A - SOA-based comprehensive enterprise level information system operation and maintenance management method - Google Patents
SOA-based comprehensive enterprise level information system operation and maintenance management method Download PDFInfo
- Publication number
- CN104156822A CN104156822A CN201410391806.8A CN201410391806A CN104156822A CN 104156822 A CN104156822 A CN 104156822A CN 201410391806 A CN201410391806 A CN 201410391806A CN 104156822 A CN104156822 A CN 104156822A
- Authority
- CN
- China
- Prior art keywords
- data
- service
- warning
- threshold value
- stage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides an SOA-based comprehensive enterprise level information system operation and maintenance management method. The method comprises steps: modular system integration is carried out; functions of the system are packaged to services; an information index early warning threshold is made; system operation, service data integration, cleaning and relevance are carried out; acquired data are judged whether to exceed the early warning threshold; and early warning threshold is carried out. Heterogeneous information system integration is realized based on an SOA architecture, the effective integration problem of operation and maintenance work by the information system is solved, the operation and maintenance ability of the information system is enhanced fully, and lean resource configuration of the information system is realized via a comprehensive monitoring mode. With the help of the prior EBS service bus, the Web service, XML and other technical means, separation of business and service is realized, data cleaning and escape rules are made, the data format of the heterogeneous information system is unified, message interaction barriers are eliminated, and according to the pre-defined early warning information and the key index decision making model, system operation and business operation situations are analyzed, and decision making basis is provided for operation and maintenance management and business services.
Description
Technical field
The invention belongs to Enterprise Informatization Technology field, particularly relate to the comprehensive O&M management-control method of a kind of enterprise information system based on SOA.
Background technology
Along with the development of intelligent grid construction, infosystem has deeply been applied at electric power enterprises at different levels and sent out, defeated, the crucial operation of the link enterprise such as core production field and human, financial, and material resources such as become, join, use, information automation system plays an important role producing, run, manage each link.But along with being on the increase of infosystem quantity, business model difference, standard disunity while construction due to system, development platform is different, therefore Floor layer Technology, data model, communication protocol are different, thereby administer and bring very large difficulty to integrated between system and data, and cause obstruction to the intelligent trouble investigation of enterprise information system and operation optimizing resource allocation, greatly increased the difficulty of infosystem operation management., relatively lag behind owing to comparing to information system application layer technical development speed in the evolution speed of the aspects such as planning in early stage, construction, testing standard, a little less than the control relative thin in the links such as demand control, quality monitoring, test and appraisal means meanwhile.The problems referred to above cause infosystem O&M and management work to become passive and disperse.
Effectively integrate information resources, the elimination " information island " of dispersion, improve information sharing efficiency, making infosystem change " concentrating collaborative " into from " disperseing isolation ", information work is turned to " taking the initiative in offering a hand " from " passive O&M ", is the fundamental requirement of state's net company informationization development.
Summary of the invention
In order to address the above problem, the object of the present invention is to provide the comprehensive O&M management-control method of a kind of enterprise information system based on SOA.
In order to achieve the above object, the comprehensive O&M management-control method of the enterprise information system based on SOA provided by the invention comprises the following step of carrying out in order:
The SO1 stage that step 1, system modular are integrated: each infosystem is carried out to modulation conformity, be the theme with each systemic-function framework, the contact of function point and the relevance of data between analytic system, the module that generates similar data or associated data between different system is identified, as the foundation of follow-up reasonable integration;
Step 2, systemic-function are encapsulated as the SO2 stage of service: utilize Web Service technology, the different function units of operation system is converted into service, generate corresponding web services descriptive language file, and mutually change realizing the service interface of service requester needs and the service interface of existing system by integrated access adapter, finally formally issue this service by ESB bus, and carry out positioning service by URL, call for user; The component model providing by SOA and interface contract, by interconnection, define because interface adopts neutral mode, are therefore independent of hardware platform, operating system and the programming language of the service of realization, and therefore each system key can be general; The assembly that utilizes SOA to provide, practical function separates with business, realizes the loose coupling between service;
Step 3, the S03 stage of formulating information index threshold value of warning: formulate rational information index threshold value of warning, that is: consider electric power enterprise system norms at different levels, appraisal standards, service operation demand and information system security service requirement, the real time data that system is produced is classified; For service operation data, according to business reality, formulated the real time data setting threshold value of warning that can be used in the normal operation of judgement business by relevant speciality management through specialized department department; Related real time data in specifying for system operation and safety management, according to related management requirement, formulates rational performance assessment criteria value, and threshold value of warning using this as this O&M management-control method; Threshold value of warning or key index can also be calculated by some real time datas, set in advance the algorithm model of threshold value of warning in implementation procedure;
Step 4: system operation and business datum integrated, clean and the associated S04 stage: using XML formatted data as unified data description instrument, the treated XML form that is finally converted to of the data of service requester and service consumer transmits via ESB bus; Adopt Simple Object Access Protocol simultaneously, realize the mutual of operation system bottom communication message by protocol converter, thereby it is unified to realize Web service data layout; By eliminating the inconsistent problem of inter-system data form, the real time data that the each system of integrating is produced becomes possibility; Data unification after each system integration collects data buffer and stores temporarily, clean according to the threshold value of warning algorithm model of formulating in the S03 stage, give up or supply data bits, the data relevant to same key index computation model are carried out to associated and extraction, by calculating the achievement data that can embody infosystem operation present situation or service operation present situation simultaneously;
Step 5: judge whether image data exceeds the S05 stage of threshold value of warning: according to the information index threshold value of warning of previous setting, system acquisition data are checked, judge whether image data exceeds threshold value of warning; If judged result is "Yes", there is system operation or service exception situation in explanation, enters next step S06 stage; Otherwise next step returns to the S04 stage;
Step 6: the S06 stage is shown in early warning: use WPF and Flex technology, adopt the three-dimensional mode of two dimension to represent the global I T of enterprise O&M data; Displaying can flexible design, set up the O&M management and control interface towards different business, different identity.
The effect of the comprehensive O&M management-control method of the enterprise information system based on SOA provided by the invention:
Realize the integrated of Heterogeneous Information System based on SOA framework, solve the problem that effectively integrates of bulk information system O&M work, fully promote infosystem O&M ability, realize the lean resource distribution of infosystem by comprehensively monitoring means, the performance infosystem value of taking the initiative in offering a hand.The comprehensive O&M management-control method of enterprise information system based on SOA is not affect on the basis of original information system, according to SOA framework thought, by technological means such as existing ESB service bus, Web service, XML, realize separating of business and service, formulate data cleansing and escape rule, the data layout of realizing Heterogeneous Information System is unified, eliminate interacting message barrier, and according to the good early warning information of predefined and key index decision model, analytic system operation and service operation situation, for operation management and business service provide decision-making foundation.
Brief description of the drawings
Fig. 1 is the comprehensive O&M management-control method of the enterprise information system based on SOA provided by the invention process flow diagram.
Embodiment
Below in conjunction with the drawings and specific embodiments, the comprehensive O&M management-control method of the enterprise information system based on SOA provided by the invention is elaborated.
As shown in Figure 1, the comprehensive O&M management-control method of the enterprise information system based on SOA provided by the invention comprises the following step of carrying out in order:
The SO1 stage that step 1, system modular are integrated: each infosystem is carried out to modulation conformity, be the theme with each systemic-function framework, the contact of function point and the relevance of data between analytic system, break system independence and professional barrier, the module that generates similar data or associated data between different system is identified, as the foundation of follow-up reasonable integration;
Step 2, systemic-function are encapsulated as the SO2 stage of service: utilize Web Service technology, the different function units of operation system is converted into service, generate corresponding web services descriptive language file, and mutually change realizing the service interface of service requester needs and the service interface of existing system by integrated access adapter, finally formally issue this service by ESB bus, and carry out positioning service by URL, call for user; The component model providing by SOA and interface contract, by interconnection, define because interface adopts neutral mode, are therefore independent of hardware platform, operating system and the programming language of the service of realization, and therefore each system key can be general; The assembly that utilizes SOA to provide, practical function separates with business, realizes the loose coupling between service;
Step 3, the S03 stage of formulating information index threshold value of warning: formulate rational information index threshold value of warning, that is: consider electric power enterprise system norms at different levels, appraisal standards, service operation demand and information system security service requirement, the real time data that system is produced is classified; For service operation data, according to business reality, formulated the real time data setting threshold value of warning that can be used in the normal operation of judgement business by relevant speciality management through specialized department department; Related real time data in specifying for system operation and safety management, according to related management requirement, formulates rational performance assessment criteria value, and threshold value of warning using this as this O&M management-control method; Threshold value of warning or key index can also be calculated by some real time datas, set in advance the algorithm model of threshold value of warning in implementation procedure;
Step 4: system operation and business datum integrated, clean and the associated S04 stage: using XML formatted data as unified data description instrument, the treated XML form that is finally converted to of the data of service requester and service consumer transmits via ESB bus; Adopt Simple Object Access Protocol simultaneously, realize the mutual of operation system bottom communication message by protocol converter, thereby it is unified to realize Web service data layout; By eliminating the inconsistent problem of inter-system data form, the real time data that the each system of integrating is produced becomes possibility; Data unification after each system integration collects data buffer and stores temporarily, clean according to the threshold value of warning algorithm model of formulating in the S03 stage, give up or supply data bits, the data relevant to same key index computation model are carried out to associated and extraction, by calculating the achievement data that can embody infosystem operation present situation or service operation present situation simultaneously;
Step 5: judge whether image data exceeds the S05 stage of threshold value of warning: according to the information index threshold value of warning of previous setting, system acquisition data are checked, judge whether image data exceeds threshold value of warning; If judged result is "Yes", there is system operation or service exception situation in explanation, enters next step S06 stage; Otherwise next step returns to the S04 stage;
Step 6: the S06 stage is shown in early warning: use WPF and Flex technology, adopt the three-dimensional mode of two dimension to represent the global I T of enterprise O&M data; Displaying can flexible design, set up the O&M management and control interface towards different business, different identity.
The comprehensive O&M management-control method of enterprise information system based on SOA provided by the invention is to utilize SOA framework advantage, calling between conventional systems connected and become Services Composition, realize the unified management to distributed data source, by standardized data-switching platform, change the difference speciality in bottom data source, thereby solve the integration problem between enterprise-level key business data system at all, enterprise information system O&M can be carried out from an overall angle systematization, promote State Grid Corporation of China's enterprise information system O&M from disperseing O&M to change to concentrated O&M.Meanwhile, by the intellectual analysis to critical sales index, can provide early warning and the decision support of crucial anomalous event, for the industrialization of information O&M is from the passive condition that initiatively provides that becomes.
Claims (1)
1. the comprehensive O&M management-control method of the enterprise information system based on SOA, is characterized in that: it comprises the following step of carrying out in order:
The SO1 stage that step 1, system modular are integrated: each infosystem is carried out to modulation conformity, be the theme with each systemic-function framework, the contact of function point and the relevance of data between analytic system, the module that generates similar data or associated data between different system is identified, as the foundation of follow-up reasonable integration;
Step 2, systemic-function are encapsulated as the SO2 stage of service: utilize Web Service technology, the different function units of operation system is converted into service, generate corresponding web services descriptive language file, and mutually change realizing the service interface of service requester needs and the service interface of existing system by integrated access adapter, finally formally issue this service by ESB bus, and carry out positioning service by URL, call for user; The component model providing by SOA and interface contract, by interconnection, define because interface adopts neutral mode, are therefore independent of hardware platform, operating system and the programming language of the service of realization, and therefore each system key can be general; The assembly that utilizes SOA to provide, practical function separates with business, realizes the loose coupling between service;
Step 3, the S03 stage of formulating information index threshold value of warning: formulate rational information index threshold value of warning, that is: consider electric power enterprise system norms at different levels, appraisal standards, service operation demand and information system security service requirement, the real time data that system is produced is classified; For service operation data, according to business reality, formulated the real time data setting threshold value of warning that can be used in the normal operation of judgement business by relevant speciality management through specialized department department; Related real time data in specifying for system operation and safety management, according to related management requirement, formulates rational performance assessment criteria value, and threshold value of warning using this as this O&M management-control method; Threshold value of warning or key index can also be calculated by some real time datas, set in advance the algorithm model of threshold value of warning in implementation procedure;
Step 4: system operation and business datum integrated, clean and the associated S04 stage: using XML formatted data as unified data description instrument, the treated XML form that is finally converted to of the data of service requester and service consumer transmits via ESB bus; Adopt Simple Object Access Protocol simultaneously, realize the mutual of operation system bottom communication message by protocol converter, thereby it is unified to realize Web service data layout; By eliminating the inconsistent problem of inter-system data form, the real time data that the each system of integrating is produced becomes possibility; Data unification after each system integration collects data buffer and stores temporarily, clean according to the threshold value of warning algorithm model of formulating in the S03 stage, give up or supply data bits, the data relevant to same key index computation model are carried out to associated and extraction, by calculating the achievement data that can embody infosystem operation present situation or service operation present situation simultaneously;
Step 5: judge whether image data exceeds the S05 stage of threshold value of warning: according to the information index threshold value of warning of previous setting, system acquisition data are checked, judge whether image data exceeds threshold value of warning; If judged result is "Yes", there is system operation or service exception situation in explanation, enters next step S06 stage; Otherwise next step returns to the S04 stage;
Step 6: the S06 stage is shown in early warning: use WPF and Flex technology, adopt the three-dimensional mode of two dimension to represent the global I T of enterprise O&M data; Displaying can flexible design, set up the O&M management and control interface towards different business, different identity.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410391806.8A CN104156822A (en) | 2014-08-11 | 2014-08-11 | SOA-based comprehensive enterprise level information system operation and maintenance management method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410391806.8A CN104156822A (en) | 2014-08-11 | 2014-08-11 | SOA-based comprehensive enterprise level information system operation and maintenance management method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104156822A true CN104156822A (en) | 2014-11-19 |
Family
ID=51882317
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410391806.8A Pending CN104156822A (en) | 2014-08-11 | 2014-08-11 | SOA-based comprehensive enterprise level information system operation and maintenance management method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104156822A (en) |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105530118A (en) * | 2015-05-04 | 2016-04-27 | 上海北塔软件股份有限公司 | Collection method and system used for operation and maintenance management |
CN105844543A (en) * | 2016-04-07 | 2016-08-10 | 国网天津市电力公司 | Automation operation management system for power enterprise information system |
CN106846216A (en) * | 2016-12-26 | 2017-06-13 | 广东金赋科技股份有限公司 | Hall management system integration method |
CN106896791A (en) * | 2015-12-21 | 2017-06-27 | 发那科株式会社 | The state change management system of the manufacturing cell in unit control system |
CN107506462A (en) * | 2017-08-30 | 2017-12-22 | 中国建设银行股份有限公司 | Data processing method, system, electronic equipment, the storage medium of Enterprise Data |
CN107516171A (en) * | 2017-08-31 | 2017-12-26 | 湖北国网华中科技开发有限责任公司 | A kind of hypothesis analysis system and its analysis method of power grid enterprises' key business indicator |
CN109660606A (en) * | 2018-12-05 | 2019-04-19 | 新华三大数据技术有限公司 | Internet message Proxy Method, apparatus and system |
CN109858807A (en) * | 2019-01-30 | 2019-06-07 | 深圳供电局有限公司 | Enterprise operation monitoring method and system |
CN110390466A (en) * | 2019-06-19 | 2019-10-29 | 广东浩云长盛网络股份有限公司 | Multi-dimensional visual operation and maintenance management device based on cloud SOA framework |
CN110535701A (en) * | 2019-08-30 | 2019-12-03 | 新华三大数据技术有限公司 | A kind of positioning problems method and device |
CN111177139A (en) * | 2019-12-31 | 2020-05-19 | 青梧桐有限责任公司 | Data quality verification monitoring and early warning method and system based on data quality system |
CN111325422A (en) * | 2018-12-14 | 2020-06-23 | 中国移动通信集团河南有限公司 | Work order distribution method and system |
CN111934895A (en) * | 2019-05-13 | 2020-11-13 | 中国移动通信集团湖北有限公司 | Intelligent early warning method and device for network management system and computing equipment |
CN112559607A (en) * | 2020-11-19 | 2021-03-26 | 国网山东省电力公司信息通信公司 | Power system communication scheduling data interaction method and system |
CN114615157A (en) * | 2022-01-19 | 2022-06-10 | 浪潮通信信息系统有限公司 | Intelligent operation and maintenance system oriented to computer network integrated scene and application method thereof |
CN114945189A (en) * | 2022-05-18 | 2022-08-26 | 广东省电信规划设计院有限公司 | Construction method and device of provincial-network-level 5G communication management system |
CN116451994A (en) * | 2023-03-23 | 2023-07-18 | 国网浙江省电力有限公司 | Site operation safety control method based on energy Internet service system |
CN116821944A (en) * | 2023-08-31 | 2023-09-29 | 中电安世(成都)科技有限公司 | Data processing method and system based on data element |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102938098A (en) * | 2012-10-15 | 2013-02-20 | 深圳供电局有限公司 | Power grid operation mode expert system |
CN103066701A (en) * | 2012-12-19 | 2013-04-24 | 云南电力调度控制中心 | Power grid dispatching real-time operation command method and system |
CN103199628A (en) * | 2013-04-28 | 2013-07-10 | 国家电网公司 | Real-time power equipment monitoring system based on OSGA (Open Grid Service Architecture) grid technology |
CN103259853A (en) * | 2013-04-24 | 2013-08-21 | 中国科学院沈阳自动化研究所 | SOA-architecture-based method for device data collecting and monitoring early warning |
CN103914791A (en) * | 2014-03-17 | 2014-07-09 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Electrical equipment state maintenance system |
-
2014
- 2014-08-11 CN CN201410391806.8A patent/CN104156822A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102938098A (en) * | 2012-10-15 | 2013-02-20 | 深圳供电局有限公司 | Power grid operation mode expert system |
CN103066701A (en) * | 2012-12-19 | 2013-04-24 | 云南电力调度控制中心 | Power grid dispatching real-time operation command method and system |
CN103259853A (en) * | 2013-04-24 | 2013-08-21 | 中国科学院沈阳自动化研究所 | SOA-architecture-based method for device data collecting and monitoring early warning |
CN103199628A (en) * | 2013-04-28 | 2013-07-10 | 国家电网公司 | Real-time power equipment monitoring system based on OSGA (Open Grid Service Architecture) grid technology |
CN103914791A (en) * | 2014-03-17 | 2014-07-09 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Electrical equipment state maintenance system |
Cited By (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105530118A (en) * | 2015-05-04 | 2016-04-27 | 上海北塔软件股份有限公司 | Collection method and system used for operation and maintenance management |
CN106896791A (en) * | 2015-12-21 | 2017-06-27 | 发那科株式会社 | The state change management system of the manufacturing cell in unit control system |
US10317866B2 (en) | 2015-12-21 | 2019-06-11 | Fanuc Corporation | State change management system for manufacturing cell in cell control system |
CN105844543A (en) * | 2016-04-07 | 2016-08-10 | 国网天津市电力公司 | Automation operation management system for power enterprise information system |
CN106846216A (en) * | 2016-12-26 | 2017-06-13 | 广东金赋科技股份有限公司 | Hall management system integration method |
CN107506462A (en) * | 2017-08-30 | 2017-12-22 | 中国建设银行股份有限公司 | Data processing method, system, electronic equipment, the storage medium of Enterprise Data |
CN107506462B (en) * | 2017-08-30 | 2020-12-08 | 中国建设银行股份有限公司 | Data processing method and system for enterprise-level data, electronic equipment and storage medium |
CN107516171A (en) * | 2017-08-31 | 2017-12-26 | 湖北国网华中科技开发有限责任公司 | A kind of hypothesis analysis system and its analysis method of power grid enterprises' key business indicator |
CN107516171B (en) * | 2017-08-31 | 2021-02-02 | 湖北国网华中科技开发有限责任公司 | Prediction analysis system and analysis method for key operation indexes of power grid enterprise |
CN109660606A (en) * | 2018-12-05 | 2019-04-19 | 新华三大数据技术有限公司 | Internet message Proxy Method, apparatus and system |
CN111325422A (en) * | 2018-12-14 | 2020-06-23 | 中国移动通信集团河南有限公司 | Work order distribution method and system |
CN111325422B (en) * | 2018-12-14 | 2023-10-27 | 中国移动通信集团河南有限公司 | Work order dispatching method and system |
CN109858807B (en) * | 2019-01-30 | 2022-11-25 | 深圳供电局有限公司 | Enterprise operation monitoring method and system |
CN109858807A (en) * | 2019-01-30 | 2019-06-07 | 深圳供电局有限公司 | Enterprise operation monitoring method and system |
CN111934895A (en) * | 2019-05-13 | 2020-11-13 | 中国移动通信集团湖北有限公司 | Intelligent early warning method and device for network management system and computing equipment |
CN110390466A (en) * | 2019-06-19 | 2019-10-29 | 广东浩云长盛网络股份有限公司 | Multi-dimensional visual operation and maintenance management device based on cloud SOA framework |
CN110535701A (en) * | 2019-08-30 | 2019-12-03 | 新华三大数据技术有限公司 | A kind of positioning problems method and device |
CN111177139A (en) * | 2019-12-31 | 2020-05-19 | 青梧桐有限责任公司 | Data quality verification monitoring and early warning method and system based on data quality system |
CN112559607B (en) * | 2020-11-19 | 2023-01-31 | 国网山东省电力公司信息通信公司 | Power system communication scheduling data interaction method and system |
CN112559607A (en) * | 2020-11-19 | 2021-03-26 | 国网山东省电力公司信息通信公司 | Power system communication scheduling data interaction method and system |
CN114615157A (en) * | 2022-01-19 | 2022-06-10 | 浪潮通信信息系统有限公司 | Intelligent operation and maintenance system oriented to computer network integrated scene and application method thereof |
CN114945189A (en) * | 2022-05-18 | 2022-08-26 | 广东省电信规划设计院有限公司 | Construction method and device of provincial-network-level 5G communication management system |
CN116451994A (en) * | 2023-03-23 | 2023-07-18 | 国网浙江省电力有限公司 | Site operation safety control method based on energy Internet service system |
CN116451994B (en) * | 2023-03-23 | 2024-01-05 | 国网浙江省电力有限公司 | Site operation safety control method based on energy Internet service system |
CN116821944A (en) * | 2023-08-31 | 2023-09-29 | 中电安世(成都)科技有限公司 | Data processing method and system based on data element |
CN116821944B (en) * | 2023-08-31 | 2023-11-14 | 中电安世(成都)科技有限公司 | Data processing method and system based on data element |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104156822A (en) | SOA-based comprehensive enterprise level information system operation and maintenance management method | |
CN104268695B (en) | A kind of multicenter basin water environment distributed type assemblies management system and method | |
CN105843182B (en) | A kind of power scheduling accident prediction system and method based on OMS | |
CN102932419B (en) | A kind of data-storage system for the safety production cloud service platform towards industrial and mining enterprises | |
CN105871605A (en) | Operation and maintenance monitoring platform based on big power marketing data | |
CN102880802B (en) | A kind of assay method for the major hazard source towards industrial and mining establishment's safety production cloud service platform system | |
CN104601383B (en) | A kind of power telecom network fault piecewise analysis method | |
CN103593804A (en) | Electric power information communication scheduling and monitoring platform | |
CN104463696A (en) | Power grid operating risk recognition and prevention method and system | |
CN106506256B (en) | A kind of equipment monitoring system and method based on platform+plug-in | |
CN102917032A (en) | Safety production cloud service platform for industrial and mining enterprises | |
TW201525710A (en) | Cloud based flexible assembly system of service and method suitable for telecommunication applications | |
CN103065228A (en) | Power-cut monitoring evaluating and warning method and equipment | |
CN114615157B (en) | Intelligent camp system oriented to integrated scene of computational network and application method of intelligent camp system | |
CN111208384A (en) | Smart power grid management system | |
De Porcellinis et al. | A holistic-reductionistic approach for modeling interdependencies | |
Panteli et al. | Enhancing situation awareness in power system control centers | |
KR101663504B1 (en) | Method and system for providing integrated managing service based smart water grid | |
Pieper et al. | Distributed co-simulation for software-in-the-loop testing of networked railway systems | |
CN116976625A (en) | Intelligent building site monitoring system based on GIS system | |
CN104732449B (en) | A kind of information system method of operation method for establishing model | |
CN104573987B (en) | One realizes PCS and electrical network multi-source operation system interoperability integrated approach | |
CN105977971A (en) | Power failure analysis method based on single line diagram of distribution network GIS power grid | |
CN116578412A (en) | Machine learning cluster computing power resource operation and maintenance method, system, equipment and storage medium | |
CN115115332A (en) | Intelligent comprehensive management and control platform suitable for medium and small hydropower stations |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: 300010 Tianjin city Hebei District Wujing Road No. 39 Applicant after: State Grid Corporation of China Applicant after: State Grid Tianjin Electric Power Company Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant before: State Grid Corporation of China Applicant before: State Grid Tianjin Electric Power Company |
|
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20141119 |
|
WD01 | Invention patent application deemed withdrawn after publication |