CN104573802B - Steel pipe counting device - Google Patents

Steel pipe counting device Download PDF

Info

Publication number
CN104573802B
CN104573802B CN201510052929.3A CN201510052929A CN104573802B CN 104573802 B CN104573802 B CN 104573802B CN 201510052929 A CN201510052929 A CN 201510052929A CN 104573802 B CN104573802 B CN 104573802B
Authority
CN
China
Prior art keywords
push rod
pedestal
side link
pushing block
ratchet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510052929.3A
Other languages
Chinese (zh)
Other versions
CN104573802A (en
Inventor
陈梦云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Tongchun New Energy Technology Co Ltd
Original Assignee
Xinyu Yuanbaoshan Agricultural Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinyu Yuanbaoshan Agricultural Development Co Ltd filed Critical Xinyu Yuanbaoshan Agricultural Development Co Ltd
Priority to CN201510052929.3A priority Critical patent/CN104573802B/en
Publication of CN104573802A publication Critical patent/CN104573802A/en
Application granted granted Critical
Publication of CN104573802B publication Critical patent/CN104573802B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Warehouses Or Storage Devices (AREA)
  • Press Drives And Press Lines (AREA)

Abstract

The invention discloses a kind of steel pipe counting device, including pedestal (1), the first side link (2), the second side link (3), push rod (4), push rod (5) and drift (6), first side link (2) is hinged with pedestal (1), and the first side link (2) is provided with the first arc-shaped rack (16);Second side link (3) is hinged with pedestal (1), second side link (3) is provided with the second arc-shaped rack (17) engaged with the first arc-shaped rack (16), and the second side link (3) is provided with arc pushing block (33);Push rod (4) is slidably fitted on pedestal (1), push rod (4) is provided with the second roller (20), push rod (4) is connected with push pedal (19), drift (6) is arranged on push pedal (19) lower surface, and resetting means is provided between push pedal (19) and pedestal (1);Pedestal (1) is provided with locating piece (32).There is provided a kind of counting efficiency high, and count accurate steel pipe counting device.

Description

Steel pipe counting device
Technical field
Dress is counted the present invention relates to the steel pipe that steel pipe in construction site technical field, more particularly to a kind of construction site is checked Put.
Background technology
Substantial amounts of steel pipe can be used in construction site, workmen carries out building pin hand by these substantial amounts of steel pipes Frame, so as to build strong and reliable shelf so that workmen is constructed on the top of the shelf.For construction team, purchase It is also a no small spending to buy these steel pipes, and before a construction team enters a construction site, oneself will be applied Work material is accurately checked, and then conveniently does account in the future, calculates cost;Also, terminate work in one building site of construction team When phase, also oneself entrained next construction material is checked, conveniently check whether to have omitted, and then reduce by one Spending of the individual construction team in a building site.During construction material is checked, workmen is typically by checking construction The number of packages of material is determined, is then carried the construction material checked and is got on the bus.Due to the steel pipe substantial amounts on building site, so For artificial check, this can be a no small engineering, and this work expends the muscle power of workpeople, and easily because checking Malfunction and reduce the overall operating efficiency of construction team.In a word, can not accurately and efficiently it be united by manually checking the quantity of steel pipe Count steel pipe quantity.
The content of the invention
The technical problem to be solved in the present invention is to overcome existing technological deficiency high there is provided a kind of counting efficiency, and is counted Accurate steel pipe counting device.
The technical solution of the present invention is to provide a kind of steel pipe counting device with following structure:Including pedestal, One side link, the second side link, push rod, push rod and drift, pedestal are provided with workbench, workbench and are equipped with paper tape;First It is hinged in the middle part of side link with pedestal, the first side link left end is provided with the sloping platform rolled for steel pipe;On the pedestal of sloping platform side Provided with the charging conduit for storing steel pipe;First side link left part is provided with chute, and push rod upper end, which is provided with, to be used to roll with chute The first roller coordinated, push rod outer wall is sheathed with sleeve, and sleeve is fixedly connected on pedestal, and push rod lower end, which is provided with, to be used to promote paper The pushing block that band is moved on the table, push rod lower end is connected with pushing block by material-pulling device, and the first side link right part is provided with the One arc-shaped rack;It is hinged in the middle part of second side link with pedestal, the second side link left part is provided with what is engaged with the first arc-shaped rack Second arc-shaped rack, the second side link right part is provided with arc pushing block;Push rod is slidably fitted on pedestal by guide pin bushing, and guide pin bushing is solid Surely it is connected on pedestal, push rod upper end is provided with rolls the second roller coordinated with arc pushing block intrados, and push rod lower end, which is fixed, to be connected Push pedal is connected to, drift is arranged on push pedal lower surface, and the resetting means resetted for push rod is provided between push pedal and pedestal;Pedestal It is provided with the locating piece for being used for being positioned when arc pushing block resets;Described material-pulling device includes support, connecting rod, and connecting rod one end is with pushing away Bar lower end is hinged, and the other end is hinged with pushing block upper surface, and connecting rod is located on the left of push rod, and connecting rod axis and pushing block upper surface institute are into folder Angle is acute angle;Push rod bottom side wall is fixedly connected with ratchet, and the ratchet center of circle is overlapped with push rod lower end pin joint, and connecting rod is provided with The ratchet coordinated with ratchet, is provided with the first extension spring, first extension spring one end in the middle part of ratchet with being connected, the other end between ratchet and connecting rod It is connected with connecting rod;Support includes transverse part and the vertical part being connected with each other, and transverse part is fixedly connected with pedestal, and vertical part lower end is located on ratchet Side, and vertical part lower end is pushed against with ratchet during push rod reset;Stage clip, pressure are provided between first side link left part and pushing block upper surface Spring one end is connected with the first side link left part, and the other end is connected with pushing block upper surface;Described resetting means include guide rod and Second extension spring, guide rod upper end is screwed with pedestal, and lower end of the guide rod is screwed after passing through push pedal with nut;Second extension spring is linked in guide rod On, second extension spring one end is connected with pedestal lower surface, and the other end is connected with push pedal upper surface.
As a modification of the present invention, described blanking groove sidewall is provided with the open slot that Open Side Down, and base side wall is set There is the projection coordinated with open slot.
As another improvement of the present invention, described guide rod is two, and two guide rods are symmetrically distributed in push rod both sides.
The present invention can effectively improve by above-mentioned structure and check steel pipe efficiency, details are as follows:By steel pipe seriatim It is placed on sloping platform, every steel pipe rolls down to charging conduit from sloping platform and collected;After every steel pipe is placed into sloping platform, due to steel pipe certainly The effect of body gravity, steel pipe can push the left part of the first side link, drive the first side link around pin joint rotate counterclockwise, i.e., First side link left part declines, so that driving push rod declines along sleeve axis direction, and push rod all the time can be along sleeve Axis direction is moved;During push rod is moved down, it is clockwise that push rod lower end can drive connecting rod to occur around the pin joint of small end The rotation in direction, so that axis of the ratchet also around ratchet on connecting rod rotates, ratchet is continuously stirred, due to being drawn first Under the pulling force effect of spring, ratchet blocks jail on the flank of tooth of ratchet all the time;With rotating clockwise for connecting rod, connecting rod lower end is to pushing block A thrust to the left can be applied, pushing block drives paper tape to be moved to the left by feat of the frictional force between pushing block lower surface and paper tape;Together When, due to the first side link left part decline can also compression press spring, stage clip can reduce to greatest extent pushing block lower surface with Gap between paper tape, the coefficient of friction between increase pushing block lower surface and paper tape then increases the frictional force between pushing block and paper tape, more Paper tape is driven to be moved to the left added with effect;
While first side link left part declines, the first arc-shaped rack of the first side link right part can be around the first frame linking Pin joint on bar is rotated counterclockwise, so that drive the second arc-shaped rack of the second side link left part to rotate clockwise, Then the arc pushing block of the second side link right part is driven to decline, arc pushing block is by promoting the second roller in arc pushing block Cambered surface is rolled to promote push rod to decline along guide pin bushing axis, and push rod lower end promotes push pedal and drift to decline with to tape perforating;Push pedal Decline the second extension spring can be pulled to open;
In reseting procedure, steel pipe slides from sloping platform and entered in charging conduit, due to the first side link left end Portion loses steel pipe Action of Gravity Field, and under the pulling force effect of the second extension spring, push pedal and drift rise vertically, and promote arc to push away Block rises, and the second side link is rotated counterclockwise, and until arc pushing block upper end is resisted against locating piece position, as returns to initial Position;Rotating counterclockwise for second side link can drive the first side link to turn clockwise;So as to the first side link left part meeting Push rod is driven to rise together, because ratchet is stuck on the flank of tooth of ratchet all the time, so, push rod understands drivening rod together when rising Rise, and connecting rod and push rod will not relatively rotate, specifically, ratchet is fixedly installed on push rod lower end, and connecting rod and The gravity of pushing block and ratchet can not be driven to push the constraint of ratchet open, i.e. connecting rod and push rod is connected as a single entity all the time;Until on push rod When being raised to elemental height, the vertical part lower end of support can contradict ratchet, and then promote pawl rotation so that ratchet is from the ratchet flank of tooth It is upper to depart from, and under the stage clip effect compressed, connecting rod can be rotated around ratchet axis to be resetted, and treats that pushing block is contacted i.e. with paper tape again For the initial position of pushing block;And at this moment, the position relationship of vertical part and ratchet has also returned to original state, and ratchet is drawn first It has been stuck in again on the flank of tooth of ratchet in the presence of spring;In summary, for each steel pipe rolled down to from sloping platform in charging conduit For can all undergo above-mentioned process, i.e., each steel pipe tumbles process and can all drive drift to make a hole paper tape, finally, Checking for centralization is carried out to the paper tape being perforated, it is only necessary to check how many hole paper delivery takes, it becomes possible to how many draws Steel pipe is tumbled from sloping platform, that is to say, that can be derived that how many root steel pipe altogether, and this makes it possible to efficiently and exactly to steel Pipe is checked.
Wherein, setting for chute can provide certain buffer distance to the motion of push rod upper end, it is to avoid push rod upper end card Extremely in the first side link left part;First roller can reduce the frictional force moved between push rod upper end and chute.
Brief description of the drawings
Fig. 1 is the schematic diagram of steel pipe counting device of the present invention.
Fig. 2 is the partial enlarged drawing of steel pipe counting device of the present invention.
Shown in figure:1st, pedestal, the 2, first side link, the 3, second side link, 4, push rod, 5, push rod, 6, drift, 7, work Platform, 8, paper tape, 9, steel pipe, 10, charging conduit, 11, sloping platform, 12, chute, the 13, first roller, 14, sleeve, 15, pushing block, 16, One arc-shaped rack, the 17, second arc-shaped rack, 18, guide pin bushing, 19, push pedal, the 20, second roller, 21, support, 21.1, transverse part, 21.2nd, vertical part, 22, connecting rod, 23, ratchet, 24, ratchet, the 25, first extension spring, the 26, second extension spring, 27, stage clip, 28, guide rod, 29, Nut, 30, open slot, 31, raised, 32, locating piece, 33, arc pushing block.
Embodiment
The invention will be further described with reference to the accompanying drawings and detailed description.
As illustrated, steel pipe counting device of the present invention includes pedestal 1, the first side link 2, the second side link 3, push rod 4, pushed away Bar 5 and drift 6, pedestal 1 are provided with workbench 7, workbench 7 and are equipped with paper tape 8;Cut with scissors with pedestal 1 at the middle part of first side link 2 Connect, the left end of the first side link 2 is provided with the sloping platform 11 rolled for steel pipe 9;Pedestal 1 close to the side of sloping platform 11, which is provided with, to be used to store The charging conduit 10 of steel pipe 9;The left part of first side link 2 is provided with chute 12, and the upper end of push rod 5, which is provided with to be used to roll with chute 12, to be coordinated The first roller 13, the outer wall of push rod 5 is sheathed with sleeve 14, and sleeve 14 is fixedly connected on pedestal 1, and the lower end of push rod 5 is provided with being used for The pushing block 15 for promoting paper tape 8 to move on the table 7, the lower end of push rod 5 is connected with pushing block 15 by material-pulling device, the first side link 2 right parts are provided with the first arc-shaped rack 16;The middle part of second side link 3 is hinged with pedestal 1, the left part of the second side link 3 provided with Second arc-shaped rack 17 of the first arc-shaped rack 16 engagement, the right part of the second side link 3 is provided with arc pushing block 33;Push rod 4 passes through Guide pin bushing 18 is slidably fitted on pedestal 1, and guide pin bushing 18 is fixedly connected on pedestal, and the upper end of push rod 4 is provided with and the inner arc of arc pushing block 33 Face rolls the second roller 20 coordinated, and the lower end of push rod 4 is fixedly connected with push pedal 19, and drift 6 is arranged on the lower surface of push pedal 19, and pushes away Being provided between plate 19 and pedestal 1 is used for the resetting means that push rod 4 resets;Pedestal 1, which is provided with, to be used to determine when arc pushing block 33 resets The locating piece 32 of position.
Described material-pulling device includes support 21, connecting rod 22, and the one end of connecting rod 22 is hinged with the lower end of push rod 5, and the other end is with pushing away The upper surface of block 15 is hinged, and connecting rod 22 is located at the left side of push rod 5, and the axis of connecting rod 22 is acute angle with the upper surface angle of pushing block 15;Push away The bottom side wall of bar 5 is fixedly connected with ratchet 23, and the center of circle of ratchet 23 is overlapped with the lower end pin joint of push rod 5, connecting rod 22 be provided with The ratchet 24 that ratchet 23 coordinates, is provided between ratchet 24 and connecting rod 22 in first extension spring 25, the one end of the first extension spring 25 and ratchet 24 Portion is connected, and the other end is connected with connecting rod 22;Support 21 includes the transverse part 21.1 and vertical part 21.2, transverse part 21.1 and base being connected with each other Seat 1 is fixedly connected, and the lower end of vertical part 21.2 is located at the top of ratchet 24, and the lower end of vertical part 21.2 is pushed against with ratchet 24 during the reset of push rod 5; Stage clip 27 is provided between the left part of first side link 2 and the upper surface of pushing block 15, the one end of stage clip 27 connects with the left part of the first side link 2 Connect, the other end is connected with the upper surface of pushing block 15.
Described resetting means includes the extension spring 26 of guide rod 28 and second, and the upper end of guide rod 28 is screwed with pedestal 1, the lower end of guide rod 28 Screwed after through push pedal 19 with nut 29;Second extension spring 26 is linked on guide rod 28, the one end of the second extension spring 26 and the lower surface of pedestal 1 Connection, the other end is connected with the upper surface of push pedal 19.
The described side wall of charging conduit 10 is provided with the open slot 30 that Open Side Down, and the side wall of pedestal 1 is provided with to be coordinated with open slot 30 Projection 31.
Described guide rod 28 is two, and two guide rods 28 are symmetrically distributed in the both sides of push rod 4.
Presently preferred embodiments of the present invention is the foregoing is only, protection scope of the present invention is not intended to limit.It is all in this hair Within bright claim, any modification, equivalent substitution and improvement for being made etc., should be included in protection scope of the present invention it It is interior.

Claims (3)

1. a kind of steel pipe counting device, it is characterised in that:It include pedestal (1), the first side link (2), the second side link (3), Push rod (4), push rod (5) and drift (6), pedestal (1) are provided with workbench (7), workbench (7) and are equipped with paper tape (8);First It is hinged in the middle part of side link (2) with pedestal (1), the first side link (2) left end is provided with the sloping platform (11) rolled for steel pipe (9);It is close The pedestal (1) of sloping platform (11) side is provided with the charging conduit (10) for being used for storing steel pipe (9);First side link (2) left part is set There is chute (12), push rod (5) upper end, which is provided with, to be used to roll the first roller (13) coordinated, push rod (5) outer wall set with chute (12) Conjunction has sleeve (14), and sleeve (14) is fixedly connected on pedestal (1), and push rod (5) lower end, which is provided with, is used to promote paper tape (8) in work The pushing block (15) moved on platform (7), push rod (5) lower end is connected with pushing block (15) by material-pulling device, the first side link (2) right-hand member Portion is provided with the first arc-shaped rack (16);It is hinged in the middle part of second side link (3) with pedestal (1), the second side link (3) left part is provided with The second arc-shaped rack (17) engaged with the first arc-shaped rack (16), the second side link (3) right part is provided with arc pushing block (33); Push rod (4) is slidably fitted on pedestal (1) by guide pin bushing (18), and guide pin bushing (18) is fixedly connected on pedestal, and push rod (4) upper end is set Have and roll the second roller (20) coordinated with arc pushing block (33) intrados, push rod (4) lower end is fixedly connected with push pedal (19), rush Head (6) is arranged on push pedal (19) lower surface, and the reset dress resetted for push rod (4) is provided between push pedal (19) and pedestal (1) Put;Pedestal (1) is provided with the locating piece (32) for being used for being positioned when arc pushing block (33) resets;Described material-pulling device includes support (21), connecting rod (22), connecting rod (22) one end is hinged with push rod (5) lower end, and the other end is hinged with pushing block (15) upper surface, connecting rod (22) it is located on the left of push rod (5), connecting rod (22) axis is acute angle with pushing block (15) upper surface angle;Push rod (5) bottom Side wall is fixedly connected with ratchet (23), and ratchet (23) center of circle is overlapped with push rod (5) lower end pin joint, and connecting rod (22) is provided with and spine The ratchet (24) that (23) coordinate is taken turns, the first extension spring (25), the first extension spring (25) one end are provided between ratchet (24) and connecting rod (22) With being connected in the middle part of ratchet (24), the other end is connected with connecting rod (22);Support (21) includes the transverse part (21.1) being connected with each other and perpendicular Portion (21.2), transverse part (21.1) is fixedly connected with pedestal (1), and vertical part (21.2) lower end is located above ratchet (24), and push rod (5) Vertical part (21.2) lower end is pushed against with ratchet (24) during reset;Set between first side link (2) left part and pushing block (15) upper surface There is stage clip (27), stage clip (27) one end is connected with the first side link (2) left part, and the other end is connected with pushing block (15) upper surface; Described resetting means includes guide rod (28) and the second extension spring (26), and guide rod (28) upper end is screwed with pedestal (1), under guide rod (28) End is screwed with nut (29) afterwards through push pedal (19);Second extension spring (26) is linked on guide rod (28), the second extension spring (26) one end It is connected with pedestal (1) lower surface, the other end is connected with push pedal (19) upper surface.
2. steel pipe counting device according to claim 1, it is characterised in that:Described charging conduit (10) side wall is provided with opening Downward open slot (30), pedestal (1) side wall is provided with the projection (31) coordinated with open slot (30).
3. steel pipe counting device according to claim 1, it is characterised in that:Described guide rod (28) is two, and two are led Bar (28) is symmetrically distributed in push rod (4) both sides.
CN201510052929.3A 2015-02-01 2015-02-01 Steel pipe counting device Active CN104573802B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510052929.3A CN104573802B (en) 2015-02-01 2015-02-01 Steel pipe counting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510052929.3A CN104573802B (en) 2015-02-01 2015-02-01 Steel pipe counting device

Publications (2)

Publication Number Publication Date
CN104573802A CN104573802A (en) 2015-04-29
CN104573802B true CN104573802B (en) 2017-10-13

Family

ID=53089819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510052929.3A Active CN104573802B (en) 2015-02-01 2015-02-01 Steel pipe counting device

Country Status (1)

Country Link
CN (1) CN104573802B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105373828B (en) * 2015-12-21 2018-01-02 宁波林升机械有限公司 Pole cuts material counting device
CN110533147B (en) * 2019-09-19 2020-03-31 福州市晋安区凤儒名工艺品有限公司 Counting device on ceramic wafer assembly line

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203366375U (en) * 2013-06-26 2013-12-25 王翀 Counter based on infrared sensor
CN104112159A (en) * 2014-07-10 2014-10-22 新兴铸管股份有限公司 Multi-diameter pipe automatic counting device for centrifugal cast pipe production line
CN204515831U (en) * 2015-02-01 2015-07-29 励志辉 Steel pipe counting assembly

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6854313B2 (en) * 2002-08-06 2005-02-15 Gary A. Knudson Tube crimping/bending apparatus

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203366375U (en) * 2013-06-26 2013-12-25 王翀 Counter based on infrared sensor
CN104112159A (en) * 2014-07-10 2014-10-22 新兴铸管股份有限公司 Multi-diameter pipe automatic counting device for centrifugal cast pipe production line
CN204515831U (en) * 2015-02-01 2015-07-29 励志辉 Steel pipe counting assembly

Also Published As

Publication number Publication date
CN104573802A (en) 2015-04-29

Similar Documents

Publication Publication Date Title
CN104573804B (en) Automatic steel tube counting device
CN104573802B (en) Steel pipe counting device
CN109605972A (en) A kind of financial binding apparatus of finance office
CN208662381U (en) A kind of new reinforcing steel bar cutter device in construction site
CN204515825U (en) For the device that steel pipe is checked
CN104573797B (en) Automatic counting unit of steel pipes
CN104627447B (en) Counting device
CN104573800B (en) Counting unit of steel pipes
CN104573798B (en) Steel pipe counter
CN104573799B (en) Automatic counting unit of steel pipes
CN104573801B (en) Steel pipe counting equipment
CN204515822U (en) Automatic steel tube counting equipment
CN204515831U (en) Steel pipe counting assembly
CN104573803B (en) Steel pipe counter
CN108016712A (en) A kind of device and its manufacture method for steel pipe storage positioning
CN104573796B (en) Counting unit of steel pipes
CN204078656U (en) A kind of medicine box feeder
CN204515829U (en) Automatic steel tube counter
CN204515830U (en) Steel pipe counting machine
CN204515824U (en) Steel pipe counting equipment
CN204515828U (en) Automatic steel tube counting assembly
CN205765885U (en) A kind of multi-leaf collimator fitting device
CN106271661B (en) A kind of adjustable Double-head shear-bow machine
CN211618237U (en) Pushing device
CN207607523U (en) A kind of steel pipe transmission positioning device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170817

Address after: 510640 Guangdong City, Tianhe District Province, No. five, road, public education building, unit 371-1, unit 2401

Applicant after: Guangdong Gaohang Intellectual Property Operation Co., Ltd.

Address before: No. 139 Zhejiang junpus Polytron Technologies Inc new Hui Road 315040 in Zhejiang province Ningbo city national high tech Zone

Applicant before: Li Zhihui

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Chen Mengyun

Inventor before: The inventor has waived the right to be mentioned

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170829

Address after: 338000 Jiangxi city of Xinyu province labor Road into the building

Applicant after: Xinyu Yuanbaoshan Agricultural Development Co., Ltd.

Address before: 510640 Guangdong City, Tianhe District Province, No. five, road, public education building, unit 371-1, unit 2401

Applicant before: Guangdong Gaohang Intellectual Property Operation Co., Ltd.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181227

Address after: 214062 Shangheyuan 27-9-1402, Liangxi District, Wuxi City, Jiangsu Province

Patentee after: Wuxi Tongchun New Energy Technology Co., Ltd.

Address before: 338000 Rongcheng Building, Labor North Road, Xinyu City, Jiangxi Province

Patentee before: Xinyu Yuanbaoshan Agricultural Development Co., Ltd.