CN204515825U - For the device that steel pipe is checked - Google Patents
For the device that steel pipe is checked Download PDFInfo
- Publication number
- CN204515825U CN204515825U CN201520070599.6U CN201520070599U CN204515825U CN 204515825 U CN204515825 U CN 204515825U CN 201520070599 U CN201520070599 U CN 201520070599U CN 204515825 U CN204515825 U CN 204515825U
- Authority
- CN
- China
- Prior art keywords
- push rod
- side link
- pedestal
- pushing block
- ratchet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of device checked for steel pipe, comprise pedestal (1), the first side link (2), the second side link (3), push rod (4), push rod (5) and drift (6), first side link (2) is hinged with pedestal (1), and the first side link (2) is provided with the first arc-shaped rack (16); Second side link (3) is hinged with pedestal (1), second side link (3) is provided with the second arc-shaped rack (17) engaged with the first arc-shaped rack (16), and the second side link (3) right part is provided with arc pushing block (31); Push rod (4) is slidably fitted on pedestal (1), push rod (4) is provided with the second roller (19) coordinated that to roll with arc pushing block (31), push rod (4) is provided with flat board (21), be provided with the first stage clip (22) between dull and stereotyped (21) and guide pin bushing (18), pedestal (1) is provided with locating piece (23).There is provided a kind of counting efficiency high, and counting is accurately for device that steel pipe is checked.
Description
Technical field
The utility model relates to building ground technical field, particularly relates to the device checked for steel pipe that steel pipe in a kind of building ground is checked.
Background technology
Can use a large amount of steel pipes in building ground, workmen is scaffolded erecting by these a large amount of steel pipes, thus builds strong and reliable shelf and construct on the top of the shelf for workmen.For building operation team, buying these steel pipes is also a no small spending, and before a construction team enters a construction site, all will check accurately the construction material of oneself, and then conveniently does account in the future, assesses the cost; Further, when the duration is terminated in construction team building site, also to check next construction material entrained by oneself, conveniently check and whether omit to some extent, and then reduce the spending of construction team in a building site.In the process of checking construction material, workmen is normally determined by the number of packages checking construction material, then the construction material checked carrying is got on the bus.Due to the steel pipe substantial amounts on building site, so for manually checking, this can be a no small engineering, and this work expends the muscle power of workpeople, and easily makes mistakes because checking and reduce the work efficiency of construction team's entirety.In a word, the quantity by manually checking steel pipe cannot add up steel pipe quantity accurately and efficiently.
Utility model content
The technical problems to be solved in the utility model is, overcomes existing technological deficiency, provides a kind of counting efficiency high, and counting is accurately for device that steel pipe is checked.
Technical solution of the present utility model is, provides a kind of device checked for steel pipe with following structure: comprise pedestal, the first side link, the second side link, push rod, push rod and drift, pedestal is provided with worktable, and worktable is equipped with paper tape; Hinged with pedestal in the middle part of first side link, the first side link left end is provided with the sloping platform rolled for steel pipe, and the pedestal near sloping platform side is provided with the charging conduit for receiving steel pipe; First side link left part is provided with chute, push rod upper end is provided with for being rolled the first roller coordinated with chute, push rod outer wall is sheathed with sleeve, sleeve is fixedly connected on pedestal, push rod lower end is provided with the pushing block for promoting paper tape movement on the table, push rod lower end is connected by material-pulling device with pushing block, and the first side link right part is provided with the first arc-shaped rack; Hinged with pedestal in the middle part of second side link, the second side link left part is provided with the second arc-shaped rack engaged with the first arc-shaped rack, and the second side link right part is provided with arc pushing block; Push rod is slidably fitted on pedestal by guide pin bushing, guide pin bushing is fixedly connected on pedestal, push rod upper end is provided with the second roller coordinated that to roll with arc pushing block intrados, push rod upper end is provided with flat board, be provided with the first stage clip between dull and stereotyped lower surface and guide pin bushing upper surface, and the first compression spring sleeve is connected on the outer wall of push rod; Pedestal is provided with the locating piece of location when resetting for arc pushing block.
Preferred as one of the present utility model, described material-pulling device comprises support, connecting rod, connecting rod one end and push rod lower end hinged, the other end and pushing block upper surface hinged, connecting rod is positioned on the left of push rod, and connecting rod axis and pushing block upper surface angle are acute angle; Push rod bottom sidewall is fixedly connected with ratchet, and the ratchet center of circle overlaps with push rod lower end pin joint, and connecting rod is provided with the ratchet coordinated with ratchet, is provided with extension spring between ratchet and connecting rod, and extension spring one end is connected with in the middle part of ratchet, and the other end is connected with connecting rod; Support comprises interconnective transverse part and vertical part, and transverse part is fixedly connected with pedestal, and lower end, vertical part is positioned at above ratchet, and when push rod resets, lower end, vertical part and ratchet push against; Be provided with the second stage clip between first side link left part and pushing block upper surface, second stage clip one end is connected with the first side link left part, and the other end is connected with pushing block upper surface.
Improve as one of the present utility model, described charging conduit sidewall is provided with the open slot that Open Side Down, and pedestal sidewall is provided with the projection coordinated with open slot.
Improve as one of the present utility model, described guide pin bushing axis and worktable place plane orthogonal.
The utility model is by above-mentioned structure, and can effectively improve the efficiency of checking/adding up steel pipe quantity, details are as follows: be placed on seriatim on sloping platform by steel pipe, and every root steel pipe tumbles charging conduit from sloping platform and collects; After every root steel pipe is placed into sloping platform, due to the effect of steel pipe self gravitation, steel pipe can press down the left part of the first side link, order about the first side link to be rotated counterclockwise around pin joint, namely the first side link left part declines, thus drive push rod to decline along sleeve axis direction, and push rod can move along sleeve axis direction all the time; In the process that push rod moves down, push rod lower end can be ordered about connecting rod around the pin joint of small end and clockwise rotation is occurred, thus the ratchet on connecting rod is also rotated around the axis of ratchet, and ratchet is stirred continuously, due under the pulling force effect of extension spring, ratchet blocks jail all the time on the flank of tooth of ratchet; Along with rotating clockwise of connecting rod, connecting rod lower end can apply a thrust left to pushing block, and pushing block drives paper tape to be moved to the left by feat of the friction force between pushing block lower surface and paper tape; Simultaneously, because the decline of the first side link left part also can compress the second stage clip, second stage clip can reduce the gap between pushing block lower surface and paper tape to greatest extent, increase the friction factor between pushing block lower surface and paper tape, then strengthen the friction force between pushing block and paper tape, more effectively drive pushing block to drive paper tape to be moved to the left;
While first side link left part declines, first arc-shaped rack of the first side link right part can rotate counterclockwise by the pin joint on the first side link, thus drive the second arc-shaped gear row culture of the second side link left part to rotate clockwise, then the arc pushing block of the second side link right part is driven to decline, arc pushing block to be rolled at the intrados of arc pushing block by promotion second roller and to decline along guide pin bushing axis to promote push rod, and push rod lower end promotes drift decline with to tape perforating; The decline of push rod can drive dull and stereotyped decline, and then dull and stereotyped lower surface can compress the first stage clip;
In reseting procedure, steel pipe enters in charging conduit from landing sloping platform, because the first side link left part loses steel pipe Action of Gravity Field, and under the elastic force effect of the first stage clip, push rod and flat board vertically rise, and promote the rising of arc pushing block, and the second side link rotates counterclockwise, until arc pushing block upper end is resisted against locating piece position, is and returns to initial position; Rotating counterclockwise of second side link can drive the first side link to turn clockwise; Thus the first side link left part can drive push rod to rise together, because ratchet is stuck on the flank of tooth of ratchet all the time, so, push rod can rise by drivening rod together when rising, and connecting rod and push rod can not relatively rotate, specifically, ratchet is fixedly installed on push rod lower end, and the head of ratchet is resisted against to prevent ratchet from reversing around ratchet axis on the ratchet flank of tooth all the time, namely connecting rod and push rod are connected as a single entity all the time; Until when push rod rises to elemental height, the lower end, vertical part of support can be low to ratchet, and then promote ratchet rotation, ratchet is departed from from the ratchet flank of tooth, and by under the second stage clip effect of compressing, connecting rod can rotate around ratchet axis and reset, and treats that pushing block contacts the initial position being pushing block again with paper tape; And at this moment, the position relationship of vertical part and ratchet has also returned to original state, ratchet has been stuck in again on the flank of tooth of ratchet under the effect of extension spring; In sum, steel pipe in charging conduit is tumbled and Yan Douhui experiences above-mentioned process from sloping platform for each root, namely the process that tumbles of each root steel pipe all can be ordered about drift and be made a call to a hole to paper tape, finally, checking of centralization is carried out to the paper tape be perforated, only need to check out on paper tape have how many holes, just can show that how many steel pipes tumble from sloping platform, that is, total how many steel pipes can be drawn, this makes it possible to efficient and exactly steel pipe checked.
Wherein, arranging of chute can provide certain buffer distance to the motion of push rod upper end, avoids push rod upper end stuck in the first side link left part, and causes transmission failure; First roller can reduce the friction force of moving between push rod upper end and chute.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the device that the utility model is checked for steel pipe.
Fig. 2 is the partial enlarged drawing of the device that the utility model is checked for steel pipe.
Shown in figure: 1, pedestal, 2, first side link, 3, second side link, 4, push rod, 5, push rod, 6, drift, 7, worktable, 8, paper tape, 9, steel pipe, 10, sloping platform, 11, charging conduit, 12, chute, 13, first roller, 14, sleeve, 15, pushing block, 16, first arc-shaped rack, 17, second arc-shaped rack, 18, guide pin bushing, 19, second roller, 20, protruding, 21, dull and stereotyped, 22, first stage clip, 23, locating piece, 24, support, 24.1, transverse part, 24.2, vertical part, 25, connecting rod, 26, ratchet, 27, ratchet, 28, extension spring, 29, second stage clip, 30, open slot, 31, arc pushing block.
Embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
As shown in the figure, the device that the utility model is checked for steel pipe comprises pedestal 1, first side link 2, second side link 3, push rod 4, push rod 5 and drift 6, and pedestal 1 is provided with worktable 7, worktable 7 is equipped with paper tape 8; Hinged with pedestal 1 in the middle part of first side link 2, the first side link 2 left end is provided with the sloping platform 10 rolled for steel pipe 9, and the pedestal 1 near sloping platform 10 side is provided with the charging conduit 11 for receiving steel pipe 9; First side link 2 left part is provided with chute 12, push rod 5 upper end is provided with for being rolled the first roller 13 coordinated with chute 12, push rod 5 outer wall is sheathed with sleeve 14, sleeve 14 is fixedly connected on pedestal 1, push rod 5 lower end is provided with the pushing block 15 for promoting paper tape 8 movement on the table 7, push rod 5 lower end is connected by material-pulling device with pushing block 15, and the first side link 2 right part is provided with the first arc-shaped rack 16; Hinged with pedestal 1 in the middle part of second side link 3, the second side link 3 left part is provided with second arc-shaped rack 17, second side link 3 right part of engaging with the first arc-shaped rack 16 and is provided with arc pushing block 31; Push rod 4 is slidably fitted on pedestal 1 by guide pin bushing 18, guide pin bushing 18 is fixedly connected on pedestal, push rod 4 upper end is provided with the second roller 19 coordinated that to roll with arc pushing block 31 intrados, push rod 4 upper end is provided with dull and stereotyped 21, be provided with the first stage clip 22 between dull and stereotyped 21 lower surfaces and guide pin bushing 18 upper surface, and the first stage clip 22 is socketed in the outer wall of push rod 4; Pedestal 1 is provided with the locating piece 23 of location when resetting for arc pushing block 31.
Described material-pulling device comprises support 24, connecting rod 25, connecting rod 25 one end and push rod 5 lower end hinged, the other end and pushing block 15 upper surface hinged, connecting rod 25 is positioned on the left of push rod 5, and connecting rod 25 axis and pushing block 15 upper surface angle are acute angle; Push rod 5 bottom sidewall is fixedly connected with ratchet 26, ratchet 26 center of circle overlaps with push rod 5 lower end pin joint, and connecting rod 25 is provided with the ratchet 27 coordinated with ratchet 26, is provided with extension spring 28 between ratchet 27 and connecting rod 25, extension spring 28 one end is connected with in the middle part of ratchet 27, and the other end is connected with connecting rod 25; Support 24 comprises interconnective transverse part 24.1 and vertical part 24.2, and transverse part 24.1 is fixedly connected with pedestal 1, and lower end, vertical part 24.2 is positioned at above ratchet 27, and when push rod 5 resets, lower end, vertical part 24.2 and ratchet 27 push against; Be provided with second stage clip 29, second stage clip 29 one end between first side link 2 left part and pushing block 15 upper surface to be connected with the first side link 2 left part, the other end is connected with pushing block 15 upper surface.
Described charging conduit 11 sidewall is provided with the open slot 30 that Open Side Down, and pedestal 1 sidewall is provided with the projection 20 coordinated with open slot 30.
Described guide pin bushing 18 axis and worktable 7 place plane orthogonal.
The foregoing is only preferred embodiment of the present utility model, not for limiting protection domain of the present utility model.All within the utility model claim, any amendment done, equivalent replacement and improvement etc., all should be included within protection domain of the present utility model.
Claims (4)
1. the device checked for steel pipe, it is characterized in that: it comprises pedestal (1), the first side link (2), the second side link (3), push rod (4), push rod (5) and drift (6), pedestal (1) is provided with worktable (7), worktable (7) is equipped with paper tape (8); First side link (2) middle part is hinged with pedestal (1), first side link (2) left end is provided with the sloping platform (10) rolled for steel pipe (9), and the pedestal (1) near sloping platform (10) side is provided with the charging conduit (11) for receiving steel pipe (9); First side link (2) left part is provided with chute (12), push rod (5) upper end is provided with for being rolled the first roller (13) coordinated with chute (12), push rod (5) outer wall is sheathed with sleeve (14), sleeve (14) is fixedly connected on pedestal (1), push rod (5) lower end is provided with for promoting the pushing block (15) of paper tape (8) in the upper movement of worktable (7), push rod (5) lower end is connected by material-pulling device with pushing block (15), and the first side link (2) right part is provided with the first arc-shaped rack (16); Second side link (3) middle part is hinged with pedestal (1), second side link (3) left part is provided with the second arc-shaped rack (17) engaged with the first arc-shaped rack (16), and the second side link (3) right part is provided with arc pushing block (31); Push rod (4) is slidably fitted on pedestal (1) by guide pin bushing (18), guide pin bushing (18) is fixedly connected on pedestal, push rod (4) upper end is provided with the second roller (19) coordinated that to roll with arc pushing block (31) intrados, push rod (4) upper end is provided with flat board (21), be provided with the first stage clip (22) between dull and stereotyped (21) lower surface and guide pin bushing (18) upper surface, and the first stage clip (22) is socketed in the outer wall of push rod (4); Pedestal (1) is provided with the locating piece (23) of location when resetting for arc pushing block (31).
2. the device checked for steel pipe according to claim 1, it is characterized in that: described material-pulling device comprises support (24), connecting rod (25), connecting rod (25) one end and push rod (5) lower end hinged, the other end and pushing block (15) upper surface hinged, connecting rod (25) is positioned at push rod (5) left side, and connecting rod (25) axis and pushing block (15) upper surface angle are acute angle; Push rod (5) bottom sidewall is fixedly connected with ratchet (26), ratchet (26) center of circle overlaps with push rod (5) lower end pin joint, connecting rod (25) is provided with the ratchet (27) coordinated with ratchet (26), extension spring (28) is provided with between ratchet (27) and connecting rod (25), extension spring (28) one end is connected with ratchet (27) middle part, and the other end is connected with connecting rod (25); Support (24) comprises interconnective transverse part (24.1) and vertical part (24.2), transverse part (24.1) is fixedly connected with pedestal (1), vertical part (24.2) lower end is positioned at ratchet (27) top, and when push rod (5) resets, (24.2) lower end, vertical part and ratchet (27) push against; The second stage clip (29) is provided with between first side link (2) left part and pushing block (15) upper surface, second stage clip (29) one end is connected with the first side link (2) left part, and the other end is connected with pushing block (15) upper surface.
3. the device checked for steel pipe according to claim 1, it is characterized in that: described charging conduit (11) sidewall is provided with the open slot (30) that Open Side Down, pedestal (1) sidewall is provided with the projection (20) coordinated with open slot (30).
4. the device checked for steel pipe according to claim 1, is characterized in that: described guide pin bushing (18) axis and worktable (7) place plane orthogonal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520070599.6U CN204515825U (en) | 2015-02-01 | 2015-02-01 | For the device that steel pipe is checked |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520070599.6U CN204515825U (en) | 2015-02-01 | 2015-02-01 | For the device that steel pipe is checked |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204515825U true CN204515825U (en) | 2015-07-29 |
Family
ID=53713775
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520070599.6U Expired - Fee Related CN204515825U (en) | 2015-02-01 | 2015-02-01 | For the device that steel pipe is checked |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204515825U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104573796A (en) * | 2015-02-01 | 2015-04-29 | 励志辉 | Counting unit of steel pipes |
CN107486688A (en) * | 2017-09-29 | 2017-12-19 | 重庆润跃机械有限公司 | The processing method of tapered hub |
CN107511293A (en) * | 2017-09-29 | 2017-12-26 | 重庆润跃机械有限公司 | Axle sleeve corrosion resistant coating painting installation |
CN109484943A (en) * | 2018-12-12 | 2019-03-19 | 宁津汇丰消声器有限公司 | A kind of carriage tenesmus deceleration device |
-
2015
- 2015-02-01 CN CN201520070599.6U patent/CN204515825U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104573796A (en) * | 2015-02-01 | 2015-04-29 | 励志辉 | Counting unit of steel pipes |
CN104573796B (en) * | 2015-02-01 | 2017-05-03 | 泉州惠安长圣生物科技有限公司 | Counting unit of steel pipes |
CN107486688A (en) * | 2017-09-29 | 2017-12-19 | 重庆润跃机械有限公司 | The processing method of tapered hub |
CN107511293A (en) * | 2017-09-29 | 2017-12-26 | 重庆润跃机械有限公司 | Axle sleeve corrosion resistant coating painting installation |
CN107486688B (en) * | 2017-09-29 | 2019-01-04 | 重庆润跃机械有限公司 | The processing method of tapered hub |
CN109484943A (en) * | 2018-12-12 | 2019-03-19 | 宁津汇丰消声器有限公司 | A kind of carriage tenesmus deceleration device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204515825U (en) | For the device that steel pipe is checked | |
CN202864333U (en) | Semi-automatic conveying device used for material box | |
CN104573804A (en) | Automatic steel tube counting device | |
CN204515822U (en) | Automatic steel tube counting equipment | |
CN103663256A (en) | Lifting platform | |
CN204576989U (en) | Propaganda board shown by a kind of works | |
CN104573797A (en) | Automatic counting unit of steel pipes | |
CN204515831U (en) | Steel pipe counting assembly | |
CN204515830U (en) | Steel pipe counting machine | |
CN204515824U (en) | Steel pipe counting equipment | |
CN103101735B (en) | workpiece feeding distributing device | |
CN104573802A (en) | Steel pipe counting device | |
CN204515829U (en) | Automatic steel tube counter | |
CN206142362U (en) | Part material feeding unit | |
CN104573799A (en) | Automatic counting unit of steel pipes | |
CN104573801A (en) | Steel pipe counting equipment | |
CN104573796A (en) | Counting unit of steel pipes | |
CN104627447B (en) | Counting device | |
CN204515826U (en) | For the equipment that steel pipe is checked | |
CN204515827U (en) | Steel pipe counter | |
CN204515828U (en) | Automatic steel tube counting assembly | |
CN104573800A (en) | Counting unit of steel pipes | |
CN104573803A (en) | Steel pipe counter | |
CN204415799U (en) | A kind of steel pipe strapper aligning device | |
CN209473343U (en) | A kind of transmitting device of automatic egg grader |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150729 Termination date: 20170201 |