Steel pipe counting assembly
Technical field
The present invention relates to building ground technical field, particularly relate to the steel pipe counting assembly that steel pipe in a kind of building ground is checked.
Background technology
Can use a large amount of steel pipes in building ground, workmen is scaffolded erecting by these a large amount of steel pipes, thus builds strong and reliable shelf and construct on the top of the shelf for workmen.For building operation team, buying these steel pipes is also a no small spending, and before a construction team enters a construction site, all will check accurately the construction material of oneself, and then conveniently does account in the future, assesses the cost; Further, when the duration is terminated in construction team building site, also to check next construction material entrained by oneself, conveniently check and whether omit to some extent, and then reduce the spending of construction team in a building site.In the process of checking construction material, workmen is normally determined by the number of packages checking construction material, then the construction material checked carrying is got on the bus.Due to the steel pipe substantial amounts on building site, so for manually checking, this can be a no small engineering, and this work expends the muscle power of workpeople, and easily makes mistakes because checking and reduce the work efficiency of construction team's entirety.In a word, the quantity by manually checking steel pipe cannot add up steel pipe quantity accurately and efficiently.
Summary of the invention
The technical problem to be solved in the present invention is, overcomes existing technological deficiency, provides a kind of counting efficiency high, and counts steel pipe counting assembly accurately.
Technical solution of the present invention is, provides a kind of steel pipe counting assembly with following structure: comprise pedestal, the first side link, the second side link, push rod, push rod and drift, pedestal is provided with worktable, and worktable is equipped with paper tape; Hinged with pedestal in the middle part of first side link, the first side link left end is provided with the sloping platform rolled for steel pipe; Pedestal near sloping platform side is provided with the charging conduit for receiving steel pipe; First side link left part is provided with chute, push rod upper end is provided with for being rolled the first roller coordinated with chute, push rod outer wall is sheathed with sleeve, sleeve is fixedly connected on pedestal, push rod lower end is provided with the pushing block for promoting paper tape movement on the table, push rod lower end is connected by material-pulling device with pushing block, and the first side link right part is provided with the first arc-shaped rack; Hinged with pedestal in the middle part of second side link, the second side link left part is provided with the second arc-shaped rack engaged with the first arc-shaped rack, and the second side link right part is provided with arc pushing block; Push rod is slidably fitted on pedestal by guide pin bushing, guide pin bushing is fixedly connected on pedestal, push rod upper end is provided with the second roller coordinated that to roll with arc pushing block intrados, push rod lower end is fixedly connected with push pedal, drift is arranged on push pedal lower surface, and is provided with the resetting means resetted for push rod between push pedal and pedestal; Pedestal is provided with the locating piece of location when resetting for arc pushing block.
Preferred as one of the present invention, described material-pulling device comprises support, connecting rod, connecting rod one end and push rod lower end hinged, the other end and pushing block upper surface hinged, connecting rod is positioned on the left of push rod, and connecting rod axis and pushing block upper surface angle are acute angle; Push rod bottom sidewall is fixedly connected with ratchet, and the ratchet center of circle overlaps with push rod lower end pin joint, and connecting rod is provided with the ratchet coordinated with ratchet, is provided with the first extension spring between ratchet and connecting rod, and first extension spring one end is connected with in the middle part of ratchet, and the other end is connected with connecting rod; Support comprises interconnective transverse part and vertical part, and transverse part is fixedly connected with pedestal, and lower end, vertical part is positioned at above ratchet, and when push rod resets, lower end, vertical part and ratchet push against; Be provided with stage clip between first side link left part and pushing block upper surface, stage clip one end is connected with the first side link left part, and the other end is connected with pushing block upper surface.
As a modification of the present invention, described resetting means comprises guide rod and the second extension spring, and guide rod upper end and pedestal screw, and lower end of the guide rod screws with nut through after push pedal; Second extension spring is linked on guide rod, and second extension spring one end is connected with pedestal lower surface, and the other end is connected with push pedal upper surface.
As a modification of the present invention, described charging conduit sidewall is provided with the open slot that Open Side Down, and pedestal sidewall is provided with the projection coordinated with open slot.
As another improvement of the present invention, described guide rod is two, and two guide rods are symmetrically distributed in push rod both sides.
The present invention is by above-mentioned structure, and effectively can improve and check steel pipe efficiency, details are as follows: be placed on seriatim on sloping platform by steel pipe, and every root steel pipe tumbles charging conduit from sloping platform and collects; After every root steel pipe is placed into sloping platform, due to the effect of steel pipe self gravitation, steel pipe can press down the left part of the first side link, order about the first side link to be rotated counterclockwise around pin joint, namely the first side link left part declines, thus drive push rod to decline along sleeve axis direction, and push rod can move along sleeve axis direction all the time; In the process that push rod moves down, push rod lower end can be ordered about connecting rod around the pin joint of small end and clockwise rotation is occurred, thus the ratchet on connecting rod is also rotated around the axis of ratchet, ratchet is stirred continuously, due under the pulling force effect of the first extension spring, ratchet blocks jail all the time on the flank of tooth of ratchet; Along with rotating clockwise of connecting rod, connecting rod lower end can apply a thrust left to pushing block, and pushing block drives paper tape to be moved to the left by feat of the friction force between pushing block lower surface and paper tape; Simultaneously, because the decline of the first side link left part also can compression press spring, stage clip can reduce the gap between pushing block lower surface and paper tape to greatest extent, increase the friction factor between pushing block lower surface and paper tape, then strengthen the friction force between pushing block and paper tape, more effectively drive paper tape to be moved to the left;
While first side link left part declines, first arc-shaped rack of the first side link right part can rotate counterclockwise by the pin joint on the first side link, thus drive the second arc-shaped rack of the second side link left part to rotate clockwise, then the arc pushing block of the second side link right part is driven to decline, arc pushing block to be rolled at the intrados of arc pushing block by promotion second roller and to decline along guide pin bushing axis to promote push rod, and push rod lower end promotes push pedal and drift decline with to tape perforating; The decline of push pedal can pull the second extension spring to open;
In reseting procedure, steel pipe enters in charging conduit from landing sloping platform, because the first side link left part loses steel pipe Action of Gravity Field, and under the pulling force effect of the second extension spring, push pedal and drift vertically rise, and promote the rising of arc pushing block, and the second side link rotates counterclockwise, until arc pushing block upper end is resisted against locating piece position, is and returns to initial position; Rotating counterclockwise of second side link can drive the first side link to turn clockwise; Thus the first side link left part can drive push rod to rise together, because ratchet is stuck on the flank of tooth of ratchet all the time, so, push rod can rise by drivening rod together when rising, and connecting rod and push rod can not relatively rotate, specifically, ratchet is fixedly installed on push rod lower end, and the gravity of connecting rod and pushing block and ratchet cannot be driven to push the constraint of ratchet open, namely connecting rod and push rod are connected as a single entity all the time; Until when push rod rises to elemental height, can conflict ratchet in the lower end, vertical part of support, and then promote ratchet rotation, ratchet is departed from from the ratchet flank of tooth, and by under the stage clip effect compressed, connecting rod can rotate around ratchet axis and reset, and treats that pushing block contacts the initial position being pushing block again with paper tape; And at this moment, the position relationship of vertical part and ratchet has also returned to original state, ratchet has been stuck in again on the flank of tooth of ratchet under the effect of the first extension spring; In sum, steel pipe in charging conduit is tumbled and Yan Douhui experiences above-mentioned process from sloping platform for each root, namely the process that tumbles of each root steel pipe all can be ordered about drift and be made a call to a hole to paper tape, finally, checking of centralization is carried out to the paper tape be perforated, only need to check out on paper tape have how many holes, just can show that how many steel pipes tumble from sloping platform, that is, total how many steel pipes can be drawn, this makes it possible to efficient and exactly steel pipe checked.
Wherein, arranging of chute can provide certain buffer distance to the motion of push rod upper end, avoids push rod upper end stuck in the first side link left part; First roller can reduce the friction force of moving between push rod upper end and chute.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of steel pipe counting assembly of the present invention.
Fig. 2 is the partial enlarged drawing of steel pipe counting assembly of the present invention.
Shown in figure: 1, pedestal, 2, first side link, 3, second side link, 4, push rod, 5, push rod, 6, drift, 7, worktable, 8, paper tape, 9, steel pipe, 10, charging conduit, 11, sloping platform, 12, chute, 13, first roller, 14, sleeve, 15, pushing block, 16, first arc-shaped rack, 17, second arc-shaped rack, 18, guide pin bushing, 19, push pedal, 20, second roller, 21, support, 21.1, transverse part, 21.2, vertical part, 22, connecting rod, 23, ratchet, 24, ratchet, 25, first extension spring, 26, second extension spring, 27, stage clip, 28, guide rod, 29, nut, 30, open slot, 31, protruding, 32, locating piece, 33, arc pushing block.
Embodiment
Below in conjunction with the drawings and specific embodiments, the invention will be further described.
As shown in the figure, steel pipe counting assembly of the present invention comprises pedestal 1, first side link 2, second side link 3, push rod 4, push rod 5 and drift 6, and pedestal 1 is provided with worktable 7, worktable 7 is equipped with paper tape 8; Hinged with pedestal 1 in the middle part of first side link 2, the first side link 2 left end is provided with the sloping platform 11 rolled for steel pipe 9; Pedestal 1 near sloping platform 11 side is provided with the charging conduit 10 for receiving steel pipe 9; First side link 2 left part is provided with chute 12, push rod 5 upper end is provided with for being rolled the first roller 13 coordinated with chute 12, push rod 5 outer wall is sheathed with sleeve 14, sleeve 14 is fixedly connected on pedestal 1, push rod 5 lower end is provided with the pushing block 15 for promoting paper tape 8 movement on the table 7, push rod 5 lower end is connected by material-pulling device with pushing block 15, and the first side link 2 right part is provided with the first arc-shaped rack 16; Hinged with pedestal 1 in the middle part of second side link 3, the second side link 3 left part is provided with second arc-shaped rack 17, second side link 3 right part of engaging with the first arc-shaped rack 16 and is provided with arc pushing block 33; Push rod 4 is slidably fitted on pedestal 1 by guide pin bushing 18, guide pin bushing 18 is fixedly connected on pedestal, push rod 4 upper end is provided with the second roller 20 coordinated that to roll with arc pushing block 33 intrados, push rod 4 lower end is fixedly connected with push pedal 19, drift 6 is arranged on push pedal 19 lower surface, and is provided with the resetting means resetted for push rod 4 between push pedal 19 and pedestal 1; Pedestal 1 is provided with the locating piece 32 of location when resetting for arc pushing block 33.
Described material-pulling device comprises support 21, connecting rod 22, connecting rod 22 one end and push rod 5 lower end hinged, the other end and pushing block 15 upper surface hinged, connecting rod 22 is positioned on the left of push rod 5, and connecting rod 22 axis and pushing block 15 upper surface angle are acute angle; Push rod 5 bottom sidewall is fixedly connected with ratchet 23, ratchet 23 center of circle overlaps with push rod 5 lower end pin joint, connecting rod 22 is provided with the ratchet 24 coordinated with ratchet 23, the first extension spring 25 is provided with between ratchet 24 and connecting rod 22, first extension spring 25 one end is connected with in the middle part of ratchet 24, and the other end is connected with connecting rod 22; Support 21 comprises interconnective transverse part 21.1 and vertical part 21.2, and transverse part 21.1 is fixedly connected with pedestal 1, and lower end, vertical part 21.2 is positioned at above ratchet 24, and when push rod 5 resets, lower end, vertical part 21.2 and ratchet 24 push against; Be provided with stage clip 27 between first side link 2 left part and pushing block 15 upper surface, stage clip 27 one end is connected with the first side link 2 left part, and the other end is connected with pushing block 15 upper surface.
Described resetting means comprises guide rod 28 and the second extension spring 26, and guide rod 28 upper end and pedestal 1 screw, guide rod 28 lower end through after push pedal 19 and nut 29 screw; Second extension spring 26 is linked on guide rod 28, and second extension spring 26 one end is connected with pedestal 1 lower surface, and the other end is connected with push pedal 19 upper surface.
Described charging conduit 10 sidewall is provided with the open slot 30 that Open Side Down, and pedestal 1 sidewall is provided with the projection 31 coordinated with open slot 30.
Described guide rod 28 is two, and two guide rods 28 are symmetrically distributed in push rod 4 both sides.