CN104573796B CN201510051613.2A CN201510051613A CN104573796B CN 104573796 B CN104573796 B CN 104573796B CN 201510051613 A CN201510051613 A CN 201510051613A CN 104573796 B CN104573796 B CN 104573796B
Authority
CN
China
Prior art keywords
push rod
pedestal
ratchet
pushing block
side link
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510051613.2A
Other languages
Chinese (zh)
Other versions
CN104573796A (en
Inventor
吴丽清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong North Bund Construction Engineering Co ltd
Original Assignee
Huian Quanzhou Changsheng Biotechnology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huian Quanzhou Changsheng Biotechnology Co Ltd filed Critical Huian Quanzhou Changsheng Biotechnology Co Ltd
Priority to CN201510051613.2A priority Critical patent/CN104573796B/en
Publication of CN104573796A publication Critical patent/CN104573796A/en
Application granted granted Critical
Publication of CN104573796B publication Critical patent/CN104573796B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Basic Packing Technique (AREA)
  • Warehouses Or Storage Devices (AREA)

Abstract

The invention discloses a counting unit of steel pipes, comprising a base (1), a first link rod (2), a second link rod (3), an ejecting rod (4), a push rod (5) and a punch (6). The first link rod (2) is hinged to the base (1) and provided with a first arc rack (16). The second link rack (3) is hinged to the base and provided with a second arc rack (17) meshing with the first arc rack (16). The right end of the second link rod (3) is provided with an arc pusher (31). The ejecting rod (4) is in sliding fit with the base (1). The ejecting rod (4) is provided with a second roller (19) in rolling fit with the arc pusher (31). The ejecting rod (4) is further provided with a flat plate (21); a first pressure spring (22) is disposed between the flat plate (21) and a guide sleeve (18); the base (1) is provided with a positioner (23). The counting unit of steel pipes is high in counting efficiency and accuracy.

Description

For the device that steel pipe is checked
Technical field
The present invention relates in construction site technical field, more particularly to a kind of construction site steel pipe check for steel pipe cleaning The device of point.
Background technology
Substantial amounts of steel pipe can be used in construction site, workmen carries out building foot handss by these substantial amounts of steel pipes Frame, so as to build strong and reliable shelf so that workmen is constructed on the top of the shelf.For construction team, purchase It is also a no small spending to buy these steel pipes, and before a construction team enters a construction site, oneself will be applied Work material is accurately checked, and then conveniently does account in the future, calculates cost;Also, terminate work in one building site of construction team When phase, also the construction material come entrained by oneself to be checked, conveniently check whether to have omitted, and then reduce by one Spending of the individual construction team in a building site.During construction material is checked, workmen is typically by checking construction The construction material checked is carried determining, then and is got on the bus by the number of packages of material.Due to the steel pipe substantial amounts on building site, so For manually checking, this can be a no small engineering, and this work expends the muscle power of workpeople, and easily because checking Malfunction and reduce the overall work efficiency of construction team.In a word, the quantity by manually checking steel pipe accurately and efficiently cannot be united Meter steel pipe quantity.
The content of the invention
The technical problem to be solved in the present invention is to overcome existing technological deficiency, there is provided a kind of counting efficiency is high, and is counted The device accurately checked for steel pipe.
The technical solution of the present invention is to provide a kind of device checked for steel pipe with following structure:Including Pedestal, the first side link, the second side link, push rod, push rod and drift, pedestal are provided with workbench, and paper is equipped with workbench Band;It is hinged with pedestal in the middle part of first side link, the first side link left end is provided with the sloping platform rolled for steel pipe, near sloping platform side Pedestal is provided with for receiving the charging conduit of steel pipe;First side link left part is provided with chute, push rod upper end be provided with for cunning Trough roller moves the first roller of cooperation, and push rod outer wall is sheathed with sleeve, and sleeve is fixedly connected on pedestal, push rod lower end be provided with for The pushing block for promoting paper tape to move on the table, push rod lower end are connected by material-pulling device with pushing block, the first side link right part It is provided with the first arc-shaped rack;It is hinged with pedestal in the middle part of second side link, the second side link left part is provided with and the first arc-shaped rack Second arc-shaped rack of engagement, the second side link right part is provided with arc pushing block;Push rod is slidably fitted on pedestal by guide pin bushing, Guide pin bushing is fixedly connected on pedestal, and push rod upper end is provided with and the second roller for coordinating, push rod upper end are rolled with arc pushing block intrados Flat board is provided with, the first stage clip is provided between flat board lower surface and guide pin bushing upper surface, and the first stage clip is socketed in the outer wall of push rod;Base Seat is provided with the locating piece positioned when resetting for arc pushing block.
Preferred as one kind of the present invention, described material-pulling device includes support, connecting rod, and connecting rod one end is cut with scissors with push rod lower end Connect, the other end is hinged with pushing block upper surface, connecting rod is located on the left of push rod, connecting rod axis is sharp with pushing block upper surface angle Angle;Push rod bottom side wall is fixedly connected with ratchet, and the ratchet center of circle is overlapped with push rod lower end pin joint, and connecting rod is provided with and ratchet The ratchet of cooperation, is provided with extension spring between ratchet and connecting rod, extension spring one end is connected with the middle part of ratchet, and the other end is connected with connecting rod; Frame includes the transverse part being connected with each other and vertical part, and transverse part is fixedly connected with pedestal, and vertical part lower end is located above ratchet, and push rod resets When vertical part lower end and ratchet push against;The second stage clip, the second stage clip one are provided between first side link left part and pushing block upper surface End is connected with the first side link left part, and the other end is connected with pushing block upper surface.
Used as a modification of the present invention, described blanking groove sidewall is provided with the open slot that Open Side Down, and base side wall sets There is the projection coordinated with open slot.
Used as a modification of the present invention, described guide pin bushing axis is vertical with workbench place plane.
The present invention can effectively improve the efficiency for checking/counting steel pipe quantity by above-mentioned structure, and details are as follows: Steel pipe is seriatim placed on sloping platform, every steel pipe rolls down to charging conduit collection from sloping platform;Sloping platform is placed in every steel pipe Afterwards, due to the effect of steel pipe self gravitation, steel pipe can push the left part of the first side link, order about the first side link around pin joint Rotate counterclockwise, i.e. the first side link left part decline, and so as to driving push rod declines along sleeve axis direction, and push rod is all the time Can move along sleeve axis direction;During push rod is moved down, connecting rod being hinged around small end can be ordered about in push rod lower end There is clockwise rotation in point, so that the ratchet on connecting rod is also rotated around the axis of ratchet, ratchet is continuously stirred, As, under the pulling force effect of extension spring, ratchet blocks jail on the flank of tooth of ratchet all the time;With rotating clockwise for connecting rod, under connecting rod End can apply a thrust to the left to pushing block, and pushing block drives paper tape to the left by feat of the frictional force between pushing block lower surface and paper tape It is mobile;Simultaneously as the second stage clip can be also compressed in the decline of the first side link left part, the second stage clip can subtract to greatest extent Gap between little pushing block lower surface and paper tape, increases the coefficient of friction between pushing block lower surface and paper tape, increases then pushing block and paper The frictional force of interband, more efficiently drives pushing block to drive paper tape to be moved to the left;
While first side link left part declines, the first arc-shaped rack of the first side link right part can be around the first frame linking Pin joint on bar is rotated counterclockwise, so as to the second arc-shaped rack for driving the second side link left part is rotated clockwise, Then the arc pushing block of the second side link right part is driven to decline, arc pushing block is by the second roller of promotion in arc pushing block Cambered surface is rolled to promote push rod to decline along guide pin bushing axis, and push rod lower end promotes drift to decline with to tape perforating;The decline of push rod The decline of flat board can be driven, and then flat board lower surface can compress the first stage clip;
In reseting procedure, steel pipe slides from sloping platform and enters in charging conduit, due to the first side link left end Portion loses steel pipe action of gravity, and under the elastic force effect of the first stage clip, push rod and flat board vertically rise, and promote arc to push away Block rises, and the second side link is rotated counterclockwise, and until arc pushing block upper end is resisted against locating piece position, as returns to initial Position;Rotating counterclockwise for second side link can drive the first side link to turn clockwise;So as to the first side link left part meeting Push rod is driven to rise together, as ratchet is stuck on the flank of tooth of ratchet all the time, so, push rod understands drivening rod together when rising Rise, and connecting rod and push rod will not relatively rotate, specifically, ratchet is fixedly installed on push rod lower end, and ratchet Head is resisted against on the ratchet flank of tooth all the time to prevent ratchet from occurring to invert around ratchet axis, i.e., connecting rod and push rod are linked as one all the time Body;When push rod rises to elemental height, the vertical part lower end of support can be low to ratchet, and then promotes pawl rotation so that spine Pawl departs from from the ratchet flank of tooth, and under the second stage clip effect compressed, connecting rod can be rotated around ratchet axis and be resetted, and treat pushing block Contact the initial position Ji Wei pushing block again with paper tape;And at this moment, vertical part has been also returned to initially with the position relationship of ratchet State, ratchet have been stuck on the flank of tooth of ratchet in the presence of extension spring again;In sum, for each rolls down to from sloping platform Tumbling process and all ordering about drift and beat to paper tape for above-mentioned process, i.e. each steel pipe can be all experienced for steel pipe in hopper One hole, finally, the paper tape to being perforated carries out checking for centralization, it is only necessary to check how many hole paper delivery takes, with regard to energy Enough show that how many steel pipe is tumbled from sloping platform, that is to say, that how many root steel pipe altogether can be derived that, this makes it possible to efficiently And exactly steel pipe is checked.
Wherein, arranging for chute can provide certain buffer distance to the motion of push rod upper end, it is to avoid push rod upper end card Extremely in the first side link left part, and cause transmission failure;First roller can reduce rubbing of moving between push rod upper end and chute Wipe power.
Description of the drawings
Fig. 1 is the schematic diagram of the device that the present invention is checked for steel pipe.
Fig. 2 is the partial enlarged drawing of the device that the present invention is checked for steel pipe.
Shown in figure:1st, pedestal, the 2, first side link, the 3, second side link, 4, push rod, 5, push rod, 6, drift, 7, work Platform, 8, paper tape, 9, steel pipe, 10, sloping platform, 11, charging conduit, 12, chute, the 13, first roller, 14, sleeve, 15, pushing block, 16, One arc-shaped rack, the 17, second arc-shaped rack, 18, guide pin bushing, the 19, second roller, 20, raised, 21, flat board, the 22, first stage clip, 23rd, locating piece, 24, support, 24.1, transverse part, 24.2, vertical part, 25, connecting rod, 26, ratchet, 27, ratchet, 28, extension spring, 29, second Stage clip, 30, open slot, 31, arc pushing block.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and detailed description.
As illustrated, the present invention includes pedestal 1, the first side link 2, the second side link 3, top for the device that steel pipe is checked Bar 4, push rod 5 and drift 6, pedestal 1 are provided with workbench 7, and paper tape 8 is equipped with workbench 7;In the middle part of first side link 2 and base Seat 1 is hinged, and 2 left end of the first side link is provided with the sloping platform 10 rolled for steel pipe 9, and the pedestal 1 near 10 side of sloping platform is provided with use In the charging conduit 11 of storage steel pipe 9;First side link, 2 left part is provided with chute 12, and 5 upper end of push rod is provided with for being rolled with chute 12 Dynamic the first roller 13 for coordinating, 5 outer wall of push rod are sheathed with sleeve 14, and sleeve 14 is fixedly connected on pedestal 1, and 5 lower end of push rod sets There is the pushing block 15 for promoting paper tape 8 to move on the table 7,5 lower end of push rod is connected by material-pulling device with pushing block 15, first 2 right part of side link is provided with the first arc-shaped rack 16;It is hinged with pedestal 1 in the middle part of second side link 3,3 left part of the second side link The second arc-shaped rack 17 engaged with the first arc-shaped rack 16 is provided with, 3 right part of the second side link is provided with arc pushing block 31;Push rod 4 are slidably fitted on pedestal 1 by guide pin bushing 18, and guide pin bushing 18 is fixedly connected on pedestal, and 4 upper end of push rod is provided with and arc pushing block 31 Intrados rolls the second roller 19 for coordinating, and 4 upper end of push rod is provided with flat board 21, between 18 upper surface of 21 lower surface of flat board and guide pin bushing The first stage clip 22 is provided with, and the first stage clip 22 is socketed in the outer wall of push rod 4;Pedestal 1 is provided with when resetting for arc pushing block 31 The locating piece 23 of positioning.
Described material-pulling device includes support 24, connecting rod 25, and 25 one end of connecting rod is hinged with 5 lower end of push rod, the other end with push away 15 upper surface of block is hinged, and connecting rod 25 is located on the left of push rod 5, and 25 axis of connecting rod is acute angle with 15 upper surface angle of pushing block;Push away 5 bottom side wall of bar is fixedly connected with ratchet 26, and 26 center of circle of ratchet is overlapped with 5 lower end pin joint of push rod, connecting rod 25 be provided with The ratchet 27 that ratchet 26 coordinates, is provided with extension spring 28 between ratchet 27 and connecting rod 25,28 one end of extension spring is connected with the middle part of ratchet 27, separately One end is connected with connecting rod 25;Support 24 includes the transverse part 24.1 being connected with each other and vertical part 24.2, and transverse part 24.1 is fixed with pedestal 1 and connected Connect, 24.2 lower end of vertical part is located above ratchet 27, and 24.2 lower end of vertical part is pushed against with ratchet 27 during the reset of push rod 5;First frame linking The second stage clip 29 is provided between 15 upper surface of 2 left part of bar and pushing block, 29 one end of the second stage clip is connected with 2 left part of the first side link Connect, the other end is connected with 15 upper surface of pushing block.
Described 11 side wall of charging conduit is provided with the open slot 30 that Open Side Down, and 1 side wall of pedestal is provided with and is coordinated with open slot 30 Projection 20.
Described 18 axis of guide pin bushing is vertical with 7 place plane of workbench.
Presently preferred embodiments of the present invention is the foregoing is only, protection scope of the present invention is not intended to limit.It is all at this Within bright claim, any modification, equivalent and improvement for being made etc., should be included in protection scope of the present invention it It is interior.

Claims (2)

1. a kind of device checked for steel pipe, it is characterised in that:It includes pedestal (1), the first side link (2), the second frame linking Bar (3), push rod (4), push rod (5) and drift (6), pedestal (1) are provided with workbench (7), and workbench is equipped with paper tape on (7) (8);It is hinged with pedestal (1) in the middle part of first side link (2), the first side link (2) left end is provided with the sloping platform rolled for steel pipe (9) (10), the pedestal (1) near sloping platform (10) side is provided with for receiving the charging conduit (11) of steel pipe (9);First side link (2) Left part is provided with chute (12), and push rod (5) upper end is provided with for rolling the first roller (13) for coordinating, push rod with chute (12) (5) outer wall is sheathed with sleeve (14), and sleeve (14) is fixedly connected on pedestal (1), and push rod (5) lower end is provided with for promoting paper tape (8) pushing block (15) for moving on workbench (7), push rod (5) lower end are connected by material-pulling device with pushing block (15), the first frame linking Bar (2) right part is provided with the first arc-shaped rack (16);It is hinged with pedestal (1) in the middle part of second side link (3), the second side link (3) Left part is provided with the second arc-shaped rack (17) engaged with the first arc-shaped rack (16), and the second side link (3) right part is provided with arc Shape pushing block (31);Push rod (4) is slidably fitted on pedestal (1) by guide pin bushing (18), and guide pin bushing (18) is fixedly connected on pedestal, top Bar (4) upper end is provided with and the second roller (19) for coordinating is rolled with arc pushing block (31) intrados, and push rod (4) upper end is provided with flat board (21) the first stage clip (22) is provided between flat board (21) lower surface and guide pin bushing (18) upper surface, and the first stage clip (22) is socketed in The outer wall of push rod (4);Pedestal (1) is provided with the locating piece (23) positioned when resetting for arc pushing block (31);Described pusher Device includes support (24), connecting rod (25), and connecting rod (25) one end is hinged with push rod (5) lower end, the other end and pushing block (15) upper table Face is hinged, and on the left of push rod (5), connecting rod (25) axis is acute angle with pushing block (15) upper surface angle to connecting rod (25);Push away Bar (5) bottom side wall is fixedly connected with ratchet (26), and ratchet (26) center of circle is overlapped with push rod (5) lower end pin joint, connecting rod (25) ratchet (27) coordinated with ratchet (26) is provided with, extension spring (28), extension spring between ratchet (27) and connecting rod (25), is provided with (28) one end is connected with the middle part of ratchet (27), and the other end is connected with connecting rod (25);Support (24) is including the transverse part being connected with each other (24.1) and vertical part (24.2), transverse part (24.1) is fixedly connected with pedestal (1), and vertical part (24.2) lower end is located on ratchet (27) Side, and vertical part (24.2) lower end is pushed against with ratchet (27) during push rod (5) reset;First side link (2) left part and pushing block (15) The second stage clip (29) is provided between upper surface, the second stage clip (29) one end is connected with the first side link (2) left part, the other end with Pushing block (15) upper surface connects;Described charging conduit (11) side wall is provided with the open slot (30) that Open Side Down, and pedestal (1) side wall sets There is the projection (20) coordinated with open slot (30).
2. the device checked for steel pipe according to claim 1, it is characterised in that:Described guide pin bushing (18) axis and work Make platform (7) place plane vertical.
CN201510051613.2A 2015-02-01 2015-02-01 Counting unit of steel pipes Active CN104573796B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510051613.2A CN104573796B (en) 2015-02-01 2015-02-01 Counting unit of steel pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510051613.2A CN104573796B (en) 2015-02-01 2015-02-01 Counting unit of steel pipes

Publications (2)

Publication Number Publication Date
CN104573796A CN104573796A (en) 2015-04-29
CN104573796B true CN104573796B (en) 2017-05-03

Family

ID=53089813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510051613.2A Active CN104573796B (en) 2015-02-01 2015-02-01 Counting unit of steel pipes

Country Status (1)

Country Link
CN (1) CN104573796B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202657676U (en) * 2012-05-22 2013-01-09 皖东韵敏精密合金有限公司 Automatic steel pipe transportation device
CN104112159A (en) * 2014-07-10 2014-10-22 新兴铸管股份有限公司 Multi-diameter pipe automatic counting device for centrifugal cast pipe production line
CN204515825U (en) * 2015-02-01 2015-07-29 励志辉 For the device that steel pipe is checked

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090100716A (en) * 2008-03-20 2009-09-24 이정희 Revolving system of touch screen box of a machine for counting and packing materials

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202657676U (en) * 2012-05-22 2013-01-09 皖东韵敏精密合金有限公司 Automatic steel pipe transportation device
CN104112159A (en) * 2014-07-10 2014-10-22 新兴铸管股份有限公司 Multi-diameter pipe automatic counting device for centrifugal cast pipe production line
CN204515825U (en) * 2015-02-01 2015-07-29 励志辉 For the device that steel pipe is checked

Also Published As

Publication number Publication date
CN104573796A (en) 2015-04-29

Similar Documents

Publication Publication Date Title
CN104573804B (en) Automatic steel tube counting device
CN102442515B (en) Vertical full-automatic medicine delivery machine
CN105207423B (en) Rotor enters axis machine
CN204515825U (en) For the device that steel pipe is checked
CN102862824B (en) Z-steel stacking equipment
CN206653422U (en) Material strip cuts tool
CN104573797B (en) Automatic counting unit of steel pipes
CN208790442U (en) The automatic wire charging device of body of a motor car harness
CN104573796B (en) Counting unit of steel pipes
CN104573800B (en) Counting unit of steel pipes
CN104573802B (en) Steel pipe counting device
CN104573799B (en) Automatic counting unit of steel pipes
CN104573801B (en) Steel pipe counting equipment
CN204515822U (en) Automatic steel tube counting equipment
CN207548957U (en) A kind of automatic timber cutter device
CN104573803B (en) Steel pipe counter
CN104627447B (en) Counting device
CN104573798B (en) Steel pipe counter
CN204515829U (en) Automatic steel tube counter
CN204515830U (en) Steel pipe counting machine
CN204515824U (en) Steel pipe counting equipment
CN204515827U (en) Steel pipe counter
CN211122354U (en) Reinforcing bar forward and reverse bending test machine
CN205045407U (en) Shoe material conveyer belt of manual regulation width
CN208699956U (en) A kind of overturning feeder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wu Liqing

Inventor before: Request for anonymity

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170406

Address after: 362000 Huian County, Fujian Province, East County, the town of Quanzhou Road, No. 22

Applicant after: QUANZHOU HUI'AN CHANGSHENG BIOTECHNOLOGY CO.,LTD.

Address before: Tianhe District Tong East Road Guangzhou city Guangdong province 510665 B-101 No. 5, room B-118

Applicant before: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

Effective date of registration: 20170406

Address after: Tianhe District Tong East Road Guangzhou city Guangdong province 510665 B-101 No. 5, room B-118

Applicant after: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

Address before: No. 139 Zhejiang junpus Polytron Technologies Inc new Hui Road 315040 in Zhejiang province Ningbo city national high tech Zone

Applicant before: Encouragement

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200916

Address after: No.1303, Changmao Champaign mansion, Zhongxing Street, Shanyao, Quangang District, Quanzhou City, Fujian Province

Patentee after: Quanzhou City Quangang District industrial technology Co.,Ltd. of Xin Yue alliances

Address before: 362000 Huian County, Fujian Province, East County, the town of Quanzhou Road, No. 22

Patentee before: QUANZHOU HUI'AN CHANGSHENG BIOTECHNOLOGY CO.,LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201110

Address after: 226100 Guangzhou road Jiangsu city Nantong Province Haimen Economic and Technological Development Zone No. 999

Patentee after: Nantong North Bund Construction Engineering Co.,Ltd.

Address before: No.1303, Changmao Champaign mansion, Zhongxing Street, Shanyao, Quangang District, Quanzhou City, Fujian Province

Patentee before: Quanzhou City Quangang District industrial technology Co.,Ltd. of Xin Yue alliances