CN104555733B - Lift heavy weave control method, equipment, system and engineering machinery - Google Patents

Lift heavy weave control method, equipment, system and engineering machinery Download PDF

Info

Publication number
CN104555733B
CN104555733B CN201410826322.1A CN201410826322A CN104555733B CN 104555733 B CN104555733 B CN 104555733B CN 201410826322 A CN201410826322 A CN 201410826322A CN 104555733 B CN104555733 B CN 104555733B
Authority
CN
China
Prior art keywords
rope
steel wire
lift heavy
wire rope
centerdot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410826322.1A
Other languages
Chinese (zh)
Other versions
CN104555733A (en
Inventor
孙磊
颜世军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zoomlion Heavy Industry Science and Technology Co Ltd
Original Assignee
Zoomlion Heavy Industry Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zoomlion Heavy Industry Science and Technology Co Ltd filed Critical Zoomlion Heavy Industry Science and Technology Co Ltd
Priority to CN201410826322.1A priority Critical patent/CN104555733B/en
Publication of CN104555733A publication Critical patent/CN104555733A/en
Application granted granted Critical
Publication of CN104555733B publication Critical patent/CN104555733B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/06Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for minimising or preventing longitudinal or transverse swinging of loads
    • B66C13/063Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for minimising or preventing longitudinal or transverse swinging of loads electrical
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/16Applications of indicating, registering, or weighing devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/18Control systems or devices
    • B66C13/22Control systems or devices for electric drives

Abstract

The invention discloses a kind of lift heavy weave control method, equipment, system and engineering machinery, the method includes: obtain current work status information and steel wire rope status information: according to current work status information and rope capacity job state mapping table, determine optimal rope capacity, wherein said rope capacity be from arm head to suspension hook between the length of steel wire rope;Control the withdrawing rope of elevator according to described optimal rope capacity and described steel wire rope status information, so that the pendulum angle of described lift heavy is less than predetermined angular range, described pendulum angle is the angle between current steel wire rope and arm place vertical guide.The present invention can be implemented in during hanging load and lift heavy amplitude of fluctuation carried out effectively, controlled in real time, it is ensured that lift heavy can the most steadily arrive is specifying position, substantially increases and hangs the efficiency carrying operation.

Description

Lift heavy weave control method, equipment, system and engineering machinery
Technical field
The present invention relates to engineering machinery field, in particular it relates to a kind of lift heavy weave control method, equipment, system and Engineering machinery.
Background technology
Fig. 1 is the schematic diagram that example crane hangs load state.Engineering machinery is carrying out hanging load operation (with mobilecrane As a example by, basically illustrate setting-up 1, the principal arm 2 of arm, the auxiliary 3 of arm, steel wire rope 4, suspension hook 5 and lift heavy 6) time, if During operation, speed of gyration is very fast or a braking time is short, and steel wire rope 4-suspension hook 5-lift heavy 6 will produce a swing by a relatively large margin. The system that in mobilecrane, steel wire rope 4-suspension hook 5-lift heavy 6 is formed is a lightly damped system, will be produced in operation Swing response attenuation get off and reach a stable state it is generally required to for a long time.
In order to avoid steel wire rope 4-suspension hook 5-lift heavy 6 produces significantly swing (referred to as lift heavy swing), prior art In the general speed of gyration used when limiting Mobile hoisting machine operation and its play braking time.Although and adopting in this way Steel wire rope 4-suspension hook 5-lift heavy 6 operation can be reduced produce the big probability swung, but it is to sacrifice efficiency as cost, can not Reduce and start the total time to lift heavy steadily this process from operation.I.e. prior art lacks and can effectively control lift heavy swing Method, equipment and system.
Summary of the invention
Can effectively control, for prior art lacks, the technical problem that lift heavy swings, the invention provides a kind of lift heavy Weave control method, the method includes: obtain current work status information and steel wire rope status information: according to current work shape State information and rope capacity-job state mapping table, determine optimal rope capacity, wherein said rope capacity be from Arm head is to the length of the steel wire rope between suspension hook;And believe according to described optimal rope capacity and described steel wire rope state Breath controls the withdrawing rope of elevator, so that the pendulum angle of described lift heavy is less than predetermined angular range, described pendulum angle is current Angle between steel wire rope and arm place vertical guide.
Correspondingly, present invention also offers a kind of lift heavy weave control equipment, this equipment includes: receptor, is used for obtaining Current work status information and steel wire rope status information;And controller, for according to current work status information and steel Cord length-job state mapping table determines optimal rope capacity, and wherein said rope capacity is to hanging from arm head The length of the steel wire rope between hook;And for controlling volume according to described optimal rope capacity and described steel wire rope status information The withdrawing rope raised so that the pendulum angle of described lift heavy is less than predetermined angular range, described pendulum angle be current steel wire rope with Angle between the vertical guide of arm place.
Additionally, present invention also offers a kind of lift heavy weave control system, this system includes: detection device, is used for detecting Current work status information and steel wire rope status information;And according to lift heavy weave control equipment provided by the present invention, its Described in detect device be connected with described lift heavy weave control equipment.
It addition, present invention also offers a kind of engineering machine included according to lift heavy weave control system provided by the present invention Tool.
Use lift heavy weave control method provided by the present invention, equipment and system, by obtaining current work state Information and steel wire rope status information, and according to current work status information and rope capacity-job state mapping table May determine that optimal rope capacity, can control according to described optimal rope capacity and described steel wire rope status information afterwards The withdrawing rope of elevator, so that the pendulum angle of described lift heavy is less than predetermined angular range, (described pendulum angle is current steel wire rope And the angle between the vertical guide of arm place), it is possible to achieve during hanging load, lift heavy amplitude of fluctuation is carried out effectively, in real time Ground controls, it is ensured that lift heavy can the most steadily arrive is specifying position, substantially increases and hangs the efficiency carrying operation.
Other features and advantages of the present invention will be described in detail in detailed description of the invention part subsequently.
Accompanying drawing explanation
Accompanying drawing is used to provide a further understanding of the present invention, and constitutes the part of description, with following tool Body embodiment is used for explaining the present invention together, but is not intended that limitation of the present invention.In the accompanying drawings:
Fig. 1 is that example crane hangs load schematic diagram;
Fig. 2 is the structural representation of the example lift heavy weave control equipment according to one embodiment of the present invention;
Fig. 3 A-3B is the scheme of installation of example detection device;
Fig. 4 is the schematic diagram of the mechanics simplified model of example arm-steel wire rope-lift heavy;And
Fig. 5 is the flow chart of the example lift heavy weave control method according to one embodiment of the present invention.
Description of reference numerals
The auxiliary of principal arm 3 arm of 1 setting-up 2 arm
4 steel wire rope 5 suspension hook 6 lift heavys
31 arm heads 32,51 detect device
Detailed description of the invention
Below in conjunction with accompanying drawing, the detailed description of the invention of the present invention is described in detail.It should be appreciated that this place is retouched The detailed description of the invention stated is merely to illustrate and explains the present invention, is not limited to the present invention.
For the angle of energy, the vibration damping process of the lightly damped system that steel wire rope 4-suspension hook 5-lift heavy 6 is formed is this Lightly damped system dissipation of energy process or this lightly damped system energy are to the transfer process of other structural system.Owing to this rises Heavy-duty machine structural system has the advantages that boom structure damping is higher, steel wire rope damping is weak, when being hung on steel cord ends suspension hook After lift heavy swings, it is swung response and is difficult to be decayed it by the damping of steel wire rope self.Therefore, the present invention provides Utilize and control rope capacity and change the structure build-in attribute of arm 3-steel wire rope 4-lift heavy 6, it is achieved each portion of proportioning again The response divided.And then the energy realizing lift heavy 6-steel wire rope 4 shifts to arm 3, and the arm with relatively high-damping is allowed quickly to consume The energy of the system of dissipating, finally realizes the purpose swinging response of rapid decay lift heavy.
In order to clearly illustrate the thought of the present invention, crane will be applied to lift heavy weave control system below Control process is described in detail, it should be appreciated that this example is exemplary non-limiting example, provided by the present invention Lift heavy weave control system go for any scene needing and lift heavy being controlled, this is not limited by the present invention Fixed.
According to one embodiment of the present invention, this system may include that detection device, is used for detecting steel wire rope state letter Breath;And according to lift heavy weave control equipment provided by the present invention, wherein said detection device and described lift heavy weave control Equipment connects.
Fig. 2 is the structural representation of the example lift heavy weave control equipment according to one embodiment of the present invention, such as Fig. 2 Shown in, this lift heavy weave control equipment may include that receptor 100, is used for obtaining current work status information and steel wire rope Status information;And controller 200, for according to current work status information and rope capacity-job state mapping table Determine the length that optimal rope capacity, wherein said rope capacity are the steel wire rope from arm head 31 to suspension hook 5; And for controlling the withdrawing rope of elevator according to described optimal rope capacity and described steel wire rope status information so that described in hang The pendulum angle of weight is less than predetermined angular range, and described pendulum angle θ is between current steel wire rope and arm place vertical guide Angle.
Specifically, described current work status information can include vehicle, hang load operating mode and lift heavy information etc..These Information can be obtained from crane PLC by receptor 100, or can also be defeated by control panel by operator Enter.And described steel wire rope status information can include current rope capacity and the pendulum angle of current steel wire rope.
Wherein, described detection device can be any device being capable of above-mentioned functions, such as device for detecting length and Angle detection devices etc., this is not defined by the present invention.
In order to more accurately obtain current rope capacity and the pendulum angle of current steel wire rope and minimize detection dress The quantity put and type, it is preferable that described detection device can be gps receiver.Detection device may be mounted at arm head 31 and suspension hook 5 at, Fig. 3 A-3B is the scheme of installation of example detection device.In this example, gps receiver can in real time by The pendulum angle of current rope capacity and current steel wire rope is sent to receptor 100.Receptor 100 will in the above-mentioned information of acquisition It is sent to controller 200.
Afterwards, controller 200 can be true according to current work status information and rope capacity-job state mapping table Fixed optimal rope capacity, wherein said rope capacity-job state mapping table is to pre-build and be stored in controller 200 On (this rope capacity-job state mapping table is set up process and will be described in detail below), and according to Described optimal rope capacity and described steel wire rope status information control the withdrawing rope of elevator, so that the pendulum angle of described lift heavy Less than predetermined angular range.
Specifically, described rope capacity-job state mapping table is set up according to following steps:
1) the mechanics simplified model of arm 3-steel wire rope 4-lift heavy 6 is set up:
Fig. 4 is the schematic diagram of the mechanics simplified model of example arm-steel wire rope-lift heavy, as shown in Figure 4, establishes arm The FEM (finite element) model of 3-steel wire rope 4-lift heavy 6 system, and utilize test that it is modified, according to emulation and result of the test, Go out the arm 3 equivalent stiffness k in luffing plane1And equivalent damping c1, arm equivalent stiffness k in plane of rotation2And Equivalent damping c2.The control swung for lift heavy, is primarily upon swing and the vibration of arm arm head of lift heavy, so from mechanics The angle of modeling, arm being equivalent to one and concentrates on equivalent mass is m1Arm arm head, and luffing, plane of rotation etc. Effect rigidity is k1、k2And equivalent damping is c1、c2Mass-spring model, lift heavy 6 be reduced to one and concentrate on equivalent mass be m2Wire rope end, steel wire rope is reduced to an a length of l, and equivalent stiffness, equivalent damping are respectively ks、csSpring, final The mechanics simplified model of the arm 3-steel wire rope 4-lift heavy 6 arrived, as shown in Figure 4.
2) kinetics equation group is obtained according to described mechanics simplified model:
For arm 3-steel wire rope 4-lift heavy 6, due to the damping of the damping remote little arm 3 self of steel wire rope 4, it is drawn Power and produce deformation much smaller than arm vibration produce response, the buoyancy effect of the most negligible steel wire rope.Therefore, based on Upper analysis can be used Lagrangian method to set up and simplify the kinetics equation obtaining following arm 3-steel wire rope 4-lift heavy 6 Group:
m 1 + m 2 0 m 2 l 0 m 1 + m 2 m 2 l θ m 2 l m 2 l θ m 2 l 2 x ·· y ·· θ ·· + c 2 0 0 0 c 1 0 0 0 0 x · y · θ · + k 2 0 0 0 k 1 0 0 0 m 2 g l x y θ = m 2 l θ θ · 2 - m 2 l θ · 2 - ( m 1 + m 2 ) g 0 ;
Wherein: k1、c1It is respectively the arm 3 equivalent stiffness in luffing plane and equivalent damping;k2、c2Exist for arm Equivalent stiffness in plane of rotation and equivalent damping;m1、m2It is respectively equivalent mass and the equivalent mass of lift heavy of arm 3;l Equivalent length for steel wire rope 4;θ、For the angle between current steel wire rope and arm 3 place vertical guide (herein by steel Cord and suspension hook, lift heavy are reduced to one), the angular velocity of this angle, the angular acceleration of this angle;(x y) is arm head 31 At the coordinate of space coordinates, andFor arm head 31 plane of rotation and the speed of luffing plane, Acceleration, g is acceleration of gravity.Owing to above-mentioned kinetics equation group is Nonlinear System of Equations, prior art therefore can be utilized In any suitable Solving Nonlinear Systems of Equations method and/or software solve, such as utilize newmark algorithm or Runge-kutta algorithm can solve equation group, makes pendulum angle minimum to find, and by steel wire rope 4 and lift heavy 6 Lightly damped system energy when arm 3 shifts most, the optimal solution of rope capacity, it is therefore desirable to carry out following searching The step of excellent solution, it may be assumed that
3) it is relevance grade function to the maximum with θ value minimum, x, y value and solves described kinetics equation group, and obtain under the conditions of this Equivalent length l of the steel wire rope obtained is stored as optimal rope capacity.Preferably, it is possible to use intelligent algorithm is with above-mentioned Newmark algorithm or Runge-kutta algorithm combine and solve this optimal solution.Described intelligent algorithm can be genetic algorithm, The intelligent algorithm such as particle cluster algorithm, ant group algorithm, for using these algorithms to find the process of optimal solution similarly to the prior art, In order to not obscure protection scope of the present invention, omit at this.
According to the method described above, load is hung according to different automobile types (i.e. equivalent stiffness, equivalent damping, equivalent mass difference), difference At least one in operating mode (i.e. equivalent stiffness, equivalent damping difference), different lift heavy information (i.e. equivalent mass is different), circulation is held Row step 1)-3), thus set up rope capacity-job state mapping table, which includes optimal steel under different situations Cord length.
As it has been described above, controller 200 can be in real time according to current work status information and rope capacity-operation shape State mapping table determines optimal rope capacity, controls according to described optimal rope capacity and described steel wire rope status information afterwards The withdrawing rope of elevator, so that the pendulum angle of described lift heavy is less than predetermined angular range.
Such as, controller 200, in the case of current rope capacity is not equal to described optimal rope capacity, controls volume The withdrawing rope raised is so that current rope capacity is equal to described optimal rope capacity.And, controller 200 is at current steel wire rope Length is equal in the case of described optimal rope capacity, it is judged that whether the pendulum angle of current lift heavy is less than predetermined angular model Enclose.Wherein, in the case of the pendulum angle of current lift heavy is less than predetermined angular range, controller 200 can control elevator Withdrawing rope, so that described lift heavy reaches to specify position, terminates this secondary control process;Otherwise, big at the pendulum angle of current lift heavy In the case of predetermined angular range, controller 200 need to monitor the pendulum of the current steel wire rope that receptor 100 obtains from detection device Dynamic angle, until pendulum angle is less than in the case of predetermined angular range, controls the withdrawing rope of elevator, so that described lift heavy reaches Specify position, terminate this secondary control process.Wherein said predetermined angular range can according to actual job situation (such as vehicle, The difference of lift heavy) it is configured, this is not defined by the present invention.
Fig. 5 is the flow chart of the example lift heavy weave control method according to one embodiment of the present invention, such as Fig. 5 institute Showing, the method may comprise steps of:
In step 1001, it is thus achieved that current work status information and steel wire rope status information;
In step 1002, according to current work status information and rope capacity-job state mapping table, determine optimal Rope capacity, wherein said rope capacity be from arm head to suspension hook between the length of steel wire rope;And
In step 1003, control the folding and unfolding of elevator according to described optimal rope capacity and described steel wire rope status information Rope, so that the pendulum angle of described lift heavy is less than predetermined angular range, described pendulum angle is current steel wire rope and arm place Angle between vertical guide.
Preferably, described current work status information includes vehicle, hangs load operating mode and lift heavy information.
Preferably, described steel wire rope status information includes current rope capacity and the pendulum angle of current steel wire rope.
Preferably, described rope capacity-job state mapping table is set up according to following steps:
1) the mechanics simplified model of arm-steel wire rope-lift heavy is set up;
2) kinetics equation group is obtained according to described mechanics simplified model:
m 1 + m 2 0 m 2 l 0 m 1 + m 2 m 2 l θ m 2 l m 2 l θ m 2 l 2 x ·· y ·· θ ·· + c 2 0 0 0 c 1 0 0 0 0 x · y · θ · + k 2 0 0 0 k 1 0 0 0 m 2 g l x y θ = m 2 l θ θ · 2 - m 2 l θ · 2 - ( m 1 + m 2 ) g 0 ;
Wherein: k1、c1It is respectively arm equivalent stiffness in luffing plane and equivalent damping;k2、c2Returning for arm Turn the equivalent stiffness in plane and equivalent damping;m1、m2It is respectively equivalent mass and the equivalent mass of lift heavy of arm;L is steel The equivalent length of cord;θ、For the angle between current steel wire rope and arm place vertical guide, the angular velocity of this angle, The angular acceleration of this angle;(x, y) is the arm head coordinate in space coordinates, andFor arm head Portion is at plane of rotation and the speed of luffing plane, acceleration, and g is acceleration of gravity;
3) it is relevance grade function to the maximum with θ value minimum, x, y value and solves described kinetics equation group, and obtain under the conditions of this Equivalent length l of the steel wire rope obtained is stored as optimal rope capacity.
Preferably, utilize newmark algorithm or Runge-kutta algorithm to be combined with intelligent algorithm and solve described kinetics side Journey group.
Preferably, described intelligent algorithm is genetic algorithm.
Preferably, control the withdrawing rope of elevator according to described optimal rope capacity and described steel wire rope status information, with The pendulum angle making described lift heavy includes less than predetermined angular range: be not equal to described optimal steel wire rope in current rope capacity In the case of length, control the withdrawing rope of elevator so that current rope capacity is equal to described optimal rope capacity, currently Rope capacity is equal in the case of described optimal rope capacity, it is judged that whether the pendulum angle of current lift heavy is less than predetermined angle Degree scope;Wherein, in the case of the pendulum angle of current lift heavy is less than predetermined angular range, control the withdrawing rope of elevator, with Described lift heavy is made to reach to specify position.
The detailed description of the invention of said method step illustrates the most in the embodiment of above-mentioned lift heavy weave control system, Do not repeat them here.
Correspondingly, present invention also offers the engineering machinery included according to lift heavy weave control system provided by the present invention (the most as shown in Figure 1), this engineering machinery not only can swing control by the lift heavy according to embodiment of the present invention included as described above System processed, and this engineering machinery can also use any one in above-mentioned control method and equipment and combinations thereof to carry out above-mentioned control Process processed.It should be appreciated that this engineering machinery can be any needs, and lift heavy is swung the engineering machinery being controlled, such as Crane.
Use lift heavy weave control method provided by the present invention, equipment and system, it is possible to achieve during hanging load Lift heavy amplitude of fluctuation is carried out effectively, controls in real time, it is ensured that lift heavy can the most steadily arrive is specifying position, Substantially increase and hang the efficiency carrying operation, and safety is higher.
The preferred embodiment of the present invention is described in detail above in association with accompanying drawing, but, the present invention is not limited to above-mentioned reality Execute the detail in mode, in the technology concept of the present invention, technical scheme can be carried out multiple letter Monotropic type, these simple variant belong to protection scope of the present invention.
It is further to note that each the concrete technical characteristic described in above-mentioned detailed description of the invention, at not lance In the case of shield, can be combined by any suitable means, in order to avoid unnecessary repetition, the present invention to various can The compound mode of energy illustrates the most separately.
Additionally, combination in any can also be carried out between the various different embodiment of the present invention, as long as it is without prejudice to this The thought of invention, it should be considered as content disclosed in this invention equally.

Claims (17)

1. a lift heavy weave control method, it is characterised in that the method includes:
Obtain current work status information and steel wire rope status information;
According to current work status information and rope capacity-job state mapping table, determine optimal rope capacity, wherein Described rope capacity be from arm head to suspension hook between the length of steel wire rope;And
The withdrawing rope of elevator is controlled according to described optimal rope capacity and described steel wire rope status information, so that described lift heavy Pendulum angle is less than predetermined angular range, and described pendulum angle is the angle between current steel wire rope and arm place vertical guide.
Method the most according to claim 1, it is characterised in that described current work status information includes vehicle, hangs load work Condition and lift heavy information.
Method the most according to claim 1, it is characterised in that described steel wire rope status information includes current rope capacity Pendulum angle with current steel wire rope.
Method the most according to claim 2, it is characterised in that described rope capacity-job state mapping table according to Lower step is set up:
1) the mechanics simplified model of arm-steel wire rope-lift heavy is set up;
2) kinetics equation group is obtained according to described mechanics simplified model:
m 1 + m 2 0 m 2 l 0 m 1 + m 2 m 2 l θ m 2 l m 2 l θ m 2 l 2 x ·· y ·· θ ·· c 2 0 0 0 c 1 0 0 0 0 x · y · θ · k 2 0 0 0 k 1 0 0 0 m 2 g l x y θ = m 2 l θ θ · 2 - m 2 l θ · 2 - ( m 1 + m 2 ) g 0 ;
Wherein: k1、c1It is respectively arm equivalent stiffness in luffing plane and equivalent damping;k2、c2Flat in revolution for arm Equivalent stiffness in face and equivalent damping;m1、m2It is respectively equivalent mass and the equivalent mass of lift heavy of arm;L is steel wire rope Equivalent length;θ、For the angle between current steel wire rope and arm place vertical guide, the angular velocity of this angle, this folder The angular acceleration at angle;(x, y) is the arm head coordinate in space coordinates, andExist for arm head Plane of rotation and the speed of luffing plane, acceleration, g is acceleration of gravity;
3) it is relevance grade function to the maximum with θ value minimum, x, y value and solves described kinetics equation group, and by acquisition under the conditions of this Equivalent length l of steel wire rope is stored as optimal rope capacity.
Method the most according to claim 4, it is characterised in that utilize newmark algorithm or Runge-kutta algorithm and intelligence Algorithm combination can solve described kinetics equation group.
Method the most according to claim 5, it is characterised in that described intelligent algorithm is genetic algorithm.
Method the most according to claim 3, it is characterised in that according to described optimal rope capacity and described steel wire rope form State information controls the withdrawing rope of elevator, so that the pendulum angle of described lift heavy includes less than predetermined angular range:
In the case of current rope capacity is not equal to described optimal rope capacity, control the withdrawing rope of elevator so that current Rope capacity is equal to described optimal rope capacity, is equal to the situation of described optimal rope capacity in current rope capacity Under, it is judged that whether the pendulum angle of current lift heavy is less than predetermined angular range;
Wherein, in the case of the pendulum angle of current lift heavy is less than predetermined angular range, control the withdrawing rope of elevator, so that institute State lift heavy to reach to specify position.
8. a lift heavy weave control equipment, it is characterised in that this equipment includes:
Receptor, is used for obtaining current work status information and steel wire rope status information;And
Controller, for determining optimal steel wire according to current work status information and rope capacity-job state mapping table Rope length, wherein said rope capacity be from arm head to suspension hook between the length of steel wire rope;And for according to institute State optimal rope capacity and the withdrawing rope of described steel wire rope status information control elevator, so that the pendulum angle of described lift heavy is little In predetermined angular range, described pendulum angle is the angle between current steel wire rope and arm place vertical guide.
Equipment the most according to claim 8, it is characterised in that described current work status information includes vehicle, hangs load work Condition and lift heavy information.
Equipment the most according to claim 8, it is characterised in that described steel wire rope status information includes current length of steel rope Degree and the pendulum angle of current steel wire rope.
11. equipment according to claim 9, it is characterised in that described rope capacity-job state mapping table according to Lower step is set up:
1) the mechanics simplified model of arm-steel wire rope-lift heavy is set up;
2) kinetics equation group is obtained according to described mechanics simplified model:
m 1 + m 2 0 m 2 l 0 m 1 + m 2 m 2 l θ m 2 l m 2 l θ m 2 l 2 x ·· y ·· θ ·· c 2 0 0 0 c 1 0 0 0 0 x · y · θ · k 2 0 0 0 k 1 0 0 0 m 2 g l x y θ = m 2 l θ θ · 2 - m 2 l θ · 2 - ( m 1 + m 2 ) g 0 ;
Wherein: k1、c1It is respectively arm equivalent stiffness in luffing plane and equivalent damping;k2、c2Flat in revolution for arm Equivalent stiffness in face and equivalent damping;m1、m2It is respectively equivalent mass and the equivalent mass of lift heavy of arm;L is steel wire rope Equivalent length;θ、For the angle between current steel wire rope and arm place vertical guide, the angular velocity of this angle, this folder The angular acceleration at angle;(x, y) is the arm head coordinate in space coordinates, andExist for arm head Plane of rotation and the speed of luffing plane, acceleration, g is acceleration of gravity;
3) it is relevance grade function to the maximum with θ value minimum, x, y value and solves described kinetics equation group, and by acquisition under the conditions of this Equivalent length l of steel wire rope is stored as optimal rope capacity.
12. equipment according to claim 11, it is characterised in that utilize newmark algorithm or Runge-kutta algorithm with Intelligent algorithm combines and solves described kinetics equation group.
13. equipment according to claim 12, it is characterised in that described intelligent algorithm is genetic algorithm.
14. equipment according to claim 10, it is characterised in that according to described optimal rope capacity and described steel wire rope Status information controls the withdrawing rope of elevator, so that the pendulum angle of described lift heavy includes less than predetermined angular range:
In the case of current rope capacity is not equal to described optimal rope capacity, control the withdrawing rope of elevator so that current Rope capacity is equal to described optimal rope capacity, is equal to the situation of described optimal rope capacity in current rope capacity Under, it is judged that whether the pendulum angle of current lift heavy is less than predetermined angular range;
Wherein, in the case of the pendulum angle of current lift heavy is less than predetermined angular range, control the withdrawing rope of elevator, so that institute State lift heavy to reach to specify position.
15. 1 kinds of lift heavy weave control systems, it is characterised in that this system includes:
Detection device, is used for detecting steel wire rope status information;And
Lift heavy weave control equipment according to any one of-14 according to Claim 8, wherein said detection device and described lift heavy Weave control equipment connects.
16. systems according to claim 15, it is characterised in that described detection device is gps receiver, is arranged on arm At head and suspension hook.
17. 1 kinds include that claim requires the engineering machinery of the lift heavy weave control system described in 15 or 16.
CN201410826322.1A 2014-12-26 2014-12-26 Lift heavy weave control method, equipment, system and engineering machinery Active CN104555733B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410826322.1A CN104555733B (en) 2014-12-26 2014-12-26 Lift heavy weave control method, equipment, system and engineering machinery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410826322.1A CN104555733B (en) 2014-12-26 2014-12-26 Lift heavy weave control method, equipment, system and engineering machinery

Publications (2)

Publication Number Publication Date
CN104555733A CN104555733A (en) 2015-04-29
CN104555733B true CN104555733B (en) 2016-07-27

Family

ID=53072956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410826322.1A Active CN104555733B (en) 2014-12-26 2014-12-26 Lift heavy weave control method, equipment, system and engineering machinery

Country Status (1)

Country Link
CN (1) CN104555733B (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484226B (en) * 2015-12-14 2017-11-10 徐工集团工程机械股份有限公司 A kind of dynamic compaction machinery band hammer fast rotation anti-swinging system and control method
CN106006417B (en) * 2016-08-17 2019-03-19 徐州重型机械有限公司 A kind of monitoring system and method that crane hook is swung
CN108373109B (en) * 2018-01-03 2019-05-14 南京工业大学 A kind of derrick crane is anti-to shake progress control method
CN108303883A (en) * 2018-01-22 2018-07-20 五邑大学 The anti-pendular regime of bridge crane based on first-order dynamic sliding moding structure
CN108502723B (en) * 2018-03-30 2019-09-10 山东建筑大学 The method and system of crane arm vibration is eliminated when crane rotation and luffing movement
CN108502724B (en) * 2018-03-30 2019-08-16 山东建筑大学 Automatic adjusument crane arm turns round dynamic stiffness to eliminate the method and system of swing
JP7151223B2 (en) * 2018-07-09 2022-10-12 株式会社タダノ Cranes and crane control methods
CN108706458B (en) * 2018-07-27 2023-11-07 湖南科技大学 Swing damping device for lifting hook
CN113942941A (en) * 2020-07-16 2022-01-18 上海宝信软件股份有限公司 Grab mechanism swing GPS positioning system, method and medium
CN113135512B (en) * 2021-04-29 2024-02-13 徐州重型机械有限公司 Crane boom monitoring method, device and system and crane
CN113343431B (en) * 2021-05-19 2022-03-22 暨南大学 Structural system reliability analysis method based on differential evolution and equivalent plane method
CN113562639B (en) * 2021-07-21 2023-05-12 山东建筑大学 Method and system for inhibiting vibration of tower body in lifting and luffing process of crane
CN113562617B (en) * 2021-07-21 2023-05-12 山东建筑大学 Method and system for inhibiting vibration of tower body during lifting movement of crane
CN113562616B (en) * 2021-07-21 2023-05-09 山东建筑大学 Method and system for intelligently adjusting luffing rigidity of crane tower body to inhibit vibration
CN114890313B (en) * 2022-03-16 2023-08-11 武汉理工大学 Grab bucket anti-shake method based on fuzzy control
CN116969331B (en) * 2023-09-21 2023-12-12 华侨大学 Five-time polynomial smooth self-defined track precision parallel crane

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1832898A (en) * 2003-08-05 2006-09-13 新东工业株式会社 Crane and controller for the same
CN101985343A (en) * 2009-07-08 2011-03-16 嫩青利勃海尔-维克股份有限公司 Crane for covering a load suspended on a load rope
CN102107819A (en) * 2010-12-09 2011-06-29 河南科技大学 Anti-shaking control method for container shore bridge hanger
CN103663143A (en) * 2013-12-13 2014-03-26 中联重科股份有限公司 Hoisting load anti-swing control device, method, system and engineering machinery
CN103723629A (en) * 2013-12-31 2014-04-16 珠海三一港口机械有限公司 Crane and anti-swing control method for steel wire rope of crane

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5293977B2 (en) * 2011-03-17 2013-09-18 富士電機株式会社 Crane steady rest control method and steady rest control apparatus
FI20115922A0 (en) * 2011-09-20 2011-09-20 Konecranes Oyj Crane control

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1832898A (en) * 2003-08-05 2006-09-13 新东工业株式会社 Crane and controller for the same
CN101985343A (en) * 2009-07-08 2011-03-16 嫩青利勃海尔-维克股份有限公司 Crane for covering a load suspended on a load rope
CN102107819A (en) * 2010-12-09 2011-06-29 河南科技大学 Anti-shaking control method for container shore bridge hanger
CN103663143A (en) * 2013-12-13 2014-03-26 中联重科股份有限公司 Hoisting load anti-swing control device, method, system and engineering machinery
CN103723629A (en) * 2013-12-31 2014-04-16 珠海三一港口机械有限公司 Crane and anti-swing control method for steel wire rope of crane

Also Published As

Publication number Publication date
CN104555733A (en) 2015-04-29

Similar Documents

Publication Publication Date Title
CN104555733B (en) Lift heavy weave control method, equipment, system and engineering machinery
CN112512951B (en) System and method for transporting a swinging hoisting load
US8627575B2 (en) Hook pose detecting equipment and crane
CN103613014B (en) Tower crane anti-collision system, method, device and tower crane
JP5961856B2 (en) Center of gravity position detection apparatus, center of gravity position detection method, and program
CN109231016B (en) Anti-collision method for building construction tower crane
CN201473235U (en) Stereoscopic visual security alarming system used for tower crane
CN102910543B (en) Crane and forward tilting prevention protection method and device thereof
CN104843585A (en) Intelligent tower crane control system
US20180111803A1 (en) Pivoting device
CN106428258B (en) A kind of vehicle anti-tippling device and method
CN106904533A (en) It is a kind of put in storage for cable machine cage during cage antiswing device and method
Arena et al. Payload oscillations control in harbor cranes via semi-active vibration absorbers: modeling, simulations and experimental results
WO2014083873A1 (en) System of vibration-damping control for crane and method of vibration-damping control for crane
CN103676973A (en) Working platform leveling control device, method and system and overhead working truck
CN108427426B (en) Method and system for controlling load oscillation of air crane
CN103644250B (en) A kind of fire-fighting truck vibration of arm control apparatus, method, system and fire-fighting truck
JP5546674B1 (en) Climbing device and crane system using the slinging device
Bakhtiari-Nejad et al. Tracking control of an underactuated gantry crane using an optimal feedback controller
CN105593893A (en) Work machine position information management system
CN105565213A (en) Suspension locking system for fork lift
CN104444872A (en) Tower crane monitoring device
CN110488604A (en) A kind of bridge crane robust control method for the pendulum positioning that disappears
CN113135512B (en) Crane boom monitoring method, device and system and crane
CN210834075U (en) Drop impact test platform system for measuring shock absorber buffering performance

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant