CN104532743B - Tower beam consolidation mechanism and corresponding cable-stayed bridge and method of construction thereof - Google Patents

Tower beam consolidation mechanism and corresponding cable-stayed bridge and method of construction thereof Download PDF

Info

Publication number
CN104532743B
CN104532743B CN201410849313.4A CN201410849313A CN104532743B CN 104532743 B CN104532743 B CN 104532743B CN 201410849313 A CN201410849313 A CN 201410849313A CN 104532743 B CN104532743 B CN 104532743B
Authority
CN
China
Prior art keywords
girder
cushion block
sarasota
tower beam
consolidation mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410849313.4A
Other languages
Chinese (zh)
Other versions
CN104532743A (en
Inventor
张革军
孟凡超
赵磊
刘明虎
吴伟胜
张梁
文锋
金秀男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Highway Consultants Co Ltd
Original Assignee
CCCC Highway Consultants Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Highway Consultants Co Ltd filed Critical CCCC Highway Consultants Co Ltd
Priority to CN201410849313.4A priority Critical patent/CN104532743B/en
Publication of CN104532743A publication Critical patent/CN104532743A/en
Application granted granted Critical
Publication of CN104532743B publication Critical patent/CN104532743B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/04Cable-stayed bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of tower beam consolidation mechanism, corresponding cable-stayed bridge and method of construction thereof, tower beam consolidation mechanism is for consolidating Sarasota and girder in cable-stayed bridge, including cushion block and fastening bolt, wherein, described cushion block is arranged between described Sarasota and girder, for filling the gap between described Sarasota and girder;Described fastening bolt sequentially passes through described Sarasota, cushion block and girder, it is possible to described Sarasota, cushion block and girder apply pretightning force, thus forms consolidation structure between described Sarasota and girder, retrain all directions degree of freedom.The present invention has the advantages such as simple for structure, stress is clear and definite, the suitability is strong, easily assembling, expense are low, can the effectively save duration, reduce cost, be conducive to controlling construction risk.

Description

Tower beam consolidation mechanism and corresponding cable-stayed bridge and method of construction thereof
Technical field
The invention belongs to bridge technology field, be specifically related to the tower beam consolidation mechanism of a kind of cable-stayed bridge, with And corresponding cable-stayed bridge and method of construction thereof.The tower beam consolidation mechanism of the present invention is for by the rope of cable-stayed bridge Tower and girder consolidate, and are particularly well-suited to during the construction of cable-stayed bridge or maintenance etc. for temporarily Property ground consolidation Sarasota and girder.
Background technology
Along with the sustained and rapid development of China's economy, since more than 20 year, domestic highway and bridge construction Obtain great development.Cable-stayed bridge as the modern type of bridge of a kind of economical rationality, in greatly across Increasingly in occupation of leading position in the bridge of footpath.And a big advantage of cable-stayed bridge is exactly in erection of main beam, Support and Temporary Piers need not be set up, and can utilize and use free cantilever erection as permanently structured suspension cable Or casting method construction.And during girder cantilever or cantilever, for ensureing stablizing of bridge structure, need Provisional being effectively connected, the most so-called tower beam temporary consolidation will be carried out between Sarasota with girder.
General tower beam consolidation mechanism is mostly by adding multiple temporary support or the interim drag-line of stretch-draw Mode realizes, and this kind of mode constructs complexity, constructs loaded down with trivial details, and expense is the highest, and for light-duty solely Pillar Sarasota is the most inapplicable.
Summary of the invention
(1) to solve the technical problem that
The technical problem to be solved is that existing tower beam consolidation mechanism structure is complicated, it is numerous to construct Trivial, costly the widest with application surface shortcoming.
(2) technical scheme
The present invention proposes a kind of tower beam consolidation mechanism, for consolidating Sarasota and girder, bag in cable-stayed bridge Including cushion block and fastening bolt, described cushion block is arranged between described Sarasota and girder, is used for filling described rope Gap between tower and girder;Described fastening bolt sequentially passes through described Sarasota, cushion block and girder, it is possible to To described Sarasota, cushion block and girder applying pretightning force, thus the formation between described Sarasota and girder Consolidation structure, retrains all directions degree of freedom.
According to a kind of detailed description of the invention of the present invention, described cushion block is used aloned or multiple stacked makes Arrange in pairs or groups at least one fastening bolt with, each cushion block.
According to a kind of detailed description of the invention of the present invention, described fastening bolt is the combination of screw bolt and nut.
According to a kind of detailed description of the invention of the present invention, described cushion block is box-shaped cushion block.
According to a kind of detailed description of the invention of the present invention, for multiple described cushion blocks, when it is superposed Can be fitted to each other.
According to a kind of detailed description of the invention of the present invention, described cushion block has at least one perforation, for Described fastening bolt passes.
According to a kind of detailed description of the invention of the present invention, also including adjusting backing plate, it is arranged at described pad Between block and Sarasota, or between described cushion block and girder.
The present invention also proposes to use cable-stayed bridge and the construction side of cable-stayed bridge of described tower beam consolidation mechanism Method.
(3) beneficial effect
The present invention uses light-duty, succinct constitution realization Tower Column of A Cable Stayed Bridge beam consolidation mechanism, and this mechanism has There are the advantages such as simple for structure, stress is clear and definite, the suitability is strong, easily assembling, expense are low, can be effectively save Duration, reduction cost, be conducive to controlling construction risk.
Accompanying drawing explanation
Fig. 1 is the scheme of installation of the tower beam consolidation mechanism of one embodiment of the present of invention;
Fig. 2 is the top view of the tower beam consolidation mechanism of one embodiment of the present of invention.
Detailed description of the invention
The tower beam consolidation mechanism of the present invention is for consolidating Sarasota and girder in cable-stayed bridge, and this mechanism includes Cushion block and fastening bolt.Cushion block is arranged between Sarasota and girder, for filling between Sarasota and girder Gap, fastening bolt then sequentially passes through Sarasota, cushion block and girder, and can be to Sarasota, cushion block and girder Apply pretightning force, thus the formation consolidation between Sarasota and girder constructs, and constrains all directions freely Degree.
When installing the consolidation mechanism of the present invention, only cushion block need to be placed between Sarasota and girder, install Fastening bolt also makes fastening bolt stretch-draw pretension;During dismounting, only need to loosen fastening bolt and remove box pad Block.
The cushion block of the present invention can be used aloned, it is also possible to multiple cushion blocks are stacked to be used, each cushion block Arrange in pairs or groups at least one fastening bolt.
The fastening bolt of described mechanism can be any workpiece that can apply pretightning force, such as bolt and spiral shell Female combination.When using bolt, preferably use high-strength bolt.The specification of bolt, number and pre- The parameters such as clamp force are the most adjustable, are adapted to different size of temporary consolidation force request.
Described cushion block is the filling workpiece of rigidity, and it is formed and size is the most unrestricted, but It is that preferably there is given shape, so that can be fitted to each other when multiple cushion block is superposed, such as There is rectangular shape or be similar to the shape of cuboid.Each cushion block shape or size can be identical, Can also be different, to adapt to gap between different tower beam construction, shape etc..
This cushion block can be i.e. solid, it is also possible to is hollow, but the most hollow, i.e. case Shape.Meanwhile, in order to pass for fastening bolt, this cushion block has at least one perforation, and this perforation is the most permissible It is smooth hole, it is also possible to be screw.
The material of cushion block is typically steel, and it can make in factory process, exists at bridge location in-site installation Between Sarasota and girder.
For making the object, technical solutions and advantages of the present invention clearer, below in conjunction with concrete real Execute example, and referring to the drawings, the present invention is described in further detail.
Fig. 1 is the scheme of installation of the tower beam consolidation mechanism of one embodiment of the present of invention.Such as Fig. 1 institute Showing, the tower beam consolidation mechanism of this embodiment is installed in single column formula cable-stayed bridge.Construction at cable-stayed bridge Cheng Zhong, by first building Sarasota, then installs girder, and girder extends from the two of Sarasota lateral span centres and Closing up eventually, in the installation process of girder, the tower beam consolidation mechanism that can use the present invention temporarily will not The girder completing to close up is fixed with Sarasota.This tower beam consolidation mechanism is arranged at the friendship of girder and Sarasota Meet place, generally install with the in-plane of girder.
For the single column formula cable-stayed bridge of this embodiment, Sarasota passes the medium position of girder at vertical direction, Therefore, the peripheral regions at Sarasota Yu the junction of girder all can arrange the tower beam consolidation mechanism of the present invention. It is the schematic diagram in the vertical section in the longitudinal extension direction (direction of traffic) at girder due to Fig. 1, therefore Illustrate only the tower beam consolidation mechanism of both sides across girder direction (shipping agency direction).
Fig. 2 is the top view of the tower beam consolidation mechanism of above-described embodiment, this figure illustrate only Sarasota with The tower beam consolidation mechanism that the side of the junction of girder is installed.As in figure 2 it is shown, this tower beam consolidation machine Structure includes box-shaped cushion block and high-strength bolt, and box-shaped cushion block is respectively aforementioned pad with the combination of high-strength bolt Block and the detailed description of the invention of fastening bolt.
Described box-shaped cushion block is the hollow cuboid component using Steel material to make, and its size can be according to handing over The size in space, the place of connecing and specifically adjust, and have through multiple perforation in two relative sides, Penetrating for high-strength bolt.
Additionally, in order to make the combination between cushion block and Sarasota, girder more tight, the tower beam of the present invention Consolidation mechanism can also include adjusting backing plate, and this adjustment backing plate is arranged between cushion block and Sarasota, or Between cushion block and girder, for making up the gap between cushion block and Sarasota, girder.This backing plate generally may be used Being plate shape Steel material, and also have the perforation can passed through for fastening bolt.The thickness of backing plate can not With, by arranging different adjusting pad plate thickness to adapt to the actual gap between tower beam.
In this embodiment, the size of box-shaped cushion block is 1.6m × 1.3m × 0.6m, adjusts the chi of backing plate Very little for 1.7m × 1.3m × 0.06m, each box-shaped cushion block and adjust and have 70 equably on backing plate and open Hole, the model of the high-strength bolt used can be M30-10.9S.
When mounted, first wear at the interstitial site between Sarasota and girder from the hollow space of Sarasota Enter each high-strength bolt, make high-strength bolt sequentially pass through adjustment backing plate, box cushion block, adjust backing plate and Girder, arrives the middle vacancy of girder, then at the other end stretch-draw high-strength bolt of high-strength bolt, and overlaps Enter nut, tighten, finally remove stretching force, make the high-strength bolt of tower beam consolidation mechanism be pressed on girder With on Sarasota, thus girder, Sarasota are firmly consolidated.
When the interstitial site of the junction between Sarasota and girder has been respectively mounted the tower beam of the present invention admittedly After knot mechanism, tower beam consolidation mechanism installs.Afterwards, the cantilever of cable-stayed bridge main-beam or outstanding can be carried out Spelling is installed, and after closing up to full-bridge, can remove tower beam temporary fixed construction.
From above-described embodiment it can be seen that consolidating of being applicable between the Sarasota of cable-stayed bridge and girder of the present invention Knot, particularly consolidates Sarasota and girder in construction or maintenance process provisionally, such as, is using cantilever Pour or during erection method construction cable-stayed bridge main-beam.
But, it should also be appreciated that the present invention be readily adaptable for use in engineering construction other building elements it Between need consolidation field.Install due to the present invention and remove the most more convenient, being therefore more suitable for needing Want the occasion of temporary consolidation.
Particular embodiments described above, is carried out the purpose of the present invention, technical scheme and beneficial effect Further describe it should be understood that the foregoing is only the specific embodiment of the present invention, Be not limited to the present invention, all within the spirit and principles in the present invention, any amendment of being made, Equivalent, improvement etc., should be included within the scope of the present invention.

Claims (7)

1. a tower beam consolidation mechanism, for consolidating Sarasota and girder in cable-stayed bridge, its feature exists In, including cushion block and fastening bolt, wherein,
Described cushion block is arranged between described Sarasota and girder, is used for filling between described Sarasota and girder Gap;
Described fastening bolt sequentially passes through described Sarasota, cushion block and girder, it is possible to described Sarasota, cushion block Apply pretightning force with girder, thus between described Sarasota and girder, form consolidation structure, retrain each side To degree of freedom;
Described fastening inspection is the combination of screw bolt and nut, and described cushion block has at least one perforation, for Described fastening bolt passes.
2. tower beam consolidation mechanism as claimed in claim 1, it is characterised in that described cushion block is single Individual use or multiple stacked use, each cushion block is arranged in pairs or groups at least one fastening bolt.
3. tower beam consolidation mechanism as claimed in claim 1, it is characterised in that described cushion block is case Shape cushion block.
4. tower beam consolidation mechanism as claimed in claim 1, it is characterised in that for multiple described Cushion block, can be fitted to each other when it is superposed.
5. tower beam consolidation mechanism as claimed in claim 1, it is characterised in that also include adjusting pad Plate, it is arranged between described cushion block and Sarasota, or between described cushion block and girder.
6. a cable-stayed bridge, uses the tower beam consolidation mechanism as according to any one of claim 1-5.
7. the method building cable-stayed bridge, uses the tower beam as according to any one of claim 1-5 Consolidation mechanism's temporary consolidation Sarasota and girder.
CN201410849313.4A 2014-12-29 2014-12-29 Tower beam consolidation mechanism and corresponding cable-stayed bridge and method of construction thereof Active CN104532743B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410849313.4A CN104532743B (en) 2014-12-29 2014-12-29 Tower beam consolidation mechanism and corresponding cable-stayed bridge and method of construction thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410849313.4A CN104532743B (en) 2014-12-29 2014-12-29 Tower beam consolidation mechanism and corresponding cable-stayed bridge and method of construction thereof

Publications (2)

Publication Number Publication Date
CN104532743A CN104532743A (en) 2015-04-22
CN104532743B true CN104532743B (en) 2016-09-28

Family

ID=52848351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410849313.4A Active CN104532743B (en) 2014-12-29 2014-12-29 Tower beam consolidation mechanism and corresponding cable-stayed bridge and method of construction thereof

Country Status (1)

Country Link
CN (1) CN104532743B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109112967B (en) * 2018-09-12 2023-07-25 长安大学 Tower beam thrust connection device and quick construction method for self-anchored suspension bridge
CN111945568B (en) * 2020-08-11 2022-05-03 中铁四局集团有限公司 Temporary limiting structure and method for arc-shaped tower body ultra-wide steel box girder cable-stayed bridge tower beam

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003328323A (en) * 2002-05-15 2003-11-19 Kajima Corp Construction method of tower structure
KR100876074B1 (en) * 2008-09-22 2008-12-26 (주) 코리아에스이 Main towers of cable stayed girder bridge and the construction method
CN101457514A (en) * 2008-12-31 2009-06-17 广东省基础工程公司 Cable stayed bridge construction method
CN102373667A (en) * 2011-09-29 2012-03-14 中铁五局集团建筑工程有限责任公司 Method for constructing three-section type inhaul cable
CN204551259U (en) * 2014-12-29 2015-08-12 中交公路规划设计院有限公司 Tower beam consolidation mechanism and corresponding cable stayed bridge

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003328323A (en) * 2002-05-15 2003-11-19 Kajima Corp Construction method of tower structure
KR100876074B1 (en) * 2008-09-22 2008-12-26 (주) 코리아에스이 Main towers of cable stayed girder bridge and the construction method
CN101457514A (en) * 2008-12-31 2009-06-17 广东省基础工程公司 Cable stayed bridge construction method
CN102373667A (en) * 2011-09-29 2012-03-14 中铁五局集团建筑工程有限责任公司 Method for constructing three-section type inhaul cable
CN204551259U (en) * 2014-12-29 2015-08-12 中交公路规划设计院有限公司 Tower beam consolidation mechanism and corresponding cable stayed bridge

Also Published As

Publication number Publication date
CN104532743A (en) 2015-04-22

Similar Documents

Publication Publication Date Title
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN103469733B (en) A kind of from falling molding box joist steel Guan Beilei door opening support and bearing method thereof
CN201567532U (en) Novel supporting structure of lid beam of bridge
CN103938546A (en) Simple-supported continuous construction method and structure thereof
CN110409318B (en) Assembling and erecting method for large-span simply-supported steel-concrete composite beam
CN101644032A (en) Beam-removing rib-increasing strengthening construction technology of highway bridge
CN109505222A (en) A kind of netted sunpender bowstring arch bridge of assembled
CN106948598A (en) A kind of aluminum alloy formwork system and its construction method for variable cross-section rectangular column
CN104532743B (en) Tower beam consolidation mechanism and corresponding cable-stayed bridge and method of construction thereof
CN103952979B (en) A kind of steel concrete superposed beam top board erection without scaffolding device and construction method
KR101198376B1 (en) Fcm pier table construction method using girder
CN104563524B (en) Anti-water-seepage prefabricated slab construction method
CN104060545A (en) Overwater suspension cable trestle capable of being used for pumping concrete and construction method and application thereof
CN108661313A (en) A kind of cast-in-place linkage section mould plate supporting device of tool-type concrete folding plate
KR20140147573A (en) Management and reverse displacement of composite bridge composite inclined support structure and installation method
CN103352425A (en) Accurate positioning method and device for integral carrying of bridge
CN104762874A (en) Joint expansion and contraction device for assembled bridge and mounting method of joint expansion and contraction device
CN104313993B (en) A kind of highway bridge and construction method thereof
CN202000265U (en) Concrete construction formwork for high pier of bridge
JP2016196799A (en) Bridge reinforcement method
CN205856999U (en) Three combine T-shaped continuous beam across antinode work beam shear wave three steel concrete
CN206768633U (en) Properties of arched corrugated steel reinforced covering plate structure thing
CN102182320B (en) Method for mounting steel reinforced concrete steel skeleton of large metallurgical industry factory building
CN204551259U (en) Tower beam consolidation mechanism and corresponding cable stayed bridge
CN204753382U (en) Prefabricated pavement of voiced protective screen of inter -city railway

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant