CN104525369A - Method for extracting finished iron from iron ore - Google Patents
Method for extracting finished iron from iron ore Download PDFInfo
- Publication number
- CN104525369A CN104525369A CN201410611113.5A CN201410611113A CN104525369A CN 104525369 A CN104525369 A CN 104525369A CN 201410611113 A CN201410611113 A CN 201410611113A CN 104525369 A CN104525369 A CN 104525369A
- Authority
- CN
- China
- Prior art keywords
- iron
- iron ore
- magnetic separation
- finished
- working procedure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Manufacture And Refinement Of Metals (AREA)
Abstract
The invention discloses a method for extracting a finished iron from iron ore. The method comprises an iron ore video information collecting working procedure, a color classifying working procedure, a preprocessing working procedure, a feeding working procedure, a conveying belt conveying working procedure and a finished iron magnetic separation working procedure which are sequentially arranged in a matched manner. According to the iron ore video information collecting working procedure, a camera or a video camera is utilized for acquiring color and shape information of iron ore raw materials which are flatly laid; according to the color classifying working procedure, the color and shape information of the iron ore is acquired through the iron ore video information collecting working procedure, and the iron ore is classified according to preset color threshold value information and preset shape threshold value information; and the finished iron magnetic separation working procedure comprises a front magnetic separation working procedure, a rear magnetic separation working procedure and a final magnetic selection working procedure. The method for extracting the finished iron from the iron ore has the advantages of being small in consumption resource amount, high in working efficiency and good in product quality.
Description
Technical field
The present invention relates to field of mechanical technique, particularly, relate to the method for refining finished iron from iron ore.
Background technology
According to physics, the chemical property of different minerals in ore, after ore reduction is levigate, adopt gravity separation method, floatation, magnetic method, electrical concentration etc., valuable mineral and gangue mineral are separated, and the valuable mineral of various symbiosis (association) is separated from each other as far as possible, removing or reduction objectionable impurities, to obtain the process of smelting or other industrial needed raw materials.Ore dressing can make the useful constituent enrichment in mineral, reduces the consumption of fuel, transport in smelting or other process, makes low-grade ore obtain economic utilization.Beneficiation test the data obtained is the Main Basis of the evaluation of deposits and design of founding the factory.
Ore dressing is most important link in whole mineral products production process, is the key sector in the enterprise of ore deposit.General large ore enterprise be all comprehensively adopt, select, the resource-based enterprises of smelting.With physics or chemical method by the valuable mineral in raw mineral materials and useless mineral (usually claiming gangue) or toxic mineral separately, or the technical process that multiple valuable mineral is separated just is called ore dressing, also known as " mineral processing ".In product, the title concentrate of useful component enrichment; The title mine tailing of unwanted contributions enrichment; The content of useful component, between concentrate and tailings, needs the title chats of process further.Metalliferous mineral concentrate extracts the raw material of metal mainly as smelting industry; Nonmetallic mineral concentrate is as the raw material of other industry; The selected product of coal is cleaned coal.Ore dressing can significantly improve the quality of raw mineral materials, reduces freight, alleviates the difficulty of process further, reduces processing cost, and can realize the comprehensive utilization of raw mineral materials.Because world fossil resource is day by day poor, utilize lean ore and complicated ore more and more, therefore need the ore amount of ore dressing process increasing.Except minority high-grade ore, metal and nonmetal (comprising <Aa coal) ore nearly all need ore dressing.
The technology of current iron ore dry-dressing machine is immature, carries out the complex process of ore dressing with iron ore dry-dressing machine, and Iron concentrate taste is lower.
Realizing in process of the present invention, inventor finding at least to exist in prior art that consumes resources amount is large, the defect such as inefficiency and poor product quality.
Summary of the invention
The object of the invention is to, for the problems referred to above, propose the method for refining finished iron from iron ore, to realize, consumes resources amount is little, operating efficiency is high and the advantage of good product quality.
For achieving the above object, the technical solution used in the present invention is: the method for refining finished iron from iron ore, comprises the iron ore video information be equipped with successively and gathers operation, color classification operation, pretreatment process, feed process, tape transport operation and finished iron magnetic separation operation; Gather operation by iron ore video information, utilize camera or video camera, obtain the CF information of the iron ore material of tiling; By color classification operation, the iron ore CF information of operation acquisition is gathered according to iron ore video information, iron ore is classified by pre-set color threshold information and preset shape threshold information, is convenient to carry out classification process to the iron ore material of different colours threshold value and/or difformity threshold value according to demand; By pretreatment process, to iron ore material carry out removal of impurities, clear, dry, pulverize and granularity selection process, make the iron ore granularity entering feed process at below 35mm; Before iron ore enters finished iron magnetic separation operation, pressure roller need be adopted smooth for iron ore roll-in; Wherein, finished iron magnetic separation operation specifically comprises front road magnetic separation operation, rear road magnetic separation operation and the selected operation of extreme trace magnetic.
Further, described front road magnetic separation operation, specifically comprise: come by duct device before magnetic separation, magnetic strips and idler pulley is provided with in duct device before magnetic separation, the iron ore carried after duct device before making to enter magnetic separation is divided into three layers after the magnetic separation of front road, upper strata is waste material, and intermediate layer is semi-finished product, and lower floor is Iron concentrate;
And/or,
Described rear road magnetic separation operation, specifically comprises: realized by duct device after magnetic separation and race tail adjusting device and grade adjusting device, be provided with magnetic and roll after magnetic separation in duct device, run in tail adjusting device and be provided with adjustment plate; Waste material layer is thrown out of under effect of inertia, and crosses adjustment plate and fall in waste material bucket; Simultaneously, semi-finished product layer is made to be divided into two parts: Part I semi-finished product are thrown out of under effect of inertia, these some of them throwing away part first bump against after on adjustment plate to be fallen in semi-finished product bucket again, wherein other are directly fallen in semi-finished product bucket under gravity, and Part II semi-finished product enter after being scraped by scraper plate in semi-finished product bucket;
And/or,
The selected operation of described extreme trace magnetic, is specifically comprised: realized by grade adjusting device, in grade adjusting device, is provided with scraper plate; The passage entered for Iron concentrate is formed between scraper plate and conveyer belt; Finally surplus Iron concentrate layer on the conveyor belt then with conveyer belt through the passage scraper plate and conveyer belt, then enter in Iron concentrate discharge bucket, the Iron concentrate finally obtained is satisfactory Iron concentrate.
Further, the magnetic after described magnetic separation in duct device rolls the magnetic field that can produce 7000-12000 Gauss, described scraper plate forward position to the distance at conveyer belt working face between 4-20mm.
Further, enter the particle diameter of the iron ore of described pretreatment process at below 30mm, the iron-holder of described Iron concentrate is more than 60%.
The method of refining finished iron from iron ore of various embodiments of the present invention, gathers operation, color classification operation, pretreatment process, feed process, tape transport operation and finished iron magnetic separation operation owing to comprising the iron ore video information be equipped with successively; Gather operation by iron ore video information, utilize camera or video camera, obtain the CF information of the iron ore material of tiling; By color classification operation, the iron ore CF information of operation acquisition is gathered according to iron ore video information, iron ore is classified by pre-set color threshold information and preset shape threshold information, is convenient to carry out classification process to the iron ore material of different colours threshold value and/or difformity threshold value according to demand; By pretreatment process, to iron ore material carry out removal of impurities, clear, dry, pulverize and granularity selection process, make the iron ore granularity entering feed process at below 35mm; Before iron ore enters finished iron magnetic separation operation, pressure roller need be adopted smooth for iron ore roll-in; Wherein, finished iron magnetic separation operation specifically comprises front road magnetic separation operation, rear road magnetic separation operation and the selected operation of extreme trace magnetic; Thus can overcome that consumes resources amount in prior art is large, the defect of inefficiency and poor product quality, to realize, consumes resources amount is little, operating efficiency is high and the advantage of good product quality.
Other features and advantages of the present invention will be set forth in the following description, and, partly become apparent from description, or understand by implementing the present invention.
Below by embodiment, technical scheme of the present invention is described in further detail.
Detailed description of the invention
Below the preferred embodiments of the present invention are described, should be appreciated that preferred embodiment described herein is only for instruction and explanation of the present invention, is not intended to limit the present invention.
According to the embodiment of the present invention, provide the method for refining finished iron from iron ore, comprise the iron ore video information be equipped with successively and gather operation, color classification operation, pretreatment process, feed process, tape transport operation and finished iron magnetic separation operation; Gather operation by iron ore video information, utilize camera or video camera, obtain the CF information of the iron ore material of tiling; By color classification operation, the iron ore CF information of operation acquisition is gathered according to iron ore video information, iron ore is classified by pre-set color threshold information and preset shape threshold information, is convenient to carry out classification process to the iron ore material of different colours threshold value and/or difformity threshold value according to demand; By pretreatment process, to iron ore material carry out removal of impurities, clear, dry, pulverize and granularity selection process, make the iron ore granularity entering feed process at below 35mm; Before iron ore enters finished iron magnetic separation operation, pressure roller need be adopted smooth for iron ore roll-in; Wherein, finished iron magnetic separation operation specifically comprises front road magnetic separation operation, rear road magnetic separation operation and the selected operation of extreme trace magnetic.
Wherein, above-mentioned front road magnetic separation operation, specifically comprise: come by duct device before magnetic separation, magnetic strips and idler pulley is provided with in duct device before magnetic separation, the iron ore carried after duct device before making to enter magnetic separation is divided into three layers after the magnetic separation of front road, upper strata is waste material, and intermediate layer is semi-finished product, and lower floor is Iron concentrate; And/or rear road magnetic separation operation, specifically comprises: realized by duct device after magnetic separation and race tail adjusting device and grade adjusting device, be provided with magnetic in duct device and roll after magnetic separation, run in tail adjusting device and be provided with adjustment plate; Waste material layer is thrown out of under effect of inertia, and crosses adjustment plate and fall in waste material bucket; Simultaneously, semi-finished product layer is made to be divided into two parts: Part I semi-finished product are thrown out of under effect of inertia, these some of them throwing away part first bump against after on adjustment plate to be fallen in semi-finished product bucket again, wherein other are directly fallen in semi-finished product bucket under gravity, and Part II semi-finished product enter after being scraped by scraper plate in semi-finished product bucket; And/or the selected operation of extreme trace magnetic, specifically comprises: realized by grade adjusting device, is provided with scraper plate in grade adjusting device; The passage entered for Iron concentrate is formed between scraper plate and conveyer belt; Finally surplus Iron concentrate layer on the conveyor belt then with conveyer belt through the passage scraper plate and conveyer belt, then enter in Iron concentrate discharge bucket, the Iron concentrate finally obtained is satisfactory Iron concentrate.
In the above-described embodiments, the magnetic after magnetic separation in duct device rolls the magnetic field that can produce 7000-12000 Gauss, scraper plate forward position to the distance at conveyer belt working face between 4-20mm.Enter the particle diameter of the iron ore of pretreatment process at below 30mm, the iron-holder of Iron concentrate is more than 60%.
Technical scheme of the present invention, iron ore is divided into three layers after front road magnetic separation operation: upper strata is waste material, and intermediate layer is semi-finished product, and lower floor is Iron concentrate; In rear road magnetic separation operation, waste material layer is thrown in waste material bucket under effect of inertia; In semi-finished product layer, some is thrown in semi-finished product bucket under effect of inertia, and another part is scraped by grade adjusting device and enters in semi-finished product bucket; Iron concentrate layer enters in Iron concentrate discharge bucket, and the iron-holder of this Iron concentrate is more than 60%.The operating process of the method is simple, and resource utilization is high.
Compared with prior art, technical scheme of the present invention, after before the magnetic separation of dry-dressing machine, duct device realizes the magnetic separation of front road, broken rear particle diameter is made to enter dry-dressing machine at the iron ore of below 30mm, under the magnetic fields of iron ore duct device before magnetic separation, obtain different according to each particle iron-holder and carry out layering, the Iron concentrate that iron-holder is high is positioned at lower floor, almost nonferrous waste material is positioned at upper strata, and is semi-finished product between Iron concentrate and waste material.The object of front road magnetic separation is by Iron concentrate layering, is convenient to select high-grade Iron concentrate in the magnetic separation of rear road.Through road magnetic separation later, finally high-grade Iron concentrate can be selected.
Last it is noted that the foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, although with reference to previous embodiment to invention has been detailed description, for a person skilled in the art, it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein portion of techniques feature.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (4)
1. from iron ore, refine the method for finished iron, it is characterized in that, comprise the iron ore video information be equipped with successively and gather operation, color classification operation, pretreatment process, feed process, tape transport operation and finished iron magnetic separation operation; Gather operation by iron ore video information, utilize camera or video camera, obtain the CF information of the iron ore material of tiling; By color classification operation, the iron ore CF information of operation acquisition is gathered according to iron ore video information, iron ore is classified by pre-set color threshold information and preset shape threshold information, is convenient to carry out classification process to the iron ore material of different colours threshold value and/or difformity threshold value according to demand; By pretreatment process, to iron ore material carry out removal of impurities, clear, dry, pulverize and granularity selection process, make the iron ore granularity entering feed process at below 35mm; Before iron ore enters finished iron magnetic separation operation, pressure roller need be adopted smooth for iron ore roll-in; Wherein, finished iron magnetic separation operation specifically comprises front road magnetic separation operation, rear road magnetic separation operation and the selected operation of extreme trace magnetic.
2. method of refining finished iron from iron ore according to claim 1, it is characterized in that, described front road magnetic separation operation, specifically comprise: come by duct device before magnetic separation, be provided with magnetic strips and idler pulley in duct device before magnetic separation, the iron ore carried after duct device before making to enter magnetic separation is divided into three layers after the magnetic separation of front road, and upper strata is waste material, intermediate layer is semi-finished product, and lower floor is Iron concentrate;
And/or,
Described rear road magnetic separation operation, specifically comprises: realized by duct device after magnetic separation and race tail adjusting device and grade adjusting device, be provided with magnetic and roll after magnetic separation in duct device, run in tail adjusting device and be provided with adjustment plate; Waste material layer is thrown out of under effect of inertia, and crosses adjustment plate and fall in waste material bucket; Simultaneously, semi-finished product layer is made to be divided into two parts: Part I semi-finished product are thrown out of under effect of inertia, these some of them throwing away part first bump against after on adjustment plate to be fallen in semi-finished product bucket again, wherein other are directly fallen in semi-finished product bucket under gravity, and Part II semi-finished product enter after being scraped by scraper plate in semi-finished product bucket;
And/or,
The selected operation of described extreme trace magnetic, is specifically comprised: realized by grade adjusting device, in grade adjusting device, is provided with scraper plate; The passage entered for Iron concentrate is formed between scraper plate and conveyer belt; Finally surplus Iron concentrate layer on the conveyor belt then with conveyer belt through the passage scraper plate and conveyer belt, then enter in Iron concentrate discharge bucket, the Iron concentrate finally obtained is satisfactory Iron concentrate.
3. method of refining finished iron from iron ore according to claim 2, it is characterized in that, magnetic after described magnetic separation in duct device rolls the magnetic field that can produce 7000-12000 Gauss, described scraper plate forward position to the distance at conveyer belt working face between 4-20mm.
4. method of refining finished iron from iron ore according to claim 1 and 2, is characterized in that, enter the particle diameter of the iron ore of described pretreatment process at below 30mm, the iron-holder of described Iron concentrate is more than 60%.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410611113.5A CN104525369A (en) | 2014-11-04 | 2014-11-04 | Method for extracting finished iron from iron ore |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410611113.5A CN104525369A (en) | 2014-11-04 | 2014-11-04 | Method for extracting finished iron from iron ore |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104525369A true CN104525369A (en) | 2015-04-22 |
Family
ID=52841101
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410611113.5A Pending CN104525369A (en) | 2014-11-04 | 2014-11-04 | Method for extracting finished iron from iron ore |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104525369A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1422701A (en) * | 2001-12-06 | 2003-06-11 | 株式会社佐竹 | Colour sorting apparatus for grain object capable of sorting out foreign magnetic metal object |
CN101343693A (en) * | 2007-07-12 | 2009-01-14 | 南京板桥钢渣有限责任公司 | Dust-separation zinc extraction method |
CN101385993A (en) * | 2008-10-20 | 2009-03-18 | 海盐机械厂 | Separation method of finished iron from iron ore dry-dressing machine |
CN101385992A (en) * | 2008-10-20 | 2009-03-18 | 海盐机械厂 | Dry dressing method for separating iron from iron ore |
CN201300090Y (en) * | 2008-10-20 | 2009-09-02 | 海盐机械厂 | Magnetic separation back track device used in iron ore dry separation machine |
CN102172556A (en) * | 2010-12-07 | 2011-09-07 | 东北大学 | High-pressure roller milling-preselection processing method for vanadic titanomagnetite |
CN103041921A (en) * | 2012-12-20 | 2013-04-17 | 山东科力华电磁设备有限公司 | Method for extracting iron ore concentrate under anhydrous condition |
-
2014
- 2014-11-04 CN CN201410611113.5A patent/CN104525369A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1422701A (en) * | 2001-12-06 | 2003-06-11 | 株式会社佐竹 | Colour sorting apparatus for grain object capable of sorting out foreign magnetic metal object |
CN101343693A (en) * | 2007-07-12 | 2009-01-14 | 南京板桥钢渣有限责任公司 | Dust-separation zinc extraction method |
CN101385993A (en) * | 2008-10-20 | 2009-03-18 | 海盐机械厂 | Separation method of finished iron from iron ore dry-dressing machine |
CN101385992A (en) * | 2008-10-20 | 2009-03-18 | 海盐机械厂 | Dry dressing method for separating iron from iron ore |
CN201300090Y (en) * | 2008-10-20 | 2009-09-02 | 海盐机械厂 | Magnetic separation back track device used in iron ore dry separation machine |
CN102172556A (en) * | 2010-12-07 | 2011-09-07 | 东北大学 | High-pressure roller milling-preselection processing method for vanadic titanomagnetite |
CN103041921A (en) * | 2012-12-20 | 2013-04-17 | 山东科力华电磁设备有限公司 | Method for extracting iron ore concentrate under anhydrous condition |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106076606B (en) | A kind of beneficiation method of magnetic-red Complex iron ore | |
CN104174482A (en) | Mineral processing technology for low grade hematite ore | |
CN114453129B (en) | Lead zinc ore recycling method | |
CN104028371A (en) | Combined dry magnetic separator and magnetic separation method | |
CN111495574A (en) | Novel low-grade ore preselection process | |
CN102824956B (en) | Poor hematite grading level and narrow level sorting process | |
CN102773156B (en) | Beneficiation method for producing blast furnace lump ore by hematite at medium-high grade | |
CN105233977B (en) | Magnetic separation recovery mine tailing technique is regrinded in magnetic separation circulation roasting | |
CN107029868A (en) | A kind of composite ore high pressure roller mill, double media, the red ore deposit sorting process of magnetic | |
CN108212504A (en) | A kind of method that pre-selection-roasting-magnetic floats technique recycling magnetic tailing | |
CN106000597B (en) | Single magnetic separation-the magnetic of chromium depleted zone shakes machine sorting process | |
CN104475246A (en) | Method for obtaining finished product iron from iron ore | |
CN103433122B (en) | A kind of medium tin ore sub-prime classification and sorting technique | |
CN104437855A (en) | Method for extracting finished iron from iron ore | |
CN104525369A (en) | Method for extracting finished iron from iron ore | |
CN104492596A (en) | Method for separating finished-product iron from iron ore | |
CN104148175B (en) | Mineral processing technology for processing mixed diamond and magnetic ore | |
CN104437853A (en) | Method for collecting finished iron products from iron ores | |
CN104475248A (en) | Method for obtaining finished product iron from iron ore | |
CN104475250A (en) | Method for obtaining finished product iron from iron ore | |
CN104437856A (en) | Method for extracting finished product iron from iron ores | |
CN104475241A (en) | Method for extracting finished product iron from iron ore | |
CN104689905A (en) | Mineral processing process for improving quality and reducing silicon of iron ore concentrate | |
CN104368436A (en) | Method for screening ferrous products out from iron ores | |
CN104437854A (en) | Method for obtaining and transporting finished iron from iron ores |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150422 |
|
RJ01 | Rejection of invention patent application after publication |