CN104514570A - Tunnel ditch cable trough form trolley - Google Patents

Tunnel ditch cable trough form trolley Download PDF

Info

Publication number
CN104514570A
CN104514570A CN201410765217.1A CN201410765217A CN104514570A CN 104514570 A CN104514570 A CN 104514570A CN 201410765217 A CN201410765217 A CN 201410765217A CN 104514570 A CN104514570 A CN 104514570A
Authority
CN
China
Prior art keywords
template
column
tunnel ditch
framework
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410765217.1A
Other languages
Chinese (zh)
Other versions
CN104514570B (en
Inventor
刘秀昌
杨玉章
姜长青
刘亚东
何旭
张玉洪
王胤
吕红军
孙玉玲
石冰
黄际政
王晓宇
王平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 19th Bureau Group Co Ltd
Seventh Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
China Railway 19th Bureau Group Co Ltd
Seventh Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 19th Bureau Group Co Ltd, Seventh Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical China Railway 19th Bureau Group Co Ltd
Priority to CN201410765217.1A priority Critical patent/CN104514570B/en
Publication of CN104514570A publication Critical patent/CN104514570A/en
Application granted granted Critical
Publication of CN104514570B publication Critical patent/CN104514570B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention relates to a tunnel ditch cable trough template trolley, which comprises a frame and templates, wherein the upper end of the frame is connected with a cross beam, the cross beam is respectively connected with a first stand column and a second stand column, the tunnel ditch cable trough trolley also comprises an arched truss, the bottom end of the arched truss is provided with an arched truss bottom beam, two ends of the arched truss bottom beam are respectively fixed on the cross beam, the lower end of the arched truss bottom beam is uniformly provided with at least one carrying pole cross beam, the carrying pole cross beam and the cross beam are respectively and movably and vertically connected with ten suspension rods, the bottom end of each suspension rod is connected with a template, the templates comprise a power cable trough template, a side ditch template, a communication signal cable trough template and a side template, and movable concrete pouring collection hoppers are arranged among the power cable trough template. The tunnel ditch cable trough formwork trolley provided by the invention solves the problems of small pouring section span, inconvenience in movement, difficulty in formwork removal and inaccuracy in positioning of an integral formwork due to the fact that an inverted L-shaped steel frame is used as a supporting main beam.

Description

A kind of tunnel ditch cable channel formwork chassis
Technical field
The present invention relates to technical field of tunnel construction, particularly relate to a kind of formwork jumbo, relate more specifically to a kind of integral mold plate chassis used when building Railway Tunnel ditch cable trench.
Background technology
At present, in the construction of Railway Tunnel ditch cable trench, need to control with each spot size of template to concrete work.Traditional concrete mould method of plate installation is: adopt fritter punching block to carry out assembled according to scantling, and use rod member to support, the locus of template is fixed.Although the method has the feature of the light and convenient transportation of modular shuttering element, lowly, construction cost is high, and appearance quality trait is difficult for work efficiency.
Disclose two kinds of integral mold plates used in the construction of Railway Tunnel ditch cable trench in prior art mobile trolley used, but also there is the defect of following four aspects in these two kinds of technical schemes:
The first, two kinds of technical schemes all have employed inverted L shape steelframe as support girder, and its shortcoming is: when one-off construction length is more than 8 meters, and the amount of deflection meeting gross distortion of support girder, can not meet design and code requirement; When length of once constructing is less than 8 meters, the amount of deflection of support girder can not gross distortion, but construction cycle-index increases, and causes the problem that construction effect reduces and construction cost increases.
The second, wherein technical scheme adds bayonet lock by angle to carry out a form removal, and because the lateral pressure after concreting makes frictional force strengthen, stripping is very difficult in this way; Another kind of technical scheme adopts to arrange demoulding shrinkage joint and demoulding fixture block to facilitate form removal, the concrete first clearing up demoulding shrinkage joint place is needed after concreting, carry out form removal again, due to lateral sulcus ditch depth and its cross section is narrow, concrete is removed very difficult, adopt often can only adopt in this way to strike and pound steel form or the method that promotes by force carrys out stripping, thus cause template deformation, repair template and will consume the plenty of time.
Three, two kinds of technical schemes are all adopt cross binding one end of integral mold plate to be fixed on the way completed on secondary lining concrete surface, solve Overall Steel Formwork location and fixing problem, but, the secondary lining face having completed construction is due to the reason such as reserved of constructing, possible line style is not on the same line, lateral deviation after causing ditch cable trench to construct, there will be the problem not meeting design and code requirement.
Running gear when four, moving about integral mold plate, two kinds of technical schemes adopt respectively: a single front-wheel and arrange the method for double movable pulley under the counterweight beam of side, these two kinds of methods are when mobile, heavy mechanical equipment is all needed to coordinate, mobile inconvenient, and completed concrete corner easily breaks by moving process.
Therefore, for above deficiency, need to provide a kind of moveable integral mold plate chassis used when building Railway Tunnel ditch cable trench.
Summary of the invention
(1) technical problem that will solve
The technical problem to be solved in the present invention is to provide a kind of tunnel ditch cable channel formwork chassis, solve owing to adopting inverted L shape steelframe to cause as support girder that the section of building span is little, form removal is inconvenient, and locate inaccurate problem owing to adopting the secondary lining face having completed construction to position the integral mold plate caused.
(2) technical scheme
In order to solve the problems of the technologies described above, the invention provides a kind of tunnel ditch cable channel formwork chassis, comprise framework and template, frame vertical straight is arranged, the both sides of framework upper end are all connected with the crossbeam stretched out to the same side, two crossbeams are connected to the first column and the second column, the first column, the second column are identical with the distance of framework;
Also comprise the arch truss be arranged at above the first column and the second column, arch truss bottom is provided with arch truss bottom girder, the two ends of arch truss bottom girder are individually fixed on crossbeam, and the lower end of arch truss bottom girder evenly arranges at least one shoulder pole crossbeam, and shoulder pole crossbeam all be arranged in parallel with crossbeam;
Shoulder pole crossbeam and crossbeam distinguish mobilizable vertical connection ten suspension rods, suspension rod bottom connects template, template comprises power cable slot template, lateral sulcus template, communicaton and signal cable slot template and cheek board, the cheek board with frame parallel is connected with in the bottom of a suspension rod near framework, in all the other nine suspension rods, every three is one group, and the bottom often organizing suspension rod connects power cable slot template, lateral sulcus template and communicaton and signal cable slot template respectively;
Power cable slot template, between lateral sulcus template and communicaton and signal cable slot template, be provided with moveable concreting aggregate bin.
Preferably, aforementioned power cable slot template, lateral sulcus template and communicaton and signal cable slot template are respectively by base plate with two side plates are dismountable forms, and three suspension rods often in group connect base plate and two side plates of power cable slot template, lateral sulcus template and communicaton and signal cable slot template respectively.
Preferably, aforesaid frame is also provided with the first diagonal brace for supporting and the second diagonal brace, the length of the first diagonal brace and the second diagonal brace is all adjustable.
Preferably, the height of aforementioned first column is less than the height of the second column, and the bottom of the first column and the second column is equipped with road wheel.
Preferably, multiple reinforcing shaped steel is vertically provided with uniformly between aforementioned arch truss and arch truss bottom girder.
Preferably, between aforementioned cheek board and framework level be provided with spiral support bar.
Preferably, aforementioned shoulder pole crossbeam lower end is provided with spacing angle steel.
Preferably, liftable wheel hub is provided with bottom aforesaid frame.
Preferably, all connected by bolt between each parts of aforementioned tunnel ditch cable channel formwork chassis.
Preferably, aforementioned suspension rod is made up of screw-thread steel.
(3) beneficial effect
Technique scheme tool of the present invention has the following advantages:
Tunnel ditch cable channel formwork chassis provided by the invention, comprise framework and template, framework upper end connecting cross beam, crossbeam is connected to the first column and the second column, also comprise arch truss and arch truss bottom girder, the two ends of arch truss bottom girder are individually fixed on crossbeam, the lower end of arch truss bottom girder evenly arranges three shoulder pole crossbeams, shoulder pole crossbeam and crossbeam distinguish mobilizable vertical connection ten suspension rods, suspension rod bottom connects template, template comprises power cable slot template, lateral sulcus template, communicaton and signal cable slot template and cheek board, power cable slot template, moveable concreting aggregate bin is provided with between lateral sulcus template and communicaton and signal cable slot template.
Tunnel ditch cable channel formwork chassis provided by the invention, with bolts, and apply arch truss, considerably increase the rigidity of chassis, make chassis have Integratively template and build the large advantage of length, apply arch truss, screw-thread steel suspension rod, make the Template Location degree of accuracy high, and its form removable is convenient and simple, formwork integral moving is easy, therefore improve construction efficiency, reduce construction cost, Surface Quality of Concrete is easily controlled, and ensure that built groove structure size is accurate.
In the present invention, the first column and framework, wheeled second column, the first diagonal brace and the second diagonal brace together form stable firmly stress system, the arc secondary lining face that chassis stress frame has not been constructed with tunnel contacts, ensure that ditch cable trench line style is straight, also ensure that the convenience of formwork jumbo movement simultaneously.
In the present invention, power cable slot template, lateral sulcus template and communicaton and signal cable slot template arrange two side plates and base plate respectively, two side plates and base plate are separable connection, two side plates and base plate are located respectively by suspension rod, crossbeam, shoulder pole crossbeam and spacing angle steel, when form removal, as long as the bolt come loose on suspension rod, and remove spacing angle steel, two side plates and base plate can be removed, the frictional force of bearing during form removable is reduced, do not need to carry out concrete removing at narrow space, stripping is become easily simple.
Accompanying drawing explanation
Fig. 1 is the overall structure schematic diagram of tunnel ditch cable channel formwork chassis of the present invention;
Fig. 2 is the lateral view of tunnel ditch cable channel formwork chassis of the present invention;
Fig. 3 is the structural representation of middle frame of the present invention;
Fig. 4 is the structural representation of arch truss in the present invention;
Fig. 5 is the structural representation of power cable slot template in the present invention;
Fig. 6 is the structural representation of lateral sulcus template in the present invention;
Fig. 7 is the structural representation of communicaton and signal cable slot template in the present invention;
Fig. 8 is the structural representation of cheek board in the present invention.
In figure: 1: framework; 2: the second columns; 3: the first columns; 4: crossbeam; 5: arch truss; 6: arch truss bottom girder; 7: shoulder pole crossbeam; 8: suspension rod; 9: power cable slot template; 10: lateral sulcus template; 11: communicaton and signal cable slot template; 12: the first diagonal braces; 13: the second diagonal braces; 14: road wheel; 15: reinforce shaped steel; 16: spiral support bar; 17: spacing angle steel; 18: wheel hub; 19: end face filled by inverted arch; 20: cheek board.
Detailed description of the invention
For making the object of the embodiment of the present invention, technical scheme and advantage clearly, below in conjunction with the accompanying drawing in the embodiment of the present invention, technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is a part of embodiment of the present invention, instead of whole embodiments.Based on the embodiment in the present invention, the every other embodiment that those of ordinary skill in the art obtain under the prerequisite not making creative work, all belongs to the scope of protection of the invention.
Embodiment one
As shown in Figure 1, 2, a kind of tunnel ditch cable channel formwork chassis that the embodiment of the present invention provides, whole chassis is arranged at tunnel invert and fills on end face 19, and the inverted arch filling end face 19 in tunnel comprises the ditch cable trench and ditch cable trench inverted arch concrete segment to be built that complete and build.
The present embodiment comprises framework 1 and template, and as shown in Figure 3, framework 1 is vertically arranged the structure of framework 1, is provided with liftable wheel hub 18 bottom framework 1.Framework 1 is placed on the position near tunnel central axis along direction, tunnel, the both sides of framework 1 upper end are all connected with the crossbeam 4 stretched out to the same side, two crossbeams 4 are connected to the first column 3 identical with the distance of framework 1 with the second column 2, first column 3, second column 2; The height of the first column 3 is less than the height of the second column 2, and the bottom of the first column 3 and the second column 2 is equipped with road wheel 14.First column 3 is positioned in the ditch cable trench completing and build, and the second column 2 is positioned in ditch cable trench inverted arch concrete segment to be built.Length framework 1 being also provided with the first diagonal brace 12 for supporting and the second diagonal brace 13, first diagonal brace 12 and the second diagonal brace 13 is all adjustable, and the minimum and maximum length of the first diagonal brace 12 is all greater than the second diagonal brace 13.
The first column 3 with road wheel 14 and framework 1, be with the second column 2, first diagonal brace 12 of road wheel 14 and the second diagonal brace 13 together form to stablize firmly stress system, the arc secondary lining face that the framework 1 of chassis has not been constructed with tunnel contacts, ensure that the ditch cable trench line style after building is straight, also ensure that the convenience of chassis movement simultaneously.
Also comprise the arch truss 5 be arranged at above the first column 3 and the second column 2, the structure of arch truss 5 as shown in Figure 4, arch truss 5 bottom is provided with arch truss bottom girder 6, vertically be provided with multiple reinforcing shaped steel 15 uniformly between arch truss 5 and arch truss bottom girder 6, be out of shape to prevent arch truss 5 and arch truss bottom girder 6.The two ends of arch truss bottom girder 6 are individually fixed on crossbeam 4, and the lower end of arch truss bottom girder 6 evenly arranges three shoulder pole crossbeams 7, and shoulder pole crossbeam 7 all be arranged in parallel with crossbeam 4.
Shoulder pole crossbeam 7 and crossbeam 4 distinguish mobilizable vertical connection ten suspension rods 8, and suspension rod 8 is made up of screw-thread steel.Suspension rod 8 bottom connects template.Arch truss 5 makes support system be separated with template system, when end face 19 out-of-flatness filled by the inverted arch of tunnel, because shoulder pole crossbeam 7 is connected each template with crossbeam 4 by mobilizable suspension rod 8, ensure that each template vertical direction is arranged, thus ensure that the ditch cable trench top after building is straight, and do not fill the impact of end face 19 out-of-flatness factor by tunnel invert.
The present embodiment, also by the suspension rod 8 that fining twisted steel is made, accurately can be located needing the end face absolute altitude of concreting, and the overall vertical-lift of template system, can not produce finished product concrete water caltrop and destroy, ensure that concrete good looking appearance.
Shoulder pole crossbeam 7 lower end is provided with spacing angle steel 17, limits the position of each template, to locate the lateral separation between each template exactly.
Template comprises power cable slot template 9, lateral sulcus template 10, communicaton and signal cable slot template 11 and cheek board 20, and the structure of each template as viewed in figures 5-8.Be connected with the cheek board 20 parallel with framework 1 in the bottom of a suspension rod 8 near framework 1, between cheek board 20 and framework 1, level is provided with spiral support bar 16.In all the other nine suspension rods 8, every three is one group, and the bottom often organizing suspension rod 8 connects power cable slot template 9, lateral sulcus template 10 and communicaton and signal cable slot template 11 respectively.
Power cable slot template 9, lateral sulcus template 10 and communicaton and signal cable slot template 11 are respectively by base plate with two side plates are dismountable forms, and three suspension rods 8 often in group connect base plate and two side plates of power cable slot template 9, lateral sulcus template 10 and communicaton and signal cable slot template 11 respectively.Power cable slot template 9, lateral sulcus template 10 and communicaton and signal cable slot template 11 arrange two side plates and base plate respectively, two side plates and base plate are separable connection, two side plates and base plate are located respectively by suspension rod, crossbeam, shoulder pole crossbeam and spacing angle steel, when form removal, as long as the bolt come loose on suspension rod, and remove spacing angle steel, two side plates and base plate can be removed, the frictional force of bearing during form removable is reduced, do not need to carry out concrete removing at narrow space, stripping is become easily simple.
Power cable slot template 9, between lateral sulcus template 10 and communicaton and signal cable slot template 11, be provided with moveable concreting aggregate bin, after concreting, Cable Groove, lateral sulcus and communicaton and signal cable groove can be formed.
All connected by bolt between each parts of the present embodiment chassis, and the shaped steel steel that all parts all adopts rigidity large, and apply arch truss 6, considerably increase the rigidity of whole chassis, single construction length is increased greatly, decreases construction cycle-index.
The present embodiment is when constructing, and band the first column 3 of road wheel 14 and a part for each template are fixed in the ditch cable trench of having constructed; After one section of ditch cable trench has been constructed, do not need overall pulling down template.When hypomere is constructed, only the first diagonal brace 12 and the second diagonal brace 13 need be packed up, the liftable wheel hub 18 of the lower end at framework 1 is put down, carry out accurately location and reliable construction with regard to next section section to be built that moved to by chassis that can be parallel.
Last it is noted that above embodiment is only in order to illustrate technical scheme of the present invention, be not intended to limit; Although with reference to previous embodiment to invention has been detailed description, those of ordinary skill in the art is to be understood that: it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein portion of techniques feature; And these amendments or replacement, do not make the essence of appropriate technical solution depart from the spirit and scope of various embodiments of the present invention technical scheme.

Claims (10)

1. a tunnel ditch cable channel formwork chassis, comprise framework (1) and template, described framework (1) is vertically arranged, it is characterized in that: the both sides of described framework (1) upper end are all connected with the crossbeam (4) stretched out to the same side, described two crossbeams (4) are connected to the first column (3) and the second column (2), and the first column (3), the second column (2) are identical with the distance of framework (1);
Also comprise the arch truss (5) being arranged at the first column (3) and the second column (2) top, described arch truss (5) bottom is provided with arch truss bottom girder (6), the two ends of described arch truss bottom girder (6) are individually fixed on described crossbeam (4), the lower end of described arch truss bottom girder (6) evenly arranges at least one shoulder pole crossbeam (7), and described shoulder pole crossbeam (7) all be arranged in parallel with described crossbeam (4);
Described shoulder pole crossbeam (7) and upper mobilizable vertical connection ten suspension rods (8) respectively of crossbeam (4), described suspension rod (8) bottom connects described template, described template comprises power cable slot template (9), lateral sulcus template (10), communicaton and signal cable slot template (11) and cheek board (20), the cheek board (20) parallel with described framework (1) is connected with in the bottom of a suspension rod (8) near framework (1), in all the other nine suspension rods (8), every three is one group, the described bottom often organizing suspension rod (8) connects described power cable slot template (9) respectively, lateral sulcus template (10) and communicaton and signal cable slot template (11),
Described power cable slot template (9), between lateral sulcus template (10) and communicaton and signal cable slot template (11), be provided with moveable concreting aggregate bin.
2. tunnel ditch cable channel formwork chassis according to claim 1, it is characterized in that: described power cable slot template (9), lateral sulcus template (10) and communicaton and signal cable slot template (11) are respectively by base plate with two side plates are dismountable forms, and three suspension rods (8) in described often group connect base plate and two side plates of power cable slot template (9), lateral sulcus template (10) and communicaton and signal cable slot template (11) respectively.
3. tunnel ditch cable channel formwork chassis according to claim 1, it is characterized in that: described framework (1) is also provided with the first diagonal brace (12) for supporting and the second diagonal brace (13), the length of described first diagonal brace (12) and the second diagonal brace (13) is all adjustable.
4. tunnel ditch cable channel formwork chassis according to claim 1, it is characterized in that: the height of described first column (3) is less than the height of the second column (2), and the bottom of described first column (3) and described second column (2) is equipped with road wheel (14).
5. tunnel ditch cable channel formwork chassis according to claim 1, is characterized in that: be vertically provided with multiple reinforcing shaped steel (15) uniformly between described arch truss (5) and arch truss bottom girder (6).
6. tunnel ditch cable channel formwork chassis according to claim 1, is characterized in that: between described cheek board (20) and described framework (1), level is provided with spiral support bar (16).
7. tunnel ditch cable channel formwork chassis according to claim 1, is characterized in that: described shoulder pole crossbeam (7) lower end is provided with spacing angle steel (17).
8. tunnel ditch cable channel formwork chassis according to claim 1, is characterized in that: described framework (1) bottom is provided with liftable wheel hub (18).
9. tunnel ditch cable channel formwork chassis according to claim 1, is characterized in that: all connected by bolt between each parts of described tunnel ditch cable channel formwork chassis.
10. tunnel ditch cable channel formwork chassis according to claim 1, is characterized in that: described suspension rod (8) is made up of screw-thread steel.
CN201410765217.1A 2014-12-12 2014-12-12 Tunnel ditch cable trough form trolley Active CN104514570B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410765217.1A CN104514570B (en) 2014-12-12 2014-12-12 Tunnel ditch cable trough form trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410765217.1A CN104514570B (en) 2014-12-12 2014-12-12 Tunnel ditch cable trough form trolley

Publications (2)

Publication Number Publication Date
CN104514570A true CN104514570A (en) 2015-04-15
CN104514570B CN104514570B (en) 2017-01-25

Family

ID=52790391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410765217.1A Active CN104514570B (en) 2014-12-12 2014-12-12 Tunnel ditch cable trough form trolley

Country Status (1)

Country Link
CN (1) CN104514570B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895582A (en) * 2015-04-20 2015-09-09 中铁二十五局集团第一工程有限公司 Overall template concrete building method for double-track tunnel ditch cable trough
CN105422139A (en) * 2015-12-14 2016-03-23 黄高飞 Tunnel ditch cable trough trolley
CN113062753A (en) * 2021-04-08 2021-07-02 贵州路桥集团有限公司 A slot lining cutting forming device for whole lining cutting platform truck of highway tunnel
CN113153368A (en) * 2021-04-15 2021-07-23 中铁十七局集团第二工程有限公司 Fixing device of curb ditch template in tunnel
CN114165259A (en) * 2021-11-06 2022-03-11 中建八局第二建设有限公司 Cable trough and side trough casting die device and method for tunnel

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02271204A (en) * 1989-04-13 1990-11-06 Toshiba Corp Sample moving table
CN201377327Y (en) * 2009-04-08 2010-01-06 中铁一局集团有限公司 Movable slip form for tunnel ditch and cable trough
CN201747057U (en) * 2010-07-17 2011-02-16 中铁十二局集团第二工程有限公司 Combined shaping steel formwork for wholly casting tunnel side ditch cable channel
CN103266900A (en) * 2013-03-25 2013-08-28 中交路桥建设有限公司 Integrated quick moving formwork for tunnel multi-longitudinal cable trough construction
CN204002852U (en) * 2014-08-13 2014-12-10 中国铁建大桥工程局集团第一工程有限公司 A kind of highway tunnel integral movable type ditch cable trench construction formwork system
CN204371362U (en) * 2014-12-12 2015-06-03 中铁十九局集团有限公司 Tunnel ditch cable trough form trolley

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02271204A (en) * 1989-04-13 1990-11-06 Toshiba Corp Sample moving table
CN201377327Y (en) * 2009-04-08 2010-01-06 中铁一局集团有限公司 Movable slip form for tunnel ditch and cable trough
CN201747057U (en) * 2010-07-17 2011-02-16 中铁十二局集团第二工程有限公司 Combined shaping steel formwork for wholly casting tunnel side ditch cable channel
CN103266900A (en) * 2013-03-25 2013-08-28 中交路桥建设有限公司 Integrated quick moving formwork for tunnel multi-longitudinal cable trough construction
CN204002852U (en) * 2014-08-13 2014-12-10 中国铁建大桥工程局集团第一工程有限公司 A kind of highway tunnel integral movable type ditch cable trench construction formwork system
CN204371362U (en) * 2014-12-12 2015-06-03 中铁十九局集团有限公司 Tunnel ditch cable trough form trolley

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895582A (en) * 2015-04-20 2015-09-09 中铁二十五局集团第一工程有限公司 Overall template concrete building method for double-track tunnel ditch cable trough
CN105422139A (en) * 2015-12-14 2016-03-23 黄高飞 Tunnel ditch cable trough trolley
CN113062753A (en) * 2021-04-08 2021-07-02 贵州路桥集团有限公司 A slot lining cutting forming device for whole lining cutting platform truck of highway tunnel
CN113062753B (en) * 2021-04-08 2023-09-19 贵州路桥集团有限公司 Groove lining forming device for highway tunnel integral lining trolley
CN113153368A (en) * 2021-04-15 2021-07-23 中铁十七局集团第二工程有限公司 Fixing device of curb ditch template in tunnel
CN114165259A (en) * 2021-11-06 2022-03-11 中建八局第二建设有限公司 Cable trough and side trough casting die device and method for tunnel
CN114165259B (en) * 2021-11-06 2024-01-12 中建八局第二建设有限公司 Cable trough and side trough casting mold device and method for tunnel

Also Published As

Publication number Publication date
CN104514570B (en) 2017-01-25

Similar Documents

Publication Publication Date Title
CN104514570A (en) Tunnel ditch cable trough form trolley
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN103161126A (en) Road bridge variable section hollow high pier slip-form construction method
CN204899941U (en) Whole movable tunnel ditch cable duct formworking jumbo
CN103470272A (en) Trolley for concrete construction on multiple sections by employing mining method and construction method thereof
CN208329596U (en) A kind of semi-machine rail type subway station side wall template construction equipment
CN204371362U (en) Tunnel ditch cable trough form trolley
CN103195450A (en) Hydraulic tunnel inverted arch operation trolley and inverted arch construction method
CN107460889A (en) Integral movable support formwork in underground comprehensive pipe gallery construction and construction method thereof
CN104453951B (en) Combined type subway station lining template trolley for baffle
CN204851287U (en) Big section moving as a whole formula formwork support
CN210858744U (en) Tunnel lining trolley template
CN204357117U (en) A kind of after-pouring band beam-slab template and lattice column thereof
CN109629439B (en) Construction method of single-tower cable-stayed bridge
CN203248170U (en) Lining trolley for secondary lining construction of pedestrian crosswalk
CN201627587U (en) Overhang operating platform fixedly connected onto complete sectional hydraulic trolley
CN104929660B (en) Formation and construction set for continuous open-cut tunnel
CN204475184U (en) Urban light rail viaduct mountain type U beam Construction Supporting System
CN113356268A (en) Integrated movable type formwork system for comprehensive pipe rack
CN106284989B (en) The sliding form bracing system of double track and complete construction method
CN104500106A (en) Tunnel inverted arch construction die carrier and tunnel inverted arch construction process
CN204552774U (en) A kind of monolithic inverted arch mould bases of locating longitudinal waterstop
CN204960306U (en) Square column steel form with adjustable
CN217327341U (en) Self-propelled long-span variable cross-section hydraulic formwork trolley
CN115748449A (en) Construction method of shaped steel die special-shaped flower trough cast-in-place concrete anti-collision guardrail

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant