CN104514010B - A kind of large scale electrolytic cell restarting is locally stretched one's legs the method for light maintenance - Google Patents
A kind of large scale electrolytic cell restarting is locally stretched one's legs the method for light maintenance Download PDFInfo
- Publication number
- CN104514010B CN104514010B CN201310457734.8A CN201310457734A CN104514010B CN 104514010 B CN104514010 B CN 104514010B CN 201310457734 A CN201310457734 A CN 201310457734A CN 104514010 B CN104514010 B CN 104514010B
- Authority
- CN
- China
- Prior art keywords
- electrolytic cell
- legs
- stretching
- light maintenance
- periphery
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C25—ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
- C25C—PROCESSES FOR THE ELECTROLYTIC PRODUCTION, RECOVERY OR REFINING OF METALS; APPARATUS THEREFOR
- C25C3/00—Electrolytic production, recovery or refining of metals by electrolysis of melts
- C25C3/06—Electrolytic production, recovery or refining of metals by electrolysis of melts of aluminium
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Electrolytic Production Of Metals (AREA)
Abstract
Locally stretched one's legs the invention discloses a kind of large scale electrolytic cell restarting the method for light maintenance, and in particular to a kind of method for carrying out light maintenance of locally being stretched one's legs electrolytic cell during large scale electrolytic cell restarting.Technical problems to be solved are costly when being carried out large repairs at present to electrolytic cell, and the equipment startup time is longer, wastes the working time, and operating efficiency is low.The present invention comprises the following steps:1st, clear up stopping the electrolytic cell after groove;2nd, the serious carborundum side wall carbon block of the upper weathering of stretching one's legs to electrolytic cell periphery is changed after cleaning out;3rd, preheated coal tar is sent forth on the stretching one's legs of electrolytic cell periphery, 4, with the periphery paste heated carries out local light maintenance to sending stretching one's legs for coal tar forth, meet to start requirement so as to reach.Using the present invention after such method, overhaul cost is reduced, reduces startup risk, shortens and starts the time, improve operating efficiency.
Description
Technical field
The present invention relates to a kind of electrolytic cell, and in particular to electrolytic cell is locally stretched one's legs during a kind of large scale electrolytic cell restarting
The method for carrying out light maintenance.
Background technology
Electrolytic cell is in normal productive process, because certain cause specific causes electrolytic cell is improper to stop groove, current electrolysis
Groove is improper stop groove after equipment is overhauled, meet when electrolytic cell is again started up requiring to carry out restarting electrolytic cell, and
Stretching one's legs for electrolytic cell is not repaired;The finishing stretched one's legs to electrolytic cell is all that electrolytic cell is stopped when electrolytic cell needs overhaul
Groove is repaired, and needs during overhaul all to lay refractory brick, insulating brick, cathode carbon pieces etc. in electrolytic cell again, every electrolytic cell is big
Repairing expense about needs 1,400,000 or so, costly, needs to restart equipment after overhaul, and it is longer and big every time to start the time
Repair and waste the working time, cause operating efficiency low.
The content of the invention
The technical problem to be solved in the present invention be it is costly when being carried out large repairs at present to electrolytic cell, equipment start the time compared with
It is long, the working time is wasted, operating efficiency is low, there is provided it is a kind of simple to operate, overhaul number is reduced, reduces overhaul cost, is reduced
The large scale electrolytic cell restarting of the number of starts of electrolytic cell is locally stretched one's legs the method for light maintenance.
To achieve the above object, the present invention uses following technical proposals:A kind of large scale electrolytic cell restarting is locally stretched one's legs
The method of light maintenance, comprises the following steps:1st, clear up stopping the electrolytic cell after groove;2nd, to electrolytic cell periphery after cleaning out
The serious carborundum side wall carbon block of upper weathering of stretching one's legs is changed;3rd, preheated coal tar is sent forth on the stretching one's legs of electrolytic cell periphery
Oil, 4, with heat periphery paste carries out local light maintenance to sending stretching one's legs for coal tar forth, so as to reach meet start requirement.
The described cleaning to electrolytic cell includes the cleaning that aluminium is stayed to the electrolyte in stopped groove, bottom land, to furnace bottom negative electrode
Carbon block and groove surrounding are stretched one's legs the cleaning of upper carborundum, the secondary cleaning to weak part of stretching one's legs.
Using the present invention after the above method, when meeting that electrolytic cell is again started up requiring, according to stopped groove actual conditions
The part of weak part of stretching one's legs electrolytic cell is stretched one's legs and carries out light maintenance, is reduced overhaul cost, is reduced startup risk, is shortened when starting
Between, improve operating efficiency.
Brief description of the drawings
Fig. 1 is the structural representation of electrolytic cell.
Fig. 2 is that electrolytic cell is stretched one's legs the partial structural diagram before light maintenance.
Fig. 3 is that electrolytic cell is stretched one's legs the partial structural diagram after light maintenance.
Embodiment
As shown in Figure 1 to Figure 3, the present invention comprises the following steps:1st, clear up stopping the electrolytic cell 1 after groove;2nd, clear up
The serious carborundum side wall carbon block of weathering on 2 of stretching one's legs on electrolytic cell periphery is changed after clean;3rd, on electrolytic cell periphery
Send preheated coal tar on stretching one's legs forth, 4, with the periphery paste heated carry out local light maintenance to sending stretching one's legs for coal tar forth,
Required so as to reach to meet to start.
The described cleaning to electrolytic cell includes the cleaning that aluminium carbon cathode blocks are stayed to the electrolyte in stopped groove, bottom land 3,
Furnace bottom cathode carbon pieces and groove surrounding are stretched one's legs the cleaning of upper carborundum, the secondary cleaning to weak part of stretching one's legs.
Electrolytic cell is in normal productive process, and when certain cause specific causes that electrolytic cell is improper to stop groove, equipment is carried out
Maintenance, meet to carry out electrolytic cell when electrolytic cell is again started up requiring light maintenance, light maintenance carries out secondary open to electrolytic cell again after terminating
It is dynamic, overhaul number is reduced, reduces startup risk, shortens and starts the time, improve operating efficiency.
Claims (1)
- A kind of method of light maintenance 1. large scale electrolytic cell restarting is locally stretched one's legs, it is characterised in that:Comprise the following steps:1st, it is right Stop the electrolytic cell after groove (1) to be cleared up;2nd, the serious carborundum side of the upper weathering of stretching one's legs to electrolytic cell periphery after cleaning out Portion's carbon block is changed;3rd, preheated coal tar is sent forth on the stretching one's legs of electrolytic cell periphery (2), 4, with the periphery heated Paste and carry out local light maintenance to sending stretching one's legs for coal tar forth, required so as to reach to meet to start;The described cleaning to electrolytic cell Cleaning including staying aluminium to the electrolyte in stopped groove, bottom land (3), upper carborundum that furnace bottom cathode carbon pieces and groove surrounding are stretched one's legs Cleaning, the secondary cleaning to weak part of stretching one's legs.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310457734.8A CN104514010B (en) | 2013-09-30 | 2013-09-30 | A kind of large scale electrolytic cell restarting is locally stretched one's legs the method for light maintenance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310457734.8A CN104514010B (en) | 2013-09-30 | 2013-09-30 | A kind of large scale electrolytic cell restarting is locally stretched one's legs the method for light maintenance |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104514010A CN104514010A (en) | 2015-04-15 |
CN104514010B true CN104514010B (en) | 2018-03-16 |
Family
ID=52789876
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310457734.8A Expired - Fee Related CN104514010B (en) | 2013-09-30 | 2013-09-30 | A kind of large scale electrolytic cell restarting is locally stretched one's legs the method for light maintenance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104514010B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104451774A (en) * | 2014-12-29 | 2015-03-25 | 云南铝业股份有限公司 | Zero allowance cell shutting polymorph high roasting method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3969213A (en) * | 1973-10-26 | 1976-07-13 | Nippon Light Metal Company Limited | Aluminum electrolytic cells |
CN1696352A (en) * | 2004-05-13 | 2005-11-16 | 河南豫港龙泉铝业有限公司 | Method for repairing liner on side of electrolytic tank without stopping the tank |
CN101270483A (en) * | 2007-03-22 | 2008-09-24 | 山西华圣铝业有限公司 | Mending and ramming method for after reigniting electrolytic tank and clearing tank |
CN102433571A (en) * | 2010-09-29 | 2012-05-02 | 中国铝业股份有限公司 | Quick minor repair method for aluminum cell |
-
2013
- 2013-09-30 CN CN201310457734.8A patent/CN104514010B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3969213A (en) * | 1973-10-26 | 1976-07-13 | Nippon Light Metal Company Limited | Aluminum electrolytic cells |
CN1696352A (en) * | 2004-05-13 | 2005-11-16 | 河南豫港龙泉铝业有限公司 | Method for repairing liner on side of electrolytic tank without stopping the tank |
CN101270483A (en) * | 2007-03-22 | 2008-09-24 | 山西华圣铝业有限公司 | Mending and ramming method for after reigniting electrolytic tank and clearing tank |
CN102433571A (en) * | 2010-09-29 | 2012-05-02 | 中国铝业股份有限公司 | Quick minor repair method for aluminum cell |
Non-Patent Citations (1)
Title |
---|
浅谈电解槽二次启动前的清炉及维修;姚惠雄;《2007中国国际铝冶金技术论坛论文集》;20071231;第603-604页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104514010A (en) | 2015-04-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105618461A (en) | Method for recycling crystalline silicon solar cell module | |
CN205853122U (en) | A kind of efficient brick cutting device for building | |
CN106629738A (en) | Method of extracting silver from crystalline silicon solar panel | |
CN101660175B (en) | Method for roasting and starting aluminum electrolytic cell | |
CN1900369A (en) | Small repair secondary roasting starting method of pre-roasting anode aluminum electrolytic bath | |
CN104514010B (en) | A kind of large scale electrolytic cell restarting is locally stretched one's legs the method for light maintenance | |
CN108301023A (en) | A kind of online minor repair method of 300/380KA large-scale pre-baked cells | |
CN203578728U (en) | Device for repairing aluminum busbar of cathode of electrolytic cell | |
KR100834338B1 (en) | Metal heat treatment cooling right time waste heat frequency and re-application system. | |
CN100507089C (en) | Method for repairing liner on side of electrolytic tank without stopping the tank | |
CN201924089U (en) | Aluminum electrolysis cell emergency short circuit power outage device | |
CN102041525A (en) | Calcination method of heterotype cathode electrolytic cell | |
CN201441993U (en) | Large-scale part cleaning device | |
CN101985761A (en) | Roasting method for secondary startup of aluminum cell | |
CN201031256Y (en) | No power-off aluminum cell short circuit power off and grooving device of aluminum electrolyze series | |
CN205951447U (en) | Dual glass assembly prevents excessive pressure frame | |
CN102433571B (en) | Quick minor repair method for aluminum cell | |
CN201962374U (en) | Protective wall for repair of damaged side furnace wall of aluminum electrolysis cell without shutdown of aluminum electrolysis cell | |
CN108914160A (en) | A kind of large-scale pre-baked cell is in lines mending method | |
CN105239096B (en) | A kind of large-scale pre-baked aluminum electrolysis cell seamless connection baking start-up method | |
CN102560551A (en) | Electrolytic aluminum anodic steel claw repairing equipment | |
CN101956218A (en) | Method and device for baking aluminium electrolysis cell with special-shaped cathodes | |
CN107236970B (en) | The method for repairing and mending of electrolytic cell sideways furnace wall | |
CN104674305A (en) | Live pouring repair method of electrolytic cell busbar | |
CN205688033U (en) | There is the aluminium cell of stop gauge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: Anyang City, Henan province 456561 Luban Linzhou City Canal Economic and Technological Development Zone on the north side of East Avenue Applicant after: LINZHOU LINFENG ALUMINUM AND ELECTRICITY Co.,Ltd. Address before: Anyang City, Henan Province, Linzhou City, 456571 cross Shuifeng Bao Industrial Zone Applicant before: LINZHOU LINFENG ALUMINUM AND ELECTRICITY Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180316 Termination date: 20210930 |