CN104499495A - 一种基坑止水帷幕墙 - Google Patents
一种基坑止水帷幕墙 Download PDFInfo
- Publication number
- CN104499495A CN104499495A CN201410810752.4A CN201410810752A CN104499495A CN 104499495 A CN104499495 A CN 104499495A CN 201410810752 A CN201410810752 A CN 201410810752A CN 104499495 A CN104499495 A CN 104499495A
- Authority
- CN
- China
- Prior art keywords
- foundation pit
- pile
- jet grouting
- piles
- curtain wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/12—Restraining of underground water by damming or interrupting the passage of underground water
- E02D19/18—Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
本发明公开了一种基坑止水帷幕墙,属于基坑施工领域,在基坑支护桩外侧或桩间设置至少一层由若干高压旋喷桩构成的止水帷幕,各高压旋喷桩桩底置于基坑坑底以下不透水地层,所述同层止水帷幕的相邻高压旋喷桩之间相互咬合,且相邻层止水帷幕间的相邻高压旋喷桩之间也相互咬合,设于桩间的止水帷幕与支护桩之间也咬合,高压旋喷桩桩的咬合部位为桩径的1/4~1/3。本发明在地下水渗透系数大,采取管井降水难度大时,可发挥较好的咬合优势,方便快捷,是一种止水效果显著的基坑止水帷幕墙。
Description
技术领域
本发明属于基坑施工领域,尤其涉及基坑止水施工。
背景技术
目前,常用的止水帷幕包括深层搅拌桩、高压摆喷墙等。
深层搅拌桩防水帷幕的优点是搅拌后水泥土不透水,施工速度快,造价低。但帷幕深度受限制,标贯击数大于15击的土层难以施工,且桩体垂直度要求高,若偏差容易造成叉脚漏水。
高压摆喷墙作止水帷幕能形成搭接良好的不透水墙,止水效果好,施工速度快,但造价略高于搅拌桩。
现有高压旋喷桩,是以高压旋转的喷嘴将水泥浆喷入土层与土体混合,形成连续搭接的水泥加固体。施工占地少、振动小、噪音较低,但容易污染环境,成本较高,对于特殊的不能使喷出浆液凝固的土质不宜采用。
现有高压旋喷桩一般是用来进行地基处理的,地基处理时桩芯间距一般为桩径的3-5倍桩径。
发明内容
本发明的目的在于:提出一种在地下水渗透系数大,采取管井降水难度大时,可发挥较好的咬合优势,方便快捷,止水效果显著的基坑止水帷幕墙。
本发明目的通过下述技术方案来实现:
一种基坑止水帷幕墙,在基坑支护桩外侧或桩间设置至少一层由若干高压旋喷桩构成的止水帷幕,各高压旋喷桩桩底置于基坑坑底以下不透水地层,所述同层止水帷幕的相邻高压旋喷桩之间相互咬合,且相邻层止水帷幕间的相邻高压旋喷桩之间也相互咬合,设于桩间的止水帷幕与支护桩之间也咬合,高压旋喷桩桩的咬合部位为桩径的1/4~1/3。
作为选择,相邻层止水帷幕的至少3个相邻高压旋喷桩之间相互咬合且与支护桩咬合。
工作过程为:该基坑止水帷幕墙结构,在基坑外侧或桩间设置高压旋喷咬合桩,利用高压旋喷咬合形成连续的加固墙,增强复合地基的不透水性,防止地下水流动和地下室浮力,并达到坑内降水的目的。
本发明的有益效果:
1)利用高压旋喷固化和置换天然基坑侧壁土体;
2)利用高压旋喷咬合形成连续的止水帷幕墙;
3)增强支护结构整体刚度和侧向承载力能力;
4)高压旋喷咬合墙增强基坑侧壁土体的不透水性,防止地下水流动和地下室浮力;
5)减低对基坑侧壁天然土体的要求,工艺简单,不同土层适应性强。
附图说明
图1是本发明实施例1的旋喷桩止水帷幕墙平面示意图;
图2是本发明实施例1的旋喷桩止水帷幕墙剖面图;
图3是本发明实施例2的旋喷桩止水帷幕墙平面示意图;
图4是本发明实施例3的旋喷桩止水帷幕墙平面示意图;
其中图中(1)为基坑边线,(2)为高压旋喷桩,(3)高压旋喷桩咬合部位,(4)止水帷幕墙,(5)为桩顶标高(自然地面),(6)为基坑底面。
具体实施方式
下列非限制性实施例用于说明本发明。
实施例1:
参考图1、2所示,一种基坑止水帷幕墙,在基坑外侧设置一层由若干高压旋喷桩2构成的止水帷幕墙4,各高压旋喷桩2桩底置于基坑坑底以下不透水地层,同层止水帷幕墙4的相邻高压旋喷桩2之间相互咬合,高压旋喷桩桩2的咬合部位3为桩径的1/3~1/2。
实施例2:
参考图3所示,一种基坑止水帷幕墙,在基坑外侧设置两层由若干高压旋喷桩2构成的止水帷幕墙4,各高压旋喷桩桩2底置于基坑坑底以下不透水地层,同层止水帷幕墙4的相邻高压旋喷桩2之间相互咬合,且相邻层止水帷幕墙4间的相邻高压旋喷桩2之间也相互咬合,高压旋喷桩桩2的咬合部位3为桩径的1/4~1/3。相邻层止水帷幕墙4的4个相邻高压旋喷桩2之间相互咬合。
实施例3:
参考图4所示,本实施例与实施例2基本相同,其区别在于:相邻层止水帷幕墙4的3个相邻高压旋喷桩2之间相互咬合。
实施例4:
本实施例与实施例2、3基本相同,其区别在于:在基坑支护桩之间设置至少一层由若干高压旋喷桩2构成的止水帷幕墙4,设于桩间的止水帷幕与支护桩之间也咬合。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。
Claims (2)
1.一种基坑止水帷幕墙,其特征在于:在基坑支护桩外侧或桩间设置至少一层由若干高压旋喷桩构成的止水帷幕,各高压旋喷桩桩底置于基坑坑底以下不透水地层,所述同层止水帷幕的相邻高压旋喷桩之间相互咬合,且相邻层止水帷幕间的相邻高压旋喷桩之间也相互咬合,设于桩间的止水帷幕与支护桩之间也咬合,高压旋喷桩桩的咬合部位为桩径的1/4~1/3。
2.如权利要求1所述的基坑止水帷幕墙,其特征在于:相邻层止水帷幕的至少3个相邻高压旋喷桩之间相互咬合且与支护桩咬合。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410810752.4A CN104499495A (zh) | 2014-12-23 | 2014-12-23 | 一种基坑止水帷幕墙 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410810752.4A CN104499495A (zh) | 2014-12-23 | 2014-12-23 | 一种基坑止水帷幕墙 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104499495A true CN104499495A (zh) | 2015-04-08 |
Family
ID=52940938
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410810752.4A Pending CN104499495A (zh) | 2014-12-23 | 2014-12-23 | 一种基坑止水帷幕墙 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104499495A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104879141A (zh) * | 2015-06-02 | 2015-09-02 | 杨积凯 | 一种隧道底部堵漏结构及其施工方法 |
CN105350544A (zh) * | 2015-09-25 | 2016-02-24 | 中国建筑第八工程局有限公司 | 用于含有块石区域的止水帷幕及其施工方法 |
CN108487924A (zh) * | 2018-02-27 | 2018-09-04 | 中国矿业大学 | 一种松散煤层沿空掘巷窄煤柱的加固方法 |
CN111877359A (zh) * | 2020-07-23 | 2020-11-03 | 广东宏堂基础建设工程有限公司 | 一种支护桩封闭式围护结构及其施工方法 |
CN113006109A (zh) * | 2021-03-02 | 2021-06-22 | 北京住总第一开发建设有限公司 | 一种强透水地层区基坑止水帷幕的施工方法 |
CN114319379A (zh) * | 2021-12-31 | 2022-04-12 | 上海市机械施工集团有限公司 | 一种基坑支护结构及施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB561765A (en) * | 1943-02-19 | 1944-06-02 | Bell Noel Gonne | Improvements in piles and foundations |
CN101328713A (zh) * | 2008-07-18 | 2008-12-24 | 华丰建设股份有限公司 | 圆形深基坑支护的施工方法 |
CN102286984A (zh) * | 2011-05-25 | 2011-12-21 | 深圳市鸿荣轩建设工程有限公司 | 一种止水帷幕及其施工方法 |
CN102286985A (zh) * | 2011-07-11 | 2011-12-21 | 中交一航局第四工程有限公司 | 双高压旋喷桩止水帷幕施工方法 |
CN202626978U (zh) * | 2012-04-10 | 2012-12-26 | 中冶建筑研究总院有限公司 | 一种水泥土咬合桩组及其构成的防渗墙、建筑基坑支护体系 |
CN203429645U (zh) * | 2013-08-23 | 2014-02-12 | 中建三局第一建设工程有限责任公司 | 边坡支护结构总成 |
CN204401638U (zh) * | 2014-12-23 | 2015-06-17 | 中国建筑西南勘察设计研究院有限公司 | 一种基坑止水帷幕墙 |
-
2014
- 2014-12-23 CN CN201410810752.4A patent/CN104499495A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB561765A (en) * | 1943-02-19 | 1944-06-02 | Bell Noel Gonne | Improvements in piles and foundations |
CN101328713A (zh) * | 2008-07-18 | 2008-12-24 | 华丰建设股份有限公司 | 圆形深基坑支护的施工方法 |
CN102286984A (zh) * | 2011-05-25 | 2011-12-21 | 深圳市鸿荣轩建设工程有限公司 | 一种止水帷幕及其施工方法 |
CN102286985A (zh) * | 2011-07-11 | 2011-12-21 | 中交一航局第四工程有限公司 | 双高压旋喷桩止水帷幕施工方法 |
CN202626978U (zh) * | 2012-04-10 | 2012-12-26 | 中冶建筑研究总院有限公司 | 一种水泥土咬合桩组及其构成的防渗墙、建筑基坑支护体系 |
CN203429645U (zh) * | 2013-08-23 | 2014-02-12 | 中建三局第一建设工程有限责任公司 | 边坡支护结构总成 |
CN204401638U (zh) * | 2014-12-23 | 2015-06-17 | 中国建筑西南勘察设计研究院有限公司 | 一种基坑止水帷幕墙 |
Non-Patent Citations (1)
Title |
---|
杨玉杰: ""旋喷桩止水帷幕在地铁基坑中的应用"", 《市政技术》 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104879141A (zh) * | 2015-06-02 | 2015-09-02 | 杨积凯 | 一种隧道底部堵漏结构及其施工方法 |
CN104879141B (zh) * | 2015-06-02 | 2017-11-03 | 杨积凯 | 一种隧道底部堵漏结构及其施工方法 |
CN105350544A (zh) * | 2015-09-25 | 2016-02-24 | 中国建筑第八工程局有限公司 | 用于含有块石区域的止水帷幕及其施工方法 |
CN108487924A (zh) * | 2018-02-27 | 2018-09-04 | 中国矿业大学 | 一种松散煤层沿空掘巷窄煤柱的加固方法 |
CN108487924B (zh) * | 2018-02-27 | 2019-06-04 | 中国矿业大学 | 一种松散煤层沿空掘巷窄煤柱的加固方法 |
CN111877359A (zh) * | 2020-07-23 | 2020-11-03 | 广东宏堂基础建设工程有限公司 | 一种支护桩封闭式围护结构及其施工方法 |
CN113006109A (zh) * | 2021-03-02 | 2021-06-22 | 北京住总第一开发建设有限公司 | 一种强透水地层区基坑止水帷幕的施工方法 |
CN113006109B (zh) * | 2021-03-02 | 2022-09-09 | 北京住总第一开发建设有限公司 | 一种强透水地层区基坑止水帷幕的施工方法 |
CN114319379A (zh) * | 2021-12-31 | 2022-04-12 | 上海市机械施工集团有限公司 | 一种基坑支护结构及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104499495A (zh) | 一种基坑止水帷幕墙 | |
CN102286984A (zh) | 一种止水帷幕及其施工方法 | |
CN206090655U (zh) | 注浆孔封堵结构 | |
CN206090653U (zh) | 锚杆静压桩注浆结构 | |
CN102691296A (zh) | 一种桩侧静压注浆桩底旋喷注浆的管桩基础及其施工方法 | |
CN103924987B (zh) | 一种smw工法桩盾构洞门防渗水结构及其施工方法 | |
CN203668969U (zh) | 地下连续墙加固防水结构 | |
CN202559361U (zh) | 一种预制高强混凝土薄壁钢管桩基坑支护结构 | |
CN105178285B (zh) | 一种扩大岩土注浆加固和防渗堵塞范围的方法 | |
CN202194149U (zh) | 一种止水帷幕 | |
CN102912797A (zh) | 一种含有降水功能的基坑支护方法 | |
CN102433878A (zh) | 一种管桩基础的后注浆装置及其施工方法 | |
CN104695456A (zh) | 一种新型竖井水平旋喷桩基坑侧壁止水帷幕的施工方法 | |
CN106381869A (zh) | 一种淤泥夹块石土层双护筒冲击成桩方法 | |
CN204401638U (zh) | 一种基坑止水帷幕墙 | |
CN110080169A (zh) | 一种基于地下室利用的围海造地的施工方法 | |
CN202482882U (zh) | 垃圾卫生填埋场垂直复合帷幕 | |
CN107268599B (zh) | 一种基底埋藏式大型充填溶洞加固结构及加固方法 | |
CN207003421U (zh) | 一种坐落于硬岩顶面的钢板桩结构 | |
CN201400890Y (zh) | 复合止水帷幕结构 | |
CN208056081U (zh) | 一种用于富水地区的双重止水结构 | |
CN104074183A (zh) | 一种钻孔及根部注入砼的组合桩植桩结构及施工方法 | |
CN208472592U (zh) | 紧邻深基坑桥梁摩擦桩的钢管桩加固构造 | |
CN206736929U (zh) | 保护周边建筑物的基坑结构 | |
JP2013147805A (ja) | 液状化対策方法及び構造 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150408 |