CN104498805B - Production method of high-carbon low-nitrogen steel for strand wires - Google Patents

Production method of high-carbon low-nitrogen steel for strand wires Download PDF

Info

Publication number
CN104498805B
CN104498805B CN201410838487.0A CN201410838487A CN104498805B CN 104498805 B CN104498805 B CN 104498805B CN 201410838487 A CN201410838487 A CN 201410838487A CN 104498805 B CN104498805 B CN 104498805B
Authority
CN
China
Prior art keywords
steel
slag
carbon
nitrogen
ton
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410838487.0A
Other languages
Chinese (zh)
Other versions
CN104498805A (en
Inventor
孔祥涛
周德
孙齐松
王勇
张玮
李政嵩
周剑波
丁宁
程四华
张慧峰
王立峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shougang Group Co Ltd
Original Assignee
Shougang Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shougang Corp filed Critical Shougang Corp
Priority to CN201410838487.0A priority Critical patent/CN104498805B/en
Publication of CN104498805A publication Critical patent/CN104498805A/en
Application granted granted Critical
Publication of CN104498805B publication Critical patent/CN104498805B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Treatment Of Steel In Its Molten State (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Abstract

The invention relates to a production method of high-carbon low-nitrogen steel for strand wires, and belongs to the technical field of steelmaking application. A small 80-ton converter is used for performing a double-slag operation, endpoint carbon is controlled at 0.15%, the tapping temperature is 1610 DEG C, slag-stopping tapping is performed, the thickness of roughing slag in the tapping process of the converter is controlled between 0mm and 40mm; a nitrogen-doped C carburant contains N of 0.005 to 0.025%, 6kg of carbon is blended with per ton of steel, Si-Ca-Ba is used for deoxidizing, the addition amount is 2.0kg per ton of steel, and the addition amount is 4.5kg per ton of steel synthetic slag; an LF80-ton refining furnace uses a synthetic slag as a slag making material; a 150mm X 150mm small square billet is used for continuous casting, a crystallizer is electromagnetically stirred at 380A and 4Hz, a high alkalinity large ladle covering agent is used, and large ladle argon shielding, tundish argon blowing in the whole process, and submersed nozzle full protection casting are used. According to the steel for steel stranded wires produced by the invention, the nitrogen in steel is controlled within 40ppm, the quality level of steel for the steel stranded wires produced by a vacuum degassing process and a large square billet continuous casting twice-heating production process is achieved, the production cost of a steel making working procedure is substantially reduced, the competitiveness of enterprise products is increased, and the economic and social benefits are great.

Description

A kind of production method of the low nitrogen twisted wire steel of high-carbon
Technical field
The invention belongs to steelmaking technical field, the production method of the low nitrogen twisted wire steel of more particularly to a kind of high-carbon, adopt It is low that the antivacuum flow process of primary converter (80 tons)+lf (80 tons) refining furnace+small billet (150mm × 150mm) continuous casting produces high-carbon Nitrogen steel it is adaptable to converter, lf stove, continuous small-billet casting adopting non-vacuum process produce high-carbon low nitrogen twisted wire steel (carbon content 0.75~ 0.83%;Nitrogen content: 20~40ppm) method, be applied to high-grade building prestressed concrete field.
Background technology
In hypereutectoid steel (c > 0.77%), nitrogen content is higher, and between dislocation, stress is bigger, and the plasticity index of steel is poorer, and the time gets over Long.Nitrogen in steel under specified conditions can reduce the performance of material, and its presence reduces the toughness of steel and moulding.So that steel is produced should Become timeliness, aging precipitation and aged brittleness.It was verified that the nitrogen in steel controls in different levels, the plasticity to steel and timeliness Time effects are very big.Certain factory (accompanying drawing 1) produces the different control process of the nitrogen that high-carbon steel swrh82b is experienced: nitrogen in steel control Between 55~90ppm, average content is 65ppm to system.The same day offline reduction of area is maintained at 0~12.5%, wire rod fracture base It is the fracture apperance that rock-candy structure or center portion only have small plastic deformation in basis;The reduction of area of 10 days is 21.6%;15 days Reduction of area is 28.9%;The reduction of area of 30 days is 36.5%.
Nitrogen in steel controls between 45~70ppm, and average content is 55ppm.The same day offline reduction of area is maintained at 10~ 14.5%, wire rod fracture substantially center portion only has the fracture apperance of small plastic deformation;The reduction of area of 10 days is 29.2%;15 days Reduction of area be 32.3%;The reduction of area of 30 days is 37.4%.Nitrogen in steel controls between 32~42ppm, and average content is 38ppm.The same day offline reduction of area is 17.5%, and normal fracture is plastic deformation fracture apperance;The reduction of area of 5 days is 32.7%;The reduction of area of 10 days is 35.5%;The reduction of area of 11~30 days is to fluctuate between 37.3~37.9%, reduction of area ripple Dynamic very little.Nitrogen in steel controls between 20~32ppm, and average content is 27ppm.The same day offline reduction of area is 26%, 2 days Reduction of area is 30%;The reduction of area of 5 days is 35%;The reduction of area of 6~30 days fluctuates between 36~38%.
Generally speaking, nitrogen in steel content is lower, and the reduction of area of wire rod is higher, this namely process for making always pursue steel In Control of Nitrogen Content more low better the reason, this is related to a production process cost and economical efficiency.
At present, high-carbon, the main side of low nitrogen steel (60si2mn, gcr15, swrh77b and swrh82b) are produced in the world Formula is: molten iron pretreatment → converter smelting+lf (+rh) refine → molding (big cross section continuous casting square billet) → secondary cogging → high-speed line Material controlled rolling → stelmor strength cools down.This is current Japan, European most widely used mode, the such as Sang Deweike of Sweden Factory's casting blank section is 265mm × 365mm, and Belgian arbed casting machine section is 260mm × 260mm, the roechljng factory of Germany Casting machine section is 240mm × 240mm, Di Sen ruhrort factory casting machine section 260mm × 330mm, and the casting machine section of Nippon Steel is 220mm×220mm.Baosteel adopts die casting process, just shuts out 130mm × 130mm~160mm by molding base (big cross section continuous casting billet) The semifinished product of × 160mm.Xing Gang rolls into 150mm × 150mm using 280mm × 325mm rectangular bloom cogging, and its technological advantage is: Meet to big degree the manufacturing requirementss of steel strand wires steel swrh82b wire rod: Cleanliness of Molten Steel degree is good, deoxidation removes and is mingled with Thing is fully (as Nippon Steel, Baosteel product: t [o] < 20ppm;[n] < 60ppm), post bake cogging avoid the center of continuous casting billet The harm of segregation and shrinkage cavity, surface quality are good, compression ratio is big.Shortcoming is complex procedures, lumber recovery is low, production cost is high, the energy Consume pollute greatly more.
For reducing production cost, domestic each iron and steel enterprise, when smelting steel strand wires with steel swrh82b, generally eliminates vacuum Degasser, nitrogen in steel, hydrogen body burden are higher.At present, the nitrogen normal level in domestic swrh82b steel is in 50~70ppm, same When in the operation of rolling, due to imposed deformation, force cooling and phase transformation, there is substantial amounts of residual stress in just offline wire rod (rolling stress, temperature stress, transformation stress).
Release due to gas and residual stress requires time for, and this just leads to swrh82b wire rod to use front needs in user Carry out Ageing Treatment.Nitrogen main harm in swrh82b shows as forming with corner angle the crisp folder of property with the element such as titanium, aluminum in steel Debris, after a certain amount of plastic deformation, inside small cavity first, and with the increase of deflection, empty quantity increases Adduction is mutually polymerized, and ultimately results in Materials Fracture.Compared with plastic occluded foreignsubstance, nitride forms brittle inclusion and is more easy to become high The origin of ductile fracture in the carbon steel cold-drawn course of processing.
Most enterprises producing high-carbon steel are limited by existing smelting equipment, cause the change of swrh77b, swrh82b steel Study point unstable, the degree of purity of steel is low.Particularly nitrogen in steel content fluctuation range fluctuates the upper limit, even super from standard min Mark, during causing the drawing of wire drawing and twisting, wire broken rate is higher, and typical case is due to the higher fracture apperance causing of nitrogen in steel content See accompanying drawing 2,3.So, after causing product enterprise drawing, the index fluctuation range such as product strength, toughness is big, and product qualified rate is low; On the other hand easily in drawing, cause brittle failure, cannot process when serious.
Content of the invention
Present invention aim at providing a kind of production method of high-carbon low nitrogen twisted wire steel, using primary converter (80 tons)+lf The antivacuum flow process of (80 tons) refining furnace+small billet (150mm × 150mm) continuous casting produces high-carbon low nitrogen steel method, is suitable for Produce high-carbon, low nitrogen steel twisted wire steel (carbon content 0.75~0.83% in converter, lf stove, continuous small-billet casting adopting non-vacuum process;Nitrogen Content 20~40ppm);Join carbon including molten iron → converter smelting → slag-stopping tapping → ladle, deoxidation and alloying → ladle slag changes Matter → lf ladle refining → feed si-ca line → steel ladle bottom argon blowing soft blow → 150mm × 150mm small billet full guard casting → crystallization Device electromagnetic agitation → heating → controlled rolling → control cooling.It is applied to high-grade building prestressed concrete field.
The steel strand wires steel being produced using the present invention, nitrogen in steel controls within 40ppm, reach vacuum degassing process, Bloom continuous casting two fire is become a useful person the steel strand wires steel quality level of technique productions, steel making working procedure production cost is greatly lowered, increases Plus Competitive Products, there is larger economic benefit and social benefit.
The technical parameter controlling in technique is as follows:
Converter adopts 80 tons of primary converter double slag operations, and aim carbon presses 0.15% control, 1610~1620 DEG C of tapping temperature, gear Slag is tapped, and controls the slag thickness in converter tapping process between 0~40mm;Micro- nitrogen carburant: n:0.005~0.025%, Join carbon 6kg/ ton steel, use si-ca-ba deoxidation, addition 2.0kg/ ton steel, 4.5kg/ ton steel synthetic slag;
Lf (80 tons) refining furnace slag material uses synthetic slag, active lime: (cao+mgo): 96.5~98%, sio2: 1~ 1.5%, co2: 1~2.0%, activity degree (4mol/ml-hcl, 40 ± 1 DEG C of temperature, 10min) > 350ml;Aluminum vanadine: al2o3: 75 ~97%, sio2: 0~10%;Cao:1~5%, mgo:2~9.5%, h2O:0~0.5%;Fluorite: caf2: 85.44~ 99%, sio2: 1~14%, s:0~0.5%, p:0~0.06%, total quantity of slag controls according to 1.0~1.2 tons, and aluminum vanadine controls Within 80~100kg, the top of the slag adds fe-si powder and carbide deoxidation, formed in power supply 15min minute white slag and finishing slag tfe < 1.0%, reduce a [o], s content in steel;Lf stove feeds ca-si line 1m/ ton steel, soft blow argon after line feeding, flow 40 at the end of processing ~60l/min, the time >=10min, slightly springs up not exposed steel with the top of the slag and is advisable, and makes to be mingled with abundant floating, refining treatment in steel Complete target a [o]: 0~10ppm.
Using 150mm × 150mm continuous small-billet casting, crystallizer adopts the electromagnetic agitation of 380a, 4hz, big using high alkalinity Covering agent, big bag argon envelope, tundish whole process Argon, the casting of submersed nozzle full guard, cast is permanent according to 1.8~2.0m/min Casting speed control, the Metal in Tundish degree of superheat controls at 25~35 DEG C, and continuous casting two cold is poured into a mould using 0.75l/kg specific water;Make With mg-ca matter dry type material strip barricade tundish, full guard cast, big bag argon envelope protects sleeve pipe argon flow amount 30~50l/min, not Plus forbid during sleeve pipe to add coverture to middle bag impact zone, open and pour front tundish argon filling, tundish selects high alkalinity coverture;Knot Brilliant device covering slag low viscosity high alkalinity special (viscosity: 1300 DEG C, 4~6 pools;Basicity (cao/sio2): 0.80~1.1) high-carbon steel Covering slag, crystallizer discharge 120 ton hour, Spraying Water of Nozzles in Secondary Cooling curve selects 0.75l/kg steel specific water;Dummy bar head goes out knot M-EMS is opened, last stove stopper stops electromagnetic agitation after stopping pouring after brilliant device;Keep senior middle school's bag liquid level cast, mistake Liquid level 700mm in journey, keeps liquid level stabilizing;Execute minimum middle bag liquid level and be not less than 400mm and carry out cast system, open and pour first Base and last base crop, tail are excised according to 2.0 meters of length.Company pours when stopping pouring, and plucks sleeve pipe using after first stopping to pour.
Converter adopts double slag operation, and head criticizes dephosphorized slag: oxygen consumption: 820~900m3/n;1380~1400 DEG C of half steel temperature, Slag dual alkalinity r:2.0~2.5;Decarbonized slag: aim carbon is pressed 0.10~0.20% and controlled, 1610~1630 DEG C of tapping temperature, Slag finishing slag dual alkalinity r:3.0~3.5;Slag-stopping tapping, controls slag thick between 0~40mm.
Using micro- nitrogen carburant (n:0.005~0.025%) 6kg/ ton steel carburetting, using calsibar alloy 2.0kg/ ton steel Deoxidation, 4.5kg/ ton steel synthetic slag;Enter lf refine stand control oxygen activity 8~18ppm, refine finishing slag fe+mno≤1.0%;Hello Ca-si line 1m/ ton steel carries out being mingled with degenerative treatments, and soft argon blowing time was at 10 minutes.
Adopt crystallizer to join electromagnetic agitation to reduce strand Central Carbon Segregation and shrinkage cavity, control the Metal in Tundish degree of superheat 25 ~35 DEG C, using the casting of 1.80~2.0m/min pulling rate full guard, bis- specific waters of 0.75kg/l, the nitrogen content interval in steel is 0.0020~0.0033%, average out to 0.0027%, nitrogen controls horizontal exceeding molten iron pretreatment → converter smelting+lf (+rh) essence The control level of refining → molding (big cross section continuous casting square billet) → secondary cogging technics flow process.
Concrete technology route:
Molten iron → 80 ton converter smelting (double slag operation) → slag-stopping tapping → ladle deoxidation alloying → ladle slag modification → Lf (80 tons) ladle refining (include temperature raising, alloy fine setting, desulfurization) → feed si-ca line → ladle blow soft blow argon → 150mm × The casting of 150mm billet caster full guard, M-EMS → strand inspection → heating → controlled rolling → control cooling.
Main technique measure:
When molten iron si:0.30~0.60%;S < 0.040%, just can carry out smelting into stove.Converter adopts double slag operation, Head batch dephosphorized slag: oxygen consumption is according to 880m3/ n controls;1360~1400 DEG C of range restraint of half steel temperature, dephosphorization basicity of slag according to 2.0 controls, duration of blast controlled according to 240 seconds.Aim carbon presses 0.15% control, p≤0.015%, s≤0.020%, finishing slag alkali Degree (cao/sio2)>3.0.Tapping temperature presses 1610~1630 DEG C of controls.The cooperation later stage slag retaining cone tapping of early stage skimming ball, controls Ladle thickness of slag layer 0~40mm.
Stokehold is joined carbon and is adopted the micro- nitrogen carburant of 6kg/ ton steel (n:0.005~0.025%), and remainder is increased using common Carbon agent polishing;Use si-ca-ba deoxidation, addition 2.0kg/t steel.Manganese is joined using mn-fe, si-fe joins silicon, absorbance according to 92% control.
The tapping time >=5min.Using slag-stopping tapping, converter slag slag thickness≤40mm in ladle;Binary is added during tapping Synthetic slag 4kg/ ton steel synthetic slag;Tapping process whole process BOTTOM ARGON BLOWING (argon pressure must assure that between 1.0~1.1mpa).
Molten steel pre- blowing argon gas 3 minutes (flow 300~400nl/min) to after refining station, and situation is seethed according to liquid level Suitably adjust.Slag material uses synthetic slag, active lime (cao+mgo:93~99%, activity degree (4mol/ml-hcl, temperature 40 ± 1 DEG C, 10min) > 350ml), aluminum vanadine (al2o3: 75~95%;sio2: 0~10%)), fluorite (caf2: 90~98%; sio2: 0~9%), the quantity of slag controls (aluminum vanadine add less control within 100kg) by 1.2 tons, and the top of the slag adds fe-si powder and carbide Deoxidation, strives for forming white slag and finishing slag tfe < 1.0% in power supply 15min minute, reduces a in steel as far as possibleo, s content.Guarantee Fast Slag Melting, various slag charges will add as early as possible.The adjustment of last batch of alloy finish Argon stirring >=5min (flow 300~ 400nl/min), uniform to ensure alloying component.
Lf stove feeds ca-si line 1m/ ton steel stove at the end of processing, and carries out deformation processing of inclusion, soft blow argon after line feeding (flow 40~60l/min) time must protect >=10min, slightly spring up not exposed steel with the top of the slag and be advisable, and makes to be mingled with steel on fully Floating.Refining treatment finishes target a [o]: 0~10ppm.
150mm × 150mm continuous small-billet casting, crystallizer adopts the electromagnetic agitation of 380a, 4hz, using the big bag of high alkalinity Coverture, big bag argon envelope, tundish whole process Argon, the casting of submersed nozzle full guard, cast is according to 1.80m/min pulling rate control System, 25~35 DEG C of controls of the Metal in Tundish degree of superheat, continuous casting two cold is poured into a mould using 0.75l/kg specific water.
Big bag is using band ar envelope long nozzle, molding casting.Using mg-ca matter dry type material strip barricade tundish, full guard Cast, big bag protection sleeve pipe argon flow amount 30~50l/min, forbids when uncased to add coverture to middle bag impact zone.Open Bag argon filling in before pouring.Tundish selects high alkalinity coverture;Crystallizer protecting residue selects low viscosity, the high-carbon steel of good heat insulating Mould flux, it is to avoid slag entrapment in mold.
Crystallizer discharge 120~130m3/ h, Spraying Water of Nozzles in Secondary Cooling curve selects 0.75l/kg steel specific water.Dummy ingot Head opens M-EMS after going out crystallizer, and last stove stopper stops electromagnetic agitation after stopping pouring.M-EMS Parameter: 380a, 4hz.Keep the cast of senior middle school bag liquid level, during liquid level 700mm, keep liquid level stabilizing.During strict implement is minimum Bag liquid level is not less than 400mm.Open and pour first base and last base crop, tail according to 2.0 meters of length.Even pour and adopt when stopping pouring Pluck sleeve pipe after first stopping to pour, forbid naked pouring.
Brief description
Fig. 1 is certain factory's different phase swrh82b timeliness data.
Fig. 2 cleaves photo for wire drawing.
Fig. 3 is wire drawing transverse fissure photo figure.
Specific embodiment
The present invention can be implemented in integrated iron and steel works, and Shougang Changzhi Iron & Steel Co., Ltd. steel mill is presented herein below, employing this The example that open-birth is produced.
Process route is: high-quality molten iron → ld (80 tons) converter smelting → converter slag-resisting tapping → ladle deoxidation alloying → Lf (80 tons) ladle refining furnace → feed si-ca line → steel ladle bottom argon blowing soft blow → 150mm × 150mm billet caster → strand.
Ld converter smelting main technologic parameters:
Volume after laying bricks: 58.5m3;Volumetric ratio [v/t]: 0.83;Tapping hole diameter [in d]: 150mm;Tapping hole angle: 10 ° of nozzle types: four hole Lavalles;Throat diameter: 31.86mm;Outlet diameter: 41.05mm;Spray orifice and oxygen rifle center wire clamp Angle: 12 ° 40 ';Mach number: 1.98;Oxygen operating pressure is 0.75~0.95mpa;Oxygen flow: 13000~16000m3/h; Ladle material: using aluminium-magnesia carbon brick and spinel pouring material.
Lf ladle refining furnace main technologic parameters:
Using one piece of bottom-blown air brick, carry out bottom blowing refining (all using argon).Ladle baking: using heat accumulating type baking Device (using coke-stove gas).Rectification systems: furnace rear on-line argon-blow and line feeding;80 tons of double lf ladle refining furnaces, heat energy 3~5 DEG C/min of power, power 14mva.
Continuous casting main technologic parameters:
5 machine 5 flows the basic arc radius of billet caster: r10m;Cast section: 150mm × 150mm;Cut lengths: 3.8 ~12m.Section: 150mm × 150mm.Pulling rate: 1.5~3m/min, average 2.5m/min.Crystallizer: copper pipe length 1000mm. Mold oscillation pattern: sinusoidal vibration.Frequency: 60~240 beats/min.Amplitude ± 5mm.Automatic liquid surface control mode: ce137 is put Penetrate source.Accuracy of detection: ± 3mm.Crystallizer discharge: 160m3/h.Electromagnetic agitation specifications parameter: magnetic stirrer rated current: 350a;Rated voltage: 380v.Apparent energy: 230kva active power: 40kw (max) frequency: 2~8hz (6hz).Insulation etc. Level: h level.Crystallizer discharge: 150m3/h.Infrared cut-to-length control system: detection cut lengths 9~12m;Dummy ingot rod type: scratch Property chain dumming bar.
Embodiment 1: heat (batch) number 6a201382
Converter smelting:
Molten iron condition c:4.25%, si:0.56%, mn:0.51%, p:0.12%, s:0.022%, temperature: 1318 DEG C.
Burden structure: 68.4 tons of molten iron addition, 4.4 tons of steel scrap.
Head batch dephosphorized slag consumption: Calx 850kg, light dolomite 1099kg;Ore deposit 1900kg difficult to understand;Oxygen consumption 880m3/n;Blow The refining time: 238 seconds;Half steel temperature: 1320 DEG C.Half steel slag specimen: cao:42.09%, sio2: 21.46%, tfe:11.71%, r: 1.96.Converter terminal: c:0.14%, p:0.014%, s:0.018%.Terminal slag specimen: cao:46.43%, sio2: 13.44%, Tfe:17.82%, r:3.46.1610 DEG C of tapping temperature.21 seconds 5 points of tapping time, 34mm after slag.Deoxidation alloying: micro- nitrogen increases Carbon agent 6kg/ ton steel;Si-Ca-Ba 2kg/ ton steel;Ferromanganese 450kg, ferrosilicon 150kg, carbon ferrochrome 110kg.
Lf ladle refining furnace:
Calx 910kg;Refining slag 112kg;Submerged arc slag 145kg;Fluorite 180kg;Bauxite 100kg;Ferrosilicon powder 100kg; Silicon-calcium wire 1m/ ton steel;Soft argon blowing rate 65nl/min, 30 seconds 12 points of time;Refine terminates outbound a [o]: 9.8ppm.
Continuous casting process:
M-EMS parameter: 380a, 4hz;Crystallizer discharge 120t/h, cooling twice selects 0.75l/kg ratio The water yield;25 DEG C of middle bag molten steel overheat;Pulling rate 1.80m/min.
Swrh82b each station carbon, nitrogen content change: converter (c:0.15%;N:0.0016%) → enter lf stove (c: 0.65%;N:0.0017%) → go out lf stove (c:0.75%;N:0.002%) → middle bag (c:0.76%;N:0.0021%) → roll Material (c:0.76%;N:0.0022%).
Embodiment 2: heat (batch) number 6a201383
Converter smelting:
Molten iron condition c:4.15%, si:0.43%, mn:0.36%, p:0.129%, s:0.011%, temperature: 1288 DEG C.
Burden structure: 69.1 tons of molten iron addition, 5.1 tons of steel scrap.
Head batch dephosphorized slag consumption: Calx 1800kg, light dolomite 475kg;Ore deposit 807kg difficult to understand;Oxygen consumption 900m3/n;Blow The refining time: 242 seconds;Half steel temperature: 1399 DEG C.Half steel slag specimen: cao:47.50%, sio2: 20.41%, tfe:11.05%, r: 2.31.Converter terminal: c:0.16%, p:0.012%, s:0.015%.Terminal slag specimen: cao:52.53%, sio2: 14.94%, Tfe:13.42%, r:3.52.1612 DEG C of tapping temperature.25 seconds 5 points of tapping time, 30mm after slag.Deoxidation alloying: micro- nitrogen increases Carbon agent 6kg/ ton steel;Si-Ca-Ba 2kg/ ton steel;Ferromanganese 440kg, ferrosilicon 155kg, carbon ferrochrome 115kg.
Lf ladle refining furnace:
Calx 912kg;Refining slag 110kg;Submerged arc slag 135kg;Fluorite 150kg;Bauxite 110kg;Ferrosilicon powder 90kg;Silicon Calcium line 1m/ ton steel;Soft argon blowing rate 60nl/min, 45 seconds 11 points of time;Refine terminates outbound a [o]: 7.8ppm.
Continuous casting process:
M-EMS parameter: 380a, 4hz;Crystallizer discharge 120t/h, cooling twice selects 0.75l/kg ratio The water yield;29 DEG C of middle bag molten steel overheat;Pulling rate 1.82m/min.
Swrh82b each station nitrogen content changes: converter (c:0.16%;N:0.0018%) → enter lf stove (c:0.67%;N: 0.0020%) → go out lf stove (c:0.77%;N:0.0022%) → middle bag (c:0.77%;N:0.0016%) → stocking (c: 0.77%;N:0.0025%).
Embodiment 3: heat (batch) number 6a201384
Converter smelting:
Molten iron condition c:4.23%, si:0.56%, mn:0.51%, p:0.12%, s:0.025%, temperature: 1320 DEG C.
Burden structure: 68.4 tons of molten iron addition, 4.4 tons of steel scrap.
Head batch dephosphorized slag consumption: Calx 850kg, light dolomite 1099kg;Ore deposit 1900kg difficult to understand;Oxygen consumption 880m3/n;Blow The refining time: 238 seconds;Half steel temperature: 1320 DEG C.Half steel slag specimen: cao:44.66%, sio2: 20.16%, tfe:13.36%, r: 2.22.Converter terminal: c:0.15%, p:0.012%, s:0.018%.Terminal slag specimen: cao:48.78%, sio2: 15.22%, Tfe:13.01%, r:3.21.1615 DEG C of tapping temperature.09 second 5 points of tapping time, 39mm after slag.Deoxidation alloying: micro- nitrogen increases Carbon agent 6kg/ ton steel;Si-Ca-Ba 2kg/ ton steel;Ferromanganese 450kg, ferrosilicon 150kg, carbon ferrochrome 110kg.
Lf ladle refining furnace:
Calx 880kg;Refining slag 1102kg;Submerged arc slag 150kg;Fluorite 170kg;Bauxite 110kg;Ferrosilicon powder 120kg; Silicon-calcium wire 1m/ ton steel;Soft argon blowing rate 66nl/min, 23 seconds 11 points of time.
Continuous casting process:
M-EMS parameter: 380a, 4hz;Crystallizer discharge 120t/h, cooling twice selects 0.75l/kg ratio The water yield;25 DEG C of middle bag molten steel overheat;Pulling rate 1.81m/min.
Swrh82b each station nitrogen content changes: converter (c:0.15%;N:0.0022%) → enter lf stove (c:0.70%;N: 0.0025%) → go out lf stove (c:0.78%;N:0.0026%) → middle bag (c:0.80%;N:0.0028%) → stocking (c: 0.81%;N:0.0030%).
Embodiment 4: heat (batch) number 6a201385
Converter smelting:
Molten iron condition c:4.2%, si:0.56%, mn:0.51%, p:0.12%, s:0.022%, temperature: 1318 DEG C.
Burden structure: 68.4 tons of molten iron addition, 4.4 tons of steel scrap.
Head batch dephosphorized slag consumption: Calx 850kg, light dolomite 1099kg;Ore deposit 1810kg difficult to understand;Oxygen consumption 870m3/n;Blow The refining time: 238 seconds;Half steel temperature: 1320 DEG C.Half steel slag specimen: cao:42.09%, sio2: 21.46%, tfe:11.71%, r: 1.96.Converter terminal: c:0.14%, p:0.014%, s:0.018%.Terminal slag specimen: cao:46.43%, sio2: 13.44%, Tfe:17.82%, r:3.46.1618 DEG C of tapping temperature.21 seconds 5 points of tapping time, 34mm after slag.Deoxidation alloying: micro- nitrogen increases Carbon agent 6kg/ ton steel;Si-Ca-Ba 2kg/ ton steel;Ferromanganese 450kg, ferrosilicon 150kg, carbon ferrochrome 110kg.
Lf ladle refining furnace:
Calx 910kg;Refining slag 112kg;Submerged arc slag 145kg;Fluorite 180kg;Bauxite 100kg;Ferrosilicon powder 100kg; Silicon-calcium wire 1m/ ton steel;Soft argon blowing rate 65nl/min, 30 seconds 12 points of time.
Continuous casting process:
M-EMS parameter: 380a, 4hz;Crystallizer discharge 120t/h, cooling twice selects 0.75l/kg ratio The water yield;35 DEG C of middle bag molten steel overheat;Pulling rate 1.85m/min.
Swrh82b each station nitrogen content changes: converter (c:0.14%;N:0.0023%) → enter lf stove (c:0.74%;N: 0.0026%) → go out lf stove (c:0.81%;N:0.0028%) → middle bag (c:0.83%;N:0.0030%) → stocking (c: 0.83%;N:0.0033%).

Claims (1)

1. a kind of method producing high-carbon low nitrogen twisted wire steel, technique includes: and desulfurizing iron skims → and converter smelting → pushing off the slag goes out Steel → ladle deoxidation and alloying → ladle slag modification → lf ladle refining → feed si-ca line → steel ladle bottom argon blowing soft blow → 150mm × 150mm small billet full guard casting → M-EMS;It is characterized in that, the technical parameter controlling in technique As follows:
Converter adopts 80 tons of primary converter double slag operations, and aim carbon presses 0.15% control, 1610~1620 DEG C of tapping temperature, and pushing off the slag goes out Steel, controls the slag thickness in converter tapping process between 0~40mm;Micro- nitrogen carburant: n:0.005~0.025%, join carbon 6kg/ ton steel, uses si-ca-ba deoxidation, addition 2.0kg/ ton steel, 4.5kg/ ton steel synthetic slag;
80 tons of lf refining furnace slag materials use synthetic slag, active lime: cao+mgo:96.5~98%, sio2: 1~1.5%, co2: 1~2.0%, activity degree > 350ml, the test condition of activity: 4mol/ml-hcl, 40 ± 1 DEG C of temperature, 10min;Aluminum vanadium Soil: al2o3: 75~97%, sio2: 0~10%, cao:1~5%, mgo:2~9.5%, h2O:0~0.5%;Fluorite: caf2: 85.44~99%, sio2: 1~14%, s:0~0.5%, p:0~0.06%, the quantity of slag presses 1~1.2 ton of control, and aluminum vanadine controls In 80~100kg, the top of the slag adds fe-si powder and carbide deoxidation, forms white slag and finishing slag tfe < 1.0% in power supply in 15 minutes, Reduce a in steel[o], s content;Lf stove feeds ca-si line 1m/ ton steel, soft blow argon after line feeding, flow 40~60l/ at the end of processing Min, the time >=10min, slightly springs up not exposed steel with the top of the slag and is advisable, and makes to be mingled with abundant floating in steel, refining treatment finishes mesh Mark a[o]: 0~10ppm;
Using 150mm × 150mm continuous small-billet casting, crystallizer adopts the electromagnetic agitation of 380a, 4hz, using the big cladding of high alkalinity Lid agent, big bag argon envelope, tundish whole process Argon, the casting of submersed nozzle full guard, cast is according to 1.8~2.0m/min pulling rate control System, the Metal in Tundish degree of superheat controls at 25~35 DEG C, and continuous casting two cold is poured into a mould using 0.75l/kg specific water;Using mg- Ca matter dry type material strip barricade tundish, full guard is not poured into a mould, big bag argon envelope protection sleeve pipe argon flow amount 30~50l/min, not plus set Forbid during pipe to add coverture to tundish impact area, open and pour front tundish argon filling, tundish selects high alkalinity coverture;Crystallization Device low viscosity high alkalinity special high-carbon steel covering slag: viscosity: 1300 DEG C, 4~6 pools;cao/sio2Basicity: 0.80~1.1, crystallization Device discharge 120~130m3/ h, Spraying Water of Nozzles in Secondary Cooling curve selects 0.75l/kg steel specific water;Dummy bar head is opened after going out crystallizer Open M-EMS, last stove stopper stops electromagnetic agitation after stopping pouring;Keep the cast of high pouring basket liquid level, during liquid Face 700mm, keeps liquid level stabilizing;Execute minimum pouring basket liquid level and be not less than 400mm and carry out cast system, open pour first base and Last base crop, tail are excised according to 2.0 meters of length;Company pours when stopping pouring, and plucks sleeve pipe using after first stopping to pour.
CN201410838487.0A 2014-12-29 2014-12-29 Production method of high-carbon low-nitrogen steel for strand wires Active CN104498805B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410838487.0A CN104498805B (en) 2014-12-29 2014-12-29 Production method of high-carbon low-nitrogen steel for strand wires

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410838487.0A CN104498805B (en) 2014-12-29 2014-12-29 Production method of high-carbon low-nitrogen steel for strand wires

Publications (2)

Publication Number Publication Date
CN104498805A CN104498805A (en) 2015-04-08
CN104498805B true CN104498805B (en) 2017-01-25

Family

ID=52940255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410838487.0A Active CN104498805B (en) 2014-12-29 2014-12-29 Production method of high-carbon low-nitrogen steel for strand wires

Country Status (1)

Country Link
CN (1) CN104498805B (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105002424A (en) * 2015-07-31 2015-10-28 河北钢铁股份有限公司承德分公司 Continuous casting method for high-carbon low-nitrogen steel
CN105127386A (en) * 2015-08-19 2015-12-09 河北钢铁股份有限公司 Continuous casting method for controlling center carbon segregation of small high-carbon hard-wire steel square billet
CN106735025A (en) * 2017-02-09 2017-05-31 首钢总公司 A kind of control method of prestress steel continuous small-billet casting center segregation
CN107236894B (en) * 2017-06-16 2019-03-15 马鞍山钢铁股份有限公司 A kind of method for making steel of low-sulfur, low titanium Aluminum steel
CN107385139A (en) * 2017-07-30 2017-11-24 湖南华菱湘潭钢铁有限公司 A kind of smelting process of high-carbon steel
CN108251598B (en) * 2018-01-12 2020-05-05 唐山钢铁集团有限责任公司 Carbon increasing and nitrogen controlling production method of medium-carbon high-alloy steel
CN108913844A (en) * 2018-08-02 2018-11-30 本钢板材股份有限公司 The control nitrogen technique of twisted wire steel steel series
CN109943683B (en) * 2019-03-06 2021-04-02 鞍钢股份有限公司 Refining and continuous casting method for producing alloy cold forging steel by using small square billets
CN110629132B (en) * 2019-09-26 2020-11-17 江苏省沙钢钢铁研究院有限公司 Wire rod for ultra-high strength steel cord and method for producing same
CN111020107A (en) * 2019-12-17 2020-04-17 芜湖新兴铸管有限责任公司 Method for controlling carbon segregation of high-carbon steel
CN110923401A (en) * 2019-12-17 2020-03-27 芜湖新兴铸管有限责任公司 Method for controlling carbon segregation of high-carbon steel
CN111471831A (en) * 2020-05-18 2020-07-31 芜湖新兴铸管有限责任公司 Ternary refining slag for high-carbon stranded wire steel, high-carbon stranded wire steel and slagging method thereof
CN112317706A (en) * 2020-09-11 2021-02-05 南京钢铁股份有限公司 Argon protection pouring operation method for continuous casting tundish
CN114082913B (en) * 2021-11-15 2022-11-22 包头钢铁(集团)有限责任公司 Control method for improving center carbon segregation of hypereutectoid steel produced by small square billet section
CN114774619B (en) * 2022-04-29 2023-10-24 中国铁建重工集团股份有限公司 Low-nitrogen high-carbon chromium bearing steel and production method thereof
CN115369207A (en) * 2022-09-06 2022-11-22 重庆钢铁股份有限公司 Method for controlling nitrogen content of non-vacuum smelting plate blank

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5650027A (en) * 1993-05-25 1997-07-22 Nippon Steel Corporation High-carbon steel wire rod and wire excellent in drawability and methods of producing the same
CN1778484A (en) * 2004-11-17 2006-05-31 首钢总公司 Continuous-casting and rolling manufacture for 82B wire rod steel strand
CN101597713A (en) * 2009-07-03 2009-12-09 首钢总公司 A kind of microalloying SWRH87B gren rod and manufacture method thereof
CN102534094B (en) * 2012-01-01 2013-05-22 首钢总公司 Method for producing tire cord steel wire by converter billet continuous casting process
CN103103307B (en) * 2013-01-24 2015-02-25 首钢总公司 Method for producing steel for low-nitrogen stranded wire by use of non-vacuum process of converter

Also Published As

Publication number Publication date
CN104498805A (en) 2015-04-08

Similar Documents

Publication Publication Date Title
CN104498805B (en) Production method of high-carbon low-nitrogen steel for strand wires
CN106148844B (en) A kind of preparation method of sulfur-bearing ultralow titanium high standard bearing steel
CN103103307B (en) Method for producing steel for low-nitrogen stranded wire by use of non-vacuum process of converter
JP5833767B2 (en) Smelting method of high aluminum low silicon ultra pure ferritic stainless steel
CN104862443B (en) A kind of smelting process of low carbon low silicon welding wire steel
CN100354562C (en) High alloy steel seamless steel pipe and production method thereof
CN110004366A (en) A kind of aluminiferous low-carbon construction(al)steel and its smelting process
CN104278197B (en) Smelting method of steel for low-silicon high-titanium welding wire
CN103233162B (en) Process for producing IF steel by using medium sheet billet in continuous casting manner
CN104178698A (en) Method for preparing bearing steel
CN103834848B (en) A kind of boracic compressor wire and steel strand steel and smelting technology thereof
CN105316558B (en) Preparation method of boron-containing steel preventing casting blank corner cracking
CN103334050B (en) Process utilizing sheet billet continuous casting to manufacture low aluminum silicon calm carbon structural steel
CN103060513A (en) Method for smelting tire cord steel and method for continuously casting tire cord steel
CN104259414A (en) Titanium-containing solder wire steel production method capable of alleviating continuous casting nozzle clogging
CN104498818A (en) ER70S-6 hot rolled wire rod and preparation method thereof
CN111910045B (en) Smelting method of high-purity austenitic stainless steel
CN110340315B (en) Method for continuously casting martensitic stainless steel by using large-section rectangular billet
CN104694819A (en) Production method for low-carbon low-silicon steel
CN102816979A (en) Production method of low-carbon sulfur series free-cutting steel continuous casting billet
CN100343397C (en) Process for producing steel containing alumium low carbon low ilicon by small square blank continuous caster
CN103215410B (en) A kind of method improved containing Nb, Ti steel cleanness
CN107794332A (en) Smelting method of 90-grade ultrahigh-strength cord steel
CN105603145A (en) Method for rectangular continuous casting production of low-carbon low-silicon steel
CN111041352A (en) External refining production method of wire rod for cutting diamond wire

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100041 Shijingshan Road, Shijingshan District, Shijingshan District, Beijing

Patentee after: Shougang Group Co. Ltd.

Address before: 100041 Shijingshan Road, Shijingshan District, Shijingshan District, Beijing

Patentee before: Capital Iron & Steel General Company

CP01 Change in the name or title of a patent holder