CN104485033A - Simulation experiment method of metro integrated control IBP (Integrated Backup Panel) - Google Patents
Simulation experiment method of metro integrated control IBP (Integrated Backup Panel) Download PDFInfo
- Publication number
- CN104485033A CN104485033A CN201410773378.5A CN201410773378A CN104485033A CN 104485033 A CN104485033 A CN 104485033A CN 201410773378 A CN201410773378 A CN 201410773378A CN 104485033 A CN104485033 A CN 104485033A
- Authority
- CN
- China
- Prior art keywords
- data
- ibp
- database server
- control
- metro
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/455—Emulation; Interpretation; Software simulation, e.g. virtualisation or emulation of application or operating system execution engines
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B9/00—Simulators for teaching or training purposes
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Software Systems (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Educational Administration (AREA)
- Educational Technology (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a simulation experiment method of a metro integrated control IBP (Integrated Backup Panel) and relates to a simulation experiment method. The method comprises the following steps: acquiring data of the IBP of a metro integrated control system key device from the site, then storing the data in a database server, generating data of the metro integrated control system key device required for an IBP simulation interface by the database server by using a random method, transmitting the data to a working station computer by a TCP/IP (Transmission Control Protocol/Internet Protocol), developing simulation experiment software of the IBP on the working station computer, displaying the data of the key device, simultaneously carrying simulation control on the metro integrated control system key device by a control button, and displaying the corresponding control state. According to the simulation experiment method of the metro integrated control IBP, a hardware system is replaced by the software simulation manner; the cost is relatively low; the control operation of the IBP can be really simulated; the IBP has the characteristics of being short in development period, high in reliability, strong in practicability and simple and convenient to maintain; the course teaching requirements of an urban rail traffic control major on a metro integrated control system can be met.
Description
Technical field
The present invention relates to a kind of emulation experiment method, particularly a kind of subway comprehensive monitoring IBP dish emulation experiment method.
Background technology
Subway comprehensive monitoring system be one towards scheduling and the mainframe computer integrated system of station operating personnel, have employed contemporary state-of-the-art computer techno-stress technology, integrated and to have interconnected multiple subsystem, as electric power monitoring system, fire protection alarm system, electronic & mechanic machine control system, shield door, Flood gate, clock system etc.Round train traffic control, passenger services, the Method of Spreading Designs such as safety of taking precautions against natural calamities.And IBP dish is the important component part of subway comprehensive monitoring system, include the key equipment connection layout of integrated and interconnection system in comprehensive monitoring system, state and control button.This IBP dish is the integrated backup panel of subway comprehensive monitoring system, be arranged in each pulpit, station, in case of emergency provide danger button, when breaking down in generation communication failure at central level or station, as the backup device of station subway comprehensive monitoring system, the button simulation monitoring dish in case of emergency used, in order to support the crucial monitoring and controlling function at station.
Set up urban track traffic comprehensively monitoring Training Room, IBP dish is absolutely necessary important component part, but due to IBP dish be backup device, need to use the key equipment by key control subway comprehensive monitoring system, if all purchased, cost is higher, if supporting with the miscellaneous equipment of subway comprehensive monitoring system, system is numerous and jumbled, maintenance cost is higher, be unfavorable for that urban track traffic controls the teaching of professional subway comprehensive monitoring system, do not meet the principle of Vocational Practical Teaching " enough, to be suitable for ".
Summary of the invention
The technical problem to be solved in the present invention is: provide a kind of subway comprehensive monitoring IBP dish emulation experiment method, to reduce costs, meet the course teaching needs that urban track traffic controls professional subway comprehensive monitoring system.
The technical scheme solved the problems of the technologies described above is: the technical scheme solved the problems of the technologies described above is: a kind of subway comprehensive monitoring IBP dish emulation experiment method, the method is the IBP dish data from collection in worksite subway comprehensive monitoring system core equipment, then be stored in database server, database server adopts the random subway comprehensive monitoring system core device data required for method generation IBP Simulation Interface, workstation computer is transferred to by ICP/IP protocol, working computer is developed the imitating-true experiment software of IBP dish, display subway comprehensive monitoring system key equipment data, carry out the analogue enlargement to subway comprehensive monitoring system key equipment by control knob simultaneously, and show corresponding state of a control.
Further technical scheme of the present invention is: the treatment scheme that described working computer obtains data, display data and display control state comprises the following steps:
S1. start:
System starts;
S2. communicate with database server:
Workstation computer communicates with database server;
S3. analysis protocol, obtains data:
Workstation computer passes the ICP/IP protocol of coming from database server resolve what receives, obtains and passes the data of coming from database server;
S4. judge that whether data are effective:
Workstation computer judges to connect whether passes the data of coming from database server effective, if effectively, then enters step S5, otherwise, repetition step S2;
S5. receive and process data, data are shown:
Workstation computer receives and processes data, also these data is shown;
S6. judged whether that control knob is pressed:
Judge whether that control knob is pressed, if so, then entered step S7, otherwise, repeat step S2;
S7. display control state:
Carry out the analogue enlargement to subway comprehensive monitoring system key equipment according to control knob, show corresponding state of a control;
S8. terminate.
Owing to adopting said structure, the subway comprehensive monitoring IBP dish emulation experiment method of the present invention is used for compared with prior art, has following beneficial effect:
1. cost is low:
System architecture used by the present invention is simple, the mode of software emulation is adopted to replace hardware system, the key equipments such as electric power monitoring system, fire protection alarm system, electronic & mechanic machine control system, shield door, Flood gate, clock system need not be purchased, thus greatly saved cost.
2. can the control operation of Simulation with I BP dish truly:
What store in database server due to the present invention is data required for the IBP dish simulating experimental system that arrives of collection in worksite, and produce at random, workstation computer is developed the simulation software of IBP dish, can the information that provides of displaying data in real-time storehouse server, carry out showing and can the control operation of Simulation with I BP dish truly.
3. the construction cycle is short, and reliability is high, practical, easy maintenance:
Because the present invention adopts the mode of software emulation to replace hardware system, the construction cycle is short, and reliability is high, practical, and the key equipment such as Maintenance free electric power monitoring system, fire protection alarm system, makes maintenance become very simple.
Due to above each point, the present invention can meet the course teaching needs that urban track traffic controls professional subway comprehensive monitoring system completely, urban track traffic control student is made skillfully to grasp the use of subway comprehensive monitoring system IBP dish, and be familiar with connection layout and the constitutional diagram of subway comprehensive monitoring composition system by operation, for work from now on lays the foundation.
Below, in conjunction with the accompanying drawings and embodiments the technical characteristic of the subway comprehensive monitoring IBP dish emulation experiment method of the present invention is further described.
Accompanying drawing explanation
Fig. 1: working computer described in embodiment one obtains the process flow diagram of the treatment scheme of data and display,
The surface chart of the imitating-true experiment software of Fig. 2: IBP dish.
Embodiment
Embodiment one:
A kind of subway comprehensive monitoring IBP dish emulation experiment method, the method is the IBP dish data from collection in worksite subway comprehensive monitoring system core equipment, then be stored in database server, database server adopts the random subway comprehensive monitoring system core device data required for method generation IBP Simulation Interface, workstation computer is transferred to by ICP/IP protocol, working computer is developed the imitating-true experiment software of IBP dish, display subway comprehensive monitoring system key equipment data, carry out the analogue enlargement to subway comprehensive monitoring system key equipment by control knob simultaneously, and show corresponding state of a control.
The treatment scheme that described working computer obtains data, display data and display control state comprises the following steps:
S1. start:
System starts;
S2. communicate with database server:
Workstation computer communicates with database server;
S3. analysis protocol, obtains data:
Workstation computer passes the ICP/IP protocol of coming from database server resolve what receives, obtains and passes the data of coming from database server;
S4. judge that whether data are effective:
Workstation computer judges to connect whether passes the data of coming from database server effective, if effectively, then enters step S5, otherwise, repetition step S2;
S5. receive and process data, data are shown:
Workstation computer receives and processes data, also these data is shown;
S6. judged whether that control knob is pressed:
Judge whether that control knob is pressed, if so, then entered step S7, otherwise, repeat step S2;
S7. display control state:
Carry out the analogue enlargement to subway comprehensive monitoring system key equipment according to control knob, show corresponding state of a control.
S8. terminate.
In the present invention, utilize commercial PC as workstation computer, adopt software emulation design IBP dish, obtain the information of database server by Ethernet interface and show.The imitating-true experiment software wherein developing IBP dish on working computer adopts Visual C++ and C# two kinds of computereses to carry out the exploitation of system, Visual C++ mainly uses the design at interface and the process of partial information, C# is mainly used in data communication and data store, process, and the method between bilingual can adopt the form of library file to carry out interface.
Claims (2)
1. a subway comprehensive monitoring IBP dish emulation experiment method, it is characterized in that: the method is the IBP dish data from collection in worksite subway comprehensive monitoring system core equipment, then be stored in database server, database server adopts the random subway comprehensive monitoring system core device data required for method generation IBP Simulation Interface, workstation computer is transferred to by ICP/IP protocol, working computer is developed the imitating-true experiment software of IBP dish, display subway comprehensive monitoring system key equipment data, carry out the analogue enlargement to subway comprehensive monitoring system key equipment by control knob simultaneously, and show corresponding state of a control.
2. subway comprehensive monitoring IBP dish emulation experiment method according to claim 1, is characterized in that: the treatment scheme that described working computer obtains data, display data and display control state comprises the following steps:
S1. start:
System starts;
S2. communicate with database server:
Workstation computer communicates with database server;
S3. analysis protocol, obtains data:
Workstation computer passes the ICP/IP protocol of coming from database server resolve what receives, obtains and passes the data of coming from database server;
S4. judge that whether data are effective:
Workstation computer judges to connect whether passes the data of coming from database server effective, if effectively, then enters step S5, otherwise, repetition step S2;
S5. receive and process data, data are shown:
Workstation computer receives and processes data, also these data is shown;
S6. judged whether that control knob is pressed:
Judge whether that control knob is pressed, if so, then entered step S7, otherwise, repeat step S2;
S7. display control state:
Carry out the analogue enlargement to subway comprehensive monitoring system key equipment according to control knob, show corresponding state of a control;
S8. terminate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410773378.5A CN104485033A (en) | 2014-12-12 | 2014-12-12 | Simulation experiment method of metro integrated control IBP (Integrated Backup Panel) |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410773378.5A CN104485033A (en) | 2014-12-12 | 2014-12-12 | Simulation experiment method of metro integrated control IBP (Integrated Backup Panel) |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104485033A true CN104485033A (en) | 2015-04-01 |
Family
ID=52759573
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410773378.5A Pending CN104485033A (en) | 2014-12-12 | 2014-12-12 | Simulation experiment method of metro integrated control IBP (Integrated Backup Panel) |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104485033A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112208587A (en) * | 2020-09-24 | 2021-01-12 | 交控科技股份有限公司 | Simulation system and simulation method for CBTC non-signal system |
-
2014
- 2014-12-12 CN CN201410773378.5A patent/CN104485033A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112208587A (en) * | 2020-09-24 | 2021-01-12 | 交控科技股份有限公司 | Simulation system and simulation method for CBTC non-signal system |
CN112208587B (en) * | 2020-09-24 | 2022-06-28 | 交控科技股份有限公司 | Simulation system and simulation method for CBTC non-signal system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ayala García et al. | Virtual reality training system for maintenance and operation of high-voltage overhead power lines | |
CN101894487B (en) | Practice and simulation training system and method for power distribution live-wire work | |
RU2617972C1 (en) | Simulator for operational and maintenance staff on the basis of virtual reality models of transformer substation | |
CN104332075B (en) | A kind of row control HWIL simulation training system and method based on B/S frameworks | |
CN105023200A (en) | Power emergency drilling system and emergency drilling method thereof | |
CN106780116A (en) | The construction method of power emergency drilling method, device and its scenario models, device | |
CN106775746A (en) | A kind of intelligent substation three-dimensional artificial training soft ware system and its platform building method | |
KR20190124045A (en) | System for training and education using augmented reality and method for training and education using therof | |
CN103901777B (en) | Power grid regulation integration combined simulation method | |
CN101620800A (en) | 500 KV substation analog simulation training system | |
CN109697903A (en) | A kind of substation relay protection safety practical training method based on VR | |
WO2008118550A3 (en) | System and method for disaster training, simulation, and response | |
CN108922302A (en) | A kind of electric shock accidents analogue system | |
CN105894576A (en) | 3D substation panoramic real-time control system based on virtual simulation technology | |
CN104537909A (en) | Railway power supply training system based on virtual reality | |
CN202650305U (en) | Personnel remote training device | |
RU2611669C1 (en) | Device for training operational personnel of power equipment | |
CN104485033A (en) | Simulation experiment method of metro integrated control IBP (Integrated Backup Panel) | |
CN111951656B (en) | Electric power network safety practical training teaching system and method based on sand table simulation and AR | |
CN103035138B (en) | Personnel remote training device | |
CN105977971A (en) | Power failure analysis method based on single line diagram of distribution network GIS power grid | |
Han et al. | Design of simulation training system for fire safety inspection based on computer simulation technology | |
CN109817053A (en) | AC/DC Power Supply Fault Simulation Training System Based on Software Simulation | |
CN111968015B (en) | Interactive training method for power transmission and transformation project construction process | |
CN106057013A (en) | Simulation training system and method based on real-time simulation kernel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150401 |