CN104485033A - Simulation experiment method of metro integrated control IBP (Integrated Backup Panel) - Google Patents

Simulation experiment method of metro integrated control IBP (Integrated Backup Panel) Download PDF

Info

Publication number
CN104485033A
CN104485033A CN201410773378.5A CN201410773378A CN104485033A CN 104485033 A CN104485033 A CN 104485033A CN 201410773378 A CN201410773378 A CN 201410773378A CN 104485033 A CN104485033 A CN 104485033A
Authority
CN
China
Prior art keywords
data
ibp
database server
control
metro
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410773378.5A
Other languages
Chinese (zh)
Inventor
陶汉卿
杨志友
吴建军
柯宝华
陈鑫洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liuzhou Railway Vocational Technical College
Original Assignee
Liuzhou Railway Vocational Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liuzhou Railway Vocational Technical College filed Critical Liuzhou Railway Vocational Technical College
Priority to CN201410773378.5A priority Critical patent/CN104485033A/en
Publication of CN104485033A publication Critical patent/CN104485033A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/455Emulation; Interpretation; Software simulation, e.g. virtualisation or emulation of application or operating system execution engines
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B9/00Simulators for teaching or training purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Software Systems (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a simulation experiment method of a metro integrated control IBP (Integrated Backup Panel) and relates to a simulation experiment method. The method comprises the following steps: acquiring data of the IBP of a metro integrated control system key device from the site, then storing the data in a database server, generating data of the metro integrated control system key device required for an IBP simulation interface by the database server by using a random method, transmitting the data to a working station computer by a TCP/IP (Transmission Control Protocol/Internet Protocol), developing simulation experiment software of the IBP on the working station computer, displaying the data of the key device, simultaneously carrying simulation control on the metro integrated control system key device by a control button, and displaying the corresponding control state. According to the simulation experiment method of the metro integrated control IBP, a hardware system is replaced by the software simulation manner; the cost is relatively low; the control operation of the IBP can be really simulated; the IBP has the characteristics of being short in development period, high in reliability, strong in practicability and simple and convenient to maintain; the course teaching requirements of an urban rail traffic control major on a metro integrated control system can be met.

Description

Subway comprehensive monitoring IBP dish emulation experiment method
Technical field
The present invention relates to a kind of emulation experiment method, particularly a kind of subway comprehensive monitoring IBP dish emulation experiment method.
Background technology
Subway comprehensive monitoring system be one towards scheduling and the mainframe computer integrated system of station operating personnel, have employed contemporary state-of-the-art computer techno-stress technology, integrated and to have interconnected multiple subsystem, as electric power monitoring system, fire protection alarm system, electronic & mechanic machine control system, shield door, Flood gate, clock system etc.Round train traffic control, passenger services, the Method of Spreading Designs such as safety of taking precautions against natural calamities.And IBP dish is the important component part of subway comprehensive monitoring system, include the key equipment connection layout of integrated and interconnection system in comprehensive monitoring system, state and control button.This IBP dish is the integrated backup panel of subway comprehensive monitoring system, be arranged in each pulpit, station, in case of emergency provide danger button, when breaking down in generation communication failure at central level or station, as the backup device of station subway comprehensive monitoring system, the button simulation monitoring dish in case of emergency used, in order to support the crucial monitoring and controlling function at station.
Set up urban track traffic comprehensively monitoring Training Room, IBP dish is absolutely necessary important component part, but due to IBP dish be backup device, need to use the key equipment by key control subway comprehensive monitoring system, if all purchased, cost is higher, if supporting with the miscellaneous equipment of subway comprehensive monitoring system, system is numerous and jumbled, maintenance cost is higher, be unfavorable for that urban track traffic controls the teaching of professional subway comprehensive monitoring system, do not meet the principle of Vocational Practical Teaching " enough, to be suitable for ".
Summary of the invention
The technical problem to be solved in the present invention is: provide a kind of subway comprehensive monitoring IBP dish emulation experiment method, to reduce costs, meet the course teaching needs that urban track traffic controls professional subway comprehensive monitoring system.
The technical scheme solved the problems of the technologies described above is: the technical scheme solved the problems of the technologies described above is: a kind of subway comprehensive monitoring IBP dish emulation experiment method, the method is the IBP dish data from collection in worksite subway comprehensive monitoring system core equipment, then be stored in database server, database server adopts the random subway comprehensive monitoring system core device data required for method generation IBP Simulation Interface, workstation computer is transferred to by ICP/IP protocol, working computer is developed the imitating-true experiment software of IBP dish, display subway comprehensive monitoring system key equipment data, carry out the analogue enlargement to subway comprehensive monitoring system key equipment by control knob simultaneously, and show corresponding state of a control.
Further technical scheme of the present invention is: the treatment scheme that described working computer obtains data, display data and display control state comprises the following steps:
S1. start:
System starts;
S2. communicate with database server:
Workstation computer communicates with database server;
S3. analysis protocol, obtains data:
Workstation computer passes the ICP/IP protocol of coming from database server resolve what receives, obtains and passes the data of coming from database server;
S4. judge that whether data are effective:
Workstation computer judges to connect whether passes the data of coming from database server effective, if effectively, then enters step S5, otherwise, repetition step S2;
S5. receive and process data, data are shown:
Workstation computer receives and processes data, also these data is shown;
S6. judged whether that control knob is pressed:
Judge whether that control knob is pressed, if so, then entered step S7, otherwise, repeat step S2;
S7. display control state:
Carry out the analogue enlargement to subway comprehensive monitoring system key equipment according to control knob, show corresponding state of a control;
S8. terminate.
Owing to adopting said structure, the subway comprehensive monitoring IBP dish emulation experiment method of the present invention is used for compared with prior art, has following beneficial effect:
1. cost is low:
System architecture used by the present invention is simple, the mode of software emulation is adopted to replace hardware system, the key equipments such as electric power monitoring system, fire protection alarm system, electronic & mechanic machine control system, shield door, Flood gate, clock system need not be purchased, thus greatly saved cost.
2. can the control operation of Simulation with I BP dish truly:
What store in database server due to the present invention is data required for the IBP dish simulating experimental system that arrives of collection in worksite, and produce at random, workstation computer is developed the simulation software of IBP dish, can the information that provides of displaying data in real-time storehouse server, carry out showing and can the control operation of Simulation with I BP dish truly.
3. the construction cycle is short, and reliability is high, practical, easy maintenance:
Because the present invention adopts the mode of software emulation to replace hardware system, the construction cycle is short, and reliability is high, practical, and the key equipment such as Maintenance free electric power monitoring system, fire protection alarm system, makes maintenance become very simple.
Due to above each point, the present invention can meet the course teaching needs that urban track traffic controls professional subway comprehensive monitoring system completely, urban track traffic control student is made skillfully to grasp the use of subway comprehensive monitoring system IBP dish, and be familiar with connection layout and the constitutional diagram of subway comprehensive monitoring composition system by operation, for work from now on lays the foundation.
Below, in conjunction with the accompanying drawings and embodiments the technical characteristic of the subway comprehensive monitoring IBP dish emulation experiment method of the present invention is further described.
Accompanying drawing explanation
Fig. 1: working computer described in embodiment one obtains the process flow diagram of the treatment scheme of data and display,
The surface chart of the imitating-true experiment software of Fig. 2: IBP dish.
Embodiment
Embodiment one:
A kind of subway comprehensive monitoring IBP dish emulation experiment method, the method is the IBP dish data from collection in worksite subway comprehensive monitoring system core equipment, then be stored in database server, database server adopts the random subway comprehensive monitoring system core device data required for method generation IBP Simulation Interface, workstation computer is transferred to by ICP/IP protocol, working computer is developed the imitating-true experiment software of IBP dish, display subway comprehensive monitoring system key equipment data, carry out the analogue enlargement to subway comprehensive monitoring system key equipment by control knob simultaneously, and show corresponding state of a control.
The treatment scheme that described working computer obtains data, display data and display control state comprises the following steps:
S1. start:
System starts;
S2. communicate with database server:
Workstation computer communicates with database server;
S3. analysis protocol, obtains data:
Workstation computer passes the ICP/IP protocol of coming from database server resolve what receives, obtains and passes the data of coming from database server;
S4. judge that whether data are effective:
Workstation computer judges to connect whether passes the data of coming from database server effective, if effectively, then enters step S5, otherwise, repetition step S2;
S5. receive and process data, data are shown:
Workstation computer receives and processes data, also these data is shown;
S6. judged whether that control knob is pressed:
Judge whether that control knob is pressed, if so, then entered step S7, otherwise, repeat step S2;
S7. display control state:
Carry out the analogue enlargement to subway comprehensive monitoring system key equipment according to control knob, show corresponding state of a control.
S8. terminate.
In the present invention, utilize commercial PC as workstation computer, adopt software emulation design IBP dish, obtain the information of database server by Ethernet interface and show.The imitating-true experiment software wherein developing IBP dish on working computer adopts Visual C++ and C# two kinds of computereses to carry out the exploitation of system, Visual C++ mainly uses the design at interface and the process of partial information, C# is mainly used in data communication and data store, process, and the method between bilingual can adopt the form of library file to carry out interface.

Claims (2)

1. a subway comprehensive monitoring IBP dish emulation experiment method, it is characterized in that: the method is the IBP dish data from collection in worksite subway comprehensive monitoring system core equipment, then be stored in database server, database server adopts the random subway comprehensive monitoring system core device data required for method generation IBP Simulation Interface, workstation computer is transferred to by ICP/IP protocol, working computer is developed the imitating-true experiment software of IBP dish, display subway comprehensive monitoring system key equipment data, carry out the analogue enlargement to subway comprehensive monitoring system key equipment by control knob simultaneously, and show corresponding state of a control.
2. subway comprehensive monitoring IBP dish emulation experiment method according to claim 1, is characterized in that: the treatment scheme that described working computer obtains data, display data and display control state comprises the following steps:
S1. start:
System starts;
S2. communicate with database server:
Workstation computer communicates with database server;
S3. analysis protocol, obtains data:
Workstation computer passes the ICP/IP protocol of coming from database server resolve what receives, obtains and passes the data of coming from database server;
S4. judge that whether data are effective:
Workstation computer judges to connect whether passes the data of coming from database server effective, if effectively, then enters step S5, otherwise, repetition step S2;
S5. receive and process data, data are shown:
Workstation computer receives and processes data, also these data is shown;
S6. judged whether that control knob is pressed:
Judge whether that control knob is pressed, if so, then entered step S7, otherwise, repeat step S2;
S7. display control state:
Carry out the analogue enlargement to subway comprehensive monitoring system key equipment according to control knob, show corresponding state of a control;
S8. terminate.
CN201410773378.5A 2014-12-12 2014-12-12 Simulation experiment method of metro integrated control IBP (Integrated Backup Panel) Pending CN104485033A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410773378.5A CN104485033A (en) 2014-12-12 2014-12-12 Simulation experiment method of metro integrated control IBP (Integrated Backup Panel)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410773378.5A CN104485033A (en) 2014-12-12 2014-12-12 Simulation experiment method of metro integrated control IBP (Integrated Backup Panel)

Publications (1)

Publication Number Publication Date
CN104485033A true CN104485033A (en) 2015-04-01

Family

ID=52759573

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410773378.5A Pending CN104485033A (en) 2014-12-12 2014-12-12 Simulation experiment method of metro integrated control IBP (Integrated Backup Panel)

Country Status (1)

Country Link
CN (1) CN104485033A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112208587A (en) * 2020-09-24 2021-01-12 交控科技股份有限公司 Simulation system and simulation method for CBTC non-signal system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112208587A (en) * 2020-09-24 2021-01-12 交控科技股份有限公司 Simulation system and simulation method for CBTC non-signal system
CN112208587B (en) * 2020-09-24 2022-06-28 交控科技股份有限公司 Simulation system and simulation method for CBTC non-signal system

Similar Documents

Publication Publication Date Title
Ayala García et al. Virtual reality training system for maintenance and operation of high-voltage overhead power lines
CN101894487B (en) Practice and simulation training system and method for power distribution live-wire work
RU2617972C1 (en) Simulator for operational and maintenance staff on the basis of virtual reality models of transformer substation
CN104332075B (en) A kind of row control HWIL simulation training system and method based on B/S frameworks
CN105023200A (en) Power emergency drilling system and emergency drilling method thereof
CN106780116A (en) The construction method of power emergency drilling method, device and its scenario models, device
CN106775746A (en) A kind of intelligent substation three-dimensional artificial training soft ware system and its platform building method
KR20190124045A (en) System for training and education using augmented reality and method for training and education using therof
CN103901777B (en) Power grid regulation integration combined simulation method
CN101620800A (en) 500 KV substation analog simulation training system
CN109697903A (en) A kind of substation relay protection safety practical training method based on VR
WO2008118550A3 (en) System and method for disaster training, simulation, and response
CN108922302A (en) A kind of electric shock accidents analogue system
CN105894576A (en) 3D substation panoramic real-time control system based on virtual simulation technology
CN104537909A (en) Railway power supply training system based on virtual reality
CN202650305U (en) Personnel remote training device
RU2611669C1 (en) Device for training operational personnel of power equipment
CN104485033A (en) Simulation experiment method of metro integrated control IBP (Integrated Backup Panel)
CN111951656B (en) Electric power network safety practical training teaching system and method based on sand table simulation and AR
CN103035138B (en) Personnel remote training device
CN105977971A (en) Power failure analysis method based on single line diagram of distribution network GIS power grid
Han et al. Design of simulation training system for fire safety inspection based on computer simulation technology
CN109817053A (en) AC/DC Power Supply Fault Simulation Training System Based on Software Simulation
CN111968015B (en) Interactive training method for power transmission and transformation project construction process
CN106057013A (en) Simulation training system and method based on real-time simulation kernel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150401