CN202650305U - Personnel remote training apparatus - Google Patents
Personnel remote training apparatus Download PDFInfo
- Publication number
- CN202650305U CN202650305U CN 201220296483 CN201220296483U CN202650305U CN 202650305 U CN202650305 U CN 202650305U CN 201220296483 CN201220296483 CN 201220296483 CN 201220296483 U CN201220296483 U CN 201220296483U CN 202650305 U CN202650305 U CN 202650305U
- Authority
- CN
- China
- Prior art keywords
- monitoring
- personnel
- module
- remote training
- simulation unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000012549 training Methods 0.000 title claims abstract description 28
- 238000004088 simulation Methods 0.000 claims abstract description 52
- 238000012544 monitoring process Methods 0.000 claims abstract description 40
- 230000005540 biological transmission Effects 0.000 claims description 6
- 238000013507 mapping Methods 0.000 claims description 5
- 230000000694 effects Effects 0.000 abstract description 5
- 230000004044 response Effects 0.000 abstract description 2
- 238000012545 processing Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000001276 controlling effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000003745 diagnosis Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Images
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The utility model aims at providing a personnel remote training apparatus which can fully simulate device conditions of a corresponding actual area and at the same time can perform training to many people. Monitoring personnel can simultaneously simulate triggering of various failures, and provide emergency drills. To achieve the effect, the personnel remote training apparatus comprises a power grid operation device data simulation unit, a power grid failure trigger simulation unit and a device monitoring data unit. Since the technical scheme described herein is adopted, the personnel remote training apparatus can simultaneously simulate the simultaneous display of each station, and can simulate to perform operations in a manner of actual operations. The power grid failure trigger simulation unit can generate random failures at any time so that students' capability of immediate response and handling ability are trained. The personnel remote training apparatus guarantees the effect of the simulation learning.
Description
Technical field
The utility model relates to a kind of training system, relates in particular to a kind of power grid accident analog simulation remote training device.
Background technology
At China Power Grids, construction along with large operation architecture, requirement for the regulation and control personnel is more and more higher, up to the present, domestic have many users using dispatcher trainning simulator, and its main application is for giveing training system call person under, accident normal at electrical network, the recovery control, trains their normal consistency ability and the high-speed decision ability during accident, improve yardman's operation level and the technical ability of analyzing and processing fault, but the equipment of different regions is installed, layout all is different.For as regulation and control personnel, iff being to carry out simulated training at experiment table, may arrive in the new environment just at a loss as to what to doly, need to relearn.The time that will delay like this handing-over.Therefore corresponding different area not only needs the scheduling knowledge that enriches and the business of monitoring; And want to simulate timely and accurately corresponding status of equipment, so that operating personnel 100% realization simulation operations.And existing dispatcher trainning simulator only can carry out single professional training, can't satisfy the training requirement of a plurality of dispatchers under the large operation architecture; Original dispatcher trainning simulator can't trigger fault from monitor staff's processing thinking when anti-accident maneuver, emergency drilling is comprehensive not.
The utility model content
The purpose of this utility model provides personnel's remote training device, can simulate the status of equipment in corresponding actual area fully, and simultaneously many people be giveed training.The monitor staff can immediately simulate and trigger various faults, and emergency drilling is provided.
For reaching described effect, the utility model personnel remote training device, comprise operation of power networks device data simulation unit, the electric network fault simulation triggers simulation unit and monitoring of tools data cell, described operation of power networks device data simulation unit comprises main display, center emulation server and attached touch-screen, described main display connects the center emulation server, the monitoring of tools data cell comprises monitoring client and service end, the center emulation server connects the service end that the electric network fault simulation triggers simulation unit and monitoring of tools data cell, and the monitoring client of described monitoring of tools data cell is arranged in each corresponding website.
Preferably, electric network fault simulation triggers and is provided with in the simulation unit that plug-in strip malfunctioning module, GIS air chamber leak module, female differential module, bag bridging 110kV prepared auto restart tripping module, service entrance switch SF6 done leaked lock modules.These modules have contained common fault, can occur at random at any time in simulation process, with test student's adaptability to changes.
Preferably, described electric network fault simulation triggers in the simulation unit and is provided with the fault expansion module, and described fault expansion module connects long-range upwards transmission port.So in a single day, there is new fault diagnosis example to occur, can updates to the electric network fault simulation and trigger in the simulation unit, allow the student in time can learn to arrive the processing scheme.
Preferably, described monitoring of tools data cell service end comprises display interface display module, administrator module and corresponding website handover module.Monitoring of tools data cell service end is made a copy to the center emulation server with the operation conditions that the site monitoring end of appointment provides, and shows in main display.Simultaneously attached touch-screen is arrived in the simulations such as action button of correspondence.This moment, the student just can simulate the situation in the site works of correspondence, and the operation under this situation can not hinder the real work of this website.The keeper can in time instruct the student by administrator module, also can be at the operational circumstances of understanding each student by administrator module afterwards.
Preferably, described monitoring of tools data cell monitoring client comprises block and shows mapping block.Block is used for each website is numbered, and is convenient to specify switch, and is used for the demonstration situation of obtaining even show mapping block, and is transferred to the center emulation server.
Preferably, the service end of described monitoring of tools data cell is connected VPN with monitoring client and is connected.Such structure avoids the transmission of emulated data to have influence on the proper network transmission of each website.
Since adopted described technical scheme, the instant playback of each website of the utility model energy Instant simulation, and the actual mode of operation of simulation operates.The electric network fault simulation triggers simulation unit and produces at any time random fault, trains student's strain and processing power.Such device has been guaranteed the effect of emulation study.
Description of drawings
The utility model is described in further detail below in conjunction with accompanying drawing:
Fig. 1 is the one-piece construction block diagram of the utility model personnel remote training device.
Embodiment
As shown in Figure 1, the utility model personnel remote training device, comprise operation of power networks device data simulation unit 1, the electric network fault simulation triggers simulation unit 2 and monitoring of tools data cell 3, described operation of power networks device data simulation unit 1 comprises main display 11, center emulation server 12 and attached touch-screen 13, described main display 11 connects center emulation server 12, monitoring of tools data cell 3 comprises monitoring client 31 and service end 32, center emulation server 12 connects the service end 32 that the electric network fault simulation triggers simulation unit 2 and monitoring of tools data cell 3, and the monitoring client 31 of described monitoring of tools data cell 3 is arranged in each corresponding website.Electric network fault simulation triggers and is provided with in the simulation unit 2 that plug-in strip malfunctioning module, GIS air chamber leak module, female differential module, bag bridging 110kV prepared auto restart tripping module, service entrance switch SF6 done leaked lock modules.Described electric network fault simulation triggers in the simulation unit 2 and is provided with the fault expansion module, and described fault expansion module connects long-range upwards transmission port.The service end 32 of described monitoring of tools data cell 3 comprises display interface display module, administrator module and corresponding website handover module.The monitoring client 31 of described monitoring of tools data cell 3 comprises block and shows mapping block.The service end 32 of described monitoring of tools data cell 3 is connected with monitoring client and is connected by VPN.
Adopt such structure, during the work of personnel's remote training device, at first selected website of specifying simulation.Block by corresponding site monitoring end 31 is determined site location, shows that then mapping block sends to center emulation server 12 with the instant messages of this website and is shown in the main display 11.Operating equipment with this website is mapped on the touch-screen 13 simultaneously.Unique sorry of student is exactly that feel when operating is different, but the equipment that relates to and corresponding website are duplicate.And the emulation of this moment can not have influence on the real work of corresponding website fully.
In the simulation operations process, except the analysis of study to main display 11 displaying contents, also need to learn the processing of accident.Therefore we are input to phenomenon data and the diagnostic trouble code classification of some most common failures in the single-chip microcomputer, make that corresponding plug-in strip malfunctioning module, GIS air chamber leak module, female differential module, bag bridging 110kV prepared auto restart tripping module, service entrance switch SF6 done leaked the fault simulation modules such as lock modules.These modules form the electric network fault simulation and trigger simulation unit 2, will occur at random at any time when emulation is learnt, and are used for improving student's adaptability to changes.The electric network fault simulation triggers in the simulation unit 2 and also is provided with the fault expansion module in addition, and described fault expansion module connects long-range upwards transmission port.In case new typical fault type is arranged, can do the fault simulation module that makes new advances by the fault expansion module.
By such structure, student's personnel role can be set, operation of power networks data, electric network fault signal, this three major types regulation and control real time data emulation in system of monitoring of tools data are shown, satisfy the demand of monitor staff's training and manoeuvre.The plug-in strip fault can be set; the GIS air chamber leaks; female differential work; the tripping of bag bridging 110kV prepared auto restart; service entrance switch SF6 leaks the multiple failures such as locking; the information such as the trend after accident occurs, variation, switch changed position, protection alarm signal, equipment operating all realize in teacher and student's simultaneous display; real realize regulation and control staff training emulation at different levels under " county's one, regulation and control one " mode, further promoted regulating and controlling mechanism emergency response under " large operation " pattern, coordinate operation and accident fast throughput.Can then trigger out different faults by administrator module according to manoeuvre scheduling, keeper, design a plurality of schemes of advancing, obtain different results, make scheduling, monitor staff obtain combat exercise on the spot in person.Utilize existing ground county regulation and control integrated technique back-up system platform model and data, realize ground county integrated function by VPN.The student can simulate the operation of real site, and the keeper then monitors and checks and rates student's study condition by administrator module, in time instructs.Administrator module can also be used for switching corresponding website and directly calling the specified fault module, with the effect of enhancement training.
The above only is specific embodiment of the utility model, but architectural feature of the present utility model is not limited to this, any those skilled in the art is in field of the present utility model, and the variation of doing or modification all are encompassed among the claim of the present utility model.
Claims (6)
1. personnel's remote training device, it is characterized in that: comprise operation of power networks device data simulation unit (1), the electric network fault simulation triggers simulation unit (2) and monitoring of tools data cell (3), described operation of power networks device data simulation unit (1) comprises main display (11), center emulation server (12) and attached touch-screen (13), described main display (11) connects center emulation server (12), monitoring of tools data cell (3) comprises monitoring client (31) and service end (32), center emulation server (12) connects the service end (32) that the electric network fault simulation triggers simulation unit (2) and monitoring of tools data cell (3), and the monitoring client (31) of described monitoring of tools data cell (3) is arranged in each corresponding website.
2. personnel's remote training device as claimed in claim 1 is characterized in that: the electric network fault simulation triggers and is provided with in the simulation unit (2) that plug-in strip malfunctioning module, GIS air chamber leak module, female differential module, bag bridging 110kV prepared auto restart tripping module, service entrance switch SF6 done leaked lock modules.
3. personnel's remote training device as claimed in claim 2 is characterized in that: described electric network fault simulation triggers in the simulation unit (2) and is provided with the fault expansion module, and described fault expansion module connects long-range upwards transmission port.
4. personnel's remote training device as claimed in claim 1, it is characterized in that: the service end (32) of described monitoring of tools data cell (3) comprises display interface display module, administrator module and corresponding website handover module.
5. personnel's remote training device as claimed in claim 1 is characterized in that: the monitoring client (31) of described monitoring of tools data cell (3) comprises block and shows mapping block.
6. such as claim 1-5 arbitrary described personnel's remote training device wherein, it is characterized in that: the service end (32) of described monitoring of tools data cell (3) is connected 31 with monitoring client) connect by VPN.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220296483 CN202650305U (en) | 2012-06-21 | 2012-06-21 | Personnel remote training apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220296483 CN202650305U (en) | 2012-06-21 | 2012-06-21 | Personnel remote training apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202650305U true CN202650305U (en) | 2013-01-02 |
Family
ID=47419375
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220296483 Expired - Lifetime CN202650305U (en) | 2012-06-21 | 2012-06-21 | Personnel remote training apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202650305U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103035138A (en) * | 2012-06-21 | 2013-04-10 | 湖州电力局 | Personnel remote training device |
CN104361780A (en) * | 2014-11-13 | 2015-02-18 | 国家电网公司 | Simulating training system and method |
CN109785702A (en) * | 2019-01-17 | 2019-05-21 | 深圳供电局有限公司 | A kind of grid simulation training system based on monitoring signal emulation |
CN110009958A (en) * | 2019-02-28 | 2019-07-12 | 南京耀多信息技术有限公司 | A kind of grid simulation training system |
CN112071145A (en) * | 2020-09-07 | 2020-12-11 | 广东电网有限责任公司 | Gas leakage simulation device |
CN112216174A (en) * | 2020-09-30 | 2021-01-12 | 国网冀北电力有限公司管理培训中心 | AC/DC power supply fault simulation system |
-
2012
- 2012-06-21 CN CN 201220296483 patent/CN202650305U/en not_active Expired - Lifetime
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103035138A (en) * | 2012-06-21 | 2013-04-10 | 湖州电力局 | Personnel remote training device |
CN103035138B (en) * | 2012-06-21 | 2014-12-17 | 湖州电力局 | Personnel remote training device |
CN104361780A (en) * | 2014-11-13 | 2015-02-18 | 国家电网公司 | Simulating training system and method |
CN109785702A (en) * | 2019-01-17 | 2019-05-21 | 深圳供电局有限公司 | A kind of grid simulation training system based on monitoring signal emulation |
CN110009958A (en) * | 2019-02-28 | 2019-07-12 | 南京耀多信息技术有限公司 | A kind of grid simulation training system |
CN112071145A (en) * | 2020-09-07 | 2020-12-11 | 广东电网有限责任公司 | Gas leakage simulation device |
CN112216174A (en) * | 2020-09-30 | 2021-01-12 | 国网冀北电力有限公司管理培训中心 | AC/DC power supply fault simulation system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202650305U (en) | Personnel remote training apparatus | |
CN103123758B (en) | A kind of dispatching automation numeral physical mixed simulation training system | |
CN103559822A (en) | Substation simulation training system | |
Qassim et al. | A survey of scada testbed implementation approaches | |
CN103177642B (en) | A kind of method improving Dispatcher Training Simulator authenticity | |
CN105225566B (en) | A kind of electric network emergency drills visual simulating deduction system | |
CN100543800C (en) | A kind of pressure-constant water supply cluster teaching system | |
CN102663912A (en) | Computer simulation systems for integrated dispatching and monitoring of regional power network | |
CN206058598U (en) | A kind of aviation electronics equips ground service training system | |
CN103903496A (en) | 10kV digital power distribution room simulation training system | |
CN110211445B (en) | Power distribution network load transfer control application training system | |
CN102831793A (en) | Entity simulation training device for high voltage electrical test | |
CN204720064U (en) | A kind of comprehensively monitoring robotization actual training device based on transformer station | |
CN203013082U (en) | 10kV digital power distribution room simulation training system | |
CN103035138B (en) | Personnel remote training device | |
CN105976682A (en) | Simulation platform used for power grid training | |
CN202855151U (en) | High voltage electrical test entity simulation training device | |
CN206558029U (en) | A kind of dispatcher training system system | |
CN104318833B (en) | The method of work of power network schedule automation experience system | |
CN207008608U (en) | A kind of device switched for multipath electric signal circuit between circuit simulation system | |
CN102903286B (en) | Distant place fault setting and monitoring system of practical training substation | |
CN106647419A (en) | Matrix mapping method for hardware channel of relay protection device | |
CN210377148U (en) | Electrical control loop fault point checking system based on programmable controller | |
Li et al. | Monitoring and control system design and implementation of emulational transformer substation based on the mcgs | |
CN208172533U (en) | Intelligent substation digital physical hybrid simulation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20130102 |