CN103035138A - Personnel remote training device - Google Patents
Personnel remote training device Download PDFInfo
- Publication number
- CN103035138A CN103035138A CN2012102084873A CN201210208487A CN103035138A CN 103035138 A CN103035138 A CN 103035138A CN 2012102084873 A CN2012102084873 A CN 2012102084873A CN 201210208487 A CN201210208487 A CN 201210208487A CN 103035138 A CN103035138 A CN 103035138A
- Authority
- CN
- China
- Prior art keywords
- monitoring
- module
- personnel
- training device
- simulation unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
The invention provides a personnel remote training device capable of completely simulating device status of a corresponding actual area, and meanwhile providing training for many people. Monitoring personnel can immediately simulatively trigger various faults and provide emergency exercises. To reach the effect, the personnel remote training device comprises a power grid operation device data simulation unit, a power grid fault simulative triggering simulation unit and a device monitoring data unit. Due to the fact that the technical scheme is adopted, the personnel remote training device is capable of immediately simulating real-time displays of every site, and operating by simulating actual operating modes. The power grid fault simulative triggering simulation unit can produce random faults at any time, so that adaptability to change and ability to handle faults of trainees can be trained. The personnel remote training device guarantees the effect of simulative study.
Description
Technical field
The present invention relates to a kind of training system, relate in particular to a kind of power grid accident analog simulation remote training device.
Background technology
At China Power Grids, construction along with large operation architecture, requirement for the regulation and control personnel is more and more higher, up to the present, domestic have many users using dispatcher trainning simulator, and its main application is for giveing training system call person under, accident normal at electrical network, the recovery control, trains their normal consistency ability and the high-speed decision ability during accident, improve yardman's operation level and the technical ability of analyzing and processing fault, but the equipment of different regions is installed, layout all is different.For as regulation and control personnel, iff being to carry out simulated training at experiment table, may arrive in the new environment just at a loss as to what to doly, need to relearn.The time that will delay like this handing-over.Therefore corresponding different area not only needs the scheduling knowledge that enriches and the business of monitoring; And want to simulate timely and accurately corresponding status of equipment, so that operating personnel 100% realization simulation operations.And existing dispatcher trainning simulator only can carry out single professional training, can't satisfy the training requirement of a plurality of dispatchers under the large operation architecture; Original dispatcher trainning simulator can't trigger fault from monitor staff's processing thinking when anti-accident maneuver, emergency drilling is comprehensive not.
Summary of the invention
The purpose of this invention is to provide personnel's remote training device, can simulate the status of equipment in corresponding actual area fully, and simultaneously many people be giveed training.The monitor staff can immediately simulate and trigger various faults, and emergency drilling is provided.
For reaching described effect, the present invention staff's remote training device, comprise operation of power networks device data simulation unit, the electric network fault simulation triggers simulation unit and monitoring of tools data cell, described operation of power networks device data simulation unit comprises main display, center emulation server and attached touch-screen, described main display connects the center emulation server, the monitoring of tools data cell comprises monitoring client and service end, the center emulation server connects the service end that the electric network fault simulation triggers simulation unit and monitoring of tools data cell, and the monitoring client of described monitoring of tools data cell is arranged in each corresponding website.
Preferably, electric network fault simulation triggers and is provided with in the simulation unit that plug-in strip malfunctioning module, GIS air chamber leak module, female differential module, bag bridging 110kV prepared auto restart tripping module, service entrance switch SF6 done leaked lock modules.These modules have contained common fault, can occur at random at any time in simulation process, with test student's adaptability to changes.
Preferably, described electric network fault simulation triggers in the simulation unit and is provided with the fault expansion module, and described fault expansion module connects long-range upwards transmission port.So in a single day, there is new fault diagnosis example to occur, can updates to the electric network fault simulation and trigger in the simulation unit, allow the student in time can learn to arrive the processing scheme.
Preferably, described monitoring of tools data cell service end comprises display interface display module, administrator module and corresponding website handover module.Monitoring of tools data cell service end is made a copy to the center emulation server with the operation conditions that the site monitoring end of appointment provides, and shows in main display.Simultaneously attached touch-screen is arrived in the simulations such as action button of correspondence.This moment, the student just can simulate the situation in the site works of correspondence, and the operation under this situation can not hinder the real work of this website.The keeper can in time instruct the student by administrator module, also can be at the operational circumstances of understanding each student by administrator module afterwards.
Preferably, described monitoring of tools data cell monitoring client comprises block and shows mapping block.Block is used for each website is numbered, and is convenient to specify switch, and is used for the demonstration situation of obtaining even show mapping block, and is transferred to the center emulation server.
Preferably, the service end of described monitoring of tools data cell is connected VPN with monitoring client and is connected.Such structure avoids the transmission of emulated data to have influence on the proper network transmission of each website.
Since adopted described technical scheme, the instant playback of each website of the present invention's energy Instant simulation, and the actual mode of operation of simulation operates.The electric network fault simulation triggers simulation unit and produces at any time random fault, trains student's strain and processing power.Such device has been guaranteed the effect of emulation study.
Description of drawings
The invention will be further described below in conjunction with accompanying drawing:
Fig. 1 is the one-piece construction block diagram of the present invention staff's remote training device.
Embodiment
As shown in Figure 1, the present invention staff's remote training device, comprise operation of power networks device data simulation unit 1, the electric network fault simulation triggers simulation unit 2 and monitoring of tools data cell 3, described operation of power networks device data simulation unit 1 comprises main display 11, center emulation server 12 and attached touch-screen 13, described main display 11 connects center emulation server 12, monitoring of tools data cell 3 comprises monitoring client 31 and service end 32, center emulation server 12 connects the service end 32 that the electric network fault simulation triggers simulation unit 2 and monitoring of tools data cell 3, and the monitoring client 31 of described monitoring of tools data cell 3 is arranged in each corresponding website.Electric network fault simulation triggers and is provided with in the simulation unit 2 that plug-in strip malfunctioning module, GIS air chamber leak module, female differential module, bag bridging 110kV prepared auto restart tripping module, service entrance switch SF6 done leaked lock modules.Described electric network fault simulation triggers in the simulation unit 2 and is provided with the fault expansion module, and described fault expansion module connects long-range upwards transmission port.The service end 32 of described monitoring of tools data cell 3 comprises display interface display module, administrator module and corresponding website handover module.The monitoring client 31 of described monitoring of tools data cell 3 comprises block and shows mapping block.The service end 32 of described monitoring of tools data cell 3 is connected with monitoring client and is connected by VPN.
Adopt such structure, during the work of personnel's remote training device, at first selected website of specifying simulation.Block by corresponding site monitoring end 31 is determined site location, shows that then mapping block sends to center emulation server 12 with the instant messages of this website and is shown in the main display 11.Operating equipment with this website is mapped on the touch-screen 13 simultaneously.Unique sorry of student is exactly that feel when operating is different, but the equipment that relates to and corresponding website are duplicate.And the emulation of this moment can not have influence on the real work of corresponding website fully.
In the simulation operations process, except the analysis of study to main display 11 displaying contents, also need to learn the processing of accident.Therefore we are input to phenomenon data and the diagnostic trouble code classification of some most common failures in the single-chip microcomputer, make that corresponding plug-in strip malfunctioning module, GIS air chamber leak module, female differential module, bag bridging 110kV prepared auto restart tripping module, service entrance switch SF6 done leaked the fault simulation modules such as lock modules.These modules form the electric network fault simulation and trigger simulation unit 2, will occur at random at any time when emulation is learnt, and are used for improving student's adaptability to changes.The electric network fault simulation triggers in the simulation unit 2 and also is provided with the fault expansion module in addition, and described fault expansion module connects long-range upwards transmission port.In case new typical fault type is arranged, can do the fault simulation module that makes new advances by the fault expansion module.
By such structure, student's personnel role can be set, operation of power networks data, electric network fault signal, this three major types regulation and control real time data emulation in system of monitoring of tools data are shown, satisfy the demand of monitor staff's training and manoeuvre.The plug-in strip fault can be set; the GIS air chamber leaks; female differential work; the tripping of bag bridging 110kV prepared auto restart; service entrance switch SF6 leaks the multiple failures such as locking; the information such as the trend after accident occurs, variation, switch changed position, protection alarm signal, equipment operating all realize in teacher and student's simultaneous display; real realize regulation and control staff training emulation at different levels under " county's one, regulation and control one " mode, further promoted regulating and controlling mechanism emergency response under " large operation " pattern, coordinate operation and accident fast throughput.Can then trigger out different faults by administrator module according to manoeuvre scheduling, keeper, design a plurality of schemes of advancing, obtain different results, make scheduling, monitor staff obtain combat exercise on the spot in person.Utilize existing ground county regulation and control integrated technique back-up system platform model and data, realize ground county integrated function by VPN.The student can simulate the operation of real site, and the keeper then monitors and checks and rates student's study condition by administrator module, in time instructs.Administrator module can also be used for switching corresponding website and directly calling the specified fault module, with the effect of enhancement training.
The above only is specific embodiments of the invention, but architectural feature of the present invention is not limited to this, and any those skilled in the art is in the field of the invention, and the variation of doing or modification all are encompassed among the claim of the present invention.
Claims (6)
1. personnel's remote training device, it is characterized in that: comprise operation of power networks device data simulation unit (1), the electric network fault simulation triggers simulation unit (2) and monitoring of tools data cell (3), described operation of power networks device data simulation unit (1) comprises main display (11), center emulation server (12) and attached touch-screen (13), described main display (11) connects center emulation server (12), monitoring of tools data cell (3) comprises monitoring client (31) and service end (32), center emulation server (12) connects the service end (32) that the electric network fault simulation triggers simulation unit (2) and monitoring of tools data cell (3), and the monitoring client (31) of described monitoring of tools data cell (3) is arranged in each corresponding website.
2. personnel's remote training device as claimed in claim 1 is characterized in that: the electric network fault simulation triggers and is provided with in the simulation unit (2) that plug-in strip malfunctioning module, GIS air chamber leak module, female differential module, bag bridging 110kV prepared auto restart tripping module, service entrance switch SF6 done leaked lock modules.
3. personnel's remote training device as claimed in claim 2 is characterized in that: described electric network fault simulation triggers in the simulation unit (2) and is provided with the fault expansion module, and described fault expansion module connects long-range upwards transmission port.
4. personnel's remote training device as claimed in claim 1, it is characterized in that: the service end (32) of described monitoring of tools data cell (3) comprises display interface display module, administrator module and corresponding website handover module.
5. personnel's remote training device as claimed in claim 1 is characterized in that: the monitoring client (31) of described monitoring of tools data cell (3) comprises block and shows mapping block.
6. such as claim 1-5 arbitrary described personnel's remote training device wherein, it is characterized in that: the service end (32) of described monitoring of tools data cell (3) is connected 31 with monitoring client) connect by VPN.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210208487.3A CN103035138B (en) | 2012-06-21 | 2012-06-21 | Personnel remote training device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210208487.3A CN103035138B (en) | 2012-06-21 | 2012-06-21 | Personnel remote training device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103035138A true CN103035138A (en) | 2013-04-10 |
CN103035138B CN103035138B (en) | 2014-12-17 |
Family
ID=48021997
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210208487.3A Active CN103035138B (en) | 2012-06-21 | 2012-06-21 | Personnel remote training device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103035138B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104700686A (en) * | 2013-12-09 | 2015-06-10 | 上海仪电信息网络有限公司 | Real-object simulated maintenance training system for domestic electronic products |
CN104835376A (en) * | 2015-04-14 | 2015-08-12 | 国网上海市电力公司 | Dispatcher training simulation system with automatic switching device of standby power supply automatic safety device operation simulating function |
CN109785702A (en) * | 2019-01-17 | 2019-05-21 | 深圳供电局有限公司 | Power grid simulation training system based on monitoring signal simulation |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101930678A (en) * | 2010-08-24 | 2010-12-29 | 国电南瑞科技股份有限公司 | Environmental simulation method of power training system |
JP2011197444A (en) * | 2010-03-19 | 2011-10-06 | Tokyo Electric Power Co Inc:The | Simulator for training of power system |
CN102436766A (en) * | 2011-12-15 | 2012-05-02 | 成都运达科技股份有限公司 | Simulation training system of relay protection in subway OCC power dispatching and method thereof |
CN202650305U (en) * | 2012-06-21 | 2013-01-02 | 湖州电力局 | Personnel remote training apparatus |
-
2012
- 2012-06-21 CN CN201210208487.3A patent/CN103035138B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011197444A (en) * | 2010-03-19 | 2011-10-06 | Tokyo Electric Power Co Inc:The | Simulator for training of power system |
CN101930678A (en) * | 2010-08-24 | 2010-12-29 | 国电南瑞科技股份有限公司 | Environmental simulation method of power training system |
CN102436766A (en) * | 2011-12-15 | 2012-05-02 | 成都运达科技股份有限公司 | Simulation training system of relay protection in subway OCC power dispatching and method thereof |
CN202650305U (en) * | 2012-06-21 | 2013-01-02 | 湖州电力局 | Personnel remote training apparatus |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104700686A (en) * | 2013-12-09 | 2015-06-10 | 上海仪电信息网络有限公司 | Real-object simulated maintenance training system for domestic electronic products |
CN104835376A (en) * | 2015-04-14 | 2015-08-12 | 国网上海市电力公司 | Dispatcher training simulation system with automatic switching device of standby power supply automatic safety device operation simulating function |
CN104835376B (en) * | 2015-04-14 | 2018-06-22 | 国网上海市电力公司 | There is the dispatcher training system system of prepared auto restart automatic safety device action simulation |
CN109785702A (en) * | 2019-01-17 | 2019-05-21 | 深圳供电局有限公司 | Power grid simulation training system based on monitoring signal simulation |
Also Published As
Publication number | Publication date |
---|---|
CN103035138B (en) | 2014-12-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202650305U (en) | Personnel remote training apparatus | |
CN102663912B (en) | Computer simulation systems for integrated dispatching and monitoring of regional power network | |
Qassim et al. | A survey of scada testbed implementation approaches | |
CN103177642B (en) | A kind of method improving Dispatcher Training Simulator authenticity | |
CN105225566B (en) | A kind of electric network emergency drills visual simulating deduction system | |
CN103617760A (en) | Power distribution network DTS (Dispatcher Training Simulation) simulation system and simulation method thereof | |
CN106971663B (en) | A kind of wind power plant analogue system and method | |
CN107369347A (en) | A kind of universal power station Three-dimensional Simulation System | |
CN206058598U (en) | A kind of aviation electronics equips ground service training system | |
CN102831793A (en) | Entity simulation training device for high voltage electrical test | |
CN110211445B (en) | Power distribution network load transfer control application training system | |
CN102855795A (en) | Electrical test equipment simulation device | |
CN104064065A (en) | Distribution network fault simulation analysis training system implementation method | |
CN107481598A (en) | A kind of emulation training platform of intelligent substation | |
CN104091514A (en) | Power grid dispatching personnel training simulation system | |
CN204720064U (en) | A kind of comprehensively monitoring robotization actual training device based on transformer station | |
CN103035138B (en) | Personnel remote training device | |
CN202855151U (en) | High voltage electrical test entity simulation training device | |
CN104318833B (en) | The method of work of power network schedule automation experience system | |
CN106647419A (en) | Matrix mapping method for hardware channel of relay protection device | |
CN109817053A (en) | Power of alterating and direct current fault simulation training system based on software emulation | |
CN202795856U (en) | Simulator for electrical test equipment | |
CN210377148U (en) | Electrical control loop fault point checking system based on programmable controller | |
Li et al. | Monitoring and control system design and implementation of emulational transformer substation based on the mcgs | |
CN112578684A (en) | Intelligent Internet of things terminal simulation device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |